B.1 SCHEDULE OF ITEMS - (BASE CONSTRUCTION)
| Item |
| Construction Items |
| Qty |
| UNIT |
| Unit Price |
| Total Price |
| 15101 |
| Mobilization |
| 1 |
| L.S. |
| $ |
| $ |
| 15201 |
| Construction Survey and Staking, method 2 |
| 1 |
| L.S. |
| $ |
| $ |
| 20104 |
| Clearing and Grubbing, Disposal Method (a) |
| 0.79 |
| Acre |
| $ |
| $ |
| 20207 |
| Removal of Individual Trees, disposal method (FS Permit) |
| 29 |
| Each |
| $ |
| $ |
| 20301 |
| Pavement Removal, Disposal Method (a) |
| 400 |
| S.Y. |
| $ |
| $ |
| 20401 |
| Roadway excavation, compaction method B, finishing method A |
| 350 |
| C.Y. |
| $ |
| $ |
| 20425A |
| Drainage Excavation, Sediment Basin |
| 3 |
| Each |
| $ |
| $ |
| 20425B |
| Drainage Excavation, Swale Ditch |
| 675 |
| L.F. |
| $ |
| $ |
| 30102 |
| Aggregate Base - CalTrans 3/4" Class 2, Compaction D |
| 620 |
| Ton |
| $ |
| $ |
| 40304 |
| Asphalt Concrete, CalTrans 1/2" 'B' Type PG64-22 |
| 485 |
| Ton |
| $ |
| $ |
| 40305 |
| Asphalt Concrete, CalTrans 1/2" 'A' Type PG64-28PM w/ 0.25% Ad-Here XL-9000 LAS |
| 300 |
| Ton |
| $ |
| $ |
| 61905 |
| Relocate Existing Boulders |
| 31 |
| Each |
| $ |
| $ |
| 63302 |
| Sign System and Installation |
| 9 |
| Each |
| $ |
| $ |
| 63304 |
| Install Camera Pole |
| 8 |
| Each |
| $ |
| $ |
| 63401 |
| Pavement Markings, Solid Line (4"), Type B |
| 2625 |
| L.F. |
| $ |
| $ |
| 63405 |
| Pavement Markings, Accessible Symbol |
| 3 |
| Each |
| $ |
| $ |
| 63501 |
| Temporary Traffic Control |
| 1 |
| L.S. |
| $ |
| $ |
| 63606 |
| Conduit, 2-inch, Schedule 40 PVC |
| 130 |
| L.F. |
| $ |
| $ |
| 63610 |
| Pull Box |
| 2 |
| Each |
| $ |
| $ |
B.1 SCHEDULE OF ITEMS – OPTION 1
| Item |
| Construction Items |
| Qty |
| UNIT |
| Unit Price |
| Total Price |
| 15101-OP1 |
| Mobilization |
| L.S. |
| 1 |
| $ |
| $ |
| 15201-OP1 |
| Construction Survey and Staking, method 2 |
| L.S. |
| 1 |
| $ |
| $ |
| 20104-OP1 |
| Clearing and Grubbing, Disposal Method (a) |
| Acre |
| 0.18 |
| $ |
| $ |
| 20207-OP1 |
| Removal of Individual Trees, disposal method (FS Permit) |
| Each |
| 7 |
| $ |
| $ |
| 20301-OP1 |
| Pavement Removal, Disposal Method (a) |
| S.Y. |
| 95 |
| $ |
| $ |
| 20401-OP1 |
| Roadway excavation, compaction method B, finishing method A |
| C.Y. |
| 60 |
| $ |
| $ |
| 30102-OP1 |
| Aggregate Base - CalTrans 3/4" Class 2, Compaction D |
| Ton |
| 160 |
| $ |
| $ |
| 40304-OP1 |
| Asphalt Concrete, CalTrans 1/2" 'B' Type PG64-22 |
| Ton |
| 115 |
| $ |
| $ |
| 60405 |
| 24"x14" Utility Box Adjustment, replace w/ traffic rated |
| L.S. |
| 1 |
| $ |
| $ |
| 63302-OP1 |
| Sign System and Installation |
| Each |
| 6 |
| $ |
| $ |
| 63401-OP1 |
| Pavement Markings, Solid Line (4"), Type B |
| L.F. |
| 1610 |
| $ |
| $ |
| 63501-OP1 |
| Temporary Traffic Control |
| L.S. |
| 1 |
| $ |
| $ |
| OPTION 1 TOTAL: |
| $___________ |
B.1 SCHEDULE OF ITEMS – OPTION 2
| Item |
| Construction Items |
| Qty |
| UNIT |
| Unit Price |
| Total Price |
| 15101-OP2 |
| Mobilization |
| L.S. |
| 1 |
| $ |
| $ |
| 15201-OP2 |
| Construction Survey and Staking, method 2 |
| L.S. |
| 1 |
| $ |
| $ |
| 20301-OP2 |
| Pavement Removal, Disposal Method (a) |
| S.Y. |
| 0.11 |
| $ |
| $ |
| 20207-OP2 |
| Removal of Individual Trees, disposal method (FS Permit) |
| Each |
| 4 |
| $ |
| $ |
| 20401-OP2 |
| Roadway excavation, compaction method B, finishing method A |
| C.Y. |
| 40 |
| $ |
| $ |
| 30102-OP2 |
| Aggregate Base - CalTrans 3/4" Class 2, Compaction D |
| Ton |
| 90 |
| $ |
| $ |
| 40304-OP2 |
| Asphalt Concrete, CalTrans 1/2" 'B' Type PG64-22 |
| Ton |
| 65 |
| $ |
| $ |
| 60105 |
| Install Concrete Valley Gutter |
| Each |
| 1 |
| $ |
| $ |
| 63302-OP2 |
| Sign System and Installation |
| Each |
| 9 |
| $ |
| $ |
| 63401-OP2 |
| Pavement Markings, Solid Line (4"), Type B |
| L.F. |
| 710 |
| $ |
| $ |
| 63501-OP2 |
| Temporary Traffic Control |
| L.S. |
| 1 |
| $ |
| $ |
| OPTION 2 TOTAL: |
| $___________ |
| BASE + OPTION 1 + OPTION 2 TOTAL: |
| $___________ |
B.2 SCHEDULE NOTES
* QUANITIES ARE ESTIMATED, CONTRACTOR SHALL FIELD VERIFY TO SATISFY ALL REQUIREMENTS OF THE DRAWINGS, STATEMENT OF WORK, AND SPECIFICATIONS.
NOTE: Payment for bond premiums in accordance with Clause 52.232-5, Payments under Fixed-Price Construction Contracts, shall not be in addition to the contract price.
| Company Name: |
| POC & Title: |