3-Attachment C - Construction Plans - Hamilton Blvd 2025-06.pdf
PDF 8 MB Posted
- Solicitation number
- Not on record
- Issued by
- Lehigh County, Pennsylvania
About this file
This document contains construction plans for ADA Curb Ramps and Traffic Signal Upgrades in South Whitehall Township, Lehigh County, Pennsylvania, prepared by The Pidcock Company for the township and PennDOT. The project involves improvements to SR 0222 (Hamilton Boulevard) and Lincoln Avenue, with work scheduled to begin on September 17, 2025. The project scope includes reconstructing curb ramps to meet ADA accessibility standards, upgrading traffic signals, modifying roadway geometry, installing new pavement markings, and relocating existing utilities and signage. The project limits extend from Station 204+50.00 to Station 206+50.00, covering approximately 300 linear feet.
The construction plans include detailed design elements such as pavement reconstruction, soil erosion and sedimentation control, roadway improvements, signing and marking plans, and traffic signal modifications. The project will involve full-depth pavement reconstruction, installation of new drainage structures, adjustments to existing right-of-way, and implementation of pedestrian accessibility features. The highway occupancy permit (HOP) application number is 348961, and the project is being funded through municipal and state transportation infrastructure channels. The design incorporates considerations for emergency vehicle access, pedestrian safety, and compliance with current transportation design standards, with particular attention to ADA requirements and modern traffic signal technologies.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOR
CONSTRUCTION PLANS
SEPTEMBER 17, 2025
LOCATED IN
SOUTH WHITEHALL TOWNSHIP, LEHIGH COUNTY, PENNSYLVANIA
ADA CURB RAMPS AND
TRAFFIC SIGNAL UPGRADES
ATTACHMENT C
AutoCAD SHX Text NOTE THIS PLAN HAS BEEN PREPARED IN CONJUNCTION WITH MUNICIPAL REGULATIONS AND ORDINANCES RELATING TO LAND USAGE AND DIMENSIONAL REQUIREMENTS OF ZONING AND RELATED PERMITS. HOWEVER, NOT CONSIDERED ARE PERIPHERAL ISSUES SUCH AS CLARITY OF TITLE, SUBSURFACE CONDITIONS INCLUDING BUT NOT LIMITED TO SOIL AND WATER CONTAMINATION, SINKHOLE ACTIVITY AND HISTORICAL AND ARCHAEOLOGICAL ISSUES, OR OTHER SUCH ISSUES AS MAY AFFECT THE MERCHANTABILITY OF THE LAND. THE PIDCOCK COMPANY MAKES NO REPRESENTATION OR WARRANTY CONCERNING THESE ISSUES WHICH SHOULD BE ADDRESSED BY QUALIFIED PROFESSIONALS ENGAGED IN THE APPROPRIATE FIELDS OF PRACTICE.
AutoCAD SHX Text
SWT-806
AutoCAD SHX Text
SHEET 1 OF 31 OF 3 OF 33
CONSTRUCTION PLANS
ADA CURB RAMPS AND TRAFFIC SIGNAL
UPGRADES
SOUTH WHITEHALL TOWNSHIP, LEHIGH COUNTY, PENNSYLVANIA
SCALE:
DATE:
CHECKED BY:
DRAWN BY:
PROJECT NUMBER:
CAD FILE: INDEX.dwg
REVISIONS
"Not Published; All Rights Reserved by The Pidcock Company."
SHEET NUMBER
FILE NUMBER
DATE DESCRIPTION
PROFESSIONAL SEAL
SWT-806
OF 3
SEPTEMBER 17, 2025
AFT
JGU
770.2401
Pl an
In fo rm at io n:
P :\7
S
W T\
0.
\C iv il\ C on st ru ct io n
Pl an s\
IN
D
EX
.d w g
P rin te d:
A ug
7,
- 8 :3
4a m
AS NOTED
NOTES:
1. THIS PLAN HAS BEEN PREPARED IN CONJUNCTION WITH MUNICIPAL
REGULATIONS AND ORDINANCES RELATING TO LAND USAGE AND
DIMENSIONAL REQUIREMENTS OF ZONING AND RELATED PERMITS.
HOWEVER, NOT CONSIDERED ARE PERIPHERAL ISSUES SUCH AS CLARITY OF
TITLE, SUBSURFACE CONDITIONS INCLUDING BUT NOT LIMITED TO SOIL AND
WATER CONTAMINATION, SINKHOLE ACTIVITY AND HISTORICAL AND
ARCHAEOLOGICAL ISSUES, OR OTHER SUCH ISSUES AS MAY AFFECT THE
MERCHANTABILITY OF THE LAND. THE PIDCOCK COMPANY MAKES NO
REPRESENTATION OR WARRANTY CONCERNING THESE ISSUES WHICH
SHOULD BE ADDRESSED BY QUALIFIED PROFESSIONALS ENGAGED IN THE
APPROPRIATE FIELDS OF PRACTICE.
2. THESE DOCUMENTS ARE PROVIDED FOR MUNICIPAL REVIEW ONLY AND ARE
NOT TO BE UTILIZED FOR ANY OTHER PURPOSE. THE DOCUMENTS ARE NOT
ISSUED FOR CONSTRUCTION UNLESS SPECIFICALLY NOTED AS SUCH BELOW.
CONTRACTOR'S OBLIGATION REGARDING COORDINATION OF
DOCUMENTS AND FIELD CONDITIONS
THE CONTRACT DOCUMENTS PRESENT THE DESIGN INTENT. IT SHALL BE THE
CONTRACTOR'S RESPONSIBILITY TO REVIEW ALL PLANS, SPECIFICATIONS,
ADDENDA, CONSTRUCTION SKETCHES AND OTHER CONTRACT DOCUMENTS FOR
CONSISTENCY. SIMILARLY, IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY
TO REVIEW FIELD CONDITIONS, INCLUDING COORDINATION WITH ALL UTILITIES.
THE CONTRACTOR SHALL COMPLETE ANY TEST EXCAVATIONS IN ADVANCE OF
ORDERING MATERIALS OR OF CONSTRUCTION IN AN AREA OF UTILITY
CROSSINGS OR POTENTIAL INVOLVEMENT. IT SHALL BE THE CONTRACTOR'S
RESPONSIBILITY TO BRING ANY INCONSISTENCIES IN THE DOCUMENTS OR ANY
APPARENT CONFLICTS TO THE ATTENTION OF THE ENGINEER BEFORE
ORDERING MATERIALS AND BEFORE PROCEEDING WITH CONSTRUCTION IN THE
AREA SO THAT THE ENGINEER MAY REVIEW THE CONDITIONS AND RECOMMEND
ANY ADJUSTMENTS TO THE DOCUMENTS THAT MAY BE NECESSARY, OR TO
RECOMMEND RELOCATION OF A UTILITY OR OTHER REMEDIAL WORK THAT MAY
BE REQUIRED.
REFER TO THE GENERAL NOTES ON SHEET 2 OF 3 FOR ALL PLAN NOTES.
INDEX AND SITE PLAN
INTERSTATE78
INTERSTATE476
PROJECT
LOCATION
MeA
W W
S S
FF
G G
T
TV
E
T
E
TV
OW
FOL
XX
FOL
OW
R-1 R-2
THREE BUSINESS DAYS BEFORE
YOU DIG - DRILL - BLAST
DIAL 8-1-1 or 1-800-242-1776 www.paonecall.org
R
SR 0222 (HAMILTON BOULEVARD)
LIN
C
O
LN
A V
E N
U E
(T- 518)
LIN
C O
LN
A
V E
N U
E (T-481)
PROJECT
AREA
SITE PLAN
AutoCAD SHX Text
RIGHT-OF-WAY LINE FOR LIMITED ACCESS
AutoCAD SHX Text
LEGAL RIGHT-OF-WAY LINE
AutoCAD SHX Text
RIGHT-OF-WAY LINE FOR LIMITED ACCESS
AutoCAD SHX Text
RIGHT-OF-WAY LINE FOR LIMITED ACCESS
AutoCAD SHX Text
LEGAL RIGHT-OF-WAY LINE
AutoCAD SHX Text
RIGHT-OF-WAY LINE FOR TOWNSHIP ROAD
AutoCAD SHX Text
RIGHT-OF-WAY LINE FOR LIMITED ACCESS
AutoCAD SHX Text
SCALE IN FEET
AutoCAD SHX Text
AutoCAD SHX Text
LOCATION MAP
AutoCAD SHX Text 1000'
AutoCAD SHX Text 2000'
AutoCAD SHX Text 2000'
AutoCAD SHX Text 4000'
AutoCAD SHX Text
SOURCE: ALLENTOWN WEST, PA. (2023)
AutoCAD SHX Text BC BOTTOM OF CURB BOTTOM OF CURB BCCMP BITUMINOUS COATED BITUMINOUS COATED CORRUGATED METAL PIPE BASELINE BASELINE B.M. BENCH MARK BENCH MARK BRL BUILDING RESTRICTION LINE BUILDING RESTRICTION LINE BT BELL TELEPHONE BELL TELEPHONE BW BOTTOM OF WALL BOTTOM OF WALL CES CONCRETE END SECTION CONCRETE END SECTION CIP CAST IRON PIPE CAST IRON PIPE CMP CORRUGATED METAL PIPE CORRUGATED METAL PIPE CO CLEANOUT CLEANOUT DIP DUCTILE IRON PIPE DUCTILE IRON PIPE EW ENDWALL ENDWALL ELEV. ELEVATION ELEVATION FH FIRE HYDRANT FIRE HYDRANT GV GAS VALVE GAS VALVE HDW HEADWALL HEADWALL HERCP HORIZONTAL ELLIPTICAL HORIZONTAL ELLIPTICAL REINFORCED CONCRETE PIPE HSD HEADLIGHT SIGHT DISTANCE HEADLIGHT SIGHT DISTANCE INV. INVERT INVERT LS LIGHT STANDARD LIGHT STANDARD MES METAL END SECTION METAL END SECTION ME METROPOLITAN EDISON METROPOLITAN EDISON MH. MANHOLE MANHOLE MO MIDDLE ORDINATE MIDDLE ORDINATE OCS OUTLET CONTROL STRUCTURE OUTLET CONTROL STRUCTURE PGL PROFILE GRADE LINE PROFILE GRADE LINE PLCC PLAIN CEMENT CONCRETE CURB PLAIN CEMENT CONCRETE CURB CURB PL CONC PLAIN CONCRETE MOUNTABLE CURB PLAIN CONCRETE MOUNTABLE CURB MTBLE CURB PPL PENNSYLVANIA POWER LIGHT PENNSYLVANIA POWER LIGHT PVC POLYVINYL CHLORIDE POLYVINYL CHLORIDE PC HORIZONTAL POINT OF CURVATURE HORIZONTAL POINT OF CURVATURE PT HORIZONTAL POINT OF TANGENCY HORIZONTAL POINT OF TANGENCY PVCC POINT OF VERTICAL POINT OF VERTICAL COMPOUND CURVATURE PVI POINT OF VERTICAL INTERSECTION POINT OF VERTICAL INTERSECTION PVT POINT OF VERTICAL TANGENCY POINT OF VERTICAL TANGENCY RCP REINFORCED CONCRETE PIPE REINFORCED CONCRETE PIPE RD ROOF DRAIN ROOF DRAIN R/W RIGHT-OF-WAY LINE RIGHT-OF-WAY LINE SAN.MH. SANITARY MANHOLE SANITARY MANHOLE SSD SIGHT STOPPING DISTANCE SIGHT STOPPING DISTANCE STA. STATION STATION TBR TO BE REMOVED TO BE REMOVED TC TOP OF CURB TOP OF CURB T/F TOP OF FOUNDATION TOP OF FOUNDATION TW TOP OF WALL TOP OF WALL VCP VITRIFIED CLAY PIPE VITRIFIED CLAY PIPE WV WATER VALVE WATER VALVE
AutoCAD SHX Text
ABBREVIATIONS
AutoCAD SHX Text
FH
AutoCAD SHX Text NOTE: THE LEGEND AND ABBREVIATIONS APPLY TO ALL SHEETS IN THE PLAN SET. THEY CONTAIN A COMPREHENSIVE LIST OF DRAWING SYMBOLS AND ABBREVIATIONS THAT MAY BE DEPICTED ON A PLAN SHEET. ALL OF THE SYMBOLS OR ABBREVIATIONS MAY NOT OCCUR ON A PLAN SHEET OR IN THE DRAWING SET. IN SOME INSTANCES PROPOSED OR EXISTING FEATURES MAY BE DEPICTED DIFFERENTLY ON A PLAN THAN IN THE LEGEND TO IMPROVE OVERALL PLAN CLARITY.
AutoCAD SHX Text
ULTIMATE R/W LINE
AutoCAD SHX Text
SOILS TYPE
AutoCAD SHX Text
BUILDING
AutoCAD SHX Text
BITUMINOUS PAVEMENT
AutoCAD SHX Text
LEGEND
AutoCAD SHX Text
GUIDERAIL
AutoCAD SHX Text
FENCE
AutoCAD SHX Text
UNDERGROUND TELEPHONE LINES
AutoCAD SHX Text
UNDERGROUND TELEVISION CABLE
AutoCAD SHX Text
UNDERGROUND ELECTRIC LINES
AutoCAD SHX Text
GAS LINE AND VALVE
AutoCAD SHX Text
FORCE MAIN WITH DIRECTION OF FLOW
AutoCAD SHX Text
SANITARY SEWER, MANHOLE, CLEANOUT AND LATERAL
AutoCAD SHX Text
WATERLINE, FIRE HYDRANT, VALVE, REDUCER, TEE, PLUG AND SERVICE
AutoCAD SHX Text
ENDWALL
AutoCAD SHX Text
END SECTION
AutoCAD SHX Text
OUTLET CONTROL STRUCTURE
AutoCAD SHX Text
SWALE, EDGES OF RIVER, CREEKS, WETLANDS, ETC.
AutoCAD SHX Text
STORM SEWER, MANHOLE, INLET AND ROOF DRAIN
AutoCAD SHX Text
SPOT ELEVATIONS
AutoCAD SHX Text
CONTOUR
AutoCAD SHX Text
UTILITY EASEMENT
AutoCAD SHX Text
BUILDING RESTRICTION LINE
AutoCAD SHX Text
ULTIMATE RIGHT-OF-WAY LINE
AutoCAD SHX Text
RIGHT-OF-WAY LINE
AutoCAD SHX Text
CENTERLINE
AutoCAD SHX Text
LOT LINE
AutoCAD SHX Text
PROPERTY LINE
AutoCAD SHX Text
DEPRESSED CURB
AutoCAD SHX Text
BITUMINOUS CURB
AutoCAD SHX Text
CONCRETE CURB
AutoCAD SHX Text
CONCRETE SIDEWALKS, APRONS, PADS, ETC.
AutoCAD SHX Text
STONE AREA
AutoCAD SHX Text
SOILS DELINEATION
AutoCAD SHX Text
OVERHEAD WIRES
AutoCAD SHX Text
UNDERGROUND FIBER OPTIC LINE
AutoCAD SHX Text
RIPRAP
AutoCAD SHX Text
DECIDUOUS TREE
AutoCAD SHX Text
EVERGREEN TREE
AutoCAD SHX Text
TELEPHONE POLE
AutoCAD SHX Text
ELECTRIC POLE
AutoCAD SHX Text
LIGHT STANDARD
ULTIMATE R/W LINE
AutoCAD SHX Text
BRL
AutoCAD SHX Text
BRL
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 449.1
AutoCAD SHX Text 449.1
AutoCAD SHX Text
EXISTING
AutoCAD SHX Text
PROPOSED
X
AutoCAD SHX Text
MH.
AutoCAD SHX Text
INLET
AutoCAD SHX Text
RD
AutoCAD SHX Text
OCS
AutoCAD SHX Text
CES
AutoCAD SHX Text
ENDWALL
AutoCAD SHX Text
CO
AutoCAD SHX Text
SAN.MH.
AutoCAD SHX Text
GV
AutoCAD SHX Text
OCS
AutoCAD SHX Text
CES
AutoCAD SHX Text
WV
AutoCAD SHX Text
FH
AutoCAD SHX Text
CO
AutoCAD SHX Text
SAN.MH.
AutoCAD SHX Text
GV
AutoCAD SHX Text
LS
AutoCAD SHX Text
LS
AutoCAD SHX Text
B.T. CO. POLE
AutoCAD SHX Text
AutoCAD SHX Text
B.T. CO. POLE
AutoCAD SHX Text
AutoCAD SHX Text
ENDWALL
AutoCAD SHX Text
PLUG
AutoCAD SHX Text
PLUG
AutoCAD SHX Text
PPL CO. POLE
AutoCAD SHX Text
AutoCAD SHX Text
PPL CO. POLE
AutoCAD SHX Text
AutoCAD SHX Text
RAILROAD
AutoCAD SHX Text
SIGN
AutoCAD SHX Text
FLOODPLAIN 100-YEARS
AutoCAD SHX Text
FLOODPLAIN 500-YEARS
AutoCAD SHX Text
ZONING BOUNDARY
AutoCAD SHX Text
IRON PIPE (FND)
AutoCAD SHX Text
PROP.COR.
AutoCAD SHX Text
WV
AutoCAD SHX Text
WV
AutoCAD SHX Text
INLET
AutoCAD SHX Text
MH.
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
NO.
AutoCAD SHX Text
LAST REVISION
AutoCAD SHX Text
PLAN DATE OR
AutoCAD SHX Text
INDEX TO DRAWINGS
AutoCAD SHX Text T I T L E
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
MULTICORELINK:COVER-Layout1 AutoCAD SHX Text
COVER SHEET
AutoCAD SHX Text
INDEX AND SITE PLAN
MULTICORELINK:SE_PLAN-Layout1 AutoCAD SHX Text
SOIL EROSION AND SEDIMENTATION CONTROL PLAN, NOTES AND DETAILS
AutoCAD SHX Text
SEPTEMBER 17, 2025
AutoCAD SHX Text
SEPTEMBER 17, 2025
AutoCAD SHX Text
SEPTEMBER 17, 2025
AutoCAD SHX Text
SUPPLEMENTAL DRAWINGS - HIGHWAY OCCUPANCY PLANS (SWT-802)
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
COVER SHEET
AutoCAD SHX Text
NOVEMBER 19, 2024
AutoCAD SHX Text
GENERAL INFORMATION PLAN
AutoCAD SHX Text
KEY MAP
AutoCAD SHX Text
GENERAL NOTES 1
AutoCAD SHX Text
GENERAL NOTES 2
AutoCAD SHX Text
TYPICAL SECTIONS
AutoCAD SHX Text
ROADWAY IMPROVEMENTS PLAN
AutoCAD SHX Text
SIGNING AND MARKING PLAN
AutoCAD SHX Text
SIGN DATA PLAN
AutoCAD SHX Text
GRADING AND UTILITY PLAN
AutoCAD SHX Text
CURB RAMP DETAILS 1
AutoCAD SHX Text
CURB RAMP DETAILS 2
AutoCAD SHX Text
ROADWAY PROFILES
AutoCAD SHX Text
NOVEMBER 19, 2024
AutoCAD SHX Text
NOVEMBER 19, 2024
AutoCAD SHX Text
NOVEMBER 19, 2024
AutoCAD SHX Text
NOVEMBER 19, 2024
AutoCAD SHX Text
NOVEMBER 19, 2024
AutoCAD SHX Text
NOVEMBER 19, 2024
AutoCAD SHX Text
NOVEMBER 19, 2024
AutoCAD SHX Text
NOVEMBER 19, 2024
AutoCAD SHX Text
NOVEMBER 19, 2024
AutoCAD SHX Text
NOVEMBER 19, 2024
AutoCAD SHX Text
NOVEMBER 19, 2024
AutoCAD SHX Text
NOVEMBER 19, 2024
AutoCAD SHX Text
SUPPLEMENTAL DRAWINGS - TRAFFIC SIGNAL PERMIT PLANS
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
SR 0222 (HAMILTON BOULEVARD) & LINCOLN AVENUE
AutoCAD SHX Text
FEBRUARY 20, 2025
AutoCAD SHX Text
SR 0222 (HAMILTON BOULEVARD) & LINCOLN AVENUE
AutoCAD SHX Text
SR 0222 (HAMILTON BOULEVARD) & LINCOLN AVENUE
AutoCAD SHX Text
FEBRUARY 20, 2025
AutoCAD SHX Text
FEBRUARY 20, 2025
AutoCAD SHX Text THE PIDCOCK COMPANY CALLED THE PENNSYLVANIA ONE-CALL SYSTEM, INC. APRIL 2, 2024 APRIL 2, 2024 AND REQUESTED THAT ALL UNDERGROUND UTILITIES BE LOCATED AT THIS SITE LOCATED IN SOUTH WHITEHALL TOWNSHIP, LEHIGH COUNTY, PENNSYLVANIA INCLUDING UNDERGROUND INCLUDING UNDERGROUND UTILITIES IN THE ADJACENT PUBLIC ROAD RIGHTS-OF-WAY. SERIAL NUMBER SERIAL NO. SERIAL NO. 20240931244 WAS ASSIGNED TO THIS PROJECT LOCATION AND THE FOLLOWING UTILITY WAS ASSIGNED TO THIS PROJECT LOCATION AND THE FOLLOWING UTILITY WAS ASSIGNED TO THIS PROJECT LOCATION AND THE FOLLOWING UTILITY OPERATORS WERE CONTACTED:
AutoCAD SHX Text THE PIDCOCK COMPANY DOES NOT MAKE ANY REPRESENTATION, WARRANTY, ASSURANCE OR GUARANTY THAT THE INFORMATION RECEIVED PURSUANT TO THE SAID REQUESTS UNDER PENNSYLVANIA ONE CALL SYSTEM, INC. AND AS REFLECTED ON THE PLAN IS CORRECT, ACCURATE OR COMPLETE. IT SHALL BE THE RESPONSIBILITY OF ANYONE PERFORMING WORK ON THE SITE TO ARRANGE FOR THE FIELD LOCATION AND PROTECTION OF ALL OVERHEAD AND SUBSURFACE UTILITIES WHICH MAY BE ENCOUNTERED DURING THE COURSE OF THEIR WORK.
AutoCAD SHX Text PRIVATE AND PUBLIC UNDERGROUND LINES AND FACILITIES SUCH AS TELEPHONE, TELEVISION, GENERAL LIGHTING, ELECTRICAL, UNDERDRAINS, PLUMBING, SEWER LINES, STORAGE TANKS, ETC., SERVING THE SITE MAY EXIST ON THE SITE. THE PIDCOCK COMPANY DOES NOT MAKE ANY REPRESENTATION, WARRANTY, ASSURANCE OR GUARANTY THAT THE PRIVATE AND PUBLIC UNDERGROUND LINES AND FACILITIES HAVE BEEN IDENTIFIED, LOCATED AND SHOWN ON THIS PLAN. IT SHALL BE THE RESPONSIBILITY OF ANYONE PERFORMING WORK, BE IT DESIGN WORK FOR FUTURE DEVELOPMENT OR ACTUAL CONSTRUCTION OR DEMOLITION ON THE PROPERTY SHOWN ON THIS PLAN TO ARRANGE FOR THE LOCATION AND PROTECTION OF ALL OVERHEAD, SURFACE AND SUBSURFACE UTILITIES WHICH COULD BE ENCOUNTERED AS THE RESULT OF WORK PERFORMED ON THIS SITE. DESIGN STAGE WORK SHOULD INCLUDE CALLING THE PENNSYLVANIA ONE CALL SYSTEM AT 1-800-242-1776. LATERAL AND SERVICE LINE NOTES UNDERGROUND LATERALS AND SERVICE LINES, INCLUDING BUT NOT LIMITED TO GAS AND ELECTRIC, MAY EXIST IN THE VICINITY OF THE PROJECT CONSTRUCTION AND MAY NOT BE SHOWN ON THE PLAN. TO THE EXTENT THAT INFORMATION WAS PROVIDED, TO US, SUCH LATERALS AND LINES HAVE BEEN INDICATED ON THE PLAN, BUT THEIR DEPICTION AND LOCATIONS SHOULD BE CONSIDERED AS ONLY APPROXIMATE, AND NOT AS COMPREHENSIVE OR ALL-INCLUSIVE. BY SHOWING SOME LATERALS AND LINES OF THIS KIND, THE PIDCOCK COMPANY DOES NOT MAKE ANY REPRESENTATION, WARRANTY, ASSURANCE, OR GUARANTY THAT ALL SUCH UNDERGROUND LATERALS AND LINES HAVE BEEN IDENTIFIED, LOCATED, AND SHOWN ON THIS PLAN. CONTRACTORS AND ANY OTHER PERSONS DESIGNING OR PERFORMING SUBSURFACE WORK IN THE VICINITY ARE RESPONSIBLE FOR GIVING APPROPRIATE ADVANCE NOTICE BY CALLING THE PENNSYLVANIA ONE CALL SYSTEM, INC. AT 1-800-242-1776 OR BY OPENING TICKET ON THEIR WEBSITE AT https://www.pa1call.org/, AND FOR CONTACTING THE APPROPRIATE PUBLIC AND https://www.pa1call.org/, AND FOR CONTACTING THE APPROPRIATE PUBLIC AND , AND FOR CONTACTING THE APPROPRIATE PUBLIC AND PRIVATE ENTITIES AND ARRANGING FOR THE FIELD LOCATION AND PROTECTION OF ALL SUCH UNDERGROUND LATERALS AND SERVICE LINES THAT COULD BE ENCOUNTERED AS A RESULT OF THE WORK TO BE PERFORMED ON THE SITE.
AutoCAD SHX Text
PENNSYLVANIA ONE CALL SYSTEM, INC. UNDERGROUND UTILITY NOTIFICATION
AutoCAD SHX Text SOUTH WHITEHALL TOWNSHIP 4444 WALBERT AVENUE ALLENTOWN, PA, 18104 CONTACT: MIKE ELIAS EMAIL: ELIASM@SOUTHWHITEHALL.COM PHONE: 610-398-0401 EXT. 280 LEHIGH COUNTY AUTHORITY 1053 SPRUCE ROAD PO BOX 3348 ALLENTOWN, PA 18106 CONTACT: JASON PETERS EMAIL: jasonpeters@lehighcountyauthority.org PHONE: 610-298-2503 EXT. 148 DORNEY PARK, LLC 3830 DORNEY PARK ROAD ALLENTOWN, PA 18104 CONTACT: PAUL WIEDER EMAIL: pwieder@dorneypark.com PHONE: 610-391-7780 BUCKEYE PARTNERS THE BUCKEYE BUILDING 6161 HAMILTON BOULEVARD ALLENTOWN, PA 18106 CONTACT: BRIAN BARR EMAIL: bbarr@buckeye.com PHONE: 610-904-4885 PPL ELECTRIC UTILITIES CORPORATION 437 BLUE CHURCH ROAD PAXINOS, PA. 17860 CONTACT: DOUG HAUPT EMAIL: dlhaupt@pplweb.com PHONE: 570-490-5684 ASTOUND BROADBAND POWERED BY RCN 5508 NORBATH BOULEVARD NORTHAMPTON, PA 18067 CONTACT: ERIC BEERS EMAIL: eric.beers@astound.com PHONE: 610-972-0597 UGI UTILITIES, INC. 2121 CITY LINE ROAD BETHLEHEM, PA 18017 CONTACT: TIMOTHY STