This document appears to be a set of project drawings and specifications for the replacement of the Fern Falls Trail Bridge in the Plumas National Forest. The key details include:
The project is a small business set-aside solicitation (Solicitation # 127EAW24R0003) with an estimated construction cost between $100,000 and $250,000. The project involves replacing an existing trail bridge, including site preparation, bridge construction using treated timber and lumber, and seeding/mulching. Contractors will be required to attend a site visit on June 10, 2024. Requests for Information must be submitted by June 18, 2024. The drawings provide details on the bridge design, including dimensions, materials, and construction specifications.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFI Official Responses - 1.pdf | ||
| A00001 - RFI Responses.pdf | ||
| 4. Supplemental Specifications.pdf | ||
| 1. Statement of Work.pdf | ||
| 5. Fire Plan.pdf | ||
| 127EAW24R0003 Fern Fall Trail Bridge Replacement.pdf | ||
| 2. Schedule.docx | DOCX document | |
| 7. RFI Form.docx | DOCX document | |
| 6. Davis-Bacon Act WD # CA20240007.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOREST LOCATION MAP
PROJECT LOCATION MAP
TRAVEL DIRECTIONS:
SHEET OF
United States Department of Agriculture
Forest Service
GAOA AAP # 573624 FERN FALLS
Fern Fall trail bridge is on the Fern Falls Trail (12E41).from the town of Graeagle drive north on highway 89 for 1.4 miles and take a right on FS highway 24 county road 519 Gold Lake Highway and drive for 6.22 miles just passed Lily lake. On the right hand side there is a parking lot. Follow the trail head for about 150yards and you will be on the trail bridge.
TRAIL BRIDGE REPLACEMENT
RECOMMENDED BY: FOREST ENGINEER
DATE
DATE
APPROVED: DIRECTOR OF ENGINEERING
DATE
APPROVED: DISTRICT RANGER
DATE
DATE
3/7 /23
:1
0 F
RI
CO
C
:\U
SE
RS
\F
RI
CO
\D
OC
UM
EN
TS
\D
OC
UM
EN
TS
\20
\20
PN
F\
FE
RN
F
AL
LS
B
RI
DG
E\
FE
RN
F
AL
LS
\F
ER
N
FA
LL
S\
AU
TO
CA
D\
DA
RR
EL
E
DI
TS
\F
ER
NF
AL
LS
T
RA
IL
B
RI
DG
E.
DW
G;
CALIFORNIA
PLUMAS COUNTY
R05 PACIFIC SOUTHWEST
PLUMAS NATIONAL FOREST
BECKWOURTH RANGER DISTRCT
INDEX OF SHEETS
SHEET
SHEET TITLE DATE
1 COVERSHEET 3/7/23
2 LOCATION MAP 3/7/2023
3 SCHEDULE OF ITEMS AND NOTES 3/7/2023
4 EXISTING CONDITIONS 3/7/2023
5 CLEARING AND GRUBBING 3/7/2023
6 TRAIL BRIDGE TYPICAL 3/7/2023
7 CONCRETE LEVELING PAD STD 3/7/2023
8 ALIGNMENT 3/7/2023
RECOMMENDED BY : REGIONAL BRIDGE ENGINEERING
DRAWING NUMBER R-1706
Trail Bridge Coordinates 39°42'4I.0l"N 120°39'50.56"W
APPROVED: FOREST SUPERVISOR
PROJECT GAOA FERN FALLS TRAIL BRIDGE REPLACEMENT AAP # 573624
UNIT PLUMAS NATIONAL FOREST
SOL. #
ITEM NO. DESCRIPTION UNIT QUANTITY
15101 Mobilization LS 1 15204 Construction Surveying and Staking LS 1 15713 Soil Erosion and Pollution Control & Dewatering LS 1 20102 Clearing and Grubbing LS 1 20801 Structural Excavation LS 1 20803 Structural Backfill LS 1 55703 4"x6" posts LF 90 55601 2"X8" S4S clear heart Redwood rail caps LF 90 55703 Glulam Diaphrams LF 16 55703 2"X8" Running planks LF 75 55703 4"x8" Planks LF 170 55703 2"X6" S4S Rail LF 160 55703 12"x12" Sill LF 10 55705 5-1/8"x16-1/2"Treated Structural Timber, Glued Laminated (two- 25') LF 50 55707 Hardware LS 1 62501 Seeding Dry Method ACRE 1 62507 Mulching, hand spread, Straw Bales, Certified Weed Free EA 5
6105.88
POINT EASTING
CPl 5000
RPl 5023.229
RP2 4982.528
CP2 4996.473
6101.04
TR
NORTHING
997.757
961.867
1084.335
ELEVATION
6100.787
6105.876
6101.205 trail to parking lot
6101.20
CP2
United States Department of Agriculture Forest Service
{ROS)
PACIFIC SOUTHWEST
PROJECT NAME
GAOA AAP#573624
FERN FALLS TRAIL
BRIDGE REPLACEMENT
PLUMAS NATIONAL
FOREST
BECKWOURTH RANGER
DISTRICT
DRAWING TITLE
EXISTING CONDITIONS
DATE
03/07/2023
ARCHIVE NO.
FS090523_R102013_L 1-002.dwg
DESIGNER DWG SHEET NO.
D. PEREIRA
DRAWN X-04
F.RICO
CHECKED
H. DODINI
SHEET 004 OF 08
PROJECT NO.
DRAWING NUMBER
R-1706
6-5/8" MINIMUM
ANCHOR BOLT
EMBEDMENT. EPOXY
BOLT TO (E) ABUTMENT
WITH HILTI HVU2 OR
EQUIVALENT EPOXY.
3" MINIMUM
CONCRET
LEVELING PAD
ABUTMENT
Ii.
EXTERIOR FACE OF OUTSIDE
GLULAM STRINGER,TYP
13/16"¢ HOLE IN SILL
FOR 3/4"¢ THREADED
ROD. ROD TO BE PLACED
6" INSIDE THE INSIDE
FACE OF THE GLULAMS
THE 12"X 12" SILL SHALL BE 4 FEET 2 INCHES LONG
TO FIT THE WIDTH OF THE EXISTING ABUTMENT
CONCRETE
LEVELING PAD
ABUTMENT
Ii.
" MINIMUM - 6" MAXIMUM
CONCRETE LEVELING PAD
INSTALL PER HILTI t---"""-"'r"-"ti:r-"""Tt-,-,llr:':7r-
REPAIR LOSE/
MISSING MORTAR
,_ _____ OUT-TO-OUT WIDTH OF STRINGERS/SLABS. ______ _. (EXTERIOR FACE TO EXTERIOR FACE)
HILTI HVU2 OR
EQUIVALENT ADHESIVE
ANCHOR W/3/4"¢
THREADED ROD IN 13/16"¢
DRILLED HOLE
1'-6" MINIMUM
OUT-TO-OUT
CONCRETE
LEVELING PAD 12"
,_ ___________ ___,ouT�fCouT ____________ _.
ELEVATION SECTION C-C
EXISTING CONCRETE LEVELING PAD AND SILL ON CE/ROCK ABUTMENT FOUNDATION
MALLEABLE IRON
WASHER
LENGT VARIES
3/4"¢ STANDARD
THREA ED ROD
ELEVATION
ANCHOR BOLT DETAIL
FASTEN DECK PLANK TO TOP OF BACKING PLANK USE
7" RINGSHANK NAILS ON 12" CENTERS
TOP OF DECK PLANKS
BEARING SHOE
13/16"¢ HOLE IN SILL
FOR 3/4"¢ THREADED
---'8D
FASTEN EACH BACKING
PLANK TO EACH
STRINGER USING (3)-7"
RING SHANK NAILS
�--- 3" DIMENSIONAL
¾" BOLT & NUT
W/(2)-MALLEABLE IRON
WASHERS
EXISTING LEVELING PAD
FOUNDATION
BACKING PLANKS
(2)-3/4"X10" LAG
SCREW AT EACH
BEARING SHOE
TIMBER SILL
* TIMBER SILL TO BE 12"Xl2" SOLID SAWN TREATED MEMBERS .
½" STEEL PLATE
FOUNDATION NOTES:
STRINGER
WIDT
r 0
PLUS I(
½" STEEL PLATE
i\"¢ HOLES, 2 STRINGER
PLACES '
½ "x5"x7"
ELASTOMERIC PAD
(TYP) (50 DUROMETER
HARDNESS)
END VIEW
s TRINGER
TH MINUS WID
l"
1" SLOT
SIDE VIEW
SPECIFICATIONS: MATERIALS AND CONSTRUCTION OF THIS STRUCTURE SHALL BE IN ACCORDANCE WITH THE STANDARD SPECIFICATION FOR CONSTRUCTION OF ROADS AND BRIDGES ON FEDERAL HIGHWAY PROJECTS (FP-14) AND STANDARD
SPECIFICATIONS FOR CONSTRUCTION OF TRAILS AND TRAIL BRIDGES ON FEDERAL PROJECTS,
HARDWARE AND STRUCTURAL STEEL: SEE SUPERSTRUCTURE DRAWINGS FOR PROJECT DESIGN CRITERIA AND GENERAL NOTES.
ANCHOR BOLTS FOR SILLS WILL BE DRILLED DOWN WITHIN THE EXISTING ABUTMENT AS SHOWN AT LEAST 6f' DEEP AND EPOXIED IN
AS SHOWN. INSTALL.
TREATED TIMBER & LUMBER: REFER TO THE GENERAL NOTES ON THE SUPERSTRUCTURE DRAWINGS FOR TREATED TIMBER & LUMBER
SPECIFICATIONS AND FIELD TREATING OF WOOD.
CONCRETE: USE STRUCTURAL CONCRETE WITH 5 SACK MINIMUM MIX APPROVED BY CO., CONCRETE SHALL RECEIVE A TOWELED SURFACE FINISH. CONCRETE SHALL HAVE 4%-6% ENTRAINED AIR. MAXIMUM SIZE AGGREGATE SHALL BE 3/4-INCH AND CONCRETE
SLUMP SHALL NOT EXCEED 4-INCH
LAG SCREW INSTALLATION: PRE-BORE LAG SCREW HOLES USING TWO DIAMETERS, ONE FOR THE SHANK AND ONE FOR THE THREADS.
THE LEAD HOLE FOR THE SHANK IS TO BE 1/16-INCH LAGER THAN THE SHANK DIAMETER AND IS TO BE BORED TO THE DEPTH OF PENETRATION OF THE SHANK . THE LEAD HOLE FOR THE THREADED PORTION IS TO BE 7D PERCENT OF BOLT DIAMETER AS SHOWN ON THE PLANS AND IS TO BE BORED AT LEAST TO THE LENGTH OF THE THREADS. DO NOT DRIVE LAG SCREWS WITH HAMMER.
United States Department of Agriculture Forest Service
(ROS)
PACIFIC SOUTHWEST
PROJECT NAME
GAOA AAP#573624
FERN FALLS TRAIL
BRIDGE REPLACEMENT
PLUMAS NATIONAL
FOREST
BECKWOURTH RANGER
DISTRICT
DRAWING TITLE
CONCRETE LEVELING
PAD STANDARD DWG
DATE
03/13/2023
ARCHIVE NO.
FS090523_R102013_L 1-002.dwg
DESIGNER
D.PEREIRA
DRAWN
F.RICO
CHECKED
H.DODINI
PROJECT NO.
DWG SHEET NO.
X-07
SHEET 07 OF 08
�-CL 4"
X
6" POST
Alignment center existing trail bridge profile
0+20 0+32 0+45 0+5?
�l\
3-X-10_X_4_'-�2-" -RO-UG-H=-�---�6l�05
�-------.-----......-----------.----E-N_D_W---..---, ALLPLANK
�,--------1---------i----i---------iU
C 0
(E) ABUTMENT
(N) LEVELING PAD,TYP.
61+00
60+95
L___------------------------60+90
USDA ◄'roREST SERV1c;>
��� �uts� iiill j�TOFA�
United States Department of Agriculture Forest Service
{ROS)
PACIFIC SOUTHWEST
PROJECT NAME
GAOA AAP#573624
FERN FALLS TRAIL
BRIDGE REPLACEMENT
PLUMAS NATIONAL
FOREST
BECKWOURTH RANGER
DISTRICT
DRAWING TITLE
ALIGNMENT
DATE
03/07/2023
ARCHIVE NO.
FS090523_R102013_L 1-002.dwg
DESIGNER DWG SHEET NO.
D. PEREIRA
DRAWN X-08
F.RICO
CHECKED
H. DODINI
II------ SHEET 008 OF 08
PROJECT NO.
| Sheets and Views |
| COVER SHEET |
| DRAWING TITLE LOCATION MAP: | |
| DATE 05072021: | |
| DESIGNER DPEREIRA: | |
| DRAWN FRICO: | |
| DWG SHEET NO X02: | |
| CHECKED HDODINI PROJECT NO: | |
| 2023-07-28T12:25:58-0700 | |
| JONATHAN BERRY |
| 2023-07-28T12:37:28-0700 | |
| Michael P. Rahe |
| 2023-07-28T07:39:26-0700 | |
| LEONARD JOB |
| 2023-07-26T14:41:13-0700 | |
| Darrell Pereira |
| 2023-08-03T14:41:47-0700 | |
| CHRISTOPHER CARLTON |
File details come from the government source that posted it. Updated .