10-Attachment No. 5 REQ-0006631 Schedule of Manufacturer.pdf

PDF 222 KB Posted

Attached to
Newburgh Road Booster Pumping Station Improvements
Solicitation number
REQ- 0006631
Issued by
Wayne County, Michigan

About this file

This is a Schedule of Manufacturers and Suppliers document for the Newburgh Road Booster Pumping Station Improvements project issued by GLWA (Great Lakes Water Authority) in Michigan, effective July 1, 2024. The project encompasses the construction of a 52-million gallon per day (MGD) capacity booster pumping station including yard piping and site work, as well as the demolition of the existing booster pumping station. The document specifies 13 line items of named or specified materials and equipment that must be used in the project, with vendors required to select one manufacturer or supplier per item from the provided options. Materials and equipment specified include modular indoor air handling units, medium-voltage motor controllers, standby engine-generator systems, automatic transfer switches, powered actuators, various valve types, process control software, bridge cranes and hoists, and centrifugal pumps. Vendors must certify the accuracy and completeness of their manufacturer selections as of the submission date.

To be considered responsive, bidders must complete the Schedule of Manufacturers and Suppliers by checking exactly one box per line item corresponding to their chosen manufacturer or supplier. Several line items permit "or-equal" or substitute items resulting from any addenda to the solicitation, providing some flexibility in equipment selection. If a vendor checks more than one manufacturer or supplier for any single item, GLWA reserves the right to select the manufacturer or supplier in its sole discretion. The document requires authorized vendor representatives to sign and date the schedule, including printed name and title.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GLWA Procurement

Effective Date:

7/1/2024

Document #:

FSA_PRO_SUP_0006

Revision Date:

N/A

Revision#:

Document Title:

Schedule of Manufacturer

Document Owner/Department:

Procurement Team

Schedule of Manufacturer

Schedule of Manufacturers and Suppliers

Requisition No.: REQ-0006631 Contract Title: Newburgh Road Booster Pumping Station Improvements

1. This contract will be awarded on the basis that only named or specified materials and equipment shall be used or furnished as specified in the Schedule of Manufacturers and Suppliers, shown on the next page.

2. To be considered a responsive bid, vendor shall select its chosen manufacturers and suppliers by checking the corresponding box for each of the listed manufacturers and suppliers, including any permitted “or-equal” or substitute items resulting from any addenda to this solicitation. Vendor shall check only one box per line item. If vendor checks more than one manufacturer or supplier per item, GLWA, in its sole discretion, shall select the manufacturer or supplier.

The undersigned vendor certifies that all information and data furnished in the Schedule of Manufacturers and Suppliers are current, accurate and complete as of the date stated below.

Enter Vendor Name:

Signature: ____________________________________

Print Name: ____________________________________

Title: ____________________________________

Dated: ____________________________________

7/1/2024

Document #:

FSA_PRO_SUP_0006

Revision Date:

N/A

Revision#:

Document Title:

Schedule of Manufacturer

Schedule of Manufacturers and Suppliers

Item # Specified Material or

Equipment Specification Section

Specified Manufacturer or Supplier

(Vendor to Select One)

Modular Indoor Air Handling

Units 23 73 13

☐ Engineered Air

☐ Carrier Corporation

☐ Daikin

☐ Trane

☐ JCI York

Medium-Voltage Reduced-

Voltage Motor Controllers 26 18 39.11

☐ Eaton

☐ Schneider Electric

☐ Innomotics (Siemens)

☐ Allen-Bradley

Medium-Voltage Variable

Frequency Motor Controllers 26 18 43

☐ Eaton

☐ Schneider Electric

☐ Innomotics (Siemens)

☐ Allen-Bradley

Standby Engine-Generator

System 26 32 13.02

☐ Caterpillar

☐ Cummins

☐ Approved Equal

5 Automatic Transfer Switches 26 36 23

☐ Asco

☐ Eaton

☐ ABB

6 Powered Actuators 40 05 57.23

☐ Rotork

☐ Limitorque

☐ EIM

☐ Auma

Cone Valves, Full Port, Cast

Iron, Conical Plug 40 05 62.31

☐ American Cone Valve

☐ Dezurik

☐ Ross

Butterfly Valves, High

Performance, Metal Seat 40 05 64.07

☐ Armacon

☐ Bray

☐ Dezurik

☐ Approved Equal

9 Check Valves – Tilting Disc 40 05 64.41

☐ Apco/Dezurik

☐ Pratt

☐ Valmatic

☐ Approved Equal

7/1/2024

Document #:

FSA_PRO_SUP_0006

Revision Date:

N/A

Revision#:

Document Title:

Schedule of Manufacturer

10 Axial Flow Valve 40 05 67.37 ☐ Mokveld Valves

☐ Approved Equal

11 Process Control Software 40 68 13 ☐ Emerson Ovation

12 Bridge Cranes and Hoists 41 22 13.13

☐ KoneCranes

☐ American Crane

☐ Yale Hoisting Division

☐ Acco Industries, Inc.

Custom Engineered Horizontal

Constant-Variable Speed Split

Case Single Stage Centrifugal

Pumps

43 23 79

☐ Ebara

☐ Fairbanks Morse

☐ Patterson Pump Company

☐ Xylem