3-ATTACHMENT No. 7 REQ-0006631 - BOOK 2 OF 3 - SPECIFICATIONS FINAL 2.24.26.pdf

PDF 34 MB Posted

Attached to
Newburgh Road Booster Pumping Station Improvements
Solicitation number
REQ- 0006631
Issued by
Wayne County, Michigan

About this file

This is a construction specifications document (Book 2 of 3) issued by the Great Lakes Water Authority (GLWA) for the Newburgh Road Booster Pumping Station Improvements project in Michigan. The project encompasses the design and construction of a new 52-million gallon per day (MGD) booster pumping station with associated yard piping, site work, and civil infrastructure, along with the demolition of the existing booster pumping station located at 36363 West 8 Mile Road in Livonia, Michigan. The work includes site clearing, excavation, concrete construction, structural steel installation, mechanical systems including centrifugal pumps and process piping, HVAC systems, plumbing and sanitary facilities, electrical systems with standby generator capability, instrumentation and control systems, security equipment, and comprehensive commissioning and testing. The contract is designated CIP132015 and was issued for bid in December 2025 for construction to commence upon notice to proceed, with contract provisions establishing specific work restrictions limiting construction to Monday through Friday between 7:00 a.m. and 3:30 p.m. eastern standard time, excluding GLWA observed holidays. The project requires coordination with GLWA's existing operations, with multiple facility shutdowns necessary for tie-ins to the 42-inch water transmission main, and includes a 35-day maximum duration for critical piping connections and thrust block installation.

The specifications establish comprehensive quality assurance and quality control requirements, detailed submittal procedures including shop drawings and product data for all materials and equipment, and phased construction sequencing designed to minimize disruption to GLWA's continuous water operations. Contractor responsibilities include mobilization and demobilization, temporary utilities and facilities, environmental controls including erosion and sediment management, traffic control along 8 Mile Road, asset data turnover with detailed preventative maintenance procedures, operations and maintenance manuals, training of Owner personnel, and comprehensive final documentation including record drawings and laser scanning. The contract includes multiple allowance items totaling approximately $5.575 million for line stop installation ($300,000), piping bypass around WAMR LV-12 ($350,000), Emerson Ovation/SCADA equipment ($830,000 cash allowance), DA Central security systems for new facility ($325,000) and existing facility ($75,000), Schneider Electric power monitoring integration ($25,000), DTE equipment and services ($200,000), and a general contingency allowance ($3.3 million). Payment procedures require monthly applications with sworn statements, documentation of stored materials, quality testing reports, and progressive billing tied to specific milestones including delivery, installation, performance acceptance testing, demonstration and training completion, and system acceptance testing, with retainage provisions and asset turnover completion required before final payment authorization.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Great Lakes Water Authority Water Supply Operations

Design Specifications for

NEWBURGH ROAD BOOSTER PUMPING

STATION IMPROVEMENTS

REQUISITION NO. 0006631

SCN - ____________

BOOK 2 OF 3 - SPECIFICATIONS

ISSUED FOR BID

December 2025 FEBRUARY 2026

This page intentionally left blank

CONTRACT NO. CIP132015

ISSUED FOR CONSTRUCTION

NEWBURGH ROAD BOOSTER

PUMPING STATION IMPROVEMENTS

GREAT LAKES WATER AUTHORITY

Great Lakes Water Authority

CONTRACT NO.

CONTRACT DOCUMENTS FOR

Newburgh Road Booster Pumping Station Improvements

November 2025

SEALS AND CERTIFICATIONS

ENGINEER: Brown & Caldwell, LLC, 100 West Big Beaver Rd., Suite 540, Troy, MI 48084.

Brett Farver, PE MI PE No. 6201063024

The seal and signature to the left applies to the following Specifications Divisions and Sections of this Project Manual:

- Division 01

- Division 02

- Division 10

- Division 40

- Division 41

- Division 43

James A. O'Neill, PE MI PE No. 6201069540

The seal and signature to the left applies to the following Specifications Divisions and Sections of this Project Manual:

- Division 31

- Division 32

- Division 33

Michael R. McReynolds, PE MI PE No. 6201065501

The seal and signature to the left applies to the following Specifications Divisions and Sections of this Project Manual:

- Division 13, Section 13 47 00

No.

LIC

E

N

SED

PROFESSIONAL ENG

IN

E E

R

STATE OF MICHIGAN

BRETT THOMAS

FARVER

6201063024

ENGINEER

December 2025

February 2026

Kihoon Park, PE MI PE No. 6201066836

The seal and signature to the left applies to the following Specifications Divisions and Sections of this Project Manual:

- Division 03

- Division 05

Toufik Bentahar, RA MI R A No. 1301043526

The seal and signature to the left applies to the following Specifications Divisions and Sections of this Project Manual:

- Division 04

- Division 06

- Division 07

- Division 08

- Division 09

Mike Breault, PE MI PE No. 6201069636

The seal and signature to the left applies to the following Specifications Divisions and Sections of this Project Manual:

- Division 22

- Division 23

Jared Telford, PE MI PE No. 6201311121

The seal and signature to the left applies to the following Specifications Divisions and Sections of this Project Manual:

- Division 26

- Division 28

Benjamin R. Galster, PE MI PE No. 6201067384

The seal and signature to the left applies to the following Specifications Divisions and Sections of this Project Manual:

- Division 27

- Division 40, Sections 40 06 20.13 to 40 79 00

Engineer’s seal and signature does not apply to the documents that comprise Division 00, Bidding and

Contracting Requirements.

It is a violation of applicable laws and regulations governing professional licensing and registration for any person, unless acting under the direction of the licensed and registered design professional(s) indicated above, to alter in any way the Specifications in this Project Manual.

END OF SEALS AND CERTIFICATIONS

CONTRACT NO. CIP132015 NEWBURGH ROAD BOOSTER

ISSUED FOR CONSTRUCTION PUMPING STATION IMPROVEMENTS

GREAT LAKES WATER AUTHORITY TABLE OF CONTENTS

00 01 10-1

TABLE OF CONTENTS

CONTRACT ORGANIZATION

ATTACHMENT 1: BOOK 1 OF 3 – CONSTRUCTION CONTRACT BETWEEN GLWA AND

CONTRACTOR

ATTACHMENT 2: BOOK 2 OF 3 – SPECIFICATIONS (THIS DOCUMENT)

APPENDIX A – HAZARDOUS MATERIALS REPORTS

APPENDIX B – GEOTECHNICAL EXPLORATION REPORT

ATTACHMENT 3: BOOK 3 OF 3 – DRAWINGS

ATTACHMENT 4: AS-BUILTS OF EXISTING NEWBURGH PUMPING STATION

ATTACHMENT 5: AS-BUILTS OF 42” WATER MAIN

ATTACHMENT 6: GLWA CS-12 AND CS-13

DIVISION 01 – GENERAL REQUIREMENTS

01 11 00 Summary of Work ........................................................................ 01 11 00-1 01 14 00 Work Restrictions ......................................................................... 01 14 00-1 01 14 16 Coordination with Owner’s Operations ....................................... 01 14 16-1 01 21 00 Allowances ................................................................................... 01 21 00-1 01 22 01 Measurement and Payment ........................................................ 01 22 01-1 01 25 00 Substitution Procedures .............................................................. 01 25 00-1 01 26 13 Request for Information Procedures ........................................... 01 26 13-1 01 29 73 Schedule of Values ....................................................................... 01 29 73-1 01 29 76 Progress Payment Procedures ..................................................... 01 29 76-1 01 31 13 Project Coordination .................................................................... 01 31 13-1 01 31 19.13 Pre-construction Conference .................................................. 01 31 19.13-1 01 31 19.23 Progress Meetings .................................................................. 01 31 19.23-1 01 31 26 Electronic Communication Protocols .......................................... 01 31 26-1 01 32 16.20 Construction Progress Schedule ............................................ 01 32 16.20-1 01 32 26 Construction Progress Reporting ................................................. 01 32 26-1 01 32 33 Photographic Documentation ..................................................... 01 32 33-1 01 32 36 NaVis Laser Scanning ................................................................... 01 32 36-1 01 32 37 Geospatial Data Requirements .................................................... 01 32 37-1 01 33 00 Submittal Procedures ................................................................... 01 33 00-1 01 33 30 Asset Turnover Process Requirements ....................................... 01 33 30-1 01 35 23 Owner’s Safety Requirements ..................................................... 01 35 23-1 01 35 53 Security ........................................................................................ 01 35 53-1 01 42 00 References ................................................................................... 01 42 00-1 01 42 13 Abbreviations and Acronyms ....................................................... 01 42 13-1 01 45 23 Testing and Inspection Services ................................................... 01 45 23-1 01 46 01 Quality Requirements .................................................................. 01 46 01-1 01 51 00 Temporary Utilities ...................................................................... 01 51 00-1

00 01 10-2

01 52 13 Field Offices and Sheds ................................................................ 01 52 13-1 01 55 00 Vehicular Access and Parking ...................................................... 01 55 00-1 01 55 26 Maintenance and Protection of Traffic ........................................ 01 55 26-1 01 57 00 Temporary Controls ..................................................................... 01 57 00-1 01 58 13 Temporary Project Signage .......................................................... 01 58 13-1 01 66 00 Product Storage and Handling ..................................................... 01 66 00-1 01 71 16 Acceptance of Conditions ............................................................ 01 71 16-1 01 71 23 Field Engineering ......................................................................... 01 71 23-1 01 71 33 Protection of Work and Property ............................................... 01 71 33-1 01 73 19 Installation .................................................................................. 01 71 19-1 01 73 24 Structural Components and Non-Building Structures .. .............. 01 73 24-1 01 73 29 Cutting and Patching .................................................................... 01 73 29-1 01 74 10 Cleaning and Disinfection of Potable Water Facilities……………….01 74 10-1 01 74 13 Progress Cleaning ......................................................................... 01 74 13-1 01 74 19 Construction Waste Management and Disposal ......................... 01 74 19-1 01 74 23 Final Cleaning ............................................................................... 01 74 23-1 01 75 11 Checkout and Startup Procedures ............................................... 01 75 11-1 01 77 19 Closeout Requirements ............................................................... 01 77 19-1 01 78 23 Operation and Maintenance Data .............................................. 01 78 23-1 01 78 36 Warranties ................................................................................... 01 78 36-1 01 78 39 Project Record Documents .......................................................... 01 78 39-1 01 78 40 OnBase Digital Document Turnover ............................................ 01 78 40-1 01 78 43 Spare Parts and Extra Materials ................................................... 01 78 43-1 01 79 13 Demonstration Testing ................................................................ 01 79 13-1 01 79 23 Instruction of Operation and Maintenance Personnel ................ 01 79 23-1 01 91 00 Commissioning ............................................................................ 01 91 00-1 01 91 23 General Testing and Commissioning Requirements .................... 01 91 23-1 01 99 90 Reference Forms .......................................................................... 01 99 00-1

DIVISION 02 – EXISTING CONDITIONS

02 01 20 Protecting Existing Underground Utilities (GLWA) ...................... 02 01 20-1 02 41 00 Demolition ................................................................................... 02 41 00-1 02 81 00 Universal and Hazardous Materials Remediation ...................... 02 81 00-1 02 82 00 Asbestos Remediation ................................................................ 02 82 00-1 02 84 00 Polychlorinated Biphenyl (PCB) Remediation ............................. 02 84 00-1

DIVISION 03 – CONCRETE

03 11 00 Concrete Forming ........................................................................ 03 11 00-1 03 15 00 Concrete Accessories ................................................................... 03 15 00-1 03 15 19 Anchorage to Concrete ................................................................ 03 15 19-1 03 20 00 Concrete Reinforcing ................................................................... 03 20 00-1

00 01 10-3

03 30 00 Cast-in-place Concrete ................................................................. 03 30 00-1 03 39 00 Concrete Curing and Finishing ..................................................... 03 39 00-1 03 41 00 Structural Precast Concrete ......................................................... 03 41 00-1 03 60 00 Grouting ....................................................................................... 03 60 00-1

DIVISION 04 – MASONRY

04 20 00 Unit Masonry ............................................................................... 04 20 00-1 04 23 00 Glass Unit Masonry ...................................................................... 04 23 00-1

DIVISION 05 – METALS

05 05 14 Hot-dip Galvanizing ...................................................................... 05 05 14-1 05 05 20 Anchor Bolts ................................................................................. 05 05 20-1 05 10 00 Structural Metal Framing ............................................................. 05 10 00-1 05 21 19 Open Web Steel Joist Framing ..................................................... 05 21 19-1 05 31 23 Steel Roof Decking ....................................................................... 05 31 23-1 05 50 00 Metal Fabrications ....................................................................... 05 50 00-1 05 51 00 Metal Stairs .................................................................................. 05 50 00-1 05 52 10 Aluminum Railings ....................................................................... 05 52 10-1 05 53 10 Metal Grating and Stair Treads .................................................... 05 53 10-1

DIVISION 06 – WOOD, PLASTICS AND COMPOSITES

06 10 00 Rough Carpentry .......................................................................... 06 10 00-1

DIVISION 07 – THERMAL AND MOISTURE PROTECTION

07 10 00 Damp Proofing and Waterproofing ............................................ 07 10 00-1 07 21 00 Building Insulation ....................................................................... 07 21 00-1 07 22 16 Roof Board Insulation .................................................................. 07 22 16-1 07 26 00 Vapor Retarders .......................................................................... 07 26 00-1 07 41 13 Metal Roof Panels ........................................................................ 07 41 13-1 07 62 00 Sheet Metal Flashing and Trim .................................................... 07 62 00-1 07 71 23 Manufactured Gutters and Downspouts …………………………………. 07 71 23-1 07 84 00 Firestopping ................................................................................. 07 84 00-1 07 91 26 Joint Fillers ................................................................................... 07 91 26-1 07 92 00 Joint Sealants ............................................................................... 07 92 00-1

00 01 10-4

DIVISION 08 – OPENINGS

08 11 13.13 Standard Hollow Metal Doors and Frames ............................. 08 11 13.13-1 08 31 20 Floor Access Doors …………………………………………………………………. 08 31 20-1 08 33 23 Overhead Coiling Doors ............................................................... 08 33 23-1 08 51 13 Aluminum Windows ………………………………………………………………. 08 51 13-1 08 71 00 Door Hardware ............................................................................ 08 71 00-1 08 81 00 Glazing .......................................................................................... 08 81 00-1 08 91 19 Fixed Louvers ............................................................................... 08 91 19-1

DIVISION 09 – FINISHES

09 30 16 Quarry Tile ……………………………………………………………………………… 09 30 16-1 09 51 13 Acoustical Panel Ceilings .............................................................. 09 51 13-1 09 61 53 Concrete Hardener ...................................................................... 09 61 53-1 09 84 13 Perforated Steel Sound Absorbing Panels ………………………..…….. 09 84 13-1 09 90 00 Painting and Coatings .................................................................. 09 90 00-1

DIVISION 10 – SPECIALTIES

10 11 00 Visual Display Units ..................................................................... 10 11 00-1 10 14 00 Signage ......................................................................................... 10 14 00-1 10 28 00 Toilet, Bath, and Laundry Accessories ......................................... 10 28 00-1 10 43 16 First Aid Cabinets ........................................................................ 10 43 16-1 10 44 00 Fire Protection Specialties ........................................................... 10 44 00-1

DIVISION 11 – EQUIPMENT (NOT USED)

DIVISION 12 – FURNISHINGS (NOT USED)

12 50 00 Furniture ...................................................................................... 12 50 00-1

DIVISION 13 – SPECIAL CONSTRUCTION

13 47 00 Insulating Flange .......................................................................... 13 47 00-1

DIVISION 14 – CONVEYING EQUIPMENT (NOT USED)

DIVISION 21 – FIRE SUPPRESSION (NOT USED)

DIVISION 22 – PLUMBING

22 05 00 Common Work Results for Plumbing........................................... 22 05 00-1 22 05 13 Common Motor Requirements .................................................... 22 05 13-1 22 05 19 Meters and Gages ........................................................................ 22 05 19-1

00 01 10-5

22 05 23 General Duty Valves for Plumbing Piping .................................... 22 05 23-1 22 05 29 Hangers and Supports .................................................................. 22 05 29-1 22 05 53 Identification for Plumbing Piping and Equipment ..................... 22 05 53-1 22 07 00 Plumbing Insulation ..................................................................... 22 07 00-1 22 11 16 Domestic Water Piping ................................................................ 22 11 16-1 22 11 19 Domestic Water Piping Specialties .............................................. 22 11 19-1 22 13 16 Sanitary Waste and Venting Pipe................................................. 22 13 16-1 22 13 19 Sanitary Waste Piping Specialties ................................................ 22 13 19-1 22 14 29 Sump Pumps ................................................................................ 22 14 29-1 22 15 13 General-Service Compressed-Air Piping ...................................... 22 15 13-1 22 16 16 Natural Gas Piping ........................................................................ 22 16 16-1 22 33 00 Electric, Domestic Water Heaters ................................................ 22 33 00-1 22 40 00 Plumbing Fixtures ........................................................................ 22 40 00-1 22 47 00 Drinking Fountains and Water Coolers ........................................ 22 05 19-1 22 61 19 Compressed-Air Equipment ......................................................... 22 61 19-1

DIVISION 23 – HEATING, VENTILATING AND AIR CONDITIONING

23 05 00 Common Work Results for HVAC ................................................. 23 05 00-1 23 05 13 Common Motor Requirements for HVAC Equipment ................. 23 05 13-1 23 05 14 Variable Frequency Motor Controllers for HVAC Equipment ...... 23 05 14-1 23 05 29 Hangers and Supports for HVAC Piping and Equipment ............. 23 05 29-1 23 05 53 Identification for HVAC ................................................................ 23 05 53-1 23 05 93 Testing, Adjusting, and Balancing for HVAC ................................ 23 05 93-1 23 07 00 HVAC Insulation .......................................................................... 23 07 00-1 23 09 23 Direct Digital Control Systems for HVAC ..................................... 23 09 23-1 23 23 00 Refrigerant Piping ........................................................................ 23 23 00-1 23 31 13 Metal Ductwork ........................................................................... 23 31 13-1 23 33 00 Air Duct Accessories ..................................................................... 23 33 00-1 23 34 23 HVAC Power Ventilators .............................................................. 23 34 23-1 23 37 13 Diffusers, Registers, and Grilles ................................................... 23 37 13-1 23 73 13 Modular Indoor Air-Handling Units ............................................. 23 73 13-1 23 81 27 Split-System Heat Pumps ............................................................. 23 81 27-1 23 82 39 Unit Heaters ................................................................................. 23 82 39-1

DIVISION 25 – INTEGRATED AUTOMATION (NOT USED)

DIVISION 26 – ELECTRICAL

26 05 00 Common Work Results for Electrical .......................................... 26 05 00-1 26 05 05 Selective Demolition for Electrical .............................................. 26 05 05-1 26 05 13 Medium Voltage Cables .............................................................. 26 05 13-1

00 01 10-6

26 05 19 Low-voltage Electrical Power Conductors and Cables ................. 26 05 19-1 26 05 23 Control Voltage Electrical Power Cables ...................................... 26 05 23-1 26 05 26 Grounding and Bonding for Electrical Systems ........................... 26 05 26-1 26 05 29 Hangers and Supports for Electrical Systems .............................. 26 05 29-1 26 05 33 Raceway and Boxes for Electrical Systems .................................. 26 05 33-1 26 05 36 Cable Trays for Electrical Systems ............................................... 26 05 36-1 26 05 43 Underground Ducts and Raceways for Electrical Systems .......... 26 05 43-1 26 05 44 Sleeves and Sleeve Seals for Electrical Raceways and Cabling ... 26 05 44-1 26 05 53 Identification for Electrical Systems ............................................ 26 05 53-1 26 05 73 Electrical Power System Studies .................................................. 26 05 73-1 26 08 00 Commissioning of Electrical Systems ........................................... 26 08 00-1 26 09 13 Electrical Power Monitoring ........................................................ 26 09 13-1 26 09 16 Electrical Controls and Relays ...................................................... 26 09 16-1 26 12 13 Substation Type Liquid-Filled Medium Voltage Transformers .... 26 12 13-1 26 12 16 Dry-Type Medium Voltage Transformers .................................... 26 12 13-1 26 13 23 Medium Voltage, Metal-Enclosed Switchgear ............................ 26 13 23-1 26 13 26 Medium Voltage, Metal Clad Switchgear .................................... 26 13 26-1 26 18 39.11 Medium-Voltage Reduced-Voltage Motor Controllers .......... 26 18 39.11-1 26 18 43 Medium-Voltage Variable Frequency Motor Controllers ............ 26 18 43-1 26 22 13 Low-Voltage Distribution Transformers ...................................... 26 22 13-1 26 24 16 Panelboards ................................................................................. 26 24 16-1 26 27 26 Wiring Devices ............................................................................. 26 27 26-1 26 28 13 Fuses ............................................................................................ 26 28 13-1 26 28 16 Enclosed Switches and Circuit Breakers ...................................... 26 28 16-1 26 29 13.03 Manual and Magnetic Motor Controllers .................................. 26 29 13.03 26 32 13.02 Standby Engine-Generator System .............................................. 26 32 13-1 26 33 53 Static Uninterruptible Power Supply ........................................... 26 33 53-1 26 36 23 Automatic Transfer Switches ....................................................... 26 12 13-1 26 41 13 Lightning Protection for Structures ............................................. 26 41 13-1 26 43 13 Surge Protection for Low-Voltage Electrical Power Circuits ....... 26 43 13-1 26 50 00 Lighting ......................................................................................... 26 12 13-1

DIVISION 27 – COMMUNICATIONS

27 13 23.21 Multi-Mode Fiber Optic Process Control Networks .................... 27 10 00-1

DIVISION 28 – ELECTRONIC SAFETY AND SECURITY (GLWA)

28 46 00 Fire Detection and Alarm ............................................................. 28 46 00-1

DIVISION 31 – EARTHWORKS

31 10 00 Site Clearing ................................................................................. 31 10 00-1

(1)

00 01 10-7

31 23 19 Dewatering ................................................................................... 31 23 19-1 31 23 23 Flowable Fill ................................................................................. 31 23 23-1 31 23 33 Excavation and Fill........................................................................ 31 23 33-1 31 50 00 Excavation Support Systems ........................................................ 31 50 00-1

DIVISION 32 – EXTERIOR IMPROVEMENTS

32 11 23 Aggregate Base Courses ............................................................... 32 11 23-1 32 12 16 Asphalt Paving .............................................................................. 32 12 16-1 32 13 13 Concrete Paving ........................................................................... 32 13 13-1 32 17 23 Pavement Markings ..................................................................... 32 17 23-1 32 31 11 Gate Operators ............................................................................ 32 31 11-1 32 31 13 Chain Link Fences and Gates ........................................................ 32 31 13-1 32 31 19 High Security Metal Fences and Gates ........................................ 32 31 19-1 32 32 00 Mechanically Stabilized Earth Retaining Wall..............................32 32 00-1 32 90 00 Planting ................................................................................... ...32 90 00-1 32 91 19.15 Topsoil and Sodding ............................................................... 32 91 19.15-1 32 92 19 Seeding ......................................................................................... 32 92 19-1

DIVISION 33 – UTILITIES

33 01 10.58 Disinfection of Water Utility Piping Systems .......................... 33 01 10.58-1 33 05 32 Cement Mortar Lined and Coated Steel Pipe .................................. 33 05 32 33 05 61 Concrete Manholes .......................................................................... 33 05 61 33 14 13 Public Water Utility Distribution Piping ....................................... 33 14 13-1 33 14 17 Water Services ............................................................................. 33 14 17-1 33 14 19 Valves and Hydrants for Water Utility Service ............................ 33 14 19-1 33 31 11 Sanitary Sewerage Gravity Piping ................................................ 33 31 11-1 33 42 00 Stormwater Conveyance .............................................................. 33 42 00-1

DIVISION 34 – TRANSPORTATION (NOT USED)

DIVISION 35 – WATERWAY AND MARINE (NOT USED)

DIVISION 40 – PROCESS INTEGRATION

40 05 01 Piping Systems…………………………………………………………………. .. ….40 05 01-1 40 05 02 Piping System Schedule .............................................................. 40 05 02-1 40 05 02.23 Potable Water ........................................................................ 40 05 02.23-1 40 05 06 Specialty Couplings and Adapters for Process Piping ................. 40 05 06-1 40 05 06.33 Piping Appurtenances ............................................................. 40 05 06.33-1

40 05 07 Hangers and Supports for Process Piping .................................... 40 05 07-1 40 05 17 Copper Process Pipe and Tubing ................................................. 40 05 17-1

00 01 10-8

40 05 19 Ductile Iron Pipe ........................................................................... 40 05 19-1 40 05 24 Steel Process Pipe ....................................................................... 40 05 24-1 40 05 45 Piping System Identification ........................................................ 40 05 45-1

40 05 57.13 Manual Actuators ................................................................... 40 05 57.13-1

40 05 57.23 Powered Actuators .................................................................... 40 05 57.23

40 05 60 Valves ........................................................................................... 40 05 60-1

40 05 62.31 Cone Valves, Full Port, Cast Iron, Conical Plug ....................... 40 05 62.31-1

40 05 63.03 Ball Valves, Stainless Steel, Threaded ..................................... 40 05 63.03-1

40 05 64.07 Butterfly Valves, High Performance, Metal Seat .................... 40 05 64.07-1

40 05 65.41 Check Valves – Tilting Disc ...................................................... 40 05 65.41-1

40 05 67.36 Pressure-Regulating Valves ..................................................... 40 05 67.36-1

40 05 67.37 Axial Flow Valve ...................................................................... 40 05 67.37-1

40 05 72 Specialty Valves ............................................................................ 40 05 72-1

40 05 78.13 Air/Vacuum Valves for Water Service .................................... 40 05 78.13-1 40 05 82 Solenoid Valves for Process Service ............................................. 40 05 82-1 40 06 20.13 Power Actuated Valve and Schedule for Process Service ...... 40 06 20.13-1 40 06 20.16 Seal Water Control Unit .......................................................... 40 06 20.16-1 40 06 70 Schedules for Instrumentation of Process Systems .................... 40 06 70-1 40 61 13 Process Control System General Provisions ................................ 40 61 13-1 40 61 21 Process Control System Testing ................................................... 40 61 21-1 40 61 93 Process Control System Input/ Output List ................................. 40 61 93-1 40 61 96 Process Control Descriptions ....................................................... 40 61 96-1 40 63 43 Programmable Logic Controllers ................................................. 40 63 43-1 40 66 00 Network and Communication Systems Testing ........................... 40 66 00-1 40 66 13 Switches and Routers ................................................................... 40 66 13-1 40 67 00 Control System Equipment Panels and Racks.............................. 40 67 00-1 40 68 00 Process Control Software ............................................................. 40 68 00-1 40 68 03 Process Control Software Coordination and Documentation ..... 40 68 03-1 40 68 13 Process Control (HMI) Software .................................................. 40 68 13-1 40 71 00 Flow Measurement ...................................................................... 40 71 00-1 40 72 00 Level Measurement ..................................................................... 40 72 00-1 40 73 00 Pressure, Strain, and Force Measurement .................................. 40 73 00-1 40 74 00 Temperature Measurement ........................................................ 40 74 00-1 40 77 00 Position and Motion Measurement ............................................. 40 77 00-1 40 79 00 Misc. Instruments, Calibration Equipment, Instrumentation...... 40 79 00-1

DIVISION 41 – MATERIAL PROCESSING AND HANDLING EQUIPMENT

41 22 13.13 Bridge Cranes and Hoists ........................................................... 41 22 13.13

DIVISION 42 – PROCESS HEATING, COOLING, AND DRYING EQUIPMENT (NOT USED)

00 01 10-9

DIVISION 43 – PROCESS GAS AND LIQUID HANDLING, PURIFICATION, AND STORAGE

EQUIPMENT

43 05 11 General Requirements for Equipment ......................................... 43 05 11-1 43 05 13 Rigid Equipment Mounts ............................................................. 43 05 13-1

43 05 14 Machine Alignment ...................................................................... 40 05 14-1

43 05 17 Vibration and Critical Speed Limitations ..................................... 40 05 17-1

43 05 21 Common Motor Requirements for Equipment ........................... 43 05 21-1

43 05 22 Medium Voltage Motors .............................................................. 43 05 22-1

43 23 03 General Requirements for Pumps ............................................... 43 23 03-1

43 23 79 Custom Eng Horizontal Constant-Variable Speed Split Case Single Stage Centrifugal Pumps ................................................................................................ 43 23 79-1

DIVISION 44 – POLLUTION CONTROL EQUIPMENT (NOT USED)

DIVISION 45 – INDUSTRY-SPECIFIC MANUFACTURING EQUIPMENT (NOT USED)

DIVISION 46 – WATER AND WASTEWATER EQUIPMENT (NOT USED)

DRAWINGS ARE A PART OF THIS CONTRACT AND THEY ARE INCLUDED AS BOOK 3 OF

3.

END OF SECTION

(1) Security specifications (28 00 00 General Security System Requirements, 28 10 00 Electronic Security System, and 28 23 00 Video Surveillance Systems are not included in the Bidding Documents due to Cybersecurity concerns. Security work is included as part of Allowance Item Nos. 4 and 5.

DRAWINGS ARE A PART OF THIS CONTRACT AND THEY ARE INCLUDED AS BOOK 3 OF

3.

Summary Of Work

01 11 00 -1

SECTION 01 11 00

SUMMARY OF WORK

PART 1 GENERAL

1.01 SUMMARY

A Section Includes:

1. Location and Description of Work.

2. Other Construction Contracts.

3. Work by Others.

4. Work By Owner.

5. Sequence and Progress of Work.

6. Salvage of Materials and Equipment.

7. Partial Utilization by Owner.

B Related Sections:

1. 01 14 00, Work Restrictions.

2. 01 14 16, Coordination with Owner’s Operations.

3. 01 21 00, Allowances.

4. 01 42 13, Abbreviations and Acronyms.

5. 01 46 01, Quality Requirements.

1.02 LOCATION AND DESCRIPTION OF WORK

A The location of the Work is shown on the Drawings.

B The summary of the scope of work to be performed on the Project includes, but is not limited to:

1. Mobilize labor, equipment, materials, tools, facilities, and incidentals to the site, and provide temporary facilities, utilities, field offices, pest control, project signage, environmental controls, progress cleaning, construction waste management, site cleaning, site security and other general requirements specified in the Contract

Documents throughout the duration of the Contract.

2. Provide project management, project scheduling, project communications, project meetings, document management, project controls, project supervision, and contract management required to plan and coordinate the Work of this Contract with that of other contracts being conducted simultaneously at the site as well as with the Owner’s operation and maintenance of the facility so that facility and system operations are maintained, and service is not disrupted during the course of the Work.

3. Execute the work with utmost care and safety, complying with applicable local, state and federal laws, rules and regulations with respect to health, safety and the environment.

01 11 00 -2

4. Maintain project records throughout the duration of the Contract, including but not limited to photographs, video, record documents, asset turnover forms, operation and maintenance data, and training documents as specified in the Contract Documents.

5. Conduct progress cleaning throughout the duration of the Contract to maintain a clean, safe and orderly site.

6. Conduct startup, testing, adjusting, balancing, commissioning, and related Work to provide complete and functional systems that are ready for Owner’s use and occupancy in order to obtain Substantial Completion of the Project.

7. Proactively complete and correct deficiencies and defective Work so that Final

Completion of the project is attained within the Contract duration.

8. Demobilize labor, equipment, materials, tools, facilities, and incidentals from the site once the project has reached Final Completion in accordance with the Contract

Documents.

C The Work to be performed under this Contract includes, but is not limited to, constructing the

Work described below and all related appurtenances. The Work includes, but is not limited to, the following:

1. The furnishment and construction of all facilities shall include but not be limited to:

a. Site/civil, geotechnical, architectural, structural, process mechanical, HVAC, plumbing, fire protection, electrical, instrumentation, controls, and supervisory control and data acquisition (SCADA). Furnish and install a complete booster pumping station including without limitation: new horizontal split case pumps, pump control valves, system valves, isolation valves, pump station bypass, pump station surge relief system, and piping on the suction and discharge side of the pumps as generally shown on the Contract drawings.

1) Furnish and install remote manually operated booster pumps in the new pump station building, wired into the new Pump Control Panel, and communication to GLWA operations.

2) Furnish and install remote manually operated, electrically actuated cone valves downstream of the booster pumps, wired into the new Pump Station Ovation

Controller, and communication to GLWA operations.

3) Furnish and install remote manually operated triple offset butterfly valves.

4) Furnish and install pump station suction and discharge piping as well as associated valves connecting the existing 42-inch water main to the pump station.

5) Tie-in new 42" suction and discharge piping to the Owner's existing 42" water main.

6) Provide all associated work related to piping tie-ins along 8 Mile Rd., including, but not limited to: maintenance of traffic, signage and excavation.

7) Furnish and install an overhead bridge crane in the new pump station.

01 11 00 -3

8) Furnish and install electric power to the new equipment within the new pump station.

9) Furnish and install a new standby engine-generator system which will provide backup power to all new equipment upon loss of main electrical service to the site.

10) Furnish and install all new instrumentation in the new facility in accordance with the Contract drawings.

11) Furnish and install necessary communications wiring to connect the instrumentation in the new facility to the Ovation Control System and provide necessary integration and programming.

12) Furnish and install sewer service to the new pump station.

13) Furnish and install all HVAC and plumbing required for the new pump station.

14) Furnish and construct concrete access drives.

15) Furnish and construct a new stormwater retention basin.

16) Provide fire protection in accordance with the Contract Documents.

2. Demolish the existing Newburgh Pumping Station building and all associated equipment, transformers, located at 36363 West 8 Mile Rd., Livonia, MI 48152. Backfill, plant, and restore areas to match existing grade.

a. Work includes demolition of the existing buried pump suction and discharge header piping and bulkheading the 42” Water Main tees along 8 Mile Rd.

