This is a cost submittal sheet for an Invitation for Bid (IFB) issued by the Utah Department of Transportation (UDOT) Procurement Services Division, with Region 2 as the conducting procurement unit, for Solicitation #UDOT270079CN. The project involves the delivery of approximately 53 cubic yards of UDOT-approved rapid set concrete to two separate job sites on different dates and times: 25 cubic yards to I-215 at 2100 North (northbound and southbound) on October 23rd at midnight, and the remaining 28 cubic yards to SR 201 MP16 on October 25th at 1:00 AM. The scope of work includes three line items: mobilization for Salt Lake County, a maturity meter with environmental washout, and volumetric truck delivery with rapid set concrete equipment and materials using 3/4-inch aggregate. UDOT will award the contract to the responsive and responsible bidder with the lowest total cost for all three line items. Actual quantities delivered may vary from the estimated amounts and will be determined in the field, with payment based on actual quantities delivered.

Bidders must submit cost proposals in the designated blue fields of the cost sheet, with pricing required for mobilization (lump sum), the maturity meter and washout (lump sum), and volumetric truck delivery per cubic yard. The basis of award is the lowest total project cost, and the contract may result in a single award to one contractor. This solicitation is issued in accordance with the State of Utah Procurement Code and Utah Administrative Code, which take precedence in case of any conflicts with the IFB provisions.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Insert company Name:
Cost Submittal-Volumetric Truck delivery (Rapid set) Station 2430 Salt LakeEnter Bid Values in Blue Fields Only
No.Item DescriptionUoMEstimated QuantitySubmited Cost per UoMCost
1Mobilization – Salt Lake County (I-215 @ 2100 N NB and SB and SR 201 MP16)Lump1$ - 0
2Maturity Meter, environmental washoutLump1$ - 0
3Volumetric Truck delivery (Rapid Set Concrete UDOT approved mix design) equipment, materials (3/4 Inch aggregate)Cubic Yard53$ - 0
Total Project Cost Summary TableTotal
Base Bid (Items 1-3)$ - 0
Fields in this table will automatically populate based on bids.
Basis of Award
UDOT will award to the contractor with the lowest total cost of line Items 1-3. Quantities listed are for estimate purposes only, actual may be more or less and will be determined in the field. Contractor will be paid based on actual quantities.

The 53 cubic yards will be delivered in two pour times: 25 cu yds on October 23rd at midnight, and the remaining 28 cu yds on October 25th at 1:00 AM.