3-Emissions Testing of Airport Utilities and Controls Division Equipment Scope of Work Final.pdf

PDF 228 KB Posted

Attached to
RFB: Emissions Testing of Airport Utilities and Controls Division Equipment (Personal Services)
Solicitation number
0502-2026-08-RFB-231581
Issued by
Los Angeles County, California

About this file

Summary

This is a Scope of Work document from the City of Los Angeles, Los Angeles World Airports (LAWA), for emissions testing services at the Central Utility Plant (CUP) at Los Angeles International Airport (LAX). The scope encompasses emissions testing of two 4.2 MW Mercury 50S solar gas turbines, their associated 35.8 MM Btu/Hr. natural gas duct burners equipped with selective catalytic reduction (SCR) systems, and two Unilux low NOx packaged boilers rated at 18 MM Btu/Hr. each. The work is mandated by the South Coast Air Quality Management District (SCAQMD) under RECLAIM Regulation XX, Rule 2012 and includes Relative Accuracy Test Audits (RATA), ammonia slip testing, source testing, tune-up testing, and quarterly carbon monoxide periodic monitoring. Testing must utilize EPA-approved and SCAQMD-approved test methods including Methods 7E, 10, and 320. The current contract expires February 17, 2027, and the successor contract will be a five-year engagement. Work will be conducted at the Airports Utilities & Controls Division located at 275 Center Way, Los Angeles, CA 90045, during standard weekly hours of 7:00 a.m. to 3:30 p.m., Monday through Friday, with provisions for overtime and weekend/holiday work as needed.

All bidders must possess a current SCAQMD Laboratory Approval Program (LAP) Certificate for RECLAIM and hold current LAP approval for NOx, CO, O2, ammonia slip testing, and CEMS RATA testing under Rule 2012. Bidders must demonstrate qualified field personnel capable of performing RATA testing, duct burner source testing, and emissions compliance testing and must submit a list of facilities where RECLAIM testing was performed within the past three years, including valid contact information. Contractor pricing must be provided via a detailed Bid Worksheet and include all direct and indirect costs, fringe benefits, overhead, insurance, materials, supplies, local travel within 100 miles of LAX, and general administration within hourly rates. Draft test reports must be submitted within 15 calendar days of test completion, with final reports delivered in AQMD-ready format. The contractor is responsible for responding to SCAQMD data requests and notices of deficiency. Payment is contingent upon LAWA's inspection and written acceptance by a designated project manager, and all correction costs resulting from contractor fault or negligence are the contractor's responsibility.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CITY OF LOS ANGELES

Los Angeles World Airports Central Utilities Plant Division

Specifications

Emissions Testing of Airport Utilities and Controls Division Equipment at LAX

Specifications – Enter Bid Title

Page | 2 of 9

CITY OF LOS ANGELES – LOS ANGELES WORLD AIRPORTS IS REQUESTING

A BID FOR EMISSIONS TESTING OF AIRPORT UTILITIES AND CONTROLS

DIVISION EQUIPMENT AT LAX

1.0 INTRODUCTION

Los Angeles International Airports’ (LAX) Central Utility Plant (CUP) has two solar gas turbines, each rated at 4.2 MW. The Mercury 50S model turbines are natural gas fired and have waste heat recovery boilers that are also equipped with 35.8 MM Btu/Hr. of natural gas duct burner firing. To reduce NOx emissions from the gas turbine and duct burners, selective catalytic reduction (SCR) systems are installed. The SCR catalyst systems rely upon injecting ammonia vapor (NH3) into the flue gases, which then pass through a catalyst material chemically reducing the NOx to elemental nitrogen and water. Each gas turbine is considered a major source of NOx and is equipped with a dedicated CEMS that will monitor NOx and O2 in the stack exhaust stream, downstream of the SCR. The NOx CEMS utilizes dual range analyzers (0-10 and 0-100). Each waste heat recovery boiler has a natural gas fired duct burner with a capacity of 35.8 MM Btu/Hr. and each duct burner is also classified as a major source of NOx. There are also two Unilux low NOx packaged boilers that have output capacities of 18 MM Btu/Hr. and each packaged boiler is classified as a large source of NOx.

LAWA holds a current contract for emissions testing of airport utilities and controls division equipment that expires on February 17, 2027. The successor contract is planned for a 5-year period.

2.0 SCOPE OF WORK

The Contractor shall conduct South Coast Air Quality Management District (SCAQMD) mandated emissions testing at the CUP at Los Angeles International Airport (LAX) in accordance with RECLAIM

Page | 3 of 9

Regulation XX, Rule 2012. This work shall include emissions testing of gas turbines, associated duct burners, and packaged boilers.

The Contractor shall perform all required emissions testing for each gas turbine and its associated duct burner, including Relative Accuracy Test Audits (RATA) and other applicable SCAQMD-required tests, with one combined test conducted per gas turbine and duct burner configuration. The scope of work also includes conducting ammonia slip testing for each gas turbine, as required by SCAQMD regulations.

For packaged boiler units, the Contractor shall perform SCAQMD-required tune-ups and source testing for each Unilux packaged boiler, including three-year nitrogen oxides (NOx) and carbon monoxide (CO) emissions testing, as applicable. In addition, the Contractor shall conduct quarterly carbon monoxide (CO) periodic monitoring for Unilux packaged boilers in accordance with SCAQMD Rule 1146.

All testing shall be performed using EPA approved and SCAQMD approved test methods, as applicable, including Methods 7E, 10, 320, or other methods required by the AQMD Permit to Operate.

Prior to initiating any emissions testing, the Contractor shall conduct a brief survey of the CUP equipment to identify specific testing requirements and shall coordinate with and advise CUP personnel of any necessary operational preparations required to facilitate the testing.

3.0 LICENSING, CERTIFICATIONS, QUALIFICATIONS,

AND WORK HISTORY

All Bidders must be in possession of a current Laboratory Approval Program (LAP) Certificate that was issued by the SCAQMD for RECLAIM. All Bidders must include a copy of this certificate in their bid submission.

Page | 4 of 9

Contractor must hold current SCAQMD LAP approval for all applicable test methods, including:

• NOx, CO, O₂

• Ammonia (NH₃) slip testing

• CEMS RATA under Rule 2012 (RECLAIM)

The Contractor shall possess the experience, knowledge, personnel, and resources necessary to perform Relative Accuracy Test Audits (RATA), Tune-up Testing, and Compliance Source Testing for major NOx-emitting sources at the LAX Central Utility Plant in accordance with all applicable federal, state, local, and South Coast Air Quality Management District (SCAQMD) requirements, including RECLAIM Regulation XX, Rule 2012, where applicable.

The Contractor shall provide qualified field testing personnel capable of performing the services required under this Scope of Work, including:

• RATA testing on gas turbines

• Duct burner source testing

• Testing of RECLAIM-regulated major sources

• Emissions compliance testing required by applicable air quality regulations

All Bidders must also include in their bid submission a list of facilities where they have performed RECLAIM testing in the last three (3) years, as specified above. This list will include valid contact names, phone numbers, and email addresses.

Page | 5 of 9

LAWA reserves the right to verify all information provided.

Information shall not be fabricated, embellished, extended, or misrepresented. Any misrepresentation of the work qualification or history may result in the exclusion of the Bidder from bid consideration.

3.1 EXCLUSIVITY TERMS

This is a non-exclusive contract and LAWA is only obligated to Contractor for the scope and amount authorized within any given executed proposal and purchase order.

4.0 SERVICE HOURS AND LOCATION

Contractor recognizes that LAWA’s hours are as follows and must be prepared in advance to adjust their work schedule to meet these hours, if deemed necessary by the project manager assigned to the project once the contract is executed. Contractor shall coordinate testing schedules with LAWA CUP operations to accommodate load conditions, startup/shutdown sequences, and operational constraints.

• Weekly Service Hours: 7:00 a.m. - 3:30 p.m., Monday - Friday

• Overtime Service Hours: 3:30 p.m. - 7:00 a.m., Monday -

Friday

• Holiday and Weekend Service: Saturday, Sunday, and nationally and federally recognized holidays

The Contractor shall report to the following location at LAX to perform the work:

Airports Utilities & Controls Division275 Center Way Los Angeles, CA 90045

Page | 6 of 9

Contractor will enter the CUP off Center Way on the South Side.

Upon arrival the Contractor will push the button at the gate to gain access.

5.0 CONTRACTOR RESPONSIBILITIES

5.1 PROPOSALS AND PURCHASE ORDERS

Upon request from LAWA, Contractor must provide a complete detailed proposal for tasks to be performed.

5.2 MATERIALS, PARTS AND SERVICES

Contractor shall not charge for materials, parts or services not included in the proposal. Monthly maintenance can be charged as a lump sum or hourly rate, however, this must be detailed in the proposal. Any services or tasks to be performed must include the time frame for the work to be completed and must not exceed the amount to be charged as detailed in the proposal.

5.3 AMENDMENTS

Any amendments to proposals and/or purchase orders must be in writing and signed both by LAWA and the Contractor.

6.0 RISKS AND CONSTRAINTS

6.1 INCIDENTAL WORK

It is expressly understood and agreed that Contractor must perform all incidental work required to complete the services as described by each proposal, including work for which no specific proposal item(s) was/were included, and/or including work which is required to furnish final, finished and detailed work consistent with and fulfilling the intent of the proposal.

Page | 7 of 9

All such incidental work must not be considered extra work for which additional compensation can be claimed by Contractor. Such incidental work is presumed to be included in the all-inclusive hourly rate set forth in the Bid Worksheet, which the Contractor is required to attach to the proposal.

6.2 CHANGE NOTIFICATION

If a change in the applicable laws, rules or regulations causes an increase in the scope of work or services to be performed by Contractor pursuant to an existing proposal and purchase order, then the parties hereto must agree upon additional compensation, if any, to be paid to Contractor, therefore, and the proposal and purchase order must be amended or revised, if authorized, in writing, by LAWA prior to the performance by Contractor of the increased work or service.

LAWA will work with Contractor who will keep LAWA fully informed of all activities related to services, parts, and materials.

7.0 REPORTING

Draft test reports shall be submitted within 15 calendar days following completion of the applicable test event. Final test reports shall be delivered in an AQMD ready form and shall incorporate and address LAWA comments prior to finalization. All reports and supporting deliverables shall be provided via electronic submission and prepared in an AQMD submittable format. The Contractor shall be responsible for responding to SCAQMD data requests, questions, and any notices of deficiency related to the Contractor’s reports, including providing revisions or supplemental information as needed.

Page | 8 of 9

8.0 INSPECTION

The delivery of products, materials, parts or completion of services and work must be inspected by LAWA to ensure it meets LAWA’s requirements and standards. If LAWA makes an unsatisfactory determination, Contractor must do what is necessary to correct the situation, without additional charge, to meet LAWA’s requirements and standards.

8.1 FINAL ACCEPTANCE

The completed product and or service shall only be deemed complete, upon written acceptance by a LAWA designated project manager.

9.0 PAYMENT CONDITIONS

9.1 COST EXPECTATIONS

For services rendered under this Contract, all costs, direct or indirect, and all expenses incurred by Contractor pursuant to this proposal, shall be paid to Contractor by LAWA, in accordance with costs detailed in this proposal or any attached Bid Worksheet. If no Bid Worksheet is attached, cost expectations must be listed clearly in the proposal.

9.2 HOURLY RATES

Hourly rates must include, without limitation, all provisions for compensation, fringe benefits, overhead, insurance, materials, supplies, communications, general/non-extensive photocopying, non-extensive reproduction, courier service, local travel (within 100 miles of LAX), general administration, other overhead expenses, profits, fees, other direct cost(s) (ODC), and all out-of-pocket expenses.

Page | 9 of 9

9.3 PAYMENT EXPECTATIONS

LAWA shall not be required to make payments for services deemed unsatisfactory or that fails to get delivered. LAWA shall make Final Acceptance determination per Section 8.1.

9.4 CORRECTION COSTS

All costs due to the fault or negligence of the Contractor must be borne by the Contractor, including, but not limited to, correcting work product, invoices, and any lost or damaged LAWA property.

10.0 CONTACT INFORMATION

Instrument Mechanic Supervisor Airport Utilities and Control Division 275 Center Way Los Angeles, CA 90045 424-646-8710