3. HVLS Fans Sources Sought Q&As.pdf
PDF 316 KB Posted
- Attached to
- 16ft HVLS Fans & Installation Federal contract opportunity
- Solicitation number
- FA468622QA005
About this file
This document contains questions and answers regarding a sources sought notice for installing high-volume low-speed fans at an Air Force facility. The Air Force is seeking proposals to install three 16-foot HVLS fans, with two mounting to existing steel beams and one to existing purlins. Bidders must include conduit, wiring, and electrical connection to a subpanel to power the fans. The facility dimensions are approximately 270 feet by 80 feet with a ceiling height varying between 27 and 36 feet. Bidders must also include fire relay installation and programming, as well as lift equipment to perform the installation given the ceiling heights. Davis-Bacon Act prevailing wage determinations will apply to the construction work.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| MFR FA468622QA005 Amendment 2.pdf | ||
| 16ft HVLS Fans Site Visit Pictures-Picture Exhibit 3.pdf | ||
| 16ft HVLS Fans Site Visit Pictures-Picture Exhibit 2.pdf | ||
| 1. Performance Work Statement-HVLS Fans Update 1.pdf | ||
| HVLS Fans Site Visit Vendor Request for Information.pdf | ||
| 16ft HVLS Fans Site Visit Pictures-Picture Exhibit 1.pdf | ||
| MFR FA468622QA005 Amendment 1.pdf | ||
| 1. Performance Work Statement-HVLS Fans.pdf | ||
| RFQ Combo-HVLS Fans.pdf | ||
| 2. Site Plan-HVLS Fans.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
HVLS Fans Sources Sought Vendor Questions & Answers
Q1: What is the mounting structure? (Steel beam, steel joist, wood)?
Steel Beam for two of the fans, and Purlins for one of the fans. But if a contractor has an alternate method, we are open to it as well.
Q2: Will we need to run power? If so, how long are the runs in ft (250 is considered in scope if out of scope we will charge additional)?
Yes, the contractor will need to include conduit, wire, and electrical tie-in to the sub panel. The rough dimensions of the facility are 270' long, 80' wide, and 27'-36' tall
Q3: Will we need to install a Fire relay?
Yes, a fire relay will be needed. Either the Fan contactor or a sub-contractor will need to install the fire relay and program the fans into the fire alarm system.
Q4: Will we need to provide a lift for the work? If so, what is the ceiling height?
Yes, the contractor will need to include lift equipment in their proposals. Ceiling height varies between ~27’-36’. 9 CES will provide available As-built drawings.
Q5: Will there be a prevailing wage?
Yes, DBA will apply to covered construction efforts.