3-BPAttach 468-2026-029581.pdf

PDF 2 MB Posted

Attached to
2026 Sanitary Sewer Rehabilitation Phase B
Solicitation number
260276
Issued by
Sedgwick County, Kansas

About this file

This file is a technical specification document for Section 806 Form High Modulus PVC Liner Pipe prepared by the City of Wichita, Kansas for the 2026 Sanitary Sewer Rehabilitation Phase B project (Contract ID: 468-2026-029581). The specification provides detailed requirements for the rehabilitation of gravity flow sanitary sewer pipelines through the insertion of preheated, folded PVC pipe that is heated and progressively unfolded and expanded against the interior surface of existing pipes. The project encompasses approximately 1,779 linear feet of 10-inch cured-in-place liner installation between Manhole (MH) 5646-212 and MH 5646-222, distributed across three sites. Site 1A includes 174 and 185 linear feet of pipe at depths of 6.9 and 6.2 feet; Site 1B comprises 175 and 180 linear feet at depths of 6.9 and 7.3 feet; and Site 1C contains 177, 181, 178, and 177 linear feet at depths ranging from 6.3 to 7.1 feet. The specification references ASTM standards F1871 and F1867 for installation procedures and material requirements.

The specification establishes detailed material, design, and installation requirements, including PVC compound specifications conforming to ASTM D-1784 with minimum tensile strength of 3,600 psi and minimum tensile modulus of 155,000 psi. Liner wall thickness and dimensional ratios must be determined according to ASTM guidelines, with maximum safe depths specified based on cell classification and dimensional ratio. Installation procedures include comprehensive preparation requirements such as closed-circuit television inspection to identify obstructions and service connections, line cleaning, and sewage bypass provisions during construction with flow diversion into downstream systems. The contractor must provide comprehensive video documentation before and after completion and must reestablish all active service connections without excavation using remote-controlled cutting devices. Strict OSHA compliance is required, particularly regarding confined space entry and work safety. Completed work must be inspected and approved by the City Engineer before project area restoration occurs in accordance with specified standards.

View the file

Other files

File Type Posted
1-260276 Bid Table.pdf PDF
2-BP 468-2026-029581.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Revised July 2024

SECTION 806

FORM HIGH MODULUS PVC LINER PIPE

806.1 SCOPE

This specification provides for the rehabilitation of gravity flow pipe lines by the insertion of a preheated, folded PVC pipe which is then further heated and progressively unfolded and expanded against the interior surface of the existing pipe. The finished Fold and Form Pipe (FFP) should extend over the installation length in a continuous, tight fitting pipe-within-a-pipe.

806.2 REFERENCE SPECIFICATION

This specification references American Society of Testing and Materials (ASTM) standards F1871 (Standard Specification for Folded/Formed Poly (Vinyl Chlroride) Pipe Type A for Existing Sewer and Conduit Rehabilitation, and F1867 (Standard Practice for Installation of Folded/Formed Poly (Vinyl Chloride) (PVC) Pipe Type A for Existing Sewer and Conduit Rehabilitation.

806.3 MATERIALS

a) The PVC compound used for the FFP shall conform to ASTM D-1784 cell classification 12111 or

32111 with minimum physical properties as listed below:

Tensile Strength ASTM D-638 3,600 psi

Tensile Modulus ASTM D-638 155,000 psi

Flexural Strength ASTM D-790 4,100 psi

Flexural Modulus ASTM D-790 145,000 psi

b) Compounds meeting the above minimum properties that have different cell classifications because one or more properties are greater those of the specified compounds are also acceptable.

c) The minimum length of the FFP shall be that deemed necessary by the Contractor to effectively span the distance between the starting point and the terminating point, unless otherwise specified.

806.4 DESIGN

Liner wall thickness shall be determined in accordance with ASTM 1867, Appendix X1. The Dimensional

Ratio (DR), the Pipe Diameter divided by the Wall Thickness, shall be determined by the Formulae contained in Appendix XI of ASTM F-1216. The long-term (time dependent) Flexural Modulus used in these calculations shall be no greater than 35% of initial, for the cell classifications identified in Section 3.1. Higher values for the long-term Flexural Modulus shall be accepted provided a 3rd party ASTM D2990 Long-term creep test result is submitted. The following table has been prepared in accordance with this requirement.

MAXIMUM SAFE DEPTH FOR FFP

DIMENSIONAL RATIOS

CELL CLASS E-MOD (PSI) 35 41 50

12111 320,000 20' 14' 9'

32111 360,000 22' 16' 10'

Assumptions

Existing pipe is not capable of loading, soil 120 lb/cf, Soil Modulus 700 psi, Ground Water 1/2 total depth, Ovality 2%, Live Load is 16,000 lb./wheel, long-term Modulus of PVC is 35% of initial Modulus per ASTM

D-790. Safety Factor is 2.

806.5 SAFETY

The Contractor shall carry out the operation in strict accordance with all applicable OSHA standards.

Particular attention is drawn to those safety requirements involving entering and working in confined spaces.

806.6 INSTALLATION PREPARATION

a) All debris which would interfere with the installation of the FFP shall be removed.

b) Inspection of pipelines shall be performed by experienced personnel trained in locating and identifying breaks, obstructions and service connections by closed circuit television. The interior of the pipeline shall be carefully inspected to determine the location of any conditions which may prevent proper installation of the FFP into the existing sewer line. Such conditions shall be noted so that these conditions can be corrected prior to installation.

c) The line shall be cleaned of obstructions such as solids, displaced joints, protruding service connections or collapsed pipe that may prevent FFP installation. If the TV inspection reveals an obstruction that cannot be removed by conventional sewer cleaning equipment, a point repair shall be made to remove or repair the obstruction. These preparatory items are incidental to the lining process, and are not additional pay items.

d) Prior to lining, the preliminary video tape of the host pipe shall be reviewed and approved by the

Engineer to assure that the host pipe requires no further protruding tap cutting, point repairs or cleaning in preparation for lining. During this review the Contractor and Engineer will agree on which of the service connections are active and are therefore to be reopened after the lining is complete. Only the active service connections will be reopened.

e) When required, flow of sewage around the section or sections of pipe designated for FFP shall be provided by the Contractor. The bypass shall be made by plugging the line at an existing upstream manhole and pumping or directing the sewage flow into a downstream manhole or adjacent system, if the adjacent system has capacity for the additional flow. The pump and bypass lines shall be of adequate capacity and size to handle the flow. Raw sewage must be pumped back into the sanitary sewer system or disposed of in a manner approved by the City, but such approval shall in no way relieve the Contractor of his responsibility and/or public liability.

f) No service connection operation will be interrupted by construction for more than 12 hours unless the Contractor has made arrangements for the building occupants, such as temporary housing.

Service connection of businesses that require water to function will be separately bypassed to avoid an adverse impact on the operation.

806.7 INSTALLATION

a) The minimum length of the FFP shall be that deemed necessary by the Contractor to effectively span the distance from the starting point to the terminating point, unless otherwise specified.

b) The spool of FFP shall be heated to make the PVC pipe flexible for insertion into the existing pipe.

c) The FFP shall be inserted into the existing pipe using a winch and cable connected to the end of the FFP. The winch shall be equipped with a dynamometer to record the pulling forces required during installation. The maximum force exerted on the FFP shall be a tensile stress of 350 psi (when heated) multiplied times the pipe wall cross sectional area.

d) Thermocouples shall be placed against the pipe at both the upstream and downstream end to monitor the pipe installation temperatures.

a) Once the necessary processing temperature has been achieved the FFP shall be expanded.

Expansion pressure shall be sufficient to unfold the FFP, press it tightly against the wall of the existing pipe and form dimples at the service connections.

g) After the FFP is completely rounded and prior to relieving the pressure holding the FFP against the existing pipe the Contractor shall cool the FFP, using air and/or water, to a temperature below 110 degrees.

806.8 SERVICE CONNECTIONS

After the pressure is removed from the FFP, the Contractor shall re-establish the existing, live service connections. This shall be done without excavation from the interior of the pipeline by means of a CCTV camera and a remote controlled cutting device that fully re-establishes the live service connection. Only active service connections will be reopened. Any inactive service connection which has been inadvertently opened will be sealed closed by the Contractor to the satisfaction of the Engineer.

806.9 WORKMANSHIP

The finished FFP shall be continuous over the entire length of the installation and conform to the contours of the walls of the host pipe. After work is completed the Contractor shall provide to the City a copy of the original video tape and a video of the completed sewer line showing all work completed including all services that were re-connected. All tapes shall be of high quality and clarity and shall show the complete footage of each line, to the satisfaction of the Engineer.

806.10 CLEANUP

After installation of the FFP has been completed and required testing indicates that the FFP is acceptable the project area disturbed by the Contractor's operation shall be restored to its original or better condition in compliance with AR 6.5 as determined by the Engineer.

E In d ia n a p o li s St

E K e ll o g g D r

SGroveSt

S Grove St

SSpruceSt

S Poplar St

SPoplarSt

S Green St

E L e w is

S t

E K e ll o g g S t

E M o rr is

S t

E M o rr is

S t

E L in c o ln

S t

SMinneapolisAve

SAshSt

S Green St

S Spruce St

E P a rk

S t

E B a y le y S t

E M e n lo

S t

E R iv e ra

S t

SMadisonAve

A

B

A

S Vassar St S Vassar St

E O rm e S t

E O rm e S t

S Lorraine AveS Lorraine Ave

S Estelle St

S Estelle St

E G il b e rt

S t

E K e ll o g g D r

E K e ll o g g D r

E K e ll o g g D r

S Green St

E L e w is

S t

E L e w is

S t

SChautauquaAve

S Erie St

S Holyoke St S Holyoke St

S Rutan St

S Volutsia St

S Volutsia St

S Hillside St

E K e ll o g g S t

C a lv a ry

C e m e te ry

C a lv a ry

C h a p e l

C h ri st ia n S ch o o l

E M e n lo

S t

E G ra il S t

S Volutsia St

S Chautauqua Ave

S Erie St

S Rutan St

SVassarSt

G eo rg e W as hi ng to n Dr

P e n le y D r

S Estelle St

E Z im m e rl y S t

E R iv e ra

S t

E A lo m a St

E A lo m a S t

E S en ne tt St

E S e n n e tt

S t

B ro a d w a y

H o m e M e d ic a l

V ie tn a m e s e

M e tr o p o li ta n

B a p ti s t C h u rc h

M J A u to

R e p a ir

SCliftonAve SCliftonAve E O rm e S t

SRooseveltSt

SQuentinSt

S Ya le St

Lo ng vi ew

L n

E K e ll o g g S t

G ra il S t

S Yale St S Yale St

E B a y le y S t

S Roosevelt St

SCliftonAve

So ur ce s:

Es ri, T om

To m

, G ar m in

, F

AO

, N O

AA

, U

SG

S, O pe nS tr ee tM ap c on tr ib ut or s, an d th e G

IS

U se r C om m un ity

0.

0.

0.

M ile s

O ve rv ie w

S

IT

E S

A

-1 C

S ee

D et ai l 1

Owner Text Box 2026 Sanitary Sewer Rehabilitation Phase B 468-2026-029581

Owner Text Box Install Approximately 1779 LF 10" Cured-In-Place Liner MH 5646-212 to 5646-222

Owner Arrow

Ge org e W as hin gto n D riv e

South Chautauqua Street

R iv er a St re et

South Volutsia Street

South Erie Street

South Estelle Street

Ea st Li nc ol n St re et

Su nn ys id e

D ol la r

G en er al

Su nn ys id e

Ba pt is t

C hu rc h

Me nlo

St re et

South Lorraine Street

Sc hw ei te rP ar k

M en lo St re et

M ap d at a

O pe nS tr ee tM ap c on tr ib ut or s, M ic ro so ft, F ac eb oo k, G oo gl e, E sr i C om m un ity M ap s co nt rib ut or s, M ap la ye r b y

Es ri

F ee t

D et ai l 1

S

IT

E

A S

IT

E

B

S

IT

E

C

I

N

I N

L

F

L F

6.

FT

D

EE

P

6.

FT

D

EE

P

6.

FT

D

EE

P

-2

-2

-2

M ap d at a

O pe nS tr ee tM ap c on tr ib ut or s, M ic ro so ft, F ac eb oo k, G oo gl e, E sr i C om m un ity M ap s co nt rib ut or s, M ap la ye r b y

Es ri

IN

I

N

L F

L

F

6.

FT

D

EE

P

7.

FT

D

EE

P

7.

FT

D

EE

P

-2

-2

-2

M ap d at a

O pe nS tr ee tM ap c on tr ib ut or s, M ic ro so ft, F ac eb oo k, G oo gl e, E sr i C om m un ity M ap s co nt rib ut or s, M ap la ye r b y

Es ri

F ee t

Si te

A

I

N

IN

L F

L

F

6.

FT

D

EE

P

6.

FT

D

EE

P

6.

FT

D

EE

P

-2

-2

-2

M ap d at a

O pe nS tr ee tM ap c on tr ib ut or s, M ic ro so ft, F ac eb oo k, G oo gl e, E sr i C om m un ity M ap s co nt rib ut or s, M ap la ye r b y

Es ri

I

N

I N

L

F

L F

6.

FT

D

EE

P

6.

FT

D

EE

P

6.

FT

D

EE

P

-2

-2

-2

M ap d at a

O pe nS tr ee tM ap c on tr ib ut or s, M ic ro so ft, F ac eb oo k, G oo gl e, E sr i C om m un ity M ap s co nt rib ut or s, M ap la ye r b y

Es ri

F ee t

Si te

B

Ea st Li nc ol n St re et

I

N

I N

L F

L

F

7.

FT

D

EE

P

6.

FT

D

EE

P

8.

FT

D

EE

P

-2

-2

-2

M ap d at a

O pe nS tr ee tM ap c on tr ib ut or s, M ic ro so ft, F ac eb oo k, G oo gl e, E sr i C om m un ity M ap s co nt rib ut or s, M ap la ye r b y

Es ri

F ee t

Si te

C

Sewer CCTV Observations 8/7/2026

10:29 AM

Alt Pipe ID: DownstreamSurvey Direction:10:01 am9/26/2023Inspected Date:25293

Distance: Remarks:O&M:Struct:Doc:Contin:%Clock 2:Clock 1:CCTV Defect :

0.00 AMH Manhole 0 0False 5646-213

0.00 MWL Miscellaneous Water Level 5 0 0False

11.20 FS Fracture Spiral 4 5 3 0False

15.70 JOM Joint Offset Medium 3 0False

20.40 JOM Joint Offset Medium 3 0False

20.40 JOM Joint Offset Medium 3 0False

45.20 CM Crack Multiple 10 5 3 0False

60.40 HSV Hole Soil Visible 2 4 5 0False

99.90 HSV Hole Soil Visible 2 4 5 0False

113.10 CS Crack Spiral 7 11 2 0False

116.40 JOM Joint Offset Medium 3 0False

125.90 MWLS Miscellaneous Water Level Sag 15 S01 2 0False

132.10 JOM Joint Offset Medium 3 0False

133.30 HSV Hole Soil Visible 2 4 5 0False

141.40 CS Crack Spiral 10 1 2 0False

143.70 FM Fracture Multiple 7 2 4 0False

146.10 FM Fracture Multiple 7 9 4 0False

146.10 FM Fracture Multiple 8 1 4 0False

147.50 SSC Surface Spalling of Damage Coating 3 4 1 0False

148.40 FM Fracture Multiple 3 5 4 0False

149.40 FS Fracture Spiral 3 5 3 0False

153.10 JOM Joint Offset Medium 3 0False

155.80 FL Fracture Longitudinal 5 3 0False

156.80 FS Fracture Spiral 7 8 3 0False

157.70 FM Fracture Multiple 2 5 4 0False

159.80 CS Crack Spiral 3 5 2 0False

173.50 MWLS Miscellaneous Water Level Sag 15 F01 2 0False

173.50 AMH Manhole 0 0False 5646-212

Page: 1

10:27 AM

Alt Pipe ID: DownstreamSurvey Direction: 9:00 am9/26/2023Inspected Date:25294

Distance: Remarks:O&M:Struct:Doc:Contin:%Clock 2:Clock 1:CCTV Defect :

0.00 AMH Manhole 0 0False 5646-214

0.00 MWL Miscellaneous Water Level 5 0 0False

27.20 MMC Miscellaneous Material Change 0 0False PVC

6.40 MMC Miscellaneous Material Change 0 0False VCP

7.30 MWLS Miscellaneous Water Level Sag 45 S01 3 0False

32.70 MWLS Miscellaneous Water Level Sag 45 F01 3 0False

41.50 MWLS Miscellaneous Water Level Sag 40 S02 3 0False

42.20 HSV Hole Soil Visible 9 11 5 0False

63.90 CS Crack Spiral 10 1 2 0False

87.80 MWLS Miscellaneous Water Level Sag 40 F02 3 0False

112.30 CM Crack Multiple 12 3 3 0False

112.30 CS Crack Spiral 7 9 2 0False

137.70 H Hole 3 0 0False

137.70 B Broken 7 8 4 0False

145.60 CL Crack Longitudinal 12 2 0False

148.10 B Broken 12 5 4 0False

156.00 CS Crack Spiral 2 4 2 0False

159.90 JOM Joint Offset Medium 3 0False

163.20 JOM Joint Offset Medium 3 0False

167.00 SSC Surface Spalling of Damage Coating 4 5 1 0False

175.40 AMH Manhole 0 0False 5646-213 LINE HAD A HOLE AND A COUPLE BROKEN SPOTS

10:24 AM

Alt Pipe ID: DownstreamSurvey Direction: 9:38 am9/22/2023Inspected Date:25295

Distance: Remarks:O&M:Struct:Doc:Contin:%Clock 2:Clock 1:CCTV Defect :

0.00 AMH Manhole 0 0False 5646-215

0.00 MWL Miscellaneous Water Level 5 0 0False

11.20 FM Fracture Multiple 9 3 4 0False

23.30 B Broken 8 3 4 0False

25.70 B Broken 9 2 4 0False

31.90 FS Fracture Spiral 11 1 3 0False

36.30 B Broken 2 4 4 0False

42.00 B Broken 7 9 4 0False

42.00 CL Crack Longitudinal 4 2 0False

85.00 B Broken 11 4 0False

123.60 FS Fracture Spiral 4 5 3 0False

123.60 FS Fracture Spiral 7 8 3 0False

128.70 FS Fracture Spiral 9 11 3 0False

167.10 FM Fracture Multiple 9 2 4 0False

170.60 B Broken 10 12 4 0False

173.10 AMH Manhole 0 0False 5646-214 LINE HAD MULTIPLE BREAKS THROUGHT LINE

10:17 AM

Alt Pipe ID: DownstreamSurvey Direction: 8:39 am9/22/2023Inspected Date:25296

Distance: Remarks:O&M:Struct:Doc:Contin:%Clock 2:Clock 1:CCTV Defect :

0.00 AMH Manhole 0 0False 5646-216

0.00 MWL Miscellaneous Water Level 5 0 0False

17.60 H Hole 3 0 0False

17.60 FS Fracture Spiral 2 5 3 0False

18.30 FS Fracture Spiral 1 5 3 0False

19.40 JOM Joint Offset Medium 3 0False

20.30 CC Crack Circumferential 2 4 1 0False

22.80 FC Fracture Circumferential 4 5 2 0False

112.90 JOM Joint Offset Medium 3 0False

162.50 BSV Broken Soil Visible 2 4 5 0False

167.40 FS Fracture Spiral 10 2 3 0False

175.20 CS Crack Spiral 4 5 2 0False

175.20 B Broken 7 9 4 0False

175.20 HSV Hole Soil Visible 4 5 5 0False

179.40 AMH Manhole 0 0False 5646-215 LINE HAD A COUPLE SMALL HOLES A FEW FRACTURES

10:16 AM

Alt Pipe ID: UpstreamSurvey Direction: 9:31 am6/21/2023Inspected Date:25297

Distance: Remarks:O&M:Struct:Doc:Contin:%Clock 2:Clock 1:CCTV Defect :

0.00 AMH Manhole 0 0False 5646-216

0.00 MWL Miscellaneous Water Level 5 0 0False

6.70 JOM Joint Offset Medium 3 0False

7.50 FS Fracture Spiral 12 3 3 0False

9.20 JOM Joint Offset Medium 3 0False

14.30 JOM Joint Offset Medium 3 0False

19.40 JOM Joint Offset Medium 3 0False

34.70 JOM Joint Offset Medium 3 0False

49.80 JOM Joint Offset Medium 3 0False

88.10 JOM Joint Offset Medium 3 0False

94.00 JOM Joint Offset Medium 3 0False

96.10 JOM Joint Offset Medium 3 0False

103.90 JOM Joint Offset Medium 3 0False

109.00 JOM Joint Offset Medium 3 0False

116.80 JOM Joint Offset Medium 3 0False

140.60 FL Fracture Longitudinal 11 3 0False

152.70 JOM Joint Offset Medium 3 0False

158.20 FM Fracture Multiple 2 5 4 0False

165.40 JOM Joint Offset Medium S01 3 0False

170.40 JOM Joint Offset Medium F01 3 0False

170.40 CL Crack Longitudinal 9 2 0False

170.40 CL Crack Longitudinal 2 2 0False

174.20 AMH Manhole 0 0False 5646-217 LINE LOOKED GOOD SOME INFILTRATION AROUND MH LID

10:13 AM

Alt Pipe ID: UpstreamSurvey Direction: 9:55 am6/21/2023Inspected Date:25298

Distance: Remarks:O&M:Struct:Doc:Contin:%Clock 2:Clock 1:CCTV Defect :

0.00 AMH Manhole 0 0False 5646-217

0.00 MWL Miscellaneous Water Level 5 0 0False

16.10 JOM Joint Offset Medium 3 0False

18.80 JOM Joint Offset Medium S01 3 0False

58.40 HSV Hole Soil Visible 9 5 0False

65.80 CS Crack Spiral 7 9 2 0False

67.10 TB Tap Break-in/Hammer 10 0 0False 2902 E. LINCOLN AVE.

126.20 CS Crack Spiral 4 5 2 0False

141.90 FS Fracture Spiral 3 5 3 0False

157.20 CS Crack Spiral 9 10 2 0False

159.50 JOM Joint Offset Medium F01 3 0False

159.50 MSA Miscellaneous Survey Abandoned 0 0False RECORDING STOPPED DUE TO DEBRIS IN LINE CAMERA WONT GO ANY FURTHER ALREADY TELEVISED FROM OTHER DIRECTION TO THIS POINT

Alt Pipe ID: DownstreamSurvey Direction: 2:17 pm6/20/2023Inspected Date:25298

Distance: Remarks:O&M:Struct:Doc:Contin:%Clock 2:Clock 1:CCTV Defect :

0.00 AMH Manhole 0 0False 5646-218

0.00 MWL Miscellaneous Water Level 5 0 0False

8.50 CM Crack Multiple 9 10 3 0False

11.20 FM Fracture Multiple 11 4 4 0False

13.50 CL Crack Longitudinal 8 2 0False

13.70 FM Fracture Multiple 7 10 4 0False

13.80 CL Crack Longitudinal 3 2 0False

16.30 CS Crack Spiral 12 1 2 0False

18.40 OBR Obstruction Rocks 5 7 5 0 2False

18.40 MSA Miscellaneous Survey Abandoned 0 0False DEBRIS IN LINE CAMERA WONT GO ANY FURTHER

10:09 AM

Alt Pipe ID: DownstreamSurvey Direction: 1:21 pm6/20/2023Inspected Date:25299

Distance: Remarks:O&M:Struct:Doc:Contin:%Clock 2:Clock 1:CCTV Defect :

0.00 AMH Manhole 0 0False 5646-219

0.00 MWL Miscellaneous Water Level 5 0 0False

1.20 CL Crack Longitudinal 3 2 0False

1.40 FL Fracture Longitudinal 9 3 0False

1.40 CL Crack Longitudinal 10 2 0False

8.50 FM Fracture Multiple 12 3 4 0False

13.30 CS Crack Spiral 11 1 2 0False

33.60 CS Crack Spiral 7 8 2 0False

33.90 FL Fracture Longitudinal 4 3 0False

36.70 FM Fracture Multiple 10 2 4 0False

73.30 TB Tap Break-in/Hammer 2 0 0False 857 S. CHAUTAUQUA AVE.

73.30 CL Crack Longitudinal 2 2 0False

76.90 CS Crack Spiral 11 1 2 0False

91.00 JOM Joint Offset Medium 3 0False

99.90 CS Crack Spiral 10 2 2 0False

105.40 FM Fracture Multiple 2 5 4 0False

156.00 CS Crack Spiral 7 11 2 0False

161.20 CM Crack Multiple 7 11 3 0False

172.60 AMH Manhole 0 0False 5646-218 LINE LOOKED GOOD

10:06 AM

Alt Pipe ID: DownstreamSurvey Direction:12:48 pm6/20/2023Inspected Date:25300

Distance: Remarks:O&M:Struct:Doc:Contin:%Clock 2:Clock 1:CCTV Defect :

0.00 AMH Manhole 0 0False 5646-220

0.00 MWL Miscellaneous Water Level 5 0 0False

1.10 CC Crack Circumferential 11 1 1 0False

2.60 JOM Joint Offset Medium 3 0False

11.50 CL Crack Longitudinal 11 2 0False

32.00 FM Fracture Multiple 11 4 4 0False

34.40 CM Crack Multiple 7 11 3 0False

34.40 FS Fracture Spiral 7 11 3 0False

36.90 FL Fracture Longitudinal 9 3 0False

36.90 CL Crack Longitudinal 12 2 0False

48.30 JOM Joint Offset Medium 3 0False

109.20 FL Fracture Longitudinal 12 3 0False

109.30 FS Fracture Spiral 10 4 3 0False

135.20 FM Fracture Multiple 7 11 4 0False

178.10 AMH Manhole 0 0False 5646-219 LINE LOOKED GOOD

10:35 AM

Alt Pipe ID: DownstreamSurvey Direction:12:31 pm6/20/2023Inspected Date:25301

Distance: Remarks:O&M:Struct:Doc:Contin:%Clock 2:Clock 1:CCTV Defect :

0.00 AMH Manhole 0 0False 5646-221

0.00 MWL Miscellaneous Water Level 5 0 0False

4.30 CL Crack Longitudinal 9 2 0False

16.40 DAGS Deposits Attached Grease 5 7 5 S01 0 2False

41.80 JOM Joint Offset Medium 3 0False

92.90 TFC Tap Factory Capped 2 0 0False

168.40 JOM Joint Offset Medium 3 0False

173.30 DAGS Deposits Attached Grease 5 7 5 F01 0 2False

173.30 AMH Manhole 0 0False 5646-220 LINE LOOKED GOOD

10:32 AM

Alt Pipe ID: DownstreamSurvey Direction:10:33 am6/20/2023Inspected Date:25302

Distance: Remarks:O&M:Struct:Doc:Contin:%Clock 2:Clock 1:CCTV Defect :

0.00 AMH Manhole 0 0False 5646-222

0.00 MWL Miscellaneous Water Level 5 0 0False

1.80 FS Fracture Spiral 8 9 3 0False

8.70 HSV Hole Soil Visible 1 4 5 0False

7.60 FM Fracture Multiple 1 4 4 0False

20.30 HSV Hole Soil Visible 2 4 5 0False

20.30 CM Crack Multiple 2 4 3 0False

20.40 FM Fracture Multiple 2 4 4 0False

20.40 FC Fracture Circumferential 8 11 2 0False

22.30 JOM Joint Offset Medium 3 0False

39.30 JOM Joint Offset Medium 3 0False

63.30 FS Fracture Spiral 7 10 3 0False

63.90 B Broken 7 10 4 0False

86.00 DAGS Deposits Attached Grease 4 8 5 S01 0 2False

95.70 TFC Tap Factory Capped 2 0 0False

144.20 CC Crack Circumferential 4 5 1 0False

167.40 FM Fracture Multiple 7 4 4 0False

175.70 DAGS Deposits Attached Grease 4 8 5 F01 0 2False

175.70 AMH Manhole 0 0False 5646-221 LINE IN DECENT SHAPE COUPLE HSV SPOTS

BPAttach_468-2026-029581
Plans_1
Overview
Detail 1
Site 1A
Site 1B
Site 1C
Plans_2_video
5646-213_5646-212
5646-214_5646-213
5646-215_5646-214
5646-216_5646-215
5646-216_5646-217
5646-217_5646-218
5646-219_5646-218
5646-220_5646-219
5646-221_5646-220
5646-222_5646-221

File details come from the government source that posted it. Updated .