3-Exhibit 3 Site Plan.pdf

PDF 8 MB Posted

Attached to
CIP-2501 Islands of Beaufort Bridge Crossings Water and Sewer Line Replacement
Solicitation number
2026-RFP-008
Issued by
Beaufort County, South Carolina

About this file

This is a site plan exhibit for a water infrastructure project in Northern Beaufort County, prepared by B5 WSA (Water and Sewer Authority) dated September 18, 2025. The map depicts detailed water main installation plans across multiple local areas including Palmetto Estates, Salem Plantation, Mink Point, Buzzard Island, and Little Buzzard Island. The exhibit shows two specific water main installation segments: 650 linear feet of water main to be placed along Anchorage Way, and 600 linear feet of water main to be placed along Islands Avenue.

The site plan covers a geographical area with significant water features, including Battery Creek and multiple small islands. The map provides precise location details, road names, and infrastructure routing, with a scale bar indicating measurements from 0 to 2,000 feet. The water main installations appear to be part of a broader infrastructure improvement or expansion project for the local water and sewer authority, targeting specific segments in the Northern Beaufort County region to enhance water distribution capabilities.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .