3-Bid Schedule Towne Center Drive Paver Replacement.docx
DOCX document 23 KB Posted
- Attached to
- IFB - Towne Center Drive Paver Replacement
- Solicitation number
- 2026-017
- Issued by
- Salt Lake County, Utah
About this file
This is a bid schedule document for the City of South Jordan, Utah, for the Towne Center Drive Paver Replacement project. The base bid (Schedule A) encompasses the construction of exposed aggregate concrete work at Towne Center Drive, approximately 1600 West, South Jordan, with work to be completed between July 1, 2026 and July 30, 2026, with substantial completion required within 30 days of Notice to Proceed. Schedule A includes mobilization and demobilization, site preparation and traffic control, construction surveying and staking, materials and compaction testing, 56.2 linear feet of 6-inch concrete landscape curb for tree wells, 4,435 square feet of concrete sidewalk with exposed aggregate, 9 safety bollards, 6 truncated dome panels (2' x 4') for ADA pedestrian ramps, 25 cubic yards of topsoil, and plantings consisting of 14 three-gallon plants, 12 two-gallon plants, and 243 one-gallon plants. An alternative bid schedule (Schedule B) is available if budget allows and consists of demolition of concrete curb and gutter and replacement of 2-foot concrete curb and gutter for 69 linear feet. The City will award the contract to the low bidder of Schedule A, with Schedule B awarded only if sufficient budget remains.
All pricing is to be submitted as lump sum amounts for mobilization and site preparation items and unit prices for individual items, with bidders required to calculate total estimated prices for each schedule. The City staff will be responsible for site preparation and furnishing and installation of untreated base course. Contractors must examine all RFB documents carefully and comply with all local, city, state, and federal standards, codes, and specifications. Bids must be submitted online through Bonfire, the State of Utah's Procurement website, by the closing date and time specified. The City will review the low bid to ensure it reflects market prices.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 1-Bid Documents Towne Center Drive Paver Replacement.pdf | ||
| 2-Plans Towne Center Drive Paver Replacement.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BID SCHEDULES
Base Bid: The sum of the following Schedule A constitutes the base bid.
Schedule A: TOWNE CENTER DRIVE – PAVERS REPLACEMENT PROJECT
Item No.
Item
Unit
| Estimated Quantity |
| Unit Price |
| Total Estimated Price |
| A-1 |
| Mobilization, Temp Facilities, De- Mobilization |
| LUMP |
| 1 |
| $ |
| $ |
| A-2 |
| Site Preparation, Traffic Control, LDP & SWPPP |
| LUMP |
| 1 |
| $ |
| $ |
| A-3 |
| Construction Surveying & Staking |
| LUMP |
| 1 |
| $ |
| $ |
| A-4 |
| Materials and Compaction Testing |
| LUMP |
| 1 |
| $ |
| $ |
| A-5 |
| 6-in Concrete Landscape Curb (Tree Wells) |
| LF |
| 56.2 |
| $ |
| $ |
| A-6 |
| Concrete Sidewalk (exposed aggregate) |
| SF |
| 4,435 |
| $ |
| $ |
| A-7 |
| Safety Bollards |
| EA |
| 9 |
| $ |
| $ |
| A-8 |
| Truncated Dome Panels (2’ x 4’) for ADA Ped Ramps |
| EA |
| 6 |
| $ |
| $ |
| A-9 |
| Top Soil |
| CY |
| 25 |
| $ |
| $ |
| A-10 |
| 3-gal Plant |
| EA |
| 14 |
| $ |
| $ |
| A-11 |
| 2-gal Plant |
| EA |
| 12 |
| $ |
| $ |
| A-12 |
| 1-gal Plant |
| EA |
| 243 |
| $ |
| $ |
BASE BID - SCHEDULE A - TOTAL = $ ______________
Bid Alternative Schedule B Items
Item No.
Item
Unit
| Estimated Quantity |
| Unit Price |
| Total Estimated Price |
| B-1 |
| Demolition of Concrete Curb & Gutter |
| LUMP |
| 1 |
| $ |
| $ |
| B-2 |
| Replace 2-ft Concrete Curb & Gutter |
| LF |
| 69 |
| $ |
| $ |
BID ALTERNATIVE - SCHEDULE B TOTAL = $
File details come from the government source that posted it. Updated .