This file is a Contract Progress Report (AF Form 3065) template documenting the status of construction work at Dyess Air Force Base for contract FA4661-26-0180, titled "Coat Roof B6030 A&C." The report tracks 38 distinct work elements across the roofing and building renovation project, with each element assigned a percentage of the total job cost, totaling 40 percent of contract value. Work elements range from initial bonding and mobilization (1.25% and 1.50% respectively) through structural demolition, framing, exterior work, mechanical and electrical rough-ins, finishing trades, and final closeout activities including operations and maintenance documentation and as-built drawings (3.00%).
The example report shows an initial submission with 1.25 percent cumulative completion, representing completion of the bonds work element only. The form includes designated signature blocks for contractor certification and contracting officer review, with fields for scheduled versus actual completion percentages and contractor remarks. According to the form instructions, this progress documentation may be used by the Contracting Officer to calculate progress payments in accordance with the contract's payment clause. The Air Force Form 3065 serves as the standardized mechanism for tracking construction progress and supporting payment requests on this 180-calendar-day roofing replacement project valued between $500,000 and $1,000,000.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| DYESS Roof Repair QA Log.pdf | ||
| Solicitation-Amendment FA466126R00070002 SF 30.pdf | ||
| Solicitation-Amendment FA466126R00070001 SF 30.pdf | ||
| Attachment C-Pricing Schedule.pdf | ||
| Solicitation - FA466126R0007.pdf | ||
| SOW - 24-0127 Repair simulator Roof B6030A-C.pdf | ||
| 2. Dyess AF 3064 - Progress Schedule Example.xlsx | XLSX spreadsheet | |
| WD_TX20260278.pdf | ||
| Q_A Sheet.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| CONTRACT PROGRESS REPORT | OMB No. 0704-0188 | |||||
| CONTRACTOR | PROJECT #: | FNWZ 26-0180 | ||||
| PROJECT NAME: | Coat Roof B6030 A&C | |||||
| REPORT #: | PERIOD COVERED | CONTRACT NO. | CONTRACT COMPLETION DATE | |||
| 1 | FROM: TO: | FA4661- | ||||
| LINE | WORK ELEMENT | % OF | % COMPLETED | % COMPLETED | ||
| NO. | TOTAL JOB | THIS PERIOD | CUMULATIVE | |||
| 1 | Bonds | 1.25 | 1.25 | 1.25 | ||
| 2 | Mobilization | 1.50 | ||||
| 3 | Submittals | 0.25 | ||||
| 4 | Remediation | 1.00 | ||||
| 5 | Remediation Testing | 1.00 | ||||
| 6 | Framing Demolition | 1.00 | ||||
| 7 | Concrete Foundation Demolition | 1.00 | ||||
| 8 | Concrete Foundations & Slabs | 1.00 | ||||
| 9 | Wall Framing | 1.00 | ||||
| 10 | Roof Framing | 1.00 | ||||
| 11 | Exterior Sheathing | 1.00 | ||||
| 12 | CMU | 1.00 | ||||
| 13 | Doors & Frames | 1.00 | ||||
| 14 | Windows | 1.00 | ||||
| 15 | Interior Framing & Sheathing | 1.00 | ||||
| 16 | Electrical Rough-In | 1.00 | ||||
| 17 | Fire Alarm / MNS Rough-In | 1.00 | ||||
| 18 | Plumbing Rough-In | 1.00 | ||||
| 19 | HVAC Equipment | 1.00 | ||||
| 20 | HVAC Rough-In | 1.00 | ||||
| 21 | Fire Suppression Rough-In | 1.00 | ||||
| 22 | Exterior Asphalt & Concrete | 1.00 | ||||
| 23 | Wall Insulation | 1.00 | ||||
| 24 | Wall Sheathing | 1.00 | ||||
| 25 | Tape, Float, Texture, & Paint | 1.00 | ||||
| 26 | Ceramic & Porcelain Tile | 1.00 | ||||
| 27 | Toilet Partitions, Cabinets, & Counters | 1.00 | ||||
| 28 | Electrical Fixtures | 1.00 | ||||
| 29 | Plumbing Fixtures | 1.00 | ||||
| 30 | Restroom Accessories | 1.00 | ||||
| 31 | Guard Rail & Bollards | 1.00 | ||||
| 32 | HVAC Start-Up | 1.00 | ||||
| 33 | Fire Alarm / MNS Testing | 1.00 | ||||
| 34 | Fire Suppression Finishout | 1.00 | ||||
| 35 | Exterior Fencing | 1.00 | ||||
| 36 | Interior & Exterior Signage | 1.00 | ||||
| 37 | Contractor Punchlist | 1.00 | ||||
| 38 | O&M & As-Builts | 3.00 | ||||
| TOTAL | 40.00 | 1.25 | 1.25 | |||
| REMARKS |
| Scheduled % Complete: | ||
| Actual % Complete: | ||
| At the Contracting Officer’s discretion and according to the payments clause of the contract, the information | ||
| provided on this form may be used for computing progress payments. | ||
| PROGRESS OR COMPLETION CERTIFICATE | ||
| I hereby certify that the contractor has satisfactorily completed the indicated percentage of the contract per contract specifications. | ||
| SUBMITTED BY OR FOR | ||
| X CONTRACTOR BASE CIVIL ENGINEER | ||
| TYPED NAME AND TITLE | SIGNATURE | DATE |
| REVIEWED BY OR FOR CONTRACTING OFFICER | ||
| TYPED NAME AND TITLE | SIGNATURE | DATE |
In House Reproduction of AF FORM 3065 PREVIOUS EDITION IS OBSOLETE U.S. G.P.O. 1984-4207979/13318
&"Times New Roman,Regular"&12
File details come from the government source that posted it. Updated .