View the file

Other files

File Type Posted
RLP Amendment 4 - 9IL2529 - NRC - 12.10.2021.pdf PDF
RLP Amendment 3 Attachment - 9IL2529 - L100 Lease - 11.10.2021.pdf PDF
RLP Amendment 3 Attachment - 9IL2529 - GSAR Rep 552.270-33 - 11.10.2021.pdf PDF
RLP Amendment 3 - 9IL2529 - NRC - 11.10.2021.pdf PDF
RLP Amendment 2 - 9IL2529 - NRC - 10.13.2021.pdf PDF
Amendment 2 - Exhibit G - 9IL2529 - NRC - GSA Form 3517B_Rev_10_21.pdf PDF
RLP Amendment 1 - 9IL2529 - NRC - 9.28.2021.pdf PDF
0 - 9IL2529 - NRC - RLP - 9.27.21.pdf PDF
8 - Exhibit H - 9IL2529 - NRC - GSA Form 1364 - Proposal to Lease Space.pdf PDF
4 - Exhibit D - 9IL2529 - NRC - Security Requirements FSL Level III.pdf PDF
7 - Exhibit G - 9IL2529 - NRC - GSA Form 3517B.pdf PDF
2 - Exhibit B - 9IL2529 - NRC - Unique Requirements.pdf PDF
6 - Exhibit F - 9IL2529 - NRC - GSA Form 3516 Solicitation Provisions.pdf PDF
5 - Exhibit E - 9IL2529 - NRC - Uncontrolled R3 Baseline Countermeasure Reqs.pdf PDF
12 - Exhibit L - 9IL2529 - NRC - Commission Agreement.pdf PDF
10 - Exhibit J - 9IL2529 - NRC - Prelease FPLS Evaluation Form 12000 PartA and PartB.pdf PDF
11 - Exhibit K - 9IL2529 - NRC - FAR 52.204-24 Representation Digital Rev.pdf PDF
1 - Exhibit A - 9IL2529 - NRC - Lease - 9.27.2021.pdf PDF
9 - Exhibit I - 9IL2529 - NRC - GSA Form 1217 - Lessor Annual Cost.pdf PDF
Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

U.S. Nuclear Regulatory Commission, Region III Office

SPACE PROGRAM

Summary

38%

19%

43%

1 : 0.875

Space Types Std.

Stnd.

ASF HC

Seats ASF

EO-1 1: 1 120 7 7 840

EO-1 1: 1 120 15 15 1,800

EO-1 1: 1 120 2 2 240

EO-2 1: 1 100 4 4 400

EO-3 1: 1.50 80 6 4 320

WS-1* 1: 1.60 50 128 80 4,000

WS-1* 1: 1 50 4 4 200

WS-1* 1: 1 50 2 2 0

WS-2 1: 1 42 4 4 0

WS-3 24 - 6 144

On-Site Staff: 172 128 7,944

DRP Off-Site Staff: 45

Total Staff: Headcount 217

Seats ASF Qnty. ASF

4 120 4 480

6 200 2 400

12 300 2 600

20 500 1 500

40 2,000 1 2,000

10 3,980

Support ASF Qnty. ASF

400 1 400

50 17 850

50 2 100

100 1 100

125 1 125

100 2 200

100 1 100

300 1 300

150 2 300

200 2 400

250 1 250

150 1 150

500 1 500

250 1 250

200 2 400

200 1 200

150 1 150

1,240 1 1,240

60 1 60

100 1 100

150 1 150

Staff Accommodated by 80 Staff-Shared Workstations 63%

Divisional Shared Storage Rooms

M P Multi-Purpose Furniture Storage Room

AV + Tech Support Room

IR

C

Ops Center

Safeguards Office

Copy / Map / Equipment Storage Room

AV + Tech Support Room

Drug Testing Restroom w/ Shower

Copy / Print / Work Rooms

Main LAN Room (450 SF if combined with MP + IRC AV/Tech Support Rooms)

IDF Room / Wiring Closet

Safeguards Room (2 workstations, mtng table for 4, secure storage)

HSDN Equipment Room

Focus Room (adjacent to IRC for PAO / GL staff during incident response)

NTEU Office

Kitchenette (convenient access to water / coffee / tea)

Mothers Room / Wellness Room

Library / Quiet Room (includes Financial Assurance Cabinet - confirm if floor re-enforcement is req.)

Staff Lockers ( storage for off-site employees + those utilizing shared workstations)

Reception / Visitor Check-In + Security Screening

Focus Rooms (1 focus room : 5 workstations)

Collaboration

Huddle Room (locate one each in close proximity to EICS + HR)

Small Conference Room / Team Room

Medium Conference Room

Large Conference Room / Executive Board Room

MP Room / Work Café / Large CR / COOP (seats 40 across two Large CR)

Workstation 1: Staff within IMC (SF included in Support)

Workstation 2: Contractors within IMC (SF included in Support)

Workstation 3: Touchdown Stations

Enclosed Office 1: RA, DRA, DD, DDD

Enclosed Office 1: Branch Chiefs

Enclosed Office 1: EICS, OI

Enclosed Office 3: OI Staff

Workstation 1: EICS Staff within suite

Enclosed Office 2: HR Staff, General Counsel

Workstation 1: Staff-Shared Workstations

Staff Seats to Collaboration Seats

Total Staff Accommodated by Available EO / WS Seats 74%

Desk Share

Ratio Totals

Personnel / Desking (based on 6.1.21 headcount data)

Total Desking 7,944

Total Collaboration 3,980

Total Support 9,130

Staff Accommodated by 80 Staff-Shared WS + 19 Focus Rooms 77%

Total Staff-Shared Workstations 86

Total Enclosed Offices (EO) 32

Total Workstations (WS) 96

Total USF 35,090

Total On-Site Headcount (HC) 172

USF / Headcount 204

DLR Group listen.DESIGN.deliver 1 of 2

U.S. Nuclear Regulatory Commission, Region III Office

SPACE PROGRAM

Support (continued) ASF Qnty. ASF

150 1 150

300 1 300

200 1 200

400 1 400

200 1 200

180 1 180

600 1 600

200 1 200

9 1 9

50 1 50

9 4 36

250 1 250

Evidence / Secure Storage Room 100 1 100

Locked File Room 80 1 80

Copy / Print Area 50 1 50

- 9,130

Total ASF:

Circulation Factor (40%):

Total USF:

Proposed Suites ASF Qnty. ASF

EICS Suite

120 1 120

50 4 200

9 1 9

Total ASF: 329

Circulation (40%): 219

Total Suite ASF: 548

OI Suite

90 1 120

80 4 320

250 1 250

100 1 100

80 1 80

50 1 50

Total ASF: 920

Circulation (40%): 613

Total Suite ASF: 1,533

Locked File Room

Copy / Print

OI Special Agent EO

OI Staff EO (4 for 6 staff)

Meeting Room (10-seat)

Evidence / Secure Storage

35,090

* Workstation 1: the target square footage for the workstations is 50 SF. Once a building has been selected, the design team will test different workstation configurations to determine which best fits within the existing building bay depth and column-grid spacing and optimizes planning efficiencies. Workstation configuration to be tested will include: 6x8 (48 sf), 7x7 (49 sf), and 6x8.5 (51 sf). Regardless of dimensions, all three workspaces will provide the same component features.

EICS Branch Chief EO

EICS Staff WS

Lateral File

21,054

14,036

X-Ray Machine Room

H R

Storage Room

Lateral Files

D R

M A

IRB Storage Room

IRB Implementation Room

Property / Supply Storage

Dock-Adjacent Storage Room (200 sf)

Badge Activation + Enrollment Room

Mail Rm / IMC (includes six (6) WS - (2) 50 SF + (4) 42 SF + 332 SF production area))

EICS Lateral File

DNMS Instrument Storage Room

O I

Meeting Room (10-seat)

DLR Group listen.DESIGN.deliver 2 of 2

File details come from the government source that posted it. Updated .