3-Bluffdale Public Works Building Solar Panel System.pdf
PDF 721 KB Posted
- Solicitation number
- COB26001G
- Issued by
- Salt Lake County, Utah
About this file
The documents are electrical construction plans and specifications for the Bluffdale Public Works facility located at 3301 W 13800 S, Bluffdale, UT 84065. The project involves a comprehensive electrical design for a new public works building, including main electrical distribution equipment, power distribution panels, site electrical infrastructure, and specialized electrical systems. The plans, dated 03/17/2023 with a project number 20030, are a permit set preparing for construction and include detailed one-line diagrams, power plans, panel schedules, and site electrical layouts.
The electrical design includes multiple transformers and switchboards with varying voltage configurations (480V/277V and 120/208V), a standby generator system rated at 450kW/563kVA, and provisions for future photovoltaic (PV) distribution equipment. The main electrical service is a 2000A, 277/480V switchboard with a utility meter, and the design incorporates automatic transfer switches for emergency and standby power systems. The electrical infrastructure supports various building systems including mechanical equipment, lighting, receptacles, exhaust fans, and specialized areas like a salt storage structure, vactor dump station, and future electric vehicle charging stations. The design emphasizes selective coordination of overcurrent protective devices and includes detailed load calculations and distribution board summaries for each panel.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
J J
J
J
J
J
J
J
J
D-TP
'T-P'
'LP'
AC85 AC85
AC85 AC85
AC85 AC85
SPLIT WIRE DUPLEX
SPLIT WIRE DUPLEX
SPLIT WIRE DUPLEX
SPACE ALLOCATED FOR
FUTURE PV DISTRIBUTION
EQUIPMENT
AF25
L5
LP- 1 LP- 1
LP- 1 LP- 1
LP- 1 LP- 1
LP-3
LP-5
WP
LP-7
LP-9
WP
LP-11
LP-13
WP
LP- 1
LP-15 LP-15
(TYP) S30
Y10
'GDS'
'EMS'
'MS'
FUTURE PV
EQUIPMENT
S5
NEW RMP PADVAUT
TRANSFORMER ES501
WP
6' - 7 1/2"
MIN. CLEARANCE
WP
ES501
S11
M
IN
C
L E
A R
A N
C E
AIR
INTAKE
VERTICLE
EXHAUST
S12
S13
S14
S15
WP
SL5-48
SL5-48
SL5-48
SL5-48
SL5-40
WP15
EH1- 1
WP15
EH1- 1
SL5-51,53
'MSD'
'SMS'
S7
S7
WP
FUTURE BRINE
STORAGE
SS-1,3
SS-1,3
S25
S25
PC15
SS- 5
SS-5
WPC
SS- 5
'SS'
'T-SS'
'D-TSS'
Y11
SINGLE RUN HEAT
TRACE (TYP)
AC85
S7
VACTOR DUMP
STRUCTURE
DISCONNECT
ES401
WP
S24
S8
S8
S8
CKT 3
CKT 1
CKT 2
Y11
SINGLE RUN HEAT
TRACE
AC85 AC85 AC85
AF25AF25
S8
WP
L5L5
BULK STORAGE
STRUCTURE DISCONNECTES401
SL4A- 28 SL4A- 28 SL4A- 28
SL4A- 28
(LCP2-4)
SL4A- 28
(LCP2-4)
SL4A-28
SL4A-17,19
SL4A-28
WP
S7
S6
S8
S8
S8 S8
S8
S8
S8
Y11
SINGLE RUN HEAT
TRACE
C K
T
O U
TL
E
T
C K
T
L
IG
H T
S
C K
T
H E
A T
T R
A C
E
N G
30 AMP
3-POLE
STRUCTURE
STEELEXTERNAL TO
RODS DRIVEN
2 GROUND
ENCASED
ELECTRODE
CONCRETE
1/2" CONDUIT WITH 1#6 CU.
1-1/4" CONDUIT WITH #6 CU. EACH
GROUNDING ELECTRODE CONDCUTOR
STRUCTURE
(TO T-SS)
A
A
A
EP701
TO EACH LOAD
O U
T
LE
T S
/L
IG
H
TS
S W
IT
C
H E
D L
T G
H E
A T
T R
A C
E G
30 AMP
4-POLE
STRUCTURE
STEELEXTERNAL TO
RODS DRIVEN
2 GROUND
ENCASED
ELECTRODE
CONCRETE
1/2" CONDUIT WITH 1#6 CU.
1-1/4" CONDUIT WITH #6 CU. EACH
GROUNDING ELECTRODE CONDCUTOR
STRUCTURE
H E
A T
T R
A C
E
S L4
A -2
S L4
A -1
S L4
A -1
S L4
A -2
(L
C P
2- 4)
N N
577 South 200 East
Salt Lake City, UT 84111
801.533.2100
123456
A
B
C
D
E
123456
DATE
PROJ#:
REVISION
COPYRIGHT
THESE PLANS ARE AN INSTRUMENT OF
SERVICE AND ARE THE PROPERTY OF
GALLOWAY, AND MAY NOT BE
DUPLICATED, DISCLOSED, OR
REPRODUCED WITHOUT THE WRITTEN
CONSENT OF GALLOWAY. COPYRIGHTS
AND INFRINGEMENTS WILL BE ENFORCED
AND PROSECUTED.
STAMP
3/
/2
3:
:0
P
M A u to d e s k D o c s /B
L C
.3
B lu ff d a le
P W
/2 -1
E
L E
C -C
E N
T R
A L V
.r v t
ES401
ENLARGED
SITE PLANS -
ELECTRICAL
03/17/2023
20030
PERMIT SET
B L
U F
F D
A L
E P
U B
L
IC
W O
R K
S
W
S
B L U
F F
D A
L E
U
T
SCALE 1/8" = 1'-0"ES401
1 ENLARGED COVERED PARKING (ADD A1 +. #1)
SCALE 1/8" = 1'-0"ES401
3 ENLARGED ELECTRICAL YARD
SITE GENERAL NOTES:
1. PROVIDE ALL REQUIRED BACKFILLING, ETC.
FOR ALL CONDUITS, PROVIDE REQUIRED
BACKFILL MATERIAL AS DIRECTED BY EACH
UTILITY.
2. COORDINATE ALL LOCATIONS AND ROUTING
WORK IN THE FIELD.
3. ROUTE CONDUITS A MINIMUM OF 2' BELOW THE
BUILDING FLOOR SLAB.
4. MINIMUM CONDUIT FOR SITE WORK SHALL BE
1".
5. CONDUIT ROUTING SHOWN IS SCHEMATIC AND
FOR CLARIFICATION COORDINATE LOCATION
WITH ALL AFFECTED TRADES.
6. PROVIDE A MINIMUM OF 12" SEPARATION
BETWEEN POWER AND COMMUNICATION
CONDUITS.
7. ALL CONDUITS THAT EXTEND THROUGH
CONCRETE SHALL BE GALVANIZED RIGID
CONDUIT AND WRAPPED WITH TWO (2) LAYERS
OF PVC TAPE.
8. ALL ELBOWS THAT ARE UNDER THE FINISHED
GRADE SHALL BE GALVANIZED RIGID CONDUIT
AND WRAPPED WITH TWO (2) LAYERS OF PVC
TAPE.
9. PROVIDE 1" C WITH (2) #8 AWG & (1) #8 AWG
GND FOR ALL SITE POLE LIGHTING CIRCUITING.
KEYED NOTES
L5 FLOOD LIGHT SHALL BE MOUNTED ON ROOF
STRUCTURE. SEAL ALL ROOF PENETRATIONS.
S5 STANDBY GENERATOR. REFER TO ONE-LINE
DIAGRAM AND SPECS FOR MORE INFORMATION.
GENERATOR HOUSING DIMENSIONS ARE BASED ON
600KW CUMMINS ENCLOSURE AND SKIT MOUNTED
24 HOUR FUEL TANK; 150" IN TOTAL HEIGHTS.
APPROVED ALTERNATE MANUFACTURER'S
GENERATORS SIZE SHALL BE ABLE TO FIT IN
ENCLOSURE WHILE PROVIDING THE REQUIRED
WORKING CLEARANCE. CONTRACTOR TO BE
RESPONSIBLE OF COSTS OF INCREASING
MASONRY ENCLOSURE SIZE FOR GENERATORS
LARGER THAN BASIS OF DESIGN. THE FUEL TANK
ACCESS SHALL BE LOCATED ON THE WEST SIDE OF
THE UNIT.
S6 PROVIDE 208V, 1Ø, 12 W/FT HEAT TRACE CABLE
AND LINE VOLTAGE SENSOR/RELAY WITH
INTEGRAL 30MA GFEP (HEATIZON #M516G, OR
APPROVED EQUIVALENT). PROVIDE 1-1/4" CONDUIT,
(2) #6 AWG, AND (1) #6 AWG GND.
S7 RUN HEAT TRACE DOWN DRAIN PIPE
APPROXIMATELY 18'. COORDINATE WITH
MECHANICAL CONTRACTOR FOR EXACT LENGTH
PRIOR TO RELEASE. REFER TO HEAT TRACE
DOWNSPOUT DETAIL ON ES501.
S8 TIE CIRCUIT THROUGH 4-POLE DISCONNECT.
S11 ARCHITECTURAL LOUVERS FOR GENERATOR
AIR-INTAKE. REFER TO ARCHITECTURAL DRAWINGS
FOR ADDITIONAL INFORMATION.
S12 PROVIDE 120V AC CIRCUIT FOR BATTERY CHARGER
PEC GENERATOR MANUFACTURE.
S13 PROVIDE CIRCUIT FOR GENERATOR ENGINE BLOCK
HEATER PER GENERATOR MANUFACTURER.
S14 PROVIDE DUPLEX OUTLET INSIDE GENERATOR
HOUSING.
S15 REFER TO ONE0LINE DIAGRAM FOR ADDITIONAL
INFORMATION AND REQUIREMENTS.
S24 PROVIDE 120V, 1Ø, 12 W/FT HEAT TRACE CABLE
AND LINE VOLTAGE SENSOR/RELAY WITH
INTEGRAL 30MA GFEP (HEATIZON #M515G, OR
APPROVED EQUIVALENT).
S25 PROVIDE 208V, 1Ø, 12 W/FT HEAT TRACE CABLE
AND LINE VOLTAGE SENSOR/RELAY (HEATIZON
#M516, OR APPROVED EQUIVALENT).
S30 PROVIDE 120V POWER FOR DRAIN PIPE HEAT
TRACE, PROVIDED BY OTHERS. COORDINATE
WORK WITH MECHANICAL.
Y10 RUN 1" CONDUIT TO SERVER 230 FOR FUTURE USE.
STUB UP NEAR ELECTRICAL EQUIPMENT, CAP OFF,
AND PROVIDE PULL STRING.
Y11 RUN 1" CONDUIT TO T.T.B. IN AREA C MEZZANINE
FOR FUTURE USE. STUB UP NEAR ELECTRICAL
EQUIPMENT AND CAP OFF AND PROVIDE PULL
STRING.
SITE GENERAL NOTES:
1. PROVIDE ALL REQUIRED BACKFILLING, ETC.
FOR ALL CONDUITS, PROVIDE REQUIRED
BACKFILL MATERIAL AS DIRECTED BY EACH
UTILITY.
2. COORDINATE ALL LOCATIONS AND ROUTING
WORK IN THE FIELD.
3. ROUTE CONDUITS A MINIMUM OF 2' BELOW THE
BUILDING FLOOR SLAB.
4. MINIMUM CONDUIT FOR SITE WORK SHALL BE
1".
5. CONDUIT ROUTING SHOWN IS SCHEMATIC AND
FOR CLARIFICATION COORDINATE LOCATION
WITH ALL AFFECTED TRADES.
6. PROVIDE A MINIMUM OF 12" SEPARATION
BETWEEN POWER AND COMMUNICATION
CONDUITS.
7. ALL CONDUITS THAT EXTEND THROUGH
CONCRETE SHALL BE GALVANIZED RIGID
CONDUIT AND WRAPPED WITH TWO (2) LAYERS
OF PVC TAPE.
8. ALL ELBOWS THAT ARE UNDER THE FINISHED
GRADE SHALL BE GALVANIZED RIGID CONDUIT
AND WRAPPED WITH TWO (2) LAYERS OF PVC
TAPE.
9. PROVIDE 1" C WITH (2) #8 AWG & (1) #8 AWG
GND FOR ALL SITE POLE LIGHTING CIRCUITING.
SCALE 1/16" = 1'-0"ES401
4 ENLARGED SALT STORAGE
SCALE 1/16" = 1'-0"ES401
2 ENLARGED VACTOR DUMP STATION
SCALE 1/16" = 1'-0"ES401
5 ENLARGED MATERIAL BULK STORAGE
SCALE: NTS
3-POLE FUSED DISCONNECT DETAIL
SCALE: NTS
4-POLE DISCONNECT DETAIL
AEcton Rectangle
AEcton Rectangle
B2
B1
B1
B1
B1
M
M M
M
F
M
M
F
M
M
T
M
M
M
M
M
M
T
J
J
J
B1
M
T
J J
JJJ
J J J
J
J
JJ
J J
J J
B3B3
B3
B3
J
J J
B3 B3
J J
J
J
B3
B3
B3
B3
T
T
M
T
T
MM
M
MM
4.8
4.3
3.7
2.8
2.2
F G H K L L.8 M N P
VESTIBULE
A A
A A
MENS RR
219HSK
MUD
ROOM
ELECTRICAL
LOCKERS
HALLWAY
WOMENS
RR
PPE
STORAGE
SCADA
SHOWER/
CHANGING
SINGLE
USER RR
ADA
SINGLE
USER RR
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
ADA
SHOWER/
CHANGING
STORAGE
STORAGE
COPY/
WORKROOM
PW
DIRECTOR
ADMIN
ASSIST.
205ADA
WOMENS
RR
TRAINING
ADA MENS
RR
VESTIBLE
BREAKROOM
MECH.
HALLWAY
LAUNDRY
EP102
EP102
EP1025 CLG
CLG
A A
SERVER
EP102
A
A
A
A
A
A
A
A
WP
EWC
WP
WP
EWC
WP
FC-A3
FC-A4
FC-A6
FC-A7
EH
FC-B1
FC-B2
EH
FC-B3
FC-B4
BC
B
FC-B8
FC-B7
FC-A8
FC-A9
FC-B5
FC-B6
CC-B9
A
SL3-37
SL1-21
SL1-19 SL1-19
SL1-21
SL1-19
SL1-19
SL1-19SL1-19
SL1-23
SL1-23
SL1-25
SL1-23
SL1-23
SL1-47
SL1-23
SL1-27
SL1-27
SL1-27
SL1-29
SL1-29
SL1-29
SL3-49
SL1-43
SL1-43
SL1-43
SL1-37 SL1-37
SL1-37
SL1-10
SL1-10
SL1-10
SL1-39
SL1-39 SL1-39 SL1-12
SL1-12
SL1-12
SL1-14
SL1-14
SL1-14
SL1-14
SL1-16
SL1-16SL1-16
SL1-16
SL1-18
SL1-18
SL1-18
SL1-18
SL1-20
SL1-20
SL1-20
SL1-20
SL1-22
SL1-22
SL1-22
SL1-24
SL1-24SL1-24
SL1-26
SL1-26
SL1-26
SL1-28 SL1-28 SL1-28
SL1-30
SL1-30
SL1-30
SL1-30
SL1-32
SL1-36 SL1-36
SL1-36
SL1-36
SL1-36
SL1-36
SL1-36
SL1-38
SL1-38
SL1-59
SL1-40
SL1-40
SL1-40
SL1-40
SL1-40
SL1-35
SL1-42S
L1
-4
SL1-42
SL1-44 SL1-44
SL1-46
SL1-46
SL1-46
SL1-46
SL1-46
L1 -5
SL1-31
SL1-31
SL1-31
SL1-31
SL1-23
SL1-21
P14
SL1-23
P14P15
P16
SL1-29
P14
+60"
P14
P14
P14
P18
SL1-37
SL1-39
SL1-41
SL1-48
SL1-48
SL1-50
L1 -3
3, SH1-2,4,6
BC
A
SL5-27,29
SL5-35,37
SL5-1,3,5
SL5-39,41
SL5-43,45
EF
SL1-45
(TYP)
SL1-2
P22
SL1-22
SL1-4
SL1-4
P21
(TYP)S
L1 -6
S L1
-6
S L1
-6
S L1
-6
S L1
-6
S L1
-6
P21
(TYP)
SL1-54
SL1-54
SL1-54 SL1-54
P21
(TYP)
SL1-54 SL1-54
SL1-59
SL1-54
SL1-54
SL1-49SL1-49
SL1-51
SL1-51
SL6-1
SL6-3
SL6-5
SL6-7
SL6-1
SL6-3
SL6-5
SL6-7
SL6-9
SL6-11
SL6-13
SL6-15
SL6-9
SL6-11
SL6-13
SL6-15
SL6-9
SL6-11
SL6-13
SL6-15
P35
SL1-56
SL1-43 P24 P24
PROJECTOR
SL1-49
SL1-51
SL1-53 SL1-53
SL5-31,33
EWC
SL1-25
A A A
FILE
STORAGE
STORAGE
SL1-34 SL1-34 SL1-34
(TYP)
P21
SL1-47
SL1-47
SL1-47
SL1-47
A
SL1-47
SL1-57
SL1-57 SL1-57
SL1-57
SL1-26
EF
EF-12
SL5-24
EP105
EF-14
EP105
SL5-28
A
L1-56
S L1
-5
S L1
-5
+60" +60"
2.8
2.2
F G
MECH.
WH
WS
SMP
B
SL1-8
SL1-8
SL1-52
L1-50
L1-48
L1-52
ATC PANEL
RCP
GUH-9
'SL5'
SL5-38
SL5-2,4
4.8
4.3
F G H
ELECTRICAL
228 'SMDPH'
'SH1'
'SL3'
'SL1'
'EH1'
'ATS-E'
'ATS-S'
SPACE ALLOCATED FOR
FUTURE PV DISTRIBUTION
EQUIPMENT
ACI-4
ACI-3
T-1
T-S1 P10
'L1'
'H1'
SL1-8
SL1-8
'MDPH'
'LCP1'
'SMDPL'
TO ACO-3-036 TO ACO-4-036
'SL6'
2.8 2.2 2 1
GFCI GFCI
SWITCH
SL1-1 SL1-3
SL1-5 SL1-7
SL1-13
SL1-15
SL1-11
SL1-17
EXHAUST FAN
EF-11 TOGGLE
SWITCH
14-50R
SL5-7,9
GFCI
GFCI GFCI
F G H
SERVER
'FACP'
'NAC'
'ANC'
'ACP-1'
'ACP-2'
'SL2'
L6-30R
L6-30R
L6-30R
'TMGB'
ACI-2
ACI-1
EC501
(TYP.)
SL1-8
SL2-1
SL2-3
SL2-5
SL2-7
SL2-9
SL2-11
SL2-10,12
SL2-13
SL2-2,4
SL2-24
SL2-6,8
SL2-26
SL2-28
SL2-30
P17P17
(TYP.)
SERVICE ENTRANCE CONDUITS
CONDUITS TO AREA C MEZZANINE
EC102
TO ACO-2-036TO ACO-1-036
577 South 200 East
Salt Lake City, UT 84111
801.533.2100
123456
A
B
C
D
E
123456
DATE
PROJ#:
REVISION
COPYRIGHT
THESE PLANS ARE AN INSTRUMENT OF
SERVICE AND ARE THE PROPERTY OF
GALLOWAY, AND MAY NOT BE
DUPLICATED, DISCLOSED, OR
REPRODUCED WITHOUT THE WRITTEN
CONSENT OF GALLOWAY. COPYRIGHTS
AND INFRINGEMENTS WILL BE ENFORCED
AND PROSECUTED.
STAMP
3/
/2
3:
:4
P
M A u to d e s k D o c s /B
L C
.3
B lu ff d a le
P W
/2 -1
E
L E
C -C
E N
T R
A L V
.r v t
EP102
AREA 'B' -
POWER PLAN
03/17/2023
20030
PERMIT SET
B L
U F
F D
A L
E P
U B
L
IC
W O
R K
S
W
S
B L U
F F
D A
L E
U
T
KEY PLAN
AREA 'C'
AREA 'B'AREA 'A'
SCALE 1/8" = 1'-0"EP102
1 AREA 'B' MAIN LEVEL - POWER PLAN
SCALE 1/4" = 1'-0"EP102
3 ENLARGED MECHANINCAL ROOM 223
SCALE 1/4" = 1'-0"EP102
2 ENLARGED ELECTRICAL ROOM 228
SCALE 1/4" = 1'-0"EP102
5 BREAKROOM 234 ELEVATION
SCALE 1/4" = 1'-0"EP102
4 ENLARGED SERVER ROOM 230
KEYED NOTES
P10 TRANSFORMER T-1 SHALL BE STACKED ON
TRANSFORMER T-S1. PROVIDE SEISMIC
SUPPORTS AS REQUIRED IN SPECIFICATIONS.
P14 PROVIDE POWER AND DATA AS SHOWN FOR TV.
COORDINATE EXACT HEIGHT AND LOCATION
WITH ET SHEETS AND ARCHITECT.
P15 PROVIDE POWER AND DATA AS SHOWN FOR A/V
CABINET. COORDINATE EXACT HEIGHT AND
LOCATION WITH ET SHEETS.
P16 PROVIDE POWER FOR MOTORIZED SCREEN.
P17 MOUNT OUTLETS IN THE BOTTOM CORNER OF
THE RACK. COORDINATE EXACT LOCATION WITH
BLUFFDALE CITY.
P18 PROVIDE OUTLET FOR OWNER RADIO SYSTEM.
COORDINATE EXACT LOCATION WITH BLUFFDALE
CITY.
P21 PROVIDE POWER FOR HARDWIRE AC
TRANSFORMERS PROVIDED WITH PLUMING
FIXTURE. COORDINATE REQUIRED CONNECTIONS
WITH PLUMBING.
P22 PRE-ACTION PANEL BY OTHERS.
P24 RUN 3/4" CONDUIT TO SHADES CONTROLLER.
COORDINATE EXACT LOCATION AND
REQUIREMENTS WITH SHADES PROVIDER.
P35 PROVIDE 120V POWER FOR SCUPPER DRAIN PIPE
HEAT TRACE, PROVIDED BY OTHERS.
COORDINATE WORK WITH MECHANICAL.
POWER GENERAL NOTES:
1. ALL 120V, 20AMP OUTLETS THAT ARE WITHIN 6'
OF ANY SINK SHALL BE GFCI.
2. THE DIVISION 26 CONTRACTOR SHALL
DETERMINE THE EXACT ROUTING OF ALL
CONDUITS IN THE FIELD. THIS PLAN
REPRESENTS A SCHEMATIC REPRESENTATION
OF DEVICE LOCATIONS AND CONDUIT RUNS.
3. DIMENSIONS OF ELECTRICAL EQUIPMENT IS
BASED ON SQUARE D. CONTRACTOR SHALL
CONFIRM THAT IF EQUIPMENT IS PROVIDED
FROM AN ALTERNATE APPROVED
MANUFACTURER, THE EQUIPMENT SHALL FIT IN
SPACES SHOWN WHILE PROVIDING NEC
REQUIRED CLEARANCES.
2 6/21/23 Addendum 02
3 11/30/23 ASI 002
8 4/22/24 RFI 67
12 10/17/24 RFI 113
LSI
350A 3P
LSI
225A 3P
LSI
800AF
3P
50A 3P
50A 3P
225A 3P
100A 4P
125A 3P
60A 3P
LSI
100A 3P
50A 3P
M
GND N
K
LSI
200A 3P
K
L S
I
A
P
100A
SPACE
250A
SPACE
GND N
100A
SPACE
100A
SPACE
Y
480V
120/208VT-P
PANEL
'LP'
GNDN
G
600A 3P
200A 3P
ATS-E
D-TP
ATS-S
M
1200A
SPACE
200AF
3P
M
Y
480V
120/208VT-S1
PANEL
'SH1'
GND N
PANEL
'SH2'
Y
480V
120/208VT-S2
PANEL
'SL4A'
PANEL
'EH1'
GND N
LSI
200AF
3P
LSI
800AF
3P
PANEL
'H1'
Y
480V
120/208VT-1
PANEL
'L1'
400A
SPACE
GND N
C
PANEL
'SL3'
PANEL
'SL2'
PANEL
'SL1'
Y
480V
120/208VT-SS
PANEL
'SL4B'
PANEL
'SS'
D-TSS
PANEL
'SL5'
800A 3P
1200A 3P
GND N
100A
SPACE
100A
SPACE
800AF
3P
800A 3P
PANEL
'SL6'
PANEL
'SLW'
LSI
150A 3P
LSI
100A 3P
LSI
200A 3P
LSI
225A 3P
LSI
100A 3P
LSI
150A 3P
GENERAL ONE-LINE NOTES:
1. THE ELECTRICAL CONTRACTOR SHALL VERIFY THE AVAILABLE FAULT CURRENT WITH THE OWNER
PRIOR TO BIDDING AND PROVIDE EQUIPMENT RATED ACCORDINGLY. SUBMIT FAULT CURRENT
CALCULATIONS WITH SHOP DRAWINGS SUBMITTAL.
2. PROVIDE FULL LENGTH VERTICAL BUSSING ALL IN ALL SWITCHBOARDS, DISTRIBUTION PANELBOARDS, AND PANELBOARDS.
3. COORDINATE SPACE WITH ALL OTHER TRADES TO MAINTAIN ALL CODE-REQUITED CLEARANCES.
4. PROVIDE PULL STRING IN ALL EMPTY AND SPARE CONDUITS.
SELECTIVE COORDINATION REQUIREMENTS:
A. CONTRACTOR SHALL PROVIDE ALL OF THE FOLLOWING FOR EMERGENCY, LEGALLY REQUIRED
STANDBY, OPTIONAL STANDBY, AND NORMAL POWER SYSTEMS:
a. FAULT CURRENT ANALYSIS.
b. ARC-FLASH STUDY.
c. SELECTIVE COORDINATION STUDY AND SETTINGS OF ALL ADJUSTABLE TRIP OVERCURRENT
PROTECTION DEVICES.
B. THE POWER SYSTEMS MUST BE SELECTIVELY COORDINATED (DOWN TO THE SMALLEST
OVERCURRENT PROTECTIVE DEVICE) TO THE FOLLOWING LEVELS:
a. EMERGENCY SYSTEM TO 0.1 SECONDS
b. OPTIONAL STANDBY SYSTEM TO 1 SECOND
c. NORMAL POWER SYSTEM TO EXTENT POSSIBLE
C. CONTRACTOR SHALL PROVIDE ELECTRONIC SOLID STATE ADJUSTABLE TRIP (LSI) CIRCUIT BREAKERS, AND/OR CIRCUIT BREAKERS WITH LARGER FRAME SIZES AS NECESSARY TO ENSURE PROPER
SELECTIVE COORDINATION. REFER TO SPECIFICATIONS FOR ADDITIONAL SELECTIVE COORDINATION
REQUIREMENTS ON EMERGENCY AND OPTIONAL STANDBY POWER SYSTEMS.
D. A PRELIMINARY SELECTIVE COORDINATION STUDY AND DEVICE SETTINGS SHALL BE SUBMITTED FOR
REVIEW AND APPROVAL. NO ELECTRICAL EQUIPMENT SUBMITTAL SHALL BE SUBMITTED FOR
APPROVAL PRIOR TO SUBMITTING THE PRELIMINARY SELECTIVE COORDINATION STUDY AND DEVICE
SETTINGS OF THE PROPOSED ELECTRICAL DISTRIBUTION EQUIPMENT AND ASSOCIATED
OVERCURRENT DEVICES. THE STUDY SHALL BE SUBMITTED FOR REVIEW BY THE ELECTRICAL
ENGINEER AND OWNER TO ENSURE CONFORMANCE TO THE CONSTRUCTION DOCUMENTS. NO
ELECTRICAL DISTRIBUTION EQUIPMENT SHALL BE RELEASED UNTIL THE SELECTIVE COORDINATION
STUDY SHOWS PROPER COORDINATION OF ALL SYSTEM ELEMENTS.
E. AT THE END OF THE PROJECT A COMPLETE FAULT CURRENT, ARC-FLASH, AND SELECTIVE
COORDINATION STUDY SHALL BE SUBMITTED FOR REVIEW. NO ARC FLASH LABELS SHALL BE APPLIED
TO ANY EQUIPMENT UNTIL THE STUDY IS REVIEWED AND ACCEPTED.
F. ONCE PRELIMINARY SELECTIVE COORDINATION STUDY IS COMPLETED, THE WITHSTAND RATING FOR THE AUTOMATIC TRANSFER SWITCHES (ATS) SHALL BE COORDINATED WITH THE SPECIFIC BREAKERS
FEEDING ATS THAT ARE PROVIDED.
G. CONTRACTOR SHALL ADJUST PROTECTIVE DEVICE SETTINGS ACCORDING TO RECOMMENDED
SETTINGS PROVIDED BY THE FINAL COORDINATION STUDY. FIELD ADJUSTMENTS SHALL BE
COMPLETED BEFORE THE PUNCH LIST WALKTHROUGH.
FEEDER GENERAL NOTES:
1. CONTRACTOR SHALL REVIEW ONE-LINE DIAGRAM AND CONFIRM FEEDER WIRE SIZES. ANY
DISCREPANCIES SHALL BE REPORTED TO THE ENGINEER PRIOR TO BID. IF DISCREPANCIES EXIST, CONTRACTOR SHALL PROVIDE CORRECT WIRE SIZE BASED ON ACTUAL BREAKER SIZE AND ANY
VOLTAGE DROP ADJUSTMENTS. SEE NEC 210.19, 215.2, 250.112, AND 310,15.
2. ALL GROUNDING WIRES SHOWN IN FEEDER SCHEDULE ARE COPPER WIRES.
3. ALL SYSTEM BONDING JUMPER CONDUCTORS SHOWN ARE TO BE RUN IN EACH PARALLEL FEEDER SET.
CONCRETE PAD-VAULT BY DIV 26
UTILITY TRANSFORMER BY RMP
MAIN/METER SERVICE SWITCHBOARD 'MS'
(277/480V, 3Ø, 4W, 2000A, 18K AIC)
NEMA 3R
(1) 6" C. BY DIV 26,
PRIMARY CONDUCTORS BY RMP
INCOMING MEDIUM VOLTAGE
SERVICE CABLE
BY RMP
PARTABLE GENERATOR DOCKING STATION 'GDS'
277/480V, 3PH, 4W, 200A
35K AIC, NEMA 3R
MECHANICAL LUGS
MALE CAM LOCK
PHASE ROTATION
MONITOR
FEMALE CAM LOCK(5) 4" C. BY DIV 26,
SECONDARY
CONDUCTORS BY RMP
(FUTURE
AUX
BLDG.)
(FUTURE
AUX
BLDG.)
LSIG
EPO
450KW/563KVA
GENERATOR
277/480V, 3Ø, 4W
EPO
ANN
BMS
TO EACH ATS
1-1/4" CONDUIT WITH
MANUFACTURER
RECOMMENDED CABLES.
LSI LSI
ELECTRICAL YARD
MAIN BUILDINGCOVERED PARKING
P2
P3
FUTURE PV DISTRIBUTION SYSTEM DISCONNECT
AND MAIN SWITCHBOARD
(FUTURE PV
SYSTEM)
TO SPACE FOR FUTURE
AUXILARY BUILDING
MAIN EMERGENCY SWITCHBOARD 'EMS'
(277/480V, 3Ø, 4W, 200A, 65K AIC)
NEMA 3R
LSI
A100 4S
INTEGRAL
CLASS 'B'
SPD
MAIN STAND-BY SWITCHBOARD 'SMDPH'
(277/480V, 3Ø, 4W, 600A, 14K AIC)
NEMA 1
A800 4T
A225 4T
A225
4VD
PROVIDSIONS FOR:
(1) 225A-3P
(2) 100A-3P
A350 3S
A125 3S
P2
P3
FUTURE PV DISTRIBUTION SYSTEM
FUTURE PV
DISTRIBUTION SYSTEM
A500 4S
A800
4VD
A600 4S
C50 3S
A100 4S
A200 4S
A200 4S
(3) 3 1/2" C.(1) 3" C.
(1) 3" C.
C50 3S
A100 4T
MAIN SWITCHBOARD 'MDPH'
(277/480V, 3Ø, 4W, 800A, 14K AIC, NEMA 1)
A225 4S
A125 3S
A300 4T
(ADD ALT. #1)
'IBT-PW'
P11
EP501
EP501
EP501
A100 4S
A500 4S
SWITCHBOARD 'SMDPL'
(120/208V, 3Ø, 4W, 800A, 10K AIC)
NEMA 1
P19 J
P13
A200 4S
A100 4S
A150 4S
C30
3VD
EP501
VACTOR DUMP
STRUCTURE
DISCONNECTES401
SALT/BRINE
STORAGE
STRUCTURE
C30 3S
C50 4T
C30 4T
CU
216B
A225 4S
PRIME MOVER SHUTDOWN PUSH
BUTTON (AS REQUIRED PER NEC
445.18 (A)(B)) MOUNTED EXTERNALLY
ON THE GENERATOR ENCLOUSRE
1-1/4' C W/ #3/0
#400 SBJ
SPD
CAT C
PULL /CT SECTION, METER, AND
MAIN SERVICE DISCONNECT 'MSD'
(277/480V, 3Ø, 4W, 2000A, 25K AIC)
NEMA 3R
NEMA 3R METER SOCKET
BY DIV 26, METERING
EQUIPMENT BY RMP
P1
(FUTURE
AUX
BLDG.)
MAIN STAND-BY SWITCHBOARD 'SMS'
(277/480V, 3Ø, 4W, 800A, 65K AIC)
NEMA 3R
LSI
A500 4S
A100 4S
INTEGRAL
CLASS 'B'
SPD
1-1/4' C W/ #3/0
TO SPACE FOR FUTURE
AUXILARY BUILDING 'IBT-AX'
TO SPACE FOR FUTURE
AUXILARY BUILDING 'IBT-AX'
1-1/4" C. 1-1/4" C.
LSIG
LSIG
(4) 3 1/2" C.
P23
P23
P23
PROVIDSIONS FOR:
(2) 100A-3P
SHUNT-TRIP
(1) 3" C.
TO SPACE FOR FUTURE
AUXILARY BUILDING
(1) 2" C. (1) 2" C.
TO SPACE FOR FUTURE
AUXILARY BUILDING
TO SPACE FOR FUTURE
AUXILARY BUILDING
AC
PROVISIONS
FOR:
(2) 100A-3P
A100 4S
A150 4S
(WELDER
PANEL)
ERMS
500AT 100AT
500AT 100AT
CU
216A
577 South 200 East
Salt Lake City, UT 84111
801.533.2100
123456
A
B
C
D
E
123456
DATE
PROJ#:
REVISION
COPYRIGHT
THESE PLANS ARE AN INSTRUMENT OF
SERVICE AND ARE THE PROPERTY OF
GALLOWAY, AND MAY NOT BE
DUPLICATED, DISCLOSED, OR
REPRODUCED WITHOUT THE WRITTEN
CONSENT OF GALLOWAY. COPYRIGHTS
AND INFRINGEMENTS WILL BE ENFORCED
AND PROSECUTED.
STAMP
3/
/2
3:
:5
P
M A u to d e s k D o c s /B
L C
.3
B lu ff d a le
P W
/2 -1
E
L E
C -C
E N
T R
A L V
.r v t
EP701
POWER
ONE-LINE
DIAGRAM
03/17/2023
20030
PERMIT SET
B L
U F
F D
A L
E P
U B
L
IC
W O
R K
S
W
S
B L U
F F
D A
L E
U
T
FEEDER SCHEDULE
FEEDER
# OF
SETS
CONDUIT
DIAMETER
(INCH)
CONDUCTOR
EQ GND
COND
ISOLATED
GROUND
SYSTEM
BONDING
JUMPER# SIZE
A100 4S 1 2 4 1/0 8 - -
A100 4T 1 2 4 1/0 - - 6
A125 3S 1 2 3 2/0 6 - -
A150 4S 1 2 4 3/0 6 - -
A175 3S 1 2 3 4/0 6 - -
A200 4S 1 2-1/2 4 250 6 - -
A225 4S 1 3 4 300 4 - -
A225 4T 1 3-1/2 4 350 - - 2
A225 4VD 1 3-1/2 4 350 3 - -
A300 4T 1 4 4 600 - - 1/0
A350 3S 2 2-1/2 3 250 3 - -
A400 4S 2 2-1/2 4 250 3 - -
A500 4S 2 3 4 350 2 - -
A600 4S 3 2-1/2 4 250 1 - -
A800 4T 3 3 4 350 - - 3/0
A800 4VD 4 3 4 300 2/0 - -
C30 3S 1 3/4 3 10 10 - -
C30 3VD 1 1-1/4 3 6 6 - -
C30 4T 1 3/4 4 10 - - 8
C50 3S 1 1 3 6 10 - -
C50 4T 1 1 4 6 - - 8
SCALE: NTS
POWER ONE-LINE DIAGRAM
KEYED NOTES
P1 PROVIDE PERMANENT LABEL ON MAIN SERVICE EQUIPMENT. LABEL SHALL READ
"MAXIMUM CALCULATED FAULT CURRENT OF ________ A CALCULATED ON __/__/__".
CALCULATED FAULT CURRENT TO BE PROVIDED BY ELECTRICAL CONTRACTOR.
P2 PROVIDE BACNET COMPATIBLE DIGITAL METER.
P3 1" CONDUIT WITH CAT6 CABLE TO MDF. PROVIDE SURGE SUPPRESSION ON BOTH
ENDS OF CAT6 CABLES.
P11 EXTERNAL GROUND BUS BAR 'IBT' PER NEC 250.94 MOUNTED IN A NEMA 3R
ENCLOSURE NEXT TO "MS".
P13 PROVIDE 1-GANG JUNCTION BOX FOR FUTURE FUEL ISLAND EPO. RUN 3/4" CONDUIT
TO PANEL 'SMDPL'. REFER TO EP701 FOR ADDITIONAL INFORMATION.
P19 PROVIDE 3" CONDUIT FROM PANEL 'SL1B' FOR FUTURE FUEL ISLAND PANEL. STUB
CONDUIT AT LOCATION SHOWN ON SHEET ES101. CAP OFF CONDUIT AND PROVIDE
PULL-STRING.
P23 COORDINATE EXACT BREAKER SIZE REQUIRED WITH SPD MANUFACTURER.
AEcton Rectangle
AEcton Rectangle
AEcton Rectangle
AEcton Rectangle
AEcton Rectangle
AEcton Rectangle
AEcton Rectangle
AEcton Rectangle
AEcton Rectangle
AEcton Rectangle
AEcton Rectangle
AEcton Rectangle
AEcton Rectangle
577 South 200 East
Salt Lake City, UT 84111
801.533.2100
123456
A
B
C
D
E
123456
DATE
PROJ#:
REVISION
COPYRIGHT
THESE PLANS ARE AN INSTRUMENT OF
SERVICE AND ARE THE PROPERTY OF
GALLOWAY, AND MAY NOT BE
DUPLICATED, DISCLOSED, OR
REPRODUCED WITHOUT THE WRITTEN
CONSENT OF GALLOWAY. COPYRIGHTS
AND INFRINGEMENTS WILL BE ENFORCED
AND PROSECUTED.
STAMP
3/
/2
3:
:5
P
M A u to d e s k D o c s /B
L C
.3
B lu ff d a le
P W
/2 -1
E
L E
C -C
E N
T R
A L V
.r v t
EP801
PANEL
SCHEDULES
03/17/2023
20030
PERMIT SET
B L
U F
F D
A L
E P
U B
L
IC
W O
R K
S
W
S
B L U
F F
D A
L E
U
T
PANELBOARD SCHEDULE KEYED NOTE:
1. PROVIDE CLASS A GROUND FAULT INTERRUPTER TYPE CIRCUIT BREAKER.
2. PROVIDE ARC FAULT CIRCUIT INTERRUPTER TYPE CIRCUIT BREAKER
3. PROVIDE 30 MILLIAMPERE EQUIPMENT GROUND FAULT PROTECTOR TYE CIRCUIT BREAKER.
4. PROVIDE SHUNT TRIP CIRCUIT BREAKER WITH 120 V COIL.
5. PROVIDE HACR RATED CIRCUIT BREAKER.
6. PROVIDE HANDLE CLAMP FOR HOLDING CIRCUIT BREAKER IN THE "ON" OR "OFF" POSITION.
7. PROVIDE SWITCHING RATED CIRCUIT BREAKER.
8. PROVIDE NEW CIRCUIT BREAKER IN EXISTING PANELBOARD (WHERE PANEL IS LOCATED AS EXISTING) OF SAME MANUFACTURER AND A.I.C. RATING AS EXISTING.
9. EXISTING LOAD
PANEL LEGEND
MS HMDP SMDPH
H1 L1 LP
EH1 SL6 SS
KEYED NOTES:
TOTAL ESTIMATED DEMAND CURRENT: 646 A
TOTAL CONNECTED CURRENT: 677 A
TOTAL ESTIMATED DEMAND LOAD: 537315 VA
25% OF LARGEST MOTOR:
TOTAL CONNECTED LOAD: 562500 VA
DISTRIBUTION BOARD TOTALS
O Other 0 VA 0.00% 0 VA K Kitchen 9400 VA 65.00% 6110 VA M Motor 261202 VA 102.63% 268061 VA E Equipment 92903 VA 100.00% 92903 VA
C Continuous 48920 VA 125.00% 61150 VA L Lighting 18216 VA 125.00% 22770 VA R Receptacle 73620 VA 56.79% 41810 VA P Panel 0 VA 0.00% 0 VA
TYPE LOAD CLASSIFICAITON CONNECTED LOAD DEMAND FACTOR ESTIMATED DEMAND
TOTAL CONNECTED CURRENT: 699 A 697 A 648 A
TOTAL CONNECTED LOAD: 191845 VA 191245 VA 179410 VA
9 -SPACE ONLY- -- -- -- --
8 CU-B1 UNIT - AREA 'A' MEZZININE 9.15 kVA 9.15 kVA 9.15 kVA 33 A
7 ATS-E 0.51 kVA 3.03 kVA 0.69 kVA 5 A
6 ATS-S 111.03 kVA 107.82 kVA 97.59 kVA 381 A
5 AC-1 - COMPRESSOR-1 118-1 7.48 kVA 7.48 kVA 7.48 kVA 27 A
4 CU-A1 UNIT - AREA 'A' MEZZININE 9.15 kVA 9.15 kVA 9.15 kVA 33 A
3 T-1 22.16 kVA 22.26 kVA 22.99 kVA 81 A
2 H1 32.37 kVA 32.37 kVA 32.37 kVA 117 A
1 SPD 0 kVA 0 kVA 0 kVA --
CKT# LOAD DESCRIPTION A B C
LOAD
AMP
KEYED
NOTE
WIRES: 4
PHASE: 3
VOLTAGE: 480/277 Wye
BOARD NAME: MDPH
DISTRIBUTION BOARD LOAD SUMMARY
KEYED NOTES:
TOTAL ESTIMATED DEMAND CURRENT: 332 A
TOTAL CONNECTED CURRENT: 381 A
TOTAL ESTIMATED DEMAND LOAD: 275918 VA
25% OF LARGEST MOTOR:
TOTAL CONNECTED LOAD: 316435 VA
DISTRIBUTION BOARD TOTALS
O Other 0 VA 0.00% 0 VA K Kitchen 9400 VA 65.00% 6110 VA
M Motor 91516 VA 102.73% 94010 VA E Equipment 60931 VA 100.00% 60931 VA C Continuous 8920 VA 125.00% 11150 VA L Lighting 13988 VA 125.00% 17485 VA
R Receptacle 73440 VA 56.81% 41720 VA P Panel 0 VA 0.00% 0 VA
TYPE LOAD CLASSIFICAITON CONNECTED LOAD DEMAND FACTOR ESTIMATED DEMAND
TOTAL CONNECTED CURRENT: 407 A 395 A 352 A
TOTAL CONNECTED LOAD: 111030 VA 107819 VA 97587 VA
3 T-S1 89.36 kVA 86.76 kVA 84.05 kVA 313 A
2 SH2 13.1 kVA 12.94 kVA 8.1 kVA 41 A
1 SH1 8.58 kVA 8.12 kVA 5.44 kVA 27 A
CKT# LOAD DESCRIPTION A B C
LOAD
AMP
KEYED
NOTE
WIRES: 4
PHASE: 3
VOLTAGE: 480/277 Wye
BOARD NAME: SMDPH
DISTRIBUTION BOARD LOAD SUMMARY
O Other 0 VA 0.00% 0 VA
K Kitchen 0 VA 0.00% 0 VA
M Motor 72164 VA 107.78% 77776 VA Total Est. Demand Current: 124 A
E Equipment 24942 VA 100.00% 24942 VA Total Conn. Current: 117 A
C Continuous 0 VA 0.00% 0 VA Total Est. Demand: 102718 VA
L Lighting 0 VA 0.00% 0 VA 25% OF LARGEST MOTOR:
R Receptacle 0 VA 0.00% 0 VA Total Conn. Load: 97106 VA
P Panel 0 VA 0.00% 0 VA
TYPE LOAD CLASSIFICATION CONNECTED LOAD DEMAND FACTOR ESTIMATED DEMAND PANEL TOTALS
TOTAL CONNECTED CURRENT PER PHASE (AMPS) 117 A 117 A 117 A
TOTAL CONNECTED LOAD PER PHASE (VA) 32369 VA 32369 VA 32369 VA
-SPACE ONLY- -- 1 -- 41 -- -- 42 -- 1 -- -SPACE ONLY-
-SPACE ONLY- -- 1 -- 39 -- -- 40 -- 1 -- -SPACE ONLY-
-SPACE ONLY- -- 1 -- 37 -- -- 38 -- 1 -- -SPACE ONLY-
-SPACE ONLY- -- 1 -- 35 -- 831 VA 36 -- -- -- -- --
-SPACE ONLY- -- 1 -- 33 -- 831 VA 34 -- -- -- -- --
-SPACE ONLY- -- 1 -- 31 -- 831 VA 32 M 3 20 A EF-6
-- -- -- -- -- 29 4157 VA 1663 VA 30 -- -- -- -- --
-- -- -- -- -- 27 4157 VA 1663 VA 28 -- -- -- -- --
PW-1 - WASH EQUIPMENT RM 25 A 3 M 25 4157 VA 1663 VA 26 M 3 20 A EF-3,5
-- -- -- -- -- 23 4157 VA 7482 VA 24 -- -- -- -- --
-- -- -- -- -- 21 4157 VA 7482 VA 22 -- -- -- -- --
PW-1 - WASH EQUIPMENT RM 25 A 3 M 19 4157 VA 7482 VA 20 M 3 60 A UCS-1 - WASH EQUIPMENT RM
-- -- -- -- -- 17 2356 VA 693 VA 18 -- -- -- -- --
-- -- -- -- -- 15 2356 VA 693 VA 16 -- -- -- -- --
MAU-1 - ROOF AREA 'A' 15 A 3 M 13 2356 VA 693 VA 14 M 3 15 A MAU-5 UNIT - ROOF AREA 'C'
-- -- -- -- -- 11 693 VA 1330 VA 12 -- -- -- -- --
-- -- -- -- -- 9 693 VA 1330 VA 10 -- -- -- -- --
MAU-2 UNIT - ROOF AREA 'A ' 15 A 3 M 7 693 VA 1330 VA 8 M 3 15 A MAU-4 UNIT - ROOF AREA 'C'
-- -- -- -- -- 5 6651 VA 2356 VA 6 -- -- -- -- --
-- -- -- -- -- 3 6651 VA 2356 VA 4 -- -- -- -- --
CR-1 40 A 3 M 1 6651 VA 2356 VA 2 M 3 15 A MAU-3 UNIT - ROOF AREA 'C'
KEYED
NOTE CIRCUIT DESCRIPTION AMP POLE
Load Type
CKT
# A B C
CKT
Load Type POLE AMP CIRCUIT DESCRIPTION
KEYED
NOTE
BRANCH BREAKERS
Min. A.I.C. RATING: 14K BUS MATERIAL: AL
DOOR TYPE: DOOR-IN-DOOR WIRES: 4 MCB RATING: - ISOLATED GROUND: -
ENCLOSURE: NEMA 1 PHASE: 3 BUS RATING: 225 A NEUTRAL RATING: 100%
MOUNTING: SURFACE VOLTAGE: 480/277 Wye MAIN TYPE: MLO SPD: -
PANEL NAME: H1 LOCATION: ELECTRICAL 228 FEED FROM: MDPH
PANELBOARD SCHEDULE
O Other 0 VA 0.00% 0 VA
K Kitchen 0 VA 0.00% 0 VA
M Motor 0 VA 0.00% 0 VA Total Est. Demand Current: 31 A
E Equipment 0 VA 0.00% 0 VA Total Conn. Current: 30 A
C Continuous 1200 VA 125.00% 1500 VA Total Est. Demand: 11163 VA
L Lighting 530 VA 125.00% 663 VA 25% OF LARGEST MOTOR:
R Receptacle 9000 VA 100.00% 9000 VA Total Conn. Load: 10730 VA
P Panel 0 VA 0.00% 0 VA
TYPE LOAD CLASSIFICATION CONNECTED LOAD DEMAND FACTOR ESTIMATED DEMAND PANEL TOTALS
TOTAL CONNECTED CURRENT PER PHASE (AMPS) 30 A 36 A 25 A
TOTAL CONNECTED LOAD PER PHASE (VA) 3530 VA 4200 VA 3000 VA
-SPARE- 20 A 1 -- 17 0 VA 0 VA 18 -- 1 20 A -SPARE-
3 DRAIN PIPE HEAT TRACE 20 A 1 C 15 1200 VA 0 VA 16 -- 1 20 A -SPARE-
RCPT - COVERED PARKING 20 A 1 R 13 1500 VA 0 VA 14 -- 1 20 A -SPARE-
RCPT - COVERED PARKING 20 A 1 R 11 1500 VA 0 VA 12 -- 1 20 A -SPARE-
RCPT - COVERED PARKING 20 A 1 R 9 1500 VA 0 VA 10 -- 1 20 A -SPARE-
RCPT - COVERED PARKING 20 A 1 R 7 1500 VA 0 VA 8 -- 1 20 A -SPARE-
RCPT - COVERED PARKING 20 A 1 R 5 1500 VA 0 VA 6 -- 1 20 A -SPARE-
RCPT - COVERED PARKING 20 A 1 R 3 1500 VA 0 VA 4 -- 1 20 A -SPARE-
7 LTG - COVERED PARKING 20 A 1 L 1 530 VA 0 VA 2 -- 1 20 A -SPARE-
KEYED
NOTE CIRCUIT DESCRIPTION AMP POLE
Load Type
CKT
# A B C
CKT
Load Type POLE AMP CIRCUIT DESCRIPTION
KEYED
NOTE
BRANCH BREAKERS
Min. A.I.C. RATING: 10K BUS MATERIAL: AL
DOOR TYPE: DOOR-IN-DOOR WIRES: 4 MCB RATING: 100 A ISOLATED GROUND: -
ENCLOSURE: NEMA 1 PHASE: 3 BUS RATING: 100 A NEUTRAL RATING: 100%
MOUNTING: SURFACE VOLTAGE: 120/208 Wye MAIN TYPE: MCB SPD: -
PANEL NAME: LP LOCATION: FEED FROM: T-P
PANELBOARD SCHEDULE
KEYED NOTES:
TOTAL ESTIMATED DEMAND CURRENT: 654 A
TOTAL CONNECTED CURRENT: 689 A
TOTAL ESTIMATED DEMAND LOAD: 543978 VA
25% OF LARGEST MOTOR:
TOTAL CONNECTED LOAD: 573230 VA
DISTRIBUTION BOARD TOTALS
O Other 0 VA 0.00% 0 VA K Kitchen 9400 VA 65.00% 6110 VA
M Motor 261202 VA 102.63% 268061 VA E Equipment 92903 VA 100.00% 92903 VA C Continuous 50120 VA 125.00% 62650 VA L Lighting 18746 VA 125.00% 23432 VA
R Receptacle 82620 VA 56.05% 46310 VA P Panel 0 VA 0.00% 0 VA
TYPE LOAD CLASSIFICAITON CONNECTED LOAD DEMAND FACTOR ESTIMATED DEMAND
TOTAL CONNECTED CURRENT: 713 A 713 A 659 A
TOTAL CONNECTED LOAD: 195375 VA 195445 VA 182410 VA
7 -SPACE ONLY- -- --
6 -SPACE ONLY- -- --
5 -SPACE ONLY- -- --
4 MDPH 191.84 kVA 191.25 kVA 179.41 kVA 677 A
3 -SPACE ONLY- -- --
2 -SPACE ONLY- -- --
1 T-P 3.53 kVA 4.2 kVA 3 kVA 13 A
CKT# LOAD DESCRIPTION A B C
LOAD
AMP
KEYED
NOTE
WIRES: 4
PHASE: 3
VOLTAGE: 480/277 Wye
BOARD NAME: MS
DISTRIBUTION BOARD LOAD SUMMARY
KEYED NOTES:
TOTAL ESTIMATED DEMAND CURRENT: 621 A
TOTAL CONNECTED CURRENT: 722 A
TOTAL ESTIMATED DEMAND LOAD: 223654 VA
25% OF LARGEST MOTOR:
TOTAL CONNECTED LOAD: 260167 VA
DISTRIBUTION BOARD TOTALS
O Other 0 VA 0.00% 0 VA K Kitchen 9400 VA 65.00% 6110 VA
M Motor 75160 VA 102.39% 76954 VA E Equipment 58931 VA 100.00% 58931 VA C Continuous 4000 VA 125.00% 5000 VA L Lighting 1015 VA 125.00% 1269 VA
R Receptacle 61740 VA 58.10% 35870 VA P Panel 0 VA 0.00% 0 VA
TYPE LOAD CLASSIFICAITON CONNECTED LOAD DEMAND FACTOR ESTIMATED DEMAND
TOTAL CONNECTED CURRENT: 748 A 726 A 700 A
TOTAL CONNECTED LOAD: 89357 VA 86761 VA 84049 VA
7 SLW 16.64 kVA 16.64 kVA 16.64 kVA 139 A
6 (FUTURE FUEL ISLAND PANEL) 3.96 kVA 3.96 kVA 3.96 kVA 33 A
5 SL6 2.52 kVA 2.88 kVA 2.3 kVA 21 A
4 SL5 19.44 kVA 22 kVA 20.24 kVA 171 A
3 SL3 21.56 kVA 19.5 kVA 17.01 kVA 161 A
2 SL2 6.44 kVA 7.22 kVA 7.08 kVA 58 A
1 SL1 18.8 kVA 14.56 kVA 16.82 kVA 139 A
CKT# LOAD DESCRIPTION A B C
LOAD
AMP
KEYED
NOTE
WIRES: 4
PHASE: 3
VOLTAGE: 120/208 Wye
BOARD NAME: SMDPL
DISTRIBUTION BOARD LOAD SUMMARY
O Other 0 VA 0.00% 0 VA
K Kitchen 0 VA 0.00% 0 VA
M Motor 0 VA 0.00% 0 VA Total Est. Demand Current: 10 A
E Equipment 0 VA 0.00% 0 VA Total Conn. Current: 8 A
C Continuous 2640 VA 125.00% 3300 VA Total Est. Demand: 3688 VA
L Lighting 166 VA 125.00% 208 VA 25% OF LARGEST MOTOR:
R Receptacle 180 VA 100.00% 180 VA Total Conn. Load: 2986 VA
P Panel 0 VA 0.00% 0 VA
TYPE LOAD CLASSIFICATION CONNECTED LOAD DEMAND FACTOR ESTIMATED DEMAND PANEL TOTALS
TOTAL CONNECTED CURRENT PER PHASE (AMPS) 12 A 12 A 3 A
TOTAL CONNECTED LOAD PER PHASE (VA) 1320 VA 1320 VA 346 VA
-SPARE- 20 A 1 -- 11 0 VA -- 12 -- 1 -- -SPACE ONLY-
-SPARE- 20 A 1 -- 9 0 VA -- 10 -- 1 -- -SPACE ONLY-
-SPARE- 20 A 1 -- 7 0 VA -- 8 -- 1 -- -SPACE ONLY-
7 LIGHTING & OUTLET 20 A 1 L 5 346 VA -- 6 -- 1 -- -SPACE ONLY-
-- -- -- -- -- 3 1320 VA -- 4 -- 1 -- -SPACE ONLY-
3 HEAT TRACE - SALT STORAGE 20 A 2 C 1 1320 VA -- 2 -- 1 -- -SPACE ONLY-
KEYED
NOTE CIRCUIT DESCRIPTION AMP POLE
Load Type
CKT
# A B C
CKT
Load Type POLE AMP CIRCUIT DESCRIPTION
KEYED
NOTE
BRANCH BREAKERS
Min. A.I.C. RATING: 10K BUS MATERIAL: AL
DOOR TYPE: DOOR-IN-DOOR WIRES: 4 MCB RATING: 50 A ISOLATED GROUND: -
ENCLOSURE: NEMA 3R PHASE: 3 BUS RATING: 100 A NEUTRAL RATING: 100%
MOUNTING: SURFACE VOLTAGE: 120/208 Wye MAIN TYPE: MCB SPD: -
PANEL NAME: SS LOCATION: FEED FROM: T-SS
PANELBOARD SCHEDULE
O Other 0 VA 0.00% 0 VA
K Kitchen 0 VA 0.00% 0 VA
M Motor 20203 VA 102.94% 20797 VA Total Est. Demand Current: 217 A
E Equipment 7030 VA 100.00% 7030 VA Total Conn. Current: 187 A
C Continuous 40000 VA 125.00% 50000 VA Total Est. Demand: 78007 VA
L Lighting 0 VA 0.00% 0 VA 25% OF LARGEST MOTOR:
R Receptacle 180 VA 100.00% 180 VA Total Conn. Load: 67413 VA
P Panel 0 VA 0.00% 0 VA
TYPE LOAD CLASSIFICATION CONNECTED LOAD DEMAND FACTOR ESTIMATED DEMAND PANEL TOTALS
TOTAL CONNECTED CURRENT PER PHASE (AMPS) 185 A 186 A 192 A
TOTAL CONNECTED LOAD PER PHASE (VA) 22161 VA 22260 VA 22992 VA
-SPARE- 20 A 1 -- 71 0 VA 0 VA 72 -- 1 20 A -SPARE-
-SPARE- 20 A 1 -- 69 0 VA 0 VA 70 -- 1 20 A -SPARE-
-SPARE- 20 A 1 -- 67 0 VA 0 VA 68 -- 1 20 A -SPARE-
-SPARE- 20 A 1 -- 65 0 VA 0 VA 66 -- 1 20 A -SPARE-
-SPARE- 20 A 1 -- 63 0 VA 0 VA 64 -- 1 20 A -SPARE-
-SPARE- 20 A 1 -- 61 0 VA 450 VA 62 M 1 20 A EF-23
-SPACE ONLY- -- 1 -- 59 -- 450 VA 60 M 1 20 A EF-16A - ROOF AREA 'C'
-SPACE ONLY- -- 1 -- 57 -- 450 VA 58 M 1 20 A EF-4A - ROOF AREA 'A'
-SPACE ONLY- -- 1 -- 55 -- 180 VA 56 R 1 20 A WASHER - LAUNDRY 229 1
-SPACE ONLY- -- 1 -- 53 -- 1500 VA 54 R 1 20 A WASHER - LAUNDRY 229 1
-SPACE ONLY- -- 1 -- 51 -- 728 VA 52 M 1 20 A B-1 UNIT - MECHANICAL RM 233
-SPACE ONLY- -- 1 -- 49 -- 60 VA 50 M 1 20 A WS-1 UNIT - MECHANICAL RM...
-SPACE ONLY- -- 1 -- 47 -- 500 VA 48 M 1 20 A SMP-1 UNIT - MECHANICAL RM...
-SPACE ONLY- -- 1 -- 45 -- 180 VA 46 E 1 20 A JUNCTION BOX - WASH...
-SPACE ONLY- -- 1 -- 43 -- 864 VA 44 M 1 20 A EF-20 UNIT - ROOF AREA 'C'
-- -- -- -- -- 41 384 VA 864 VA 42 M 1 20 A EF-19 UNIT - ROOF AREA 'C'
-- -- -- -- -- 39 384 VA 696 VA 40 M 1 20 A EF-9 UNIT - ROOF AREA 'A'
MAU-6 15 A 3 M 37 384 VA 696 VA 38 M 1 15 A EF-8 UNIT - ROOF AREA 'A'
-- -- -- -- -- 35 2675 VA 528 VA 36 M 1 20 A HR-1
DRYER - LAUNDRY 229 30 A 2 E 33 2675 VA 1056 VA 34 M 1 20 A HR-1
-- -- -- -- -- 31 2500 VA 936 VA 32 M 1 20 A EF-2 UNIT - ROOF AREA 'A'
FUTURE EV CHARGERS 30 A 2 C 29 2500 VA 420 VA 30 -- -- -- -- --
-- -- -- -- -- 27 2500 VA 420 VA 28 -- -- -- -- --
FUTURE EV CHARGERS 30 A 2 C 25 2500 VA 420 VA 26 M 3 20 A EF-18 UNIT - ROOF AREA 'C'
-- -- -- -- -- 23 2500 VA 793 VA 24 -- -- -- -- --
FUTURE EV CHARGERS 30 A 2 C 21 2500 VA 793 VA 22 -- -- -- -- --
-- -- -- -- -- 19 2500 VA 793 VA 20 M 3 20 A EF-17 UNIT - ROOF AREA 'C'
FUTURE EV CHARGERS 30 A 2 C 17 2500 VA 793 VA 18 -- -- -- -- --
-- -- -- -- -- 15 2500 VA 793 VA 16 -- -- -- -- --
FUTURE EV CHARGERS 30 A 2 C 13 2500 VA 793 VA 14 M 3 20 A EF-16 UNIT - ROOF AREA 'C'
-- -- -- -- -- 11 2500 VA 793 VA 12 -- -- -- -- --
FUTURE EV CHARGERS 30 A 2 C 9 2500 VA 793 VA 10 -- -- -- -- --
-- -- -- -- -- 7 2500 VA 793 VA 8 M 3 20 A EF-7 UNIT - ROOF AREA 'A'
FUTURE EV CHARGERS 30 A 2 C 5 2500 VA 793 VA 6 -- -- -- -- --
-- -- -- -- -- 3 2500 VA 793 VA 4 -- -- -- -- --
FUTURE EV CHARGERS 30 A 2 C 1 2500 VA 793 VA 2 M 3 20 A EF-4 UNIT - ROOF AREA 'A'
KEYED
NOTE CIRCUIT DESCRIPTION AMP POLE
Load Type
CKT
# A B C
CKT
Load Type POLE AMP CIRCUIT DESCRIPTION
KEYED
NOTE
BRANCH BREAKERS
Min. A.I.C. RATING: 10K BUS MATERIAL: AL
DOOR TYPE: DOOR-IN-DOOR WIRES: 4 MCB RATING: 300 A ISOLATED GROUND: -
ENCLOSURE: NEMA 1 PHASE: 3 BUS RATING: 400 A NEUTRAL RATING: 100%
MOUNTING: SURFACE VOLTAGE: 120/208 Wye MAIN TYPE: MCB SPD: -
PANEL NAME: L1 LOCATION: ELECTRICAL 228 FEED FROM: T-1
PANELBOARD SCHEDULE
O Other 0 VA 0.00% 0 VA
K Kitchen 0 VA 0.00% 0 VA
M Motor 0 VA 0.00% 0 VA Total Est. Demand Current: 6 A
E Equipment 0 VA 0.00% 0 VA Total Conn. Current: 5 A
C Continuous 0 VA 0.00% 0 VA Total Est. Demand: 5285 VA
L Lighting 4228 VA 125.00% 5285 VA 25% OF LARGEST MOTOR:
R Receptacle 0 VA 0.00% 0 VA Total Conn. Load: 4228 VA
P Panel 0 VA 0.00% 0 VA
TYPE LOAD CLASSIFICATION CONNECTED LOAD DEMAND FACTOR ESTIMATED DEMAND PANEL TOTALS
TOTAL CONNECTED CURRENT PER PHASE (AMPS) 2 A 11 A 3 A
TOTAL CONNECTED LOAD PER PHASE (VA) 513 VA 3025 VA 690 VA
-SPARE- 20 A 1 -- 29 0 VA 0 VA 30 -- 1 20 A -SPARE-
-SPARE- 20 A 1 -- 27 0 VA 0 VA 28 -- 1 20 A -SPARE-
-SPARE- 20 A 1 -- 25 0 VA 0 VA 26 -- 1 20 A -SPARE-
-SPARE- 20 A 1 -- 23 0 VA 0 VA 24 -- 1 20 A -SPARE-
-SPARE- 20 A 1 -- 21 0 VA 0 VA 22 -- 1 20 A -SPARE-
-SPARE- 20 A 1 -- 19 0 VA 0 VA 20 -- 1 20 A -SPARE-
-SPARE- 20 A 1 -- 17 0 VA 0 VA 18 -- 1 20 A -SPARE-
-SPARE- 20 A 1 -- 15 0 VA 0 VA 16 -- 1 20 A -SPARE-
-SPARE- 20 A 1 -- 13 0 VA 0 VA 14 -- 1 20 A -SPARE-
-SPARE- 20 A 1 -- 11 0 VA 0 VA 12 -- 1 20 A -SPARE-
-SPARE- 20 A 1 -- 9 0 VA 0 VA 10 -- 1 20 A -SPARE-
-SPARE- 20 A 1 -- 7 0 VA 0 VA 8 -- 1 20 A -SPARE-
LTG - AREA A MEZZANINE... 20 A 1 L 5 690 VA 0 VA 6 -- 1 20 A -SPARE-
LTG - AREA A & B 20 A 1 L 3 3025 VA 0 VA 4 -- 1 20 A -SPARE-
LTG - EXTERIOR 20 A 1 L 1 513 VA 0 VA 2 -- 1 20 A -SPARE-
KEYED
NOTE CIRCUIT DESCRIPTION AMP POLE
Load Type
CKT
# A B C
CKT
Load Type POLE AMP CIRCUIT DESCRIPTION
KEYED
NOTE
BRANCH BREAKERS
Min. A.I.C. RATING: 10K BUS MATERIAL: AL
DOOR TYPE: DOOR-IN-DOOR WIRES: 4 MCB RATING: - ISOLATED GROUND: -
ENCLOSURE: NEMA 1 PHASE: 3 BUS RATING: 100 A NEUTRAL RATING: 100%
MOUNTING: SURFACE VOLTAGE: 480/277 Wye MAIN TYPE: MLO SPD: CAT A
PANEL NAME: EH1 LOCATION: ELECTRICAL 228 FEED FROM: ATS-E
PANELBOARD SCHEDULE
O Other 0 VA 0.00% 0 VA
K Kitchen 0 VA 0.00% 0 VA
M Motor 0 VA 0.00% 0 VA Total Est. Demand Current: 21 A
E Equipment 500 VA 100.00% 500 VA Total Conn. Current: 21 A
C Continuous 0 VA 0.00% 0 VA Total Est. Demand: 7700 VA
L Lighting 0 VA 0.00% 0 VA 25% OF LARGEST MOTOR:
R Receptacle 7200 VA 100.00% 7200 VA Total Conn. Load: 7700 VA
P Panel 0 VA 0.00% 0 VA
TYPE LOAD CLASSIFICATION CONNECTED LOAD DEMAND FACTOR ESTIMATED DEMAND PANEL TOTALS
TOTAL CONNECTED CURRENT PER PHASE (AMPS) 21 A 24 A 19 A
TOTAL CONNECTED LOAD PER PHASE (VA) 2520 VA 2880 VA 2300 VA
-SPARE- 20 A 1 -- 41 0 VA -- 42 -- 1 -- -SPACE ONLY-
-SPARE- 20 A 1 -- 39 0 VA -- 40 -- 1 -- -SPACE ONLY-
-SPARE- 20 A 1 -- 37 0 VA -- 38 -- 1 -- -SPACE ONLY-
-SPARE- 20 A 1 -- 35 0 VA -- 36 -- 1 -- -SPACE ONLY-
-SPARE- 20 A 1 -- 33 0 VA -- 34 -- 1 -- -SPACE ONLY-
-SPARE- 20 A 1 -- 31 0 VA -- 32 -- 1 -- -SPACE ONLY-
-SPARE- 20 A 1 -- 29 0 VA -- 30 -- 1 -- -SPACE ONLY-
-SPARE- 20 A 1 -- 27 0 VA -- 28 -- 1 -- -SPACE ONLY-
-SPARE- 20 A 1 -- 25 0 VA -- 26 -- 1 -- -SPACE ONLY-
-SPARE- 20 A 1 -- 23 0 VA -- 24 -- 1 -- -SPACE ONLY-
-SPARE- 20 A 1 -- 21 0 VA -- 22 -- 1 -- -SPACE ONLY-
-SPARE- 20 A 1 -- 19 0 VA -- 20 -- 1 -- -SPACE ONLY-
SITE CCTV CAMERA 20 A 1 E 17 500 VA -- 18 -- 1 -- -SPACE ONLY-
FLOOR BOX - RROM 116 20 A 1 R 15 1080 VA -- 16 -- 1 -- -SPACE ONLY-
FLOOR BOX - RROM 116 20 A 1 R 13 1080 VA -- 14 -- 1 -- -SPACE ONLY-
FLOOR BOX - RROM 116 20 A 1 R 11 1080 VA -- 12 -- 1 -- -SPACE ONLY-
FLOOR BOX - RROM 116 20 A 1 R 9 1080 VA -- 10 -- 1 -- -SPACE ONLY-
FLOOR BOX - RROM 116 20 A 1 R 7 720 VA -- 8 -- 1 -- -SPACE ONLY-
FLOOR BOX - RROM 116 20 A 1 R 5 720 VA -- 6 -- 1 -- -SPACE ONLY-
FLOOR BOX - RROM 116 20 A 1 R 3 720 VA -- 4 -- 1 -- -SPACE ONLY-
FLOOR BOX - RROM 116 20 A 1 R 1 720 VA -- 2 -- 1 -- -SPACE ONLY-
KEYED
NOTE CIRCUIT DESCRIPTION AMP POLE
Load Type
CKT
# A B C
CKT
Load Type POLE AMP CIRCUIT DESCRIPTION
KEYED
NOTE
BRANCH BREAKERS
Min. A.I.C. RATING: 10K BUS MATERIAL: AL
DOOR TYPE: DOOR-IN-DOOR WIRES: 4 MCB RATING: - ISOLATED GROUND: -
ENCLOSURE: NEMA 1 PHASE: 3 BUS RATING: 100 A NEUTRAL RATING: 100%
MOUNTING: SURFACE VOLTAGE: 120/208 Wye MAIN TYPE: MLO SPD: -
PANEL NAME: SL6 LOCATION: ELECTRICAL 228 FEED FROM: SMDPL
PANELBOARD SCHEDULE
7 3/26/24 PR 04