3. Perform other Work as specified in the Contract or required for a complete and properly functioning installation.

4. Maintenance of Public and Facility Roads

a. Contractor is responsible for work along 8 Mile Road including traffic control, signage, cleaning, and excavation, etc.

b. Contractor is responsible for maintenance of paved and un-paved roads and other site routes necessary for the Contractor to execute the Work of this Contract. This includes but is not necessarily limited to the construction of temporary engineered pavements and restoration of existing pavements that may be necessary because of the Contractor’s deliveries and vehicular traffic throughout the duration of the

Contract.

c. Contractor shall sweep and clean public roads, facility roads, and entrance approaches at a minimum daily to keep the site free of dust and construction debris. Cleaning of all roads shall be performed during pipning tie-ins to teh 42"

Water Main along 8 Mile Rd. Failure by the Contractor to meet this requirement may result in GLWA cleaning the roads and deducting the associated costs of cleaning the roads from Contractor's Application for Payment.

d. Contractor shall provide, erect and maintain signage at each site that directs its truck and vehicular traffic along the specified approved traffic routes for this Contract.

5. Snow Removal

01 11 00 -4

a. Contractor is responsible for removing snow from the facility roads, parking areas and staging areas to keep these areas safe, accessible and useable for the

Contractor’s truck, vehicle and employee traffic throughout the duration of the

Contract.

b. Contractor shall remove snow to areas that will not interrupt or otherwise interfere with GLWA’s operations, vehicular traffic, or occupancy of the site.

D Contracting Method: The Project shall be constructed under one single prime contract.

E Hazardous Environmental Conditions:

1. Definitions:

a. Constituents of Concern: Asbestos, petroleum, radioactive materials, polychlorinated biphenyls (PCBs), hazardous waste, and any substance, product, waste, or other material of any nature whatsoever that is or becomes listed, regulated, or addressed pursuant to (a) the Comprehensive Environmental

Response, Compensation and Liability Act, 42 U.S.C. §§9601 et seq. (“CERCLA”); (b) the Hazardous Materials Transportation Act, 49 U.S.C. §§5101 et seq.; (c) the

Resource Conservation and Recovery Act, 42 U.S.C. §§6901 et seq. (“RCRA”); (d) the

Toxic Substances Control Act, 15 U.S.C. §§2601 et seq.; the Clean Water Act, 33

U.S.C. §§1251 et seq.; (f) the Clean Air Act, 42 U.S.C. §§7401 et seq.; or (g) any other federal, state, or local statute, law, rules, regulation, ordinance, resolution, code, order, r decree regulating, relating to, or imposing liability or standards of conduct concerning, any hazardous, toxic, or dangerous waste, substance, or material.

b. Hazardous Environmental Condition: The presence at the Site of Constituents of

Concern in such quantities or circumstances that may present a danger to persons or property exposed thereto. The presence at Site of materials that are necessary for the execution of the Work, of or that are to be incorporated in the Work, and that are controlled or contained pursuant to industry practices, Laws and Regulations, and the requirements of the Contract, does not establish a Hazardous

Environmental Condition.

2. A Hazardous Environmental Condition, described in the following reports, will affect the

Work.

a. Report dated September 18, 2024, prepared by NTH Consultants, Ltd., entitled:

Report on Hazardous Materials Survey – GLWA Newburgh Road Pumping Station, Livonia, Michigan, consisting of 56 pages. Technical data contained in such report upon whose accuracy Contractor may rely are the testing methods, the locations and logs of the sampling and testing, the laboratory test methods and results, and similar factual data.

b. Report dated February 13, 2025, prepared by NTH Consultants, Ltd., entitled: Report on Hazardous Materials Survey – GLWA Newburgh Road Pumping

Station Replacement, Farmington Hills, Michigan, consisting of 36 pages. Technical data contained in such report upon whose accuracy Contractor may rely are the

01 11 00 -5 testing methods, the locations and logs of the sampling and testing, the laboratory test methods and results, and similar factual data.

c. Regarding the reports in a. and b. above: Sampling and testing information represent characteristics to the extent indicated, only for the point location of the associated sample or test. Contractor shall make its own interpretations of the conditions to be encountered between sampling and testing points. Contractor shall note the limitations, if any, on the results, and understands that the report(s) listed above were prepared for the sole use of Project Design Lead and Owner relative to the Project’s design phase. Use of the results and reports for other purposes is not warranted by Owner, except for Technical Data upon which Contractor may rely.

F Contractor shall be responsible for identifying, selecting and employing its means and methods in the proper execution of the Work so that the Work is satisfactorily completed in accordance with the Contract Documents. Contractor shall plan its execution of the Work in advance and design its own procedures and temporary facilities needed to satisfactorily perform and complete the Work in every respect.

1.03 WORK BY OTHERS

A Non-Professional Services Contracted by Owner: Owner will retain services of the following entities to perform the services indicated relative to the Project. Contractor shall coordinate and schedule the Work with, and cooperate with, the entities performing the following services for Owner.

1. Testing and Code-Required Special Inspections:

a. Owner has, or will, retain the services of a qualified testing laboratory to perform testing and code-required special inspections for the Work, in accordance with

Section 01 46 01, Quality Requirements, and selected other provisions of the

Contract Documents related to field testing.

2. Others needed, as determined by OWNER, throughout the duration of the Contract.

1.04 WORK BY OWNER

A Owner will perform the following in connection with the Work:

1. Operate all existing valves, gates, pumps, equipment, and appurtenances.

1.05 SALVAGE OF MATERIALS AND EQUIPMENT

A Existing materials and equipment removed and not shown or specified to be reused in the

Work will become Contractor’s property, except those items included in Section 02 41 00

Demolition, which shall remain Owner’s property.

B Existing materials and equipment removed by Contractor shall not be reused in the Work.

01 11 00 -6

C Removal, Storage, Handling, Reinstallation:

1. Carefully remove in manner to prevent damage all materials and equipment shown or indicated to be salvaged and reused or to remain property of Owner.

