3-Attachment C-Specifications and Geotechnical Survey.pdf
PDF 10 MB Posted
- Solicitation number
- 26-51
- Issued by
- Brazoria County, Texas
About this file
Contract Specification Summary
This is a comprehensive specification document for the Brazoria County Quintana Beach Park Septic System, Electrical and Loop Road Improvements project, prepared by Huitt-Zollars, Inc. for Brazoria County, Texas. The project includes construction of a new septic system adjacent to the existing system at 330 5th Street, Quintana, Texas 77541, a new vehicular loop on the south side of Spoonbill Circle, extension of existing RV parking pads to 45 feet in length, and upgrade of all RV electrical services to 50-amp pedestals. The specifications are organized into multiple divisions covering concrete work (forming, reinforcing, and cast-in-place), electrical systems (general provisions, scope of work, testing, conductors, grounding, raceways, boxes, gutters, identification, short circuit analysis, lighting controls, transformers, panelboards, equipment wiring, controls, wiring devices, fuses, switches, and generator sets), earthwork, structural elements, and various mechanical and operational systems. The project is issued for bid and permit with specifications dated 03/27/2026, and all work must be performed in accordance with the International Building Code 2018 Edition, National Electrical Code 2023 Edition, and all applicable federal, state, and local regulations.
The specifications establish comprehensive requirements for materials, quality assurance, submittals, and execution standards for all electrical and structural components. Key electrical requirements include short circuit analysis and protective device coordination studies, surge protection devices, and arc flash hazard analysis prior to equipment submittals. All materials must be new, of best grade and quality, and from reputable manufacturers regularly engaged in production of such materials. The contractor is responsible for obtaining all applicable permits and paying associated fees, coordinating with other trades to prevent conflicts, providing temporary construction facilities including power and lighting, and maintaining detailed project record documents and as-built drawings. Testing and inspection services are required throughout construction, with an independent testing laboratory to verify compliance with contract documents, and all equipment must undergo factory testing prior to shipment and field testing upon installation. The contract requires the contractor to provide operator training, operating and maintenance manuals, and a 12-month warranty on all materials and equipment installed, with extended manufacturer warranties for equipment bearing factory guarantees.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
10350 RICHMOND AVE, SUITE 300
HOUSTON, TX 77042-4248 713-622-1180
WWW.HUITT-ZOLLARS.COM
BRAZORIA COUNTY QUINTANA BEACH
SEPTIC SYSTEM, ELECTRICAL AND
LOOP ROAD IMPROVEMENTS
PROJECT NO.
R316181.01
ISSUE FOR BID AND PERMIT
SPECIFICATIONS
BRAZORIA COUNTY
330 5th Street, Quintana, Texas 77541
03/27/2026
3/27/26
CSP #26-51 Quintana Beach Park -Septic, Electrical & Loop Road
Brazoria County Quintana Beach Park TABLE OF CONTENTS
Septic System, Electrical and Loop Road Improvements DOCUMENT 00 0110
HZ Project No. R316181.01
Issue for Bid and Permit 00 0110-1
DOCUMENT 00 01 10 - TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING DOCUMENTS
00 0101 - Project Title Page
00 0102 - Table of Contents
00 3132 - Geotechnical Data
00 3133 - OSSF Design Report
DIVISION 01 - GENERAL REQUIREMENTS
01 1100 - Summary of Work
01 4523 - Testing and Inspection Services
01 5000 - Temporary Facilities and Controls
Remaining Sections to be based on Owner’s Documents
01 2500 - Product Substitution Procedures
01 2613 - Request for Interpretation (RFI)
01 2614 - Request for Interpretation (RFI) Form
01 3100 - Project Management and Coordination
01 3216 - Construction Progress Documentation
01 3233 - Photographic Documentation
01 3300 - Submittal Procedures
01 4000 - Quality Requirements
01 4200 - References
01 5000 - Temporary Facilities and Controls
01 6000 - Product Requirements
01 7123 - Field Engineering
01 7329 - Cutting and Patching
01 7410 - Cleaning Up
01 7419 - Construction Waste Management and Disposal
01 7700 - Closeout Procedures
01 7823 - Operation and Maintenance Data
01 7839 - Project Record Documents
01 7900 - Demonstration and Training
DIVISION 02 - EXISTING CONDITIONS
02 4119 - Selective Demolition
DIVISION 03 - CONCRETE
03 1000 - Concrete Forming and Accessories
03 2000 - Concrete Reinforcement
03 3000 - Cast-In-Place Concrete
DIVISION 04 - MASONRY
No Sections Required
DIVISION 05 - METALS
No Sections Required
HZ Project No. R316181.01
Issue for Bid and Permit 00 0110-2
DIVISION 06 - WOOD, PLASTICS AND COMPOSITES
No Sections Required
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 9200 - Joint Sealants
DIVISION 08 - OPENINGS
No Sections Required
DIVISION 09 - FINISHES
No Sections Required
DIVISION 10 - SPECIALTIES
No Sections Required
DIVISION 22 - PLUMBING
No Sections Required
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
No Sections Required
DIVISION 26 - ELECTRICAL
26 0001 - Electrical General Provisions
26 0002 - Electrical Scope of Work
26 0125 - Electrical Testing
26 0501 - Basic Materials and Methods
26 0519 - Low Voltage Conductors and Cables
26 0526 - Grounding and Bonding for Electrical Systems
26 0533 - Electrical Raceways
26 0534 - Electrical Boxes
26 0535 - Electrical Gutters and Wireways
26 0553 - Identification for Electrical Systems
26 0573 - Short Circuit Analysis - Coordination Study
26 0926 - Low Voltage Lighting Control
26 2200 - Low Voltage Transformers
26 2416 - Panelboards
26 2717 - Equipment Wiring
26 2718 - Miscellaneous Electrical Controls and Control Wiring
26 2726 - Wiring Devices
26 2813 - Low Voltage Fuses
26 2818 - Enclosed Switches
26 3213 - Engine Generator Sets
26 3623 - Automatic Transfer Switches
26 4113 - Lighting Protection for Structures
26 4313 - Surge Protective Devices
26 5100 - Interior Lighting
26 5600 - Exterior Lighting
HZ Project No. R316181.01
Issue for Bid and Permit 00 0110-3
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
28 3103 - Addressable Device Fire Alarm System
DIVISION 31 - EARTHWORK
31 1000 - Sit Clearing
31 2000 - Earthwork
31 2317 - Trenching
31 2334 - Trench Backfill
31 2335 - Trench Safety System
31 2500 - Erosion Control
32 5000 - Excavation Support and Protection
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 1216 - Asphalt Paving
32 1313 - Concrete Paving
32 9200 - Turf and Grasses
DIVISION 33 - UTILITIES
33 3100 - Sanitary Utility Sewerage Piping
END OF TABLE OF CONTENTS
TEXAS BOARD OF PROFESSIONAL ENGINEERS
REGISTRATION NUMBER F-001183
GEOTECHNICAL STUDY
PROPOSED SEPTIC TANKS AND ASPHALT PAVING
QUINTANA BEACH COUNTY PARK
330 5TH STREET
QUINTANA, TEXAS
PROJECT NO. 25-754E
TO
HUITT-ZOLLARS, INC.
HOUSTON, TEXAS
BY
GEOTECH ENGINEERING AND TESTING
SERVICING
TEXAS, LOUISIANA, NEW MEXICO, OKLAHOMA, ARIZONA
NOVEMBER 2025
www.geotecheng.com
ACCREDITED
CERTIFICATE #0075-01
#0075-02
GEOTECH ENGINEERING and TESTING
Geotechnical, Environmental, Construction Materials, and Forensic Engineering
Huitt-Zollars, Inc. Project No.:25-754E 10350 Richmond Avenue Report No.: 1 Houston, Texas 77042 Report Type: 31/19/E November 20, 2025 Attention: Mr. Joseph Nash
GEOTECHNICAL STUDY
PROPOSED SEPTIC TANKS AND ASPHALT PAVING
QUINTANA BEACH COUNTY PARK
330 5TH STREET
QUINTANA, TEXAS
Gentlemen:
Submitted here is the report of Geotech Engineering and Testing (GET) geotechnical exploration for design of proposed Septic Tanks and paving at the above referenced location. The planned facilities were discussed in detail with Mr. Joseph Nash with Huitt-Zollars, Inc., to plan studies that would provide the necessary design and construction recommendations. This study was authorized by Ms.
Katherine A. Mears, PE, ENV SP, on November 4, 2025.
This report presents the results of our field explorations and laboratory testing together with design recommendations for the construction of the proposed, Septic Tanks, and paving in Quintana, Texas.
17407 US Highway 59 North • Houston, Texas 77398 • Tel.: 713-699-4000 • Fax: 713-699-9200 Texas • Louisiana • New Mexico • Oklahoma • Arizona
Website: www.geotecheng.com i
We appreciate the opportunity to be of service. Should you have any questions or need additional assistance, please call.
Very truly yours, TBPE Registration Number F-001183
Max Salehi, M.S.
Project Manager
James Namekar, Ph D., P.E.
Chief Engineer
MS/JN/DAE/ms
Copies Submitted: (1) PDF Copy Email – Huitt-Zollars, Inc.– Mr. Joseph Nash
(1) PDF Copy Email – Huitt-Zollars, Inc.– Ms. Katherine A. Mears, PE, ENV SP
(1) PDF Copy Email – Cnesvadba@Huitt-Zollars.com
(1) PDF Copy Email – Cnielsen@Huitt-Zollars.com
11/20/2025 ii
TABLE OF CONTENTS
PAGE
1.0 SUMMARY
2.0 INTRODUCTION
3.0 FIELD EXPLORATION
4.0 LABORATORY TESTS
4.1 General
4.2 Classification Tests
4.3 Strength Tests
4.4 Soil Sample Storage
5.0 GENERAL SOILS AND DESIGN CONDITIONS
5.1 Site Conditions
5.2 Soil Stratigraphy
5.3 Soil Properties
5.4 Water-Level Measurements
6.0 POTENTIAL VERTICAL MOVEMENT
7.0 FOUNDATION RECOMMENDATIONS FOR SEPTIC AREA PUMP TANKS
7.1 Foundation Type
7.2 Mat Type Foundation
7.2.1 Allowable net bearing pressures for mat foundations on silty sand soils
7.2.2 Lateral capacity for mat foundations on silty sand soils
7.2.3 Uplift capacity for mat foundation
7.2.4 Modulus of subgrade reaction (k)
7.3 Foundation Settlement
7.4 Site Drainage
8.0 PAVEMENT SECTIONS
9.0 CONSTRUCTION CONSIDERATIONS
9.1 Site Preparation
9.2 Groundwater Control
9.2.1 General
9.2.2 Dewatering Technique
9.3 Mat Foundation Excavations
9.4 Suitability of On-Site Soils for Use as Fill
9.4.1 General
9.4.2 Select Structural Fill
9.4.3 Structural Fill
9.4.4 General Fill
9.4.5 Use of On-Site Soils as Fill
9.5 Earthwork
9.5.1 General
9.5.2 Improving Drainage
9.5.3 Subgrade Drying
9.5.4 Soil Mixing
9.5.5 Removal and Replacement
9.5.6 Modification/Stabilization
9.6 Construction Surveillance
10.0 RECOMMENDED ADDITIONAL STUDIES
iii
11.0 STANDARD OF CARE
12.0 REFERENCES
ILLUSTRATIONS
PLATE
Site Vicinity Map 1 Plan of Borings
Soil Stratigraphy Profile 3 Logs of Borings 4 – 7 Key to Log Terms and Symbols 8 Project Site Pictures 9 Uplift Capacity of Mat Foundations 10
APPENDIX
Appendix A – Pavement Sections
Project No. 25-754E 1
1.0 SUMMARY
It is planned to construct Septic Tanks, and paving at Quintana Park, Quintana, Texas. A site vicinity map of the project site is presented on Plate 1. The purpose of our study was to explore subsurface conditions at the subject site and using the information obtained, develop recommendations to guide design and construction of the proposed facilities.
Soil conditions were explored by conducting four (4) soil borings to evaluate soil stratigraphy across the site and to obtain soil samples for laboratory testing. The field explorations and laboratory test results were reviewed, and a summary of our findings is presented below:
1. In general, the soil stratigraphy at the project is variable as follows:
Stratum No.
Range of Depth, ft.
Soil Description*
I 0 – 2 FILL: SILTY SAND (SM), brown, reddish brown, with root fibers to 2’, ferrous nodules, shell
II 2 – 15 SILTY SAND (SM), loose to medium dense, reddish brown, brown, with root fibers to 4’, shell
III 2 – 8/ 10 – 13 LEAN CLAY (CL), firm to stiff, reddish brown, brown, with root fibers to 1’, shell, sand seams and layers
2. The project site has a potential vertical rise of about 1.0-inch.
3. Depth to groundwater is important for the design and construction of the proposed facilities.
Our short-term field exploration indicates that groundwater was not encountered during and after 0.33-hour of drilling
4. We understand that the structural loads for the proposed Septic Tanks will be supported on mat type foundation. The foundation analysis and recommendations for Septic Tanks are provided in Section 7.0 of this report.
5. Recommendation for asphalt pavement is presented in Section 8.0 of this report.
Project No. 25-754E 2
2.0 INTRODUCTION
It is planned to construct Septic Tanks, and paving at Quintana Park, Quintana, Texas. A site vicinity map of the project site is presented on Plate 1. The specific project information includes the following:
Facility Remarks
Septic Tanks We understand that Septic area will have three Tanks. These Tanks shall be supported on mat foundations.
Pavement
We understand that there will be asphalt paving subject to auto and light trucks.
The purpose of our study was to explore subsurface conditions at the subject site and using the information obtained, develop recommendations to guide design and construction of the proposed facilities. Our recommendation on site preparation and soil stabilization is in general accordance with the Brazoria County Drainage Criteria Manual (Ref. 1). Also, our paving recommendations are developed on the basis of Brazoria County Subdivision Regulations, August 28, 2023 (Ref. 2) is provided in Appendix A of this report.
3.0 FIELD EXPLORATION
The soil conditions were explored by conducting four (4) soil tests borings, located approximately as shown on Plate 2. The number of borings, depths and locations were provided by the client. The boring schedule is as follows:
Facility No. of Boring (s) Boring Depth, ft.
Septic Tanks
B-1 and B-2
Asphalt Pavement
B-3 and B-4
In Borings B-1, and B-2, soil samples were obtained continuously from the ground surface to 10-ft and at 5-ft intervals, thereafter to the completion depth of the borings at 15-ft. In Boring B-3 and B-4, soil samples were obtained continuously from the ground surface to the completion depth of the boring at 10-ft. The cohesive soils were sampled in general accordance with the ASTM D 1587, using a Shelby tube sampler.
Cohesionless and some cohesive soils were generally sampled with a split-spoon sampler driven in general accordance with the Standard Penetration Test (SPT), ASTM D 1586. This test is conducted by recording the number of blows required for a 140-pound weight falling 30 inches to drive the sampler 12-inch into the soil. Driving resistance for the SPT, expressed as blows per foot of sampler resistance (N), is tabulated on the boring logs.
Soil samples were examined and classified in the field, and cohesive soil strengths were estimated using a calibrated hand penetrometer. This data, together with a classification of the soils encountered and strata limits, is presented on the soil stratigraphy profile, Plate 3, and logs of borings, Plates 4 through 7.
A key to the log terms and symbols is shown on Plate 8.
Project No. 25-754E 3
The borings were drilled dry, without the aid of drilling fluids, to more accurately estimate the depth of groundwater. Water level observations made during and after drilling are indicated at the bottom portion of the individual logs.
4.0 LABORATORY TESTS
4.1 General
Soil classifications and shear strengths were further evaluated by laboratory tests on representative samples of the major strata. The laboratory tests were performed in general accordance with ASTM Standards. Specifically, ASTM D 2487 is used for classification of soils for engineering purposes.
4.2 Classification Tests
As an aid to visual soil classifications, physical properties of the soils were evaluated by classification tests. These tests consisted of natural moisture content tests (ASTM D 4643), percent finer than the No. 200 sieve tests (ASTM D 1140), and Atterberg limit determinations (ASTM D 4318, Method B). Similarity of these properties is indicative of uniform strength and compressibility characteristics for soils of essentially the same geological origin. Results of these tests are tabulated on the boring log at respective sample depths.
4.3 Strength Tests
Undrained shear strengths of the cohesive soils, measured in the field, were verified by calibrated hand penetrometer tests, unconfined compressive strength tests (ASTM D 2166) and torvane tests. Natural water content and dry unit weight were determined routinely for each unconfined compressive strength test. These test results are also presented on the boring logs.
4.4 Soil Sample Storage
Soil samples tested or not tested in the laboratory will be stored for a period of seven days subsequent to submittal of this report. The samples will be discarded after this period, unless we are instructed otherwise.
5.0 GENERAL SOILS AND DESIGN CONDITIONS
5.1 Site Conditions
The project site and the surrounding areas are flat and exhibit topographic variation of less than three-ft. Currently, the project site is vacant and covered with grass. Project site pictures were taken during our field exploration and are presented on the cover page and Plate 9.
5.2 Soil Stratigraphy
Subsurface soils appear to be relatively variable across the site. Details of subsurface conditions at each boring location are presented on the boring log. In general, the soils can be grouped into three (3) major strata with depth limit and characteristics as follows:
Project No. 25-754E 4
Stratum No.
Range of Depth, ft.
Soil Description*
I 0 – 2 FILL: SILTY SAND (SM), brown, reddish brown, with root fibers to 2’, ferrous nodules, shell
II 2 – 15 SILTY SAND (SM), loose to medium dense, reddish brown, brown, with root fibers to 4’, shell
III 2 – 8/ 10 – 13 LEAN CLAY (CL), firm to stiff, reddish brown, brown, with root fibers to 1’, shell, sand seams and layers
* Classification in general accordance with the Unified Soil Classification System (ASTM D 2487)
5.3 Soil Properties
Soil strength and index properties and how they relate to lift station design are summarized below:
Stratum No. Soil Type PI(s) SPT Soil Expansivity Soil Shear
Strength, tsf Remarks
I Fill: Silty Sand (SM) – – Non- Expansive – Moisture Sensitive
II Silty Sand (SM) – 5 – 10 Non- Expansive – Moisture Sensitive
III Lean Clay (CL) 22 – 24 10 Moderately Expansive 0.31 – 0.38 –
Legend: PI = Plasticity Index SPT = Standard Penetration Test
5.4 Water-Level Measurements
The soil boring was dry augured to evaluate the presence of perched or free-water conditions.
The levels where free water was encountered in the open boreholes during our field exploration and 0.33-hours after drilling are shown on the boring logs. Our groundwater measurements are as follows:
Groundwater Depth, ft. Groundwater Depth, ft.
Boring No(s). at the Time of Drilling at 0.33-Hour Later
B-1 through B-4 Dry Dry
Fluctuations in groundwater generally occur as a function of seasonal moisture variation, temperature, groundwater withdrawal and future construction activities that may alter the surface drainage and subdrainage characteristics of this site.
An accurate evaluation of the hydrostatic water table in the relatively impermeable clays and low permeable silts/sands requires long term observation of monitoring wells and/or piezometers. It is not possible to accurately predict the pressure and/or level of groundwater that might occur based upon short-term site exploration. The installation of piezometers/monitoring wells was beyond the scope of our study. We recommend that the groundwater level be verified just before construction if any excavations are planned.
Project No. 25-754E 5
We recommend that GET be immediately notified if a noticeable change in groundwater occurs from that mentioned in our report. We would be pleased to evaluate the effect of any groundwater changes on our design and construction sections of this report.
6.0 POTENTIAL VERTICAL MOVEMENT
Vertical movement of expansive soils is commonly referred to in terms of the Potential Vertical Rise (PVR, Ref. 3) that can occur due to changes in soil moisture content. Accepted methods of estimating PVR includes the use of empirical relationships and the results of laboratory Atterberg limits and moisture content tests. The Project site has a Potential Vertical Rise (PVR) of 1.0-inch.
7.0 FOUNDATION RECOMMENDATIONS FOR SEPTIC TANKS
7.1 Foundation Type
Foundations for the proposed facilities should satisfy two independent design criteria. First, the maximum design pressure exerted at the foundation level should not exceed allowable net bearing pressure based on an adequate factor of safety with respect to soil shear strength.
Secondly, the magnitude of total and differential settlements under sustained foundation loads must be such that the structure is not damaged or its intended use impaired.
We understand that the load of the proposed Septic Tanks will be supported on mat type foundation. Our foundation recommendations for Septic Tanks are presented in the following report sections.
7.2 Mat Type Foundation
7.2.1 Allowable net bearing pressures for mat foundations on silty sand soils
The proposed structural loads for the Septic Tanks can be supported on mat foundation on cohesionless soils founded in the near surface soils. The following allowable net bearing pressures can be used for foundation support of the proposed structure:
Allowable Net Bearing Pressure, psf
Bearing Soil Type Minimum Depth, ft (1,3) Dead Load (2) Total Load (dead + live)
Loose Sand 3 900 1350
Notes: 1. With respect to existing grade.
2. Dead + sustained live loading.
3. The actual depth of Mat should be determined based on structural loads.
Mat foundations proportioned in accordance with the above bearing values will have safety factors of 3.0 and 2.0 with respect to shearing failure for dead and total loading, respectively.
Mat weight below final grade can be neglected in the determination of design loading.
The above equations include a factor of safety of 3.0 with respect to shearing failure. For total loading (dead + live load), the allowable net bearing pressures obtained from the above equations and the pressure limits should be increased by 50 percent.
Project No. 25-754E 6
The above equations include a factor of safety of 3.0 with respect to shearing failure. We recommend that the maximum allowable dead foundation loading (dead + sustained live load) be limited to 1,000 psf (for footing widths greater than four-feet) to limit footing settlements to tolerable levels (less than one-inch). The maximum allowable bearing pressure for dead loading should be reduced to 1,000 psf for footings with a width (B) of one-foot. The above-mentioned bearing capacities should be reduced by 50 percent if the subgrade soils become saturated or have potential for saturation. A minimum footing width of one-foot should be used in design.
For total loading (dead + live load), the allowable net bearing pressures obtained from the above equations and the pressure limits should be increased by 50 percent.
Based on our current groundwater observations, the mat excavations may not encounter groundwater. Any water inflow must be pumped out using a sump-pump. The mat excavations should be free of loose material and water prior to concrete placements, and concrete should be poured as soon as possible.
Detailed observations of mat foundation construction should be required by a qualified engineering technician to assure that the mat is (a) founded in the proper bearing stratum, (b) have the proper depth, (c) have the correct size, and (d) that all loose materials have been removed prior to concrete placement.
7.2.2 Lateral capacity for mat foundations on silty sand soils
Lateral loads on mat foundations may be resisted by soil friction and by the passive resistance of the soils. An ultimate friction coefficient of 0.3 may be used between the bottom of foundation or slab and the supporting soils. A factor of safety of 2.0 should be used in the design. The passive resistance of natural soils or properly compacted fill may be assumed to be equal to the pressure developed by a fluid with a density of 90h pounds per square foot, where h is the depth below the top of the mat footings. A one-third increase in the passive value may be used for wind loads. The passive pressure and the frictional resistance of the soils may be combined without reduction in determining the total lateral resistance.
7.2.3 Uplift capacity for mat foundation
The ultimate uplift capability of a mat can be estimated using the information shown on Plate 12 and the following empirical equation:
SFT WWQ
Where: WF = Weight of Foundation (Submerged), pounds WS = Weight of Soil Column Above the Mat, pounds; Use Soil Unit Weight, ’ = 62 pcf QT = Ultimate Capacity of a Mat, Pounds; Use factor of safety = 1.5
7.2.4 Modulus of subgrade reaction (k)
The modulus of subgrade reaction (k, pci) may be used in order to design the mat foundation.
An empirical Modulus of Subgrade Reaction value of 40 pci can be applied for the design of mat foundation at this site.
Project No. 25-754E 7
7.3 Foundation Settlement
A settlement analysis was not within the scope of this study. We recommend that the detailed settlement analysis should be conducted once the final foundation type and corresponding loads are determined for the proposed structures.
7.4 Site Drainage
It is recommended that site drainage be well developed. Surface water should be directed away from the foundation soils (use a slope of about 5% in the grass within 10-ft of foundation). No ponding of surface water should be allowed near the structure.
In the event that sprinkler systems are used, we recommend that the sprinkler system be placed all around the structure to provide a uniform moisture condition throughout the year. This will reduce fluctuations in subsoil moisture and corresponding movement.
8.0 PAVEMENT SECTIONS
We understand that concrete or asphalt paving is planned for the proposed facilities. Our field exploration and laboratory testing data indicate that the surficial soils consist of silty sand (SM) soils.
Our preliminary pavement section recommendations are provided in Appendix A.
As stated in the site preparation section of this report, the site has potential for construction problems related to portion of the surficial layer of silty sand (SM) soils encountered at the project site. These permeable surficial soils are underlain by relatively impermeable clays. Thus, due to poor site drainage, wet season or site geohydrology, water ponds on the clays and creates a “perched water table condition.”
This condition may result in an increase in subsoil moisture contents and subsequent swelling of the underlying moderately expansive / highly expansive soils.
We recommend the contractor do not clear/expose significant portions of paving at one time. The contractor should only expose the amount of paving that he/she can complete in a short period of time to lessen potential perched water and corresponding pumping problems.
9.0 CONSTRUCTION CONSIDERATIONS
9.1 Site Preparation
The project site has the potential for construction problems related to the surficial layer of fill silty sand soils. These permeable surficial soils are underlain by relatively impermeable clay soils. Thus, due to poor site drainage, wet season or site geohydrology, water ponds on the clays soils and creates a “perched water table condition”. The surficial fill silty sand could become extremely soft when wet, and must be stabilized, aerated, or replaced in order to minimize rutting and pumping. Therefore, these soils may have to be improved.
Our recommendations on subgrade improvements are presented in the earthwork section of this report. Our recommendations for site preparations in the pavement areas are summarized below:
Project No. 25-754E 8
1. In general, remove all vegetation, tree roots, organic topsoil, existing foundations, paved areas and any undesirable materials from the construction area. Tree trunks and tree roots under the floor slabs should be removed to a root size of less than 0.5-inch. We recommend that the stripping depth be evaluated at the time of construction by a soil technician.
2. Any on-site fill soils, encountered in the structure and pavement areas during construction, must have records of successful compaction tests signed by a licensed professional engineer that confirms the use of the fill and record of construction and earthwork testing. These tests must have been performed on all the lifts for the entire thickness of the fill. In the event that no compaction test results are available, the fill soils must be removed, processed and recompacted in accordance with our site preparation recommendations. Excavation should extend at least two feet beyond the structure and pavement area. Alternatively, the existing fill soils should be tested comprehensively to evaluate the degree of compaction in the fill soils.
3. The subgrade areas should then be proofrolled with a loaded dump truck or similar pneumatic-tired equipment with loads ranging from 25- to 50-tons. The proofrolling serves to compact surficial soils and to detect any soft or loose zones. The proofrolling should be conducted in accordance with TxDOT Standard Specification Item 216. Any soils deflecting excessively under moving loads should be undercut to firm soils and recompacted. Any subgrade stabilization should be conducted after site proofrolling is completed and approved by the geotechnical engineer. The proofrolling operations should be observed by an experienced geotechnician.
4. Scarify the subgrade, add moisture, or dry if necessary, and recompact to 95% of the maximum dry density as determined by ASTM D 698 (Standard Proctor). The moisture content at the time of compaction of subgrade soils should be between optimum and +3% of the Proctor optimum value. We recommend that the degree of compaction and moisture in the subgrade soils be verified by field density tests at the time of construction.
We recommend a minimum of four field density tests per lift or one every 2,500 square feet of floor slab areas, which is greater.
5. The backfill soils in the trench/underground utility areas and tree root excavation areas should consist of selected structural fill, compacted as described in Item 4. In the event of compaction difficulties, the trenches should be backfilled with cement-stabilized sand or other materials approved by the geotechnical engineer. Due to high permeability of sands and potential surface water intrusion, bank sands should not be used as backfill material in the trench/underground utility areas and tree root excavation areas.
6. In cut areas, the soils should be excavated to grade and the surface soils proofrolled and scarified to a minimum depth of six-inch and recompacted to the previously mentioned density and moisture content.
7. The subgrade and fill moisture content and density must be maintained until paving or floor slabs are completed. We recommend that these parameters be verified by field moisture and density tests at the time of construction.
Project No. 25-754E 9
9.2 Groundwater Control
9.2.1 General
Our short-term field exploration indicates that groundwater was not encountered during and after 0.33-hour of drilling. However, groundwater may rise during wet seasons, therefore, dewatering may be required. Fluctuations in groundwater can occur as a function of seasonal moisture variation. Groundwater control recommendations are presented in the following report sections.
9.2.2 Dewatering Technique
In the event that groundwater is encountered during construction, it is our opinion that groundwater should be lowered to a depth of at least three-ft below the deepest excavation grade in order to provide dry working conditions and firm bedding. Any minor water inflow in cohesive soil layers can probably be removed using a sump-pump or trench sump-pump.
Wellpoint system can be used in the area where sandy soils are present. Due to the presence of cohesionless and the hydrostatic pressure, blow up may occur in some areas if an effective dewatering system is not in place at the time of construction.
Piezometers should be installed near the excavation area to further evaluate groundwater levels in the area prior to construction. The piezometers should be left in place during construction to monitor groundwater levels and effectiveness of the dewatering system.
Design of a dewatering system should consider the amount of groundwater to be lowered and the permeability of the affected soils. The selection and proper implementation of an effective groundwater control system is the responsibility of the contractor. The design of dewatering system for groundwater and surface water control should be in accordance with the Brazoria County Drainage Criteria Manual.
9.3 Mat Foundation Excavations
An excavation or trench which is five-ft or deeper must be protected by sheeting/bracing shoring or sloped. Based on soil strength data, temporary (less than 24 hours) open-trenched, non-surcharged, and unsupported excavations should be made on slopes of flatter. Vertical cuts can be constructed, provided shoring and bracing are used for the excavation wall stability. Benched excavation can also be used with average slopes of about 1(h):1(v) and steps should not be higher than five-ft. In all cases, excavations should conform to OSHA guidelines. Flatter slopes may have to be used if large amounts of sand need to be excavated for deep installations.
Specifications should require that no water be allowed to pond in the excavations. The surface slopes should be protected from deterioration and weathering if they are to be left open for more than 24 hours.
Excavations should be performed with equipment capable of providing a relatively clean bearing area. Excavation equipment should not disturb the soil beneath the design excavation bottom and should not leave large amounts of loose soil in the excavation.
Project No. 25-754E 10
Foundation excavations should be protected against any significant change in soil moisture content and disturbance by construction activity. If concrete is not poured the same day, the excavation is completed, we recommend placement of a thin seal slab over the base of the excavation.
9.4 Suitability of On-Site Soils for Use as Fill
9.4.1 General
The on-site soils can be used as fill. There are typically three types of fill at a site. These fills can be classified as described in the following report sections.
9.4.2 Select Structural Fill
This is the type of fill that can be used under the floor slabs, paving, etc. These soils should consist of lean clays, free of root organics, with liquid limit of less than 40 and plasticity indices between 12 and 20 and at least 50% of soil particles passing No. 200 sieve.
9.4.3 Structural Fill
This type does not meet the Atterberg limit requirements for select structural fill. This fill should consist of lean clays or fat clays. They can be used under post-tensioned slab or paving.
9.4.4 General Fill
This type of fill consists of sands and silts. These soils are moisture sensitive and are difficult to compact in a wet condition (they may pump). These soils can be used as structural fill with the understating that they can erode easily and if they get wet, they are difficult to compact (they may pump). These soils can result in a perched water table. The owner and the civil engineer must be aware of these potential issues.
9.4.5 Use of On-Site Soils as Fill
The on-site soils can be used as fill materials as described below:
Use as Fill
Stratum No.(1)
Soil Type
Select Structural Fill
Structural Fill
General Fill
Notes
I Fill: Silty Sand (SM) – – 2, 3
II Silty Sand (SM) – – 2, 3
III Lean Clay (CL) – 2, 4
Notes:
1. See soil stratigraphy and design conditions sections of this report for strata description.
2. All fill soils should be free of organics, roots, etc.
3. The on-site cohesionless soils are moisture sensitive and erode easily. These soils will pump when they get wet. Compaction difficulties will occur in these soils in a wet condition.
4. These soils, once lime modified (4% by dry weight), can be used as select structural fill.
Project No. 25-754E 11
9.5 Earthwork
9.5.1 General
Difficult access and workability problems will most likely occur in the surficial silty sand soils due to poor site drainage, wet season, or site geohydrology. Considering the soils stratigraphy, the construction of this project should be conducted during the dry season to avoid major earthwork problems. In the event the subgrade soils become wet and experience pumping problems, they can be improved by (a) improving drainage, (b) opened up to dry up, (c) mixing cohesionless soils with cohesive soils, (d) removed and replaced with dry cohesive soils or (e) chemically modified or stabilized. These alternatives are discussed in the following report sections.
9.5.2 Improving Drainage
The project site drainage in the pumping soils can be accomplished by placing several shallow bleeder ditches (about 18-inches ±) in the surficial cohesionless soils. These bleeder ditches should be directed to a low area, such as a hole (detention pond) or another ditch in the lowest elevation area of the site. This will allow the surficial soils to drain the water and make the drying process faster. The hole/low area should not be under the building areas. The excess water can be pumped out of the hole and moved off-site.
9.5.3 Subgrade Drying
The on-site wet soils can be opened up so that it would dry up. However, opening up the surficial cohesionless soils for drying purposes may not be practical, due to cyclic rainfall in the Gulf- Coast area.
9.5.4 Soil Mixing
The on-site cohesionless (Silty Sand, Strata I and II) soils can be mixed with on-site cohesive soils (Strata III) to reduce subgrade pumping. The soils can come from on-site water and sewer excavations or imported in. GET can do a mix design to come up with soil mix percentages, if this option is considered.
9.5.5 Removal and Replacement
The surficial cohesionless soils can be removed and replaced with select structural fill. The actual depth of removal and replacement should be evaluated in the field, but it can be whole thickness of surficial cohesionless soils. This procedure will include removal of the surficial cohesionless soils, proofrolling and compacting the subgrade cohesive soils to a minimum of 95 percent standard proctor density (ASTM D 698). The site can then be backfilled with select structural fill, compacted to a minimum of 95 percent of standard proctor density. The proofrolling should be in accordance with the site preparation section of this report. All of the fill soils should be placed and tested in accordance with the site preparation section of this report.
Project No. 25-754E 12
9.5.6 Modification/Stabilization
We recommend that the on-site cohesionless soils be modified (to dry up), using 5 to 10 percent fly ash by dry weight. The fly ash stabilization should be in accordance to Texas Department of Transportation (TxDOT) Specification, Item 265. The estimated amounts of fly ash per depth of modification are as follows:
Modification Depth, in.
Fly Ash Weight Range, lbs. per Square Yard
5% 10%
6 23 45 12 46 90 18 69 135 24 92 180
We recommend that five percent fly ash be used if the surficial soils are relatively moist at the time of application. Higher levels (10 percent) of fly ash should be used if wet and soggy subgrade soils are encountered.
The subgrade soils should be removed to a depth of 24-inches (or more) below existing grade.
These soils should be stockpiled. The soils below a depth of 24-inches should be modified to a depth of 12-inches. These soils should be compacted to a minimum of 95 percent of standard proctor density (ASTM D 698). The stockpiled soils should then be modified and replaced in six-inch lifts and compacted to 95 percent of maximum dry density as determined by ASTM D 698 at moisture contents within ±2 percent of optimum.
Due to poor drainage and the depth of the cohesionless soils, the depth of stabilization may be as deep as depth of cohesionless soils. A test section can be implemented for this purpose. The subgrade soils should be modified in six-inch lifts and compacted within four hours of mixing and placement. All of the subgrade soils should be compacted to a minimum of 95 percent of the standard proctor density at the moisture content with optimum. The degree of compaction for the lifts, below a depth of 24-inches can be relaxed to 90 percent of maximum dry density to ease the construction procedures.
The subcontractor who will be doing the subgrade modification or stabilization should be experienced with stabilization procedures and methods. Furthermore, all of the earthwork at this project should be monitored by our geotechnician to assure compliance with the project specifications.
Once the subgrade is constructed, the soils at the top of subgrade should be slicked and the subgrade needs to be crowned such that the all surface water would drain away. No low areas should be left within the subgrade areas, since these areas would hold water and destroy the subgrade structure.
Project No. 25-754E 13
9.6 Construction Surveillance
Construction surveillance and quality control tests should be planned to verify materials and placement in accordance with the specifications. The recommendations presented in this report were based on a discrete number of soil test borings. Soil type and properties may vary across the site. As a part of quality control, if this condition is noted during the construction, we can then evaluate and revise the design and construction to minimize construction delays and cost overruns. We recommend the following quality control procedures be followed by a licensed engineer or technician during the construction of the facility:
o Monitor all phases of trench safety.
o Observe the site stripping and proofrolling (if any).
o Verify the type, depth and amount of stabilizer.
o Verify the compaction of subgrade soils.
o Evaluate the quality of fill and monitor the fill compaction for all lifts.
o Monitor and test the excavations for strength, cleanness, depth, size, etc.
o Observe the make-up prior to concrete placement.
o Observe all excavation operations.
o Monitor concrete placement, conduct slump tests and make concrete cylinders.
o Monitor installation of mat foundations and driven piles foundations.
It is the responsibility of the client to notify GET when each phase of the construction is taking place so that proper quality control and procedures are implemented.
10.0 RECOMMENDED ADDITIONAL STUDIES
We recommend the following additional studies be conducted:
1. This report has been based on assumed conditions/characteristics of the proposed development where specific information was not available. It is recommended that the architect, civil engineer and structural engineer along with any other design professionals involved in this project carefully review these assumptions to ensure they are consistent with the actual planned development. When discrepancies exist, they should be brought to our attention to ensure they do not affect the conclusions and recommendations provided herein. We recommend that GET be retained to review the plans and specifications to ensure that the geotechnical related conclusions and recommendations provided herein have been correctly interpreted as intended.
2. Conduct site characterization studies. These studies will include the following separate studies:
o Phase I Geologic Fault Study to look for geologic faults at or near the site.
Project No. 25-754E 14 o Phase I Environmental Site Assessment Study to evaluate the risk of contamination at the site.
o Conduct a site visit to look for drainage features, slopes, seeps, trees and other vegetation; fence lines, ponds, stock Tanks, areas of fill, etc.
11.0 STANDARD OF CARE
The recommendations described herein were conducted in a manner consistent with the level of care and skill ordinarily exercised by members of the geotechnical engineering profession practicing contemporaneously under similar conditions in the locality of the project. No other warranty or guarantee, expressed or implied, is made other than the work was performed in a proper and workmanlike manner.
12.0 REFERENCES
1. Brazoria County Drainage Criteria Manual”, Brazoria County, November 2003.
2. “Subdivision Regulations”, Brazoria County, August 28, 2023.
3. "Method for Determining the Potential Vertical Rise, PVR," State Department of Highways and
Public Transportation, Test Method Tex 124-E, Austin, Texas.
4. Committee Papers from Foundation Performance Association (FPA), see FPA Website:
http://www.foundationperformance.org/committee_papers.cfm.
GEOTECH ENGINEERING AND TESTING PLATE 1
SITE VICINITY MAP
PROJECT: G/S for Brazoria County Quintana Park, 330 5th Street Quintana, Texas 77541
SCALE: NOT TO SCALE DATE: NOVEMBER 2023 PROJECT NO.: 25-754E
NORTH
PROJECT SITE
GEOTECH ENGINEERING AND TESTING PLATE 2
PLAN OF BORINGS (boring locations are approximate)
PROJECT: G/S for Brazoria County Quintana Park, 330 5th Street
Quintana, Texas 77541
SCALE: NOT TO SCALE DATE: NOVEMBER 2025 PROJECT NO.: 25-754E
NORTH
0.3122
B-1 Su(tsf)NPI
0.6224
0.31
B-2 Su(tsf)NPI
B-3 Su(tsf)NPI
B-4 Su(tsf)NPI
PLATE NUMBER
Lean Clay (CL)Fill
Quintana, Texas
Water Level Reading at time of drilling.
B-1
JOB NUMBER
Borehole Lithology
Water Level Reading after drilling.
Explanation
Borehole Number
Silty Sand (SM)
Lithology Graphics
25-754E
G/S for Septic Tank and Asphalt Paving at Quintana Beach County
Park, 330 5th Street
D ep th fe et
17407 US Highway 59 Houston, Texas 77396
Geotech Engineering and Testing
Plate 3
FILL: SILTY SAND (SM), reddish brown, brown, with root fibers to 2', gravels
LEAN CLAY (CL), stiff, reddish brown, brown, with root fibers to 4', gravels, sand seams and layers
SILTY SAND (SM), loose, reddish brown, brown, gravels, shell
LEAN CLAY (CL), firm, reddish brown, brown, gravels, sand seams and layers
SILTY SAND (SM), loose, reddish brown, brown, gravels, shell
FILL: SILTY SAND (SM), reddish brown, brown, with root fibers to 2', gravels
LEAN CLAY (CL), stiff, reddish brown, brown, with root fibers to 4', gravels, sand seams and layers
SILTY SAND (SM), loose, reddish brown, brown, gravels, shell
LEAN CLAY (CL), firm, reddish brown, brown, gravels, sand seams and layers
SILTY SAND (SM), loose, reddish brown, brown, gravels, shell
23 22
FILL: SILTY SAND (SM), reddish brown, brown, with root fibers to 2', gravels
LEAN CLAY (CL), stiff, reddish brown, brown, with root fibers to 4', gravels, sand seams and layers
SILTY SAND (SM), loose, reddish brown, brown, gravels, shell
LEAN CLAY (CL), firm, reddish brown, brown, gravels, sand seams and layers
SILTY SAND (SM), loose, reddish brown, brown, gravels, shell
39 2217
FILL: SILTY SAND (SM), reddish brown, brown, with root fibers to 2', gravels
LEAN CLAY (CL), stiff, reddish brown, brown, with root fibers to 4', gravels, sand seams and layers
SILTY SAND (SM), loose, reddish brown, brown, gravels, shell
LEAN CLAY (CL), firm, reddish brown, brown, gravels, sand seams and layers
SILTY SAND (SM), loose, reddish brown, brown, gravels, shell
GEOTECH ENGINEERING & TESTING
DRY AUGER:
WET ROTARY:
S Y
M B
O L
NO FREE WATER ENCOUNTERED DURING DRILLING
ELEVATION: Existing Grade
P
LA
S T
IC
L
IM
IT
PLATE 4
Sheet 1 of 1
S P
T N
-V A
LU
E bl ow s pe r fo ot
UNCONFINED COMPRESSIONO
V
M , p pm
D E
P T
H , f t
TORVANE
0 DRILLED BY: Joel (T) LOGGED BY: Ricardo
N A
T U
R A
L M
O
IS
T U
R E
C O
N T
E N
T
LI
Q
U
ID
L
IM
IT
LOG OF BORING NO. B-1
S A
M P
LE
S
____ TO ____ ft.
0.5 1.0 1.5 2.0 2.5
HAND PENETROMETER
DESCRIPTION
P E
R C
E N
T P
A S
S
IN
G N
O . 2
S
IE
V
E
WATER OBSERVATIONS:
P
LA
S T
IC
IT
Y
IN
D E
X
____ TO ____ ft.
UNDRAINED SHEAR STRENGTH,
tsf
UNCONSOLIDATED-UNDRAINED
TRIAXIAL
UNDRAINED SHEAR STRENGTH,
tsf
P E
R C
E N
T P
A S
S
IN
G N
O . 2
S
IE
V
E
LI
Q
U
ID
L
IM
IT
LOG OF BORING NO. B-1
S A
M P
LE
S
WATER OBSERVATIONS:
P
LA
S T
IC
IT
Y
IN
D E
X
____ TO ____ ft.
____ TO ____ ft.
UNCONSOLIDATED-UNDRAINED
TRIAXIAL
DESCRIPTION
S P
T N
-V A
LU
E bl ow s pe r fo ot
O V
M , p pm
DRILLED BY: Joel (T) LOGGED BY: Ricardo
R Q
D L
E N
G T
H . i n
N A
T U
R A
L M
O
IS
T U
R E
C O
N T
E N
T
C O
R
IN
G R
E C
O V
E R
Y
L E
N G
T H
, i n
R Q
D -R
O C
K Q
U A
LI
T
Y D
E S
E G
N A
T
IO
N
PLATE 4
Sheet 1 of 1
HAND PENETROMETER
ELEVATION: Existing Grade
GEOTECH ENGINEERING & TESTING
UNCONFINED COMPRESSIOND
E
P T
H , f t
TORVANE
P
LA
S T
IC
L
IM
IT
DRY AUGER:
WET ROTARY:
S Y
M B
O L
NO FREE WATER ENCOUNTERED DURING DRILLING
0.5 1.0 1.5 2.0 2.5
C O
R
IN
G L
E N
G T
H , i n
PROJECT: G/S for Septic Tank and Asphalt Paving at Quintana Beach County Park, 330 5th Street
LOCATION: Quintana, Texas
PROJECT NO.: 25-754E STATION NO.:
DATE: 10-31-25 COMPLETION DEPTH: 15.0 ft.
Geotech Engineering and Testing
17407 US Highway 59
Houston, Texas 77396
Phone: 713-699-4000 Fax: 713-699-9200 gravels
SILTY SAND (SM), loose, reddish brown, brown, with root fibers to 4', gravels, shell
LEAN CLAY (CL), stiff, reddish brown, brown, gravels, sand seams and layers
SILTY SAND (SM), loose, reddish brown, brown, gravels, shell
LEAN CLAY (CL), firm, reddish brown, brown, gravels, sand seams and layers
SILTY SAND (SM), loose, reddish brown, brown, gravels, shell
FILL: SILTY SAND (SM), reddish brown, brown, with root fibers to 2', gravels
SILTY SAND (SM), loose, reddish brown, brown, with root fibers to 4', gravels, shell
LEAN CLAY (CL), stiff, reddish brown, brown, gravels, sand seams and layers
SILTY SAND (SM), loose, reddish brown, brown, gravels, shell
LEAN CLAY (CL), firm, reddish brown, brown, gravels, sand seams and layers
SILTY SAND (SM), loose, reddish brown, brown, gravels, shell
2222 24
FILL: SILTY SAND (SM), reddish brown, brown, with root fibers to 2', gravels
SILTY SAND (SM), loose, reddish brown, brown, with root fibers to 4', gravels, shell
LEAN CLAY (CL), stiff, reddish brown, brown, gravels, sand seams and layers
SILTY SAND (SM), loose, reddish brown, brown, gravels, shell
LEAN CLAY (CL), firm, reddish brown, brown, gravels, sand seams and layers
SILTY SAND (SM), loose, reddish brown, brown, gravels, shell
42 2418
FILL: SILTY SAND (SM), reddish brown, brown, with root fibers to 2', gravels
SILTY SAND (SM), loose, reddish brown, brown, with root fibers to 4', gravels, shell
LEAN CLAY (CL), stiff, reddish brown, brown, gravels, sand seams and layers
SILTY SAND (SM), loose, reddish brown, brown, gravels, shell
LEAN CLAY (CL), firm, reddish brown, brown, gravels, sand seams and layers
SILTY SAND (SM), loose, reddish brown, brown, gravels, shell
GEOTECH ENGINEERING & TESTING
DRY AUGER:
WET ROTARY:
S Y
M B
O L
NO FREE WATER ENCOUNTERED DURING DRILLING
ELEVATION: Existing Grade
P
LA
S T
IC
L
IM
IT
PLATE 5
Sheet 1 of 1
S P
T N
-V A
LU
E bl ow s pe r fo ot
UNCONFINED COMPRESSIONO
V
M , p pm
D E
P T
H , f t
TORVANE
0 DRILLED BY: Joel (T) LOGGED BY: Ricardo
N A
T U
R A
L M
O
IS
T U
R E
C O
N T
E N
T
LI
Q
U
ID
L
IM
IT
LOG OF BORING NO. B-2
S A
M P
LE
S
____ TO ____ ft.
0.5 1.0 1.5 2.0 2.5
HAND PENETROMETER
DESCRIPTION
P E
R C
E N
T P
A S
S
IN
G N
O . 2
S
IE
V
E
WATER OBSERVATIONS:
P
LA
S T
IC
IT
Y
IN
D E
X
____ TO ____ ft.
UNDRAINED SHEAR STRENGTH,
tsf
UNCONSOLIDATED-UNDRAINED
TRIAXIAL
UNDRAINED SHEAR STRENGTH,
tsf
P E
R C
E N
T P
A S
S
IN
G N
O . 2
S
IE
V
E
LI
Q
U
ID
L
IM
IT
LOG OF BORING NO. B-2
S A
M P
LE
S
WATER OBSERVATIONS:
P
LA
S T
IC
IT
Y
IN
D E
X
____ TO ____ ft.
____ TO ____ ft.
UNCONSOLIDATED-UNDRAINED
TRIAXIAL
DESCRIPTION
S P
T N
-V A
LU
E bl ow s pe r fo ot
O V
M , p pm
DRILLED BY: Joel (T) LOGGED BY: Ricardo
R Q
D L
E N
G T
H . i n
N A
T U
R A
L M
O
IS
T U
R E
C O
N T
E N
T
C O
R
IN
G R
E C
O V
E
N G
T H
, i n
R Q
D -R
O C
K Q
U A
LI
T
Y D
E S
E G
N A
T
IO
N
PLATE 5
Sheet 1 of 1
HAND PENETROMETER
ELEVATION: Existing Grade
GEOTECH ENGINEERING & TESTING
UNCONFINED COMPRESSIOND
E
P T
H , f t
TORVANE
P
LA
S T
IC
L
IM
IT
DRY AUGER:
WET ROTARY:
S Y
M B
O L
NO FREE WATER ENCOUNTERED DURING DRILLING
0.5 1.0 1.5 2.0 2.5
C O
R
IN
G L
E N
G T
H , i n
PROJECT: G/S for Septic Tank and Asphalt Paving at Quintana Beach County Park, 330 5th Street
LOCATION: Quintana, Texas
PROJECT NO.: 25-754E STATION NO.:
DATE: 10-31-25 COMPLETION DEPTH: 15.0 ft.
Geotech Engineering and Testing
17407 US Highway 59 gravels
SILTY SAND (SM), loose, reddish brown, brown, with root fibers to 4', gravels, shell
FILL: SILTY SAND (SM), reddish brown, brown, with root fibers to 2', gravels
SILTY SAND (SM), loose, reddish brown, brown, with root fibers to 4', gravels, shell
FILL: SILTY SAND (SM), reddish brown, brown, with root fibers to 2', gravels
SILTY SAND (SM), loose, reddish brown, brown, with root fibers to 4', gravels, shell
FILL: SILTY SAND (SM), reddish brown, brown, with root fibers to 2', gravels
SILTY SAND (SM), loose, reddish brown, brown, with root fibers to 4', gravels, shell
GEOTECH ENGINEERING & TESTING
DRY AUGER:
WET ROTARY:
S Y
M B
O L
NO FREE WATER ENCOUNTERED DURING DRILLING
ELEVATION: Existing Grade
P
LA
S T
IC
L
IM
IT
PLATE 6
Sheet 1 of 1
S P
T N
-V A
LU
E bl ow s pe r fo ot
UNCONFINED COMPRESSIONO
V
M , p pm
D E
P T
H , f t
TORVANE
0 DRILLED BY: Joel (T) LOGGED BY: Ricardo
N A
T U
R A
L M
O
IS
T U
R E
C O
N T
E N
T
LI
Q
U
ID
L
IM
IT
LOG OF BORING NO. B-3
S A
M P
LE
S
____ TO ____ ft.
0.5 1.0 1.5 2.0 2.5
HAND PENETROMETER
DESCRIPTION
P E
R C
E N
T P
A S
S
IN
G N
O . 2
S
IE
V
E
WATER OBSERVATIONS:
P
LA
S T
IC
IT
Y
IN
D E
X
____ TO ____ ft.
UNDRAINED SHEAR STRENGTH,
tsf
UNCONSOLIDATED-UNDRAINED
TRIAXIAL
UNDRAINED SHEAR STRENGTH,
tsf
P E
R C
E N
T P
A S
S
IN
G N
O . 2
S
IE
V
E
LI
Q
U
ID
L
IM
IT
LOG OF BORING NO. B-3
S A
M P
LE
S
WATER OBSERVATIONS:
P
LA
S T
IC
IT
Y
IN
D E
X
____ TO ____ ft.
____ TO ____ ft.
UNCONSOLIDATED-UNDRAINED
TRIAXIAL
DESCRIPTION
S P
T N
-V A
LU
E bl ow s pe r fo ot
O V
M , p pm
DRILLED BY: Joel (T) LOGGED BY: Ricardo
R Q
D L
E N
G T
H . i n
N A
T U
R A
L M
O
IS
T U
R E
C O
N T
E N
T
C O
R
IN
G R
E C
O V
E
N G
T H
, i n
R Q
D -R
O C
K Q
U A
LI
T
Y D
E S
E G
N A
T
IO
N
PLATE 6
Sheet 1 of 1
HAND PENETROMETER
ELEVATION: Existing Grade
GEOTECH ENGINEERING &…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .