This is a Schedule of Items pricing template for the GAOA Chantry Phase 2 Recreation Area Improvements project at Angeles National Forest in California. The schedule outlines ten base construction line items and one optional item related to site remediation and improvement work. Base construction items include mobilization, demolition of an existing barracks structure and associated asphalt/concrete surfaces, asbestos and lead testing and sampling, removal of underground utilities, construction of new asphalt pavement and retaining wall at a shuttle stop, removal of a radio communications tower, and general grading and earthwork. The optional eleventh item covers potential asbestos and lead remediation. Quantities are estimated and subject to field verification by the contractor, with payment based on actual work performed rather than bid quantities. All contractors must submit pricing for all items to be considered for award.

Contractors submitting quotes must provide a bid bond or guarantee if the proposal exceeds $150,000, with bond premium costs included under the mobilization line item. The schedule requires contractors to complete company information including name, address, UEI number, point of contact details, phone, email, and tax identification number. This small business set-aside acquisition is issued as a Request for Quotation under solicitation number 127EAW26Q0019 by the Department of Agriculture Forest Service, with a deadline for Requests for Information by April 29, 2026, at 11:00 AM Pacific Time. One award will be made from this solicitation.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SCHEDULE OF ITEMS

GAOA Chantry Phase 2 Recreation Area Improvements Angeles National Forest

NO.
DESCRIPTION
QTY
UNIT
PRICE
AMOUNT

BASE CONSTRUCTION ITEMS

1
Mobilization
1
JOB
2
Demolition Of Existing Barracks Structure (C.M.U. Block) & Hauling
1660
S.F.
3
Demolition Of Asphalt Concrete and Base & Hauling
395
S.F.
4
Demolition Of Concrete Walkway & Concrete Pads
1698
S.F.
5
Testing And Sampling for Asbestos and Lead
1
L.S.
6
Removal Of Underground Utilities and Capping Waterlines (All Utilities to Be Terminated at Limits of Construction)
1
L.S.
7
New Asphalt Pavement at Shuttle Stop (3-Inch HMA With 4-Inch Agg Base)
845
S.F.
8
New Retaining Wall & Safety Railing for New Shuttle Stop
74.5
L.F.
9
Remove And Dispose Existing 25-Ft Radio Comm Tower
1
L.S.
10
General Grading and Earthwork for Shuttle Stop and Demolished Building
1
L.S.

Option Item:

11
Remediation for asbestos and lead
1
L.S.
Base Estimate
$
Option Estimate
$
Total Estimate
$

SCHEDULE NOTES

* QUANITIES ARE ESTIMATED, CONTRACTOR SHALL FIELD VERIFY TO SATISFY ALL REQUIREMENTS OF THE DRAWINGS, STATEMENT OF WORK, AND SPECIFICATIONS.

* All quantities in the bid schedule are contract quantities. Payment will be made on actual work performed.

* One award will be made from this solicitation; contractors must submit pricing for all items.

* Bid Bond/Guarantee. REQUIRED for proposals exceeding $150,000.00 IAW FAR 52.228-1 Bid Guarantee. Payment for bond premiums shall not be in addition to the contract price. Include bond payments under Mobilization.

The contractor shall complete the table below and include the information with their quote.

Company Name:

Company Address:

UEI Number:

POC Name and Title:

Phone Number:

Email:

Tax ID: