3-Fitchie Creek Subcontractors Fillable.pdf

PDF 1 MB Posted

Attached to
SB-FP-14-2526 Fitchie Creek Trail Improvements
Solicitation number
SB-FP-14-2526 Fitchie Creek Trail Improvements
Issued by
Kane County, Illinois

About this file

This is a sub-contractors fillable form for the Fitchie Creek Trail Improvements project (SB-FP-14-2526) issued by the Kane County Forest Preserve District in Illinois. The form is designed for the primary contractor to identify and document any sub-contractors that will be utilized on the project. The project involves restoring proper trail function along a limestone hiking trail, including correcting drainage-related deficiencies, repairing eroded sections, improving durability, and reducing ongoing maintenance costs caused by uncontrolled runoff. The form provides space for up to three sub-contractors with corresponding descriptions of work to be performed, or allows the contractor to certify that no sub-contractors will be used on the project.

The document requires the contractor to sign and print their name along with the date to certify the accuracy of the sub-contractor information provided. Contact information for the Kane Forest Preserve District is listed as 1996 South Kirk Road, Suite 320, Geneva, Illinois 60134, with Bill Lenert serving as President and Benjamin Haberthur as Executive Director. No specific pricing, funding amounts, set-asides, or contract term information is detailed within this particular form, as it functions solely as a sub-contractor disclosure and certification document required as part of the bidding or contracting process.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1996 South Kirk Road, Suite 320, Geneva, Illinois 60134

Bill Lenert, President Benjamin Haberthur, Executive Director

(630) 232-5980 Fax: (630) 232-5924 www.kaneforest.com

SUB-CONTRACTORS

The listed Sub-contractors will perform the work indicated herein:

1. Sub-Contractor__________________________________________________________________

Work Performed__________________________________________________________________

2. Sub-Contractor__________________________________________________________________

Work Performed__________________________________________________________________

3. Sub-Contractor__________________________________________________________________

Work Performed__________________________________________________________________

No Sub-Contractors will be used for this project.

I certify that all information above is correct.

Signed:________________________________________________Date:___________________________

Printed Name:__________________________________________

SB-FP-14-2526

http://www.kaneforest.com/

1. Sub-Contractor__________________________________________________________________
Work Performed__________________________________________________________________
2. Sub-Contractor__________________________________________________________________
Work Performed__________________________________________________________________
3. Sub-Contractor__________________________________________________________________
Work Performed__________________________________________________________________
No Sub-Contractors will be used for this project.
I certify that all information above is correct.
Signed:________________________________________________Date:___________________________
Printed Name:__________________________________________
1 SubContractor:
Work Performed:
2 SubContractor:
Work Performed_2:
3 SubContractor:
Work Performed_3:
I certify that all information above is correct: Off
Date:
Printed Name:

File details come from the government source that posted it. Updated .