3. Schedule of Items.pdf

PDF 72 KB Posted

Attached to
M2 Pavement Patching at Mendocino NF, Grindstone Ranger District
Solicitation number
127EAW25R0034
Issued by

About this file

The document is a Schedule of Items for the M2 Pavement Patching project at Mendocino National Forest, Grindstone Ranger District. The schedule outlines five line items with their corresponding measurement methods (MM), units, and quantities: 1) Mobilization (1 LS), 2) Erosion Control (1 LS), 3) Pavement Removal (220 SY), 4) AC Pavement Patching, Type 2, Grade 1/2" (220 SY), and 5) Temporary Traffic Control (1 LS). All items are coded with a "CQ" measurement method and have placeholder unit prices, indicating this is a preliminary pricing structure for the roadway maintenance project. The quantities suggest a focused scope of work involving surface layer removal, preparation, and patch placement along a specific road segment within the national forest.

View the file

Other files

File Type Posted
5. Drawings 11x17.pdf PDF
2. Sources Sought (Market Survey).pdf PDF
1. SF 1442 - 127EAW25R0034 (NRE Included).pdf PDF
4. Site Plan.pdf PDF
9. SAM.gov Q&A.xlsx XLSX spreadsheet
8. Davis-Bacon Act WD # CA20250007 (Tehama County).pdf PDF
6. FP-14.pdf PDF
7. Evaluation Factors.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

08-CON-M2 PAVEMENT PATCHING - Schedule of Items

Item Description MM Unit Qnty Unit Price Cost

151-01 Mobilization CQ LS 1

157-02 Erosion Control CQ LS 1

413-01 Pavement Removal CQ SY 220

418-01 AC pavement patching, Type: 2, Grade: 1/2" CQ SY 220

635-01 Temporary Traffic Control CQ LS 1

TOTAL