3. Blank Cost Estimate Breakdown.pdf
PDF 196 KB Posted
- Attached to
- Lake Texoma Breakwater & Anchoring System Repairs Federal contract opportunity
- Solicitation number
- FA302020R0021
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 5. Updated breakwater Photos 9 Sep 2020.pdf | ||
| Amendment 1 - FA302020R00210001.pdf | ||
| 2. Breakwater Photos.pdf | ||
| Solicitation - FA302020R0021.pdf | ||
| 1. Statement of Work.pdf | ||
| 4. Wage Determination, Building TX20200249 27Aug20.pdf | ||
| 3. Blank Cost Estimate Breakdown.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UNIT PRICE
TOTAL
MATERIAL
COST
UNIT PRICE
TOTAL LABOR
COST
UNIT PRICE
TOTAL
EQUIPMENT
COST
1 Project Manager WKS -$ -$ -$ -$ -$ -$
2 Superintendent WKS -$ -$ -$ -$ -$
3 Concrete Blocks Set & Poured JOB -$ -$ -$ -$ -$ -$ -$ -$
4 Breakwater Welding JOB -$ -$ -$ -$ -$ -$
5 Remove Existing Cable JOB -$ -$ -$ -$ -$ -$
6 Re-spool Winches with New Cable JOB -$ -$ -$ -$ -$ -$ -$
5 Drop Anchor Blocks w/Attached Cable JOB -$ -$ -$ -$ -$ -$
6 Prime Contractor Overhead % -$
7 Prime Contractor Profit % -$
8 Bond % -$
Sub-Total -$
**The above Line items are only recommendations and should be added and deleted as needed**
PURCHASE REQUEST NUMBER: PROJECT NUMBER: WORK LOCATION:
Sheppard AFB, TX
LINE NO. ITEM
UNIT OF
MEASURE
QUANTITY
MATERIAL COST LABOR COST EQUIPMENT COST
OTHER
DIRECT COSTS
LINE TOTAL
CONSTRUCTION COST ESTIMATE DATE:
CONTRACTOR: ADDRESS:
CONTRACT FOR (word to be performed): PROPOSED TOTAL CONTRACT PRICE: -$