2-Attachment B - Plan Set.pdf
PDF 18 MB Posted
- Solicitation number
- 26-51
- Issued by
- Brazoria County, Texas
About this file
Brazoria County Quintana Beach Park - Septic, Electrical & Loop Road Project
This plan set document outlines the design specifications for Brazoria County's construction project at Quintana Beach Park located at 330 5th Street, Quintana, Texas 77541 (Project No. R316181.01). The project encompasses three primary components: installation of a new septic system with treatment tanks and absorption beds, expansion of electrical infrastructure to serve recreational vehicle (RV) sites, and construction of a vehicular loop road with associated parking pad extensions. The septic system design includes a 3,000-gallon pre-treatment tank, an 8,000-gallon dosing tank manifolded with three 2,755-gallon tanks, four 1,500-gallon aerobic treatment unit (ATU) tanks, and two 3,010-gallon pump tanks to replace the existing 7,500-gallon and 3,000-gallon tanks being demolished. The electrical infrastructure expansion provides service to 58 RV sites with individual 50-amp pedestals, supplied by pad-mounted transformers and distribution panels rated at 75 kilowatts, 45 kilowatts, and 15 kilowatts as appropriate. The vehicular improvements include new full-depth asphalt pavement, concrete pad extensions and replacements for RV sites, sidewalk replacements, and stormwater pollution prevention plan (SWPPP) measures including filter fencing, stabilized construction entrances, and concrete truck washout areas. The design work was completed by Huitt-Zollars (civil engineer), and E&C Engineers & Consultants (MEP engineer), with plan sheets issued for bid and permit on March 27, 2026.
The project documentation includes comprehensive civil, electrical, and mechanical/plumbing design plans with 25 civil sheets, 10 electrical sheets covering site demolition, site plans, details, riser diagrams and equipment schedules, and detailed specifications for all construction elements. The septic system design accommodates existing site conditions in a Zone VE flood hazard area with a base flood elevation of 15 feet, utilizing K-Rain 6-zone alternating valves for distribution to treatment beds. Electrical service calculations indicate a total load of 285,360 volt-amperes for the complete RV site infrastructure based on NEC requirements of 12,000 volt-amperes per site with a 41-percent demand factor for sites exceeding 36 units. All construction specifications comply with TxDOT standards for asphalt placement, ACI requirements for concrete work, and applicable National Electrical Code provisions. The project requires coordination with CenterPoint Energy for service connections and adherence to floodplain construction requirements as indicated on the Federal Emergency Management Agency Flood Insurance Rate Map Panel No. 48039C0820K dated December 30, 2020.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .