| CONSTRUCTION COST ESTIMATE | DATE: | ||||||||||
| CONTRACTOR: | ADDRESS: | ||||||||||
| CONTRACT FOR (word to be performed): | PROPOSED TOTAL CONTRACT PRICE: | $ - 0 | |||||||||
| PURCHASE REQUEST NUMBER: | PROJECT NUMBER: | WORK LOCATION: Sheppard AFB, TX | |||||||||
| LINE NO. | ITEM | UNIT OF MEASURE | QUANTITY | MATERIAL COST | LABOR COST | EQUIPMENT COST | OTHER DIRECT COSTS | LINE TOTAL | |||
| UNIT PRICE | TOTAL MATERIAL COST | UNIT PRICE | TOTAL LABOR COST | UNIT PRICE | TOTAL EQUIPMENT COST | ||||||
| 1 | Project Manager | WKS | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| 2 | Superintendent | WKS | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 3 | Concrete Blocks Set & Poured | JOB | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| 4 | Breakwater Welding | JOB | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| 5 | Remove Existing Cable | JOB | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| 6 | Re-spool Winches with New Cable | JOB | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 5 | Drop Anchor Blocks w/Attached Cable | JOB | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| 6 | Prime Contractor Overhead | % | $ - 0 | ||||||||
| 7 | Prime Contractor Profit | % | $ - 0 | ||||||||
| 8 | Bond | % | $ - 0 | ||||||||
| Sub-Total | $ - 0 | ||||||||||
| **The above Line items are only recommendations and should be added and deleted as needed** |