3-Attachment E Components of the WWTP.pdf
PDF 36 KB Posted
- Solicitation number
- RFP-204-25
- Issued by
- Boulder County, Colorado
About this file
The document is an equipment inventory list detailing capital and non-capital equipment for a wastewater treatment facility. The list includes 22 different equipment items such as generators, pumps, electrical systems, and monitoring equipment, with each item noting its description, estimated life cycle, and year of installation. Equipment ranges from critical infrastructure like the Generator (installed in 2008) to specialized components like the Magnesium Hydroxide Pump (installed in 2018) and the SBR Decanter (installed in 2008).
The equipment inventory shows a mix of relatively new and older infrastructure, with installation years spanning from 2007 to 2021. The estimated life cycles vary significantly, from 2 years for the Magnesium Hydroxide drum mixer to 20 years for items like the Generator, Wastewater Building, and SBR Electrical Panel. The list includes both capital equipment (such as the Generator and UV Disinfection System) and non-capital equipment (like Effluent Pumps and Influent Sampler), providing a comprehensive overview of the facility's mechanical and electrical assets. The most recent additions include the Dissolved Oxygen Control Unit (2021) and the Effluent Decant Valve (2021), suggesting ongoing infrastructure upgrades and maintenance.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .