This file is a Contract Progress Report (AF Form 3065) template documenting the status of construction work at Dyess Air Force Base for contract FA4661-26-0180, titled "Coat Roof B6030 A&C." The report tracks 38 distinct work elements across the roofing and building renovation project, with each element assigned a percentage of the total job cost, totaling 40 percent of contract value. Work elements range from initial bonding and mobilization (1.25% and 1.50% respectively) through structural demolition, framing, exterior work, mechanical and electrical rough-ins, finishing trades, and final closeout activities including operations and maintenance documentation and as-built drawings (3.00%).

The example report shows an initial submission with 1.25 percent cumulative completion, representing completion of the bonds work element only. The form includes designated signature blocks for contractor certification and contracting officer review, with fields for scheduled versus actual completion percentages and contractor remarks. According to the form instructions, this progress documentation may be used by the Contracting Officer to calculate progress payments in accordance with the contract's payment clause. The Air Force Form 3065 serves as the standardized mechanism for tracking construction progress and supporting payment requests on this 180-calendar-day roofing replacement project valued between $500,000 and $1,000,000.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

CONTRACT PROGRESS REPORTOMB No. 0704-0188
CONTRACTORPROJECT #:FNWZ 26-0180
PROJECT NAME:Coat Roof B6030 A&C
REPORT #:PERIOD COVEREDCONTRACT NO.CONTRACT COMPLETION DATE
1FROM: TO:FA4661-
LINEWORK ELEMENT% OF% COMPLETED% COMPLETED
NO.TOTAL JOBTHIS PERIODCUMULATIVE
1Bonds1.251.251.25
2Mobilization1.50
3Submittals0.25
4Remediation1.00
5Remediation Testing1.00
6Framing Demolition1.00
7Concrete Foundation Demolition1.00
8Concrete Foundations & Slabs1.00
9Wall Framing1.00
10Roof Framing1.00
11Exterior Sheathing1.00
12CMU1.00
13Doors & Frames1.00
14Windows1.00
15Interior Framing & Sheathing1.00
16Electrical Rough-In1.00
17Fire Alarm / MNS Rough-In1.00
18Plumbing Rough-In1.00
19HVAC Equipment1.00
20HVAC Rough-In1.00
21Fire Suppression Rough-In1.00
22Exterior Asphalt & Concrete1.00
23Wall Insulation1.00
24Wall Sheathing1.00
25Tape, Float, Texture, & Paint1.00
26Ceramic & Porcelain Tile1.00
27Toilet Partitions, Cabinets, & Counters1.00
28Electrical Fixtures1.00
29Plumbing Fixtures1.00
30Restroom Accessories1.00
31Guard Rail & Bollards1.00
32HVAC Start-Up1.00
33Fire Alarm / MNS Testing1.00
34Fire Suppression Finishout1.00
35Exterior Fencing1.00
36Interior & Exterior Signage1.00
37Contractor Punchlist1.00
38O&M & As-Builts3.00
TOTAL40.001.251.25
REMARKS
Scheduled % Complete:
Actual % Complete:
At the Contracting Officer’s discretion and according to the payments clause of the contract, the information
provided on this form may be used for computing progress payments.
PROGRESS OR COMPLETION CERTIFICATE
I hereby certify that the contractor has satisfactorily completed the indicated percentage of the contract per contract specifications.
SUBMITTED BY OR FOR
X CONTRACTOR BASE CIVIL ENGINEER
TYPED NAME AND TITLESIGNATUREDATE
REVIEWED BY OR FOR CONTRACTING OFFICER
TYPED NAME AND TITLESIGNATUREDATE

In House Reproduction of AF FORM 3065 PREVIOUS EDITION IS OBSOLETE U.S. G.P.O. 1984-4207979/13318

&"Times New Roman,Regular"&12