3-Fitchie Creek Subcontractors Fillable.pdf
PDF 1 MB Posted
- Attached to
- SB-FP-14-2526 Fitchie Creek Trail Improvements
- Solicitation number
- SB-FP-14-2526 Fitchie Creek Trail Improvements
- Issued by
- Kane County, Illinois
About this file
This is a sub-contractors fillable form for the Fitchie Creek Trail Improvements project (SB-FP-14-2526) issued by the Kane County Forest Preserve District in Illinois. The form is designed for the primary contractor to identify and document any sub-contractors that will be utilized on the project. The project involves restoring proper trail function along a limestone hiking trail, including correcting drainage-related deficiencies, repairing eroded sections, improving durability, and reducing ongoing maintenance costs caused by uncontrolled runoff. The form provides space for up to three sub-contractors with corresponding descriptions of work to be performed, or allows the contractor to certify that no sub-contractors will be used on the project.
The document requires the contractor to sign and print their name along with the date to certify the accuracy of the sub-contractor information provided. Contact information for the Kane Forest Preserve District is listed as 1996 South Kirk Road, Suite 320, Geneva, Illinois 60134, with Bill Lenert serving as President and Benjamin Haberthur as Executive Director. No specific pricing, funding amounts, set-asides, or contract term information is detailed within this particular form, as it functions solely as a sub-contractor disclosure and certification document required as part of the bidding or contracting process.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1996 South Kirk Road, Suite 320, Geneva, Illinois 60134
Bill Lenert, President Benjamin Haberthur, Executive Director
(630) 232-5980 Fax: (630) 232-5924 www.kaneforest.com
SUB-CONTRACTORS
The listed Sub-contractors will perform the work indicated herein:
1. Sub-Contractor__________________________________________________________________
Work Performed__________________________________________________________________
2. Sub-Contractor__________________________________________________________________
Work Performed__________________________________________________________________
3. Sub-Contractor__________________________________________________________________
Work Performed__________________________________________________________________
No Sub-Contractors will be used for this project.
I certify that all information above is correct.
Signed:________________________________________________Date:___________________________
Printed Name:__________________________________________
SB-FP-14-2526
http://www.kaneforest.com/
| 1. Sub-Contractor__________________________________________________________________ |
| Work Performed__________________________________________________________________ |
| 2. Sub-Contractor__________________________________________________________________ |
| Work Performed__________________________________________________________________ |
| 3. Sub-Contractor__________________________________________________________________ |
| Work Performed__________________________________________________________________ |
| No Sub-Contractors will be used for this project. |
| I certify that all information above is correct. |
| Signed:________________________________________________Date:___________________________ |
| Printed Name:__________________________________________ |
| 1 SubContractor: |
| Work Performed: |
| 2 SubContractor: |
| Work Performed_2: |
| 3 SubContractor: |
| Work Performed_3: |
| I certify that all information above is correct: Off |
| Date: |
| Printed Name: |
File details come from the government source that posted it. Updated .