Amendment A00001 - 127EAW26Q0019 - GAOA Chantry Phase 2 Recreation Area Improvements.pdf

PDF 1 MB Posted

Attached to
GAOA Chantry Phase 2 Recreation Area Improvements
Solicitation number
127EAW26Q0019
Issued by

About this file

This is an Amendment of Solicitation/Modification of Contract (Standard Form 30) issued by the USDA Forest Service.

The amendment provides Government responses to two Requests for Information (RFIs) submitted for Solicitation 127EAW26Q0019, the GAOA Chantry Phase 2 Recreation Area Improvements project at Angeles National Forest, California. Amendment A00001 is effective April 29, 2026, with an issue date of April 7, 2026. All offerors must acknowledge receipt of this amendment in their quotation submission; failure to acknowledge may result in the quote being deemed non-responsive. RFI #1 clarified that the contract period of performance is 120 calendar days, as specified in both the SF-1442 and Statement of Work, superseding the 48-day reference in Specification Section 01 11 00. RFI #2 confirmed that the contractor is responsible for completing all asbestos and lead sampling as specified in the Schedule of Items, with the Forest Service providing no sampling services. All other terms and conditions of the original solicitation remain unchanged and in full force and effect.

View the file

Other files

File Type Posted
7. Fire Plan.pdf PDF
6. Specifications.pdf PDF
3. Schedule of Items.docx DOCX document
1. Solicitation Terms and Conditions - GAOA Chantry Phase 2.pdf PDF
9. Contract Administration Data.pdf PDF
10. RFI Form.docx DOCX document
4. Resource Protection Measures.pdf PDF
5. Drawing.pdf PDF
8. Davis-Bacon Act WD - CA20260022 - Los Angeles County.pdf PDF
2. Statement Of Work.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

15C. DATE SIGNED 16C. DATE SIGNED

PAGE OF PAGES

CODE

(X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

2. AMENDMENT/MODIFICATION NUMBER

A00001

6. ISSUED BY

USDA FOREST SERVICE

BUSINESS OPERATIONS

PROCUREMENT OPERATIONS CONSTRUCTION AND A-E

DIVISION, WEST

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code)

ALL OFFERORS

9A. AMENDMENT OF SOLICITATION NUMBER

127EAW26Q0019

1 2

04/29/2026

9B. DATED (SEE ITEM 11)

04/07/2026

1166398

7EAW

X 1

X

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Solicitation: 127EAW26Q0019 Project Name: GAOA Chantry Phase 2 Recreation Area Improvements Angeles National Forest, California

Amendment A00001

See page 2 for additional information.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

TANYA I. TORRES

AMENDMENT OF SOLICITAITON/MODIFICATION OF CONTRACT PAGE NO. 2 OF 2

CONTINUATION PAGE

CONTRACT NO:

127EAW26Q0019

ORDER NO: MODIFICATION NO:

A00001

14. DESCRIPTION OF AMENDMENT/MODIFICATION (CONTINUED)

Amendment 00001 is hereby issued to provide the Government’s responses to all submitted Requests for Information (RFIs). All contractors must acknowledge receipt of this amendment in their quotation submission. Failure to acknowledge this amendment may result in the quote being deemed non‑responsive.

RFI #1 –The SF-1442 and Statement of Work indicate a performance period of 120 calendar days, while Specification Section 01 11 00 references 48 calendar days. Could you please confirm which duration governs the contract?

Answer: The contract period of performance is 120 days, as specified in both the SF‑1442 and the Statement of Work (SOW).

RFI #2 –The Schedule of Items includes “Testing and Sampling for Asbestos and Lead,” while the demolition specifications indicate that testing may be provided by the Forest Service. Could you clarify whether the contractor is responsible for performing and carrying the cost of initial hazardous materials testing?

Answer: The contractor is responsible for completing all asbestos and lead sampling as specified in the Schedule of Items. The Forest Service will not be conducting any sampling of the buildings.

B. All other terms and conditions remain unchanged.

///////////////////////////////////////////////LAST ITEM//////////////////////////////////////////////////

A00001 - 127EAW24R0017 - Crestline Group CG Renovation
Amendment - A00001 - 127EAW23R0011 - Sky Ranch Road

SF 30 Continuation Page

File details come from the government source that posted it. Updated .