2. Store and protect salvaged items shown or indicated to be used in the Work.

3. Replace in-kind or with new items those items of materials and equipment damaged during removal, storage, or handling through Contractor’s actions, negligence, or improper procedures.

1.06 PARTIAL UTILIZATION BY OWNER

A Prior to Substantial Completion of the entire Work under the Contract, substantially complete the Work as follows:

1. Milestone M1:

a. Furnish and install a complete booster pumping station including: new horizontal split case pumps, pump control valves, system valves, isolation valves, pump station bypass, pump station surge relief system, generator and electrical equipment, and piping on the suction and discharge side of the pumps up to the tie-in to the 42"

Water Main.

b. Pressure testing, leak testing, and disinfection (up to the 42" Water Main Tie-in) complete

c. Component testing (dry testing) complete

d. Functional Testing complete - proper equipment (pumps and valves) Installation and electrical/bump test (pump motors and pump rotation)

e. Pump Station is isolated from the distribution system

f. Operator training (by Contractor) complete

1.07 PROJECT STRATEGIC COMMUNICATIONS PLAN (SCP)

A The SCP details plans for alerting local governments, property owners, tenants, business owners, schools, and the general public of upcoming construction and its anticipated impact.

The intent of the SCP is to promote community outreach early in project development so that issues can be addressed before or as they arise. Specific SCP areas of concern include property access, service disruption, erosion control and drainage, noise, traffic maintenance and control, and construction scheduling. Contractor shall perform all notification activities, in accordance with the following:

1. Contractor shall implement/establish a dedicated email address where citizens can voice concerns related to the project. Complaints received should be documented in a Citizen

Complaint Log (by the Contractor), which can be further used to allocate team members responsible for addressing complaints and monitoring their resolution. Contractor shall respond to emails, but shall coordinate responses with the Owner and Engineer.

2. Contractor shall provide and erect a free-standing (supported by galvanized steel posts) dynamic project sign at the construction site within view of 8 Mile Rd. The dynamic

01 11 00 -7 project sign shall have a digital display and shall provide actionable information on construction and road/lane closures. The dynamic project sign shall be 4 ft. x 8 ft. with an LED Matrix Display size with a minimum range of 48 pixels high by 128 pixels wide.

The sign face shall be 1/8 inch thick UV-opaque, non-breakable polycarbonate.

Mounting frame shall be 6061-T6 aluminum alloy.

3. Contractor shall schedule and coordinate the following: meeting individually with, calling or sending mass mailings or letters (as appropriate) to affected community members.

4. Contractor shall prepare and distribute informational flyers/brochures, and conduct project information workshops (at least four) to solicit comments and detail specific project impacts, such as impacts to services or traffic.

5. Contractor shall schedule, coordinate, and hold a pre-construction public information meeting/open house for interested members of the public to review plans, construction schedule, and traffic impacts, particularly dates of road or access closures.

6. Contractor shall send mass mailings of project impacts and information flyers, focused on any water service disruptions and 8 Mile Rd./Metroview Rd. lane closures.

7. Owner shall publish news releases detailing the project start date, pertinent project information, and specific traffic impact information.

8. Owner shall publish a regular cadence of news releases with specific traffic impact information, as warranted and as information changes.

9. At the completion of the Contract, the Contractor shall remove project signage and send out notifications to the public that Construction is complete.

1.08 ATTACHMENTS

A The documents listed below and attached following this Section's "End of Section" designation are part of this Section:

1. 01 11 00-A - Table of Delegated Design Items

PART 2 PRODUCTS: NOT USED

PART 3 EXECUTION: NOT USED

Specification Section or Drawing Item Description Delegated Design Reference

03 41 00 Structural Precast Concrete Section 03 41 00, Article 1.03.C.1

05 21 19 Open Web Steel Joist Framing Section 05 21 19, Article 1.04.B.1.b

05 05 20 Anchor Bolts Section 05 05 20, Article 1.04.A.6

05 51 00 Metal Stairs Section 01 51 00, Article 1.05.A.5

05 52 10 Aluminum Railings Section 05 52 10, Article 1.04.A.5

Dwg. A-00-008 Exterior Door Canopies Dwg. A-00-008, CANOPY NOTE

09 84 13 Perforated Steel Sound Absorbing Panels Section 09 84 13, Article 1.02.C

22 05 29 Hangers and Supports for Plumbing Section 22 05 29, Article 1.04.A

NPS-BPS-MCP-001 Foundation Drain Sump Motor Control Panel Section 22 14 29, Article 1.02.F

NPS-BPS-MCP-002 Sewage Ejector Sump Motor Control Panel Section 22 14 29, Article 1.02.F

22 16 16 Natural Gas Piping (pipe supports) Section 22 16 16, Article 1.03.C

23 05 29 Hangers and Supports For HVAC Piping and Equipment Section 23 05 29, Article 1.04.A

23 09 23 Direct Digital Control Systems for HVAC Section 23 09 23, Article 1.02.F

26 05 36 Cable Trays for Electrical Systems

Section 26 05 36, Articles 1.01.B, 1.04.C., 1.04.D.2, and 1.05.B

26 41 13 Lightning Protection for Structures Section 26 41 13 1.01.B

28 46 00 Fire Detection and Alarm Section 28 46 00 1.01.A

40 05 01 Pipe Supports Section 40 05 01, Article 1.01.C

40 05 06 Linestop - Detail 4 on Drawing C-00-303 Section 40 05 06, Article 1.04.B.4

NPS-OR-NC-001 Newburgh Booster Pump Station Main Network Cabinet Section 40 67 00, Article 1.01 B

NPS-OR-DROP-51/101 Ovation Drop 51/101 Cabinet (Ovation Controller) Section 40 67 00, Article 1.01 B

NPS-OR-NC-002 Ovation Network Enclosure Section 40 67 00, Article 1.01 B

NPS-BPS-CP-001 Telog Power Panel Section 40 67 00, Article…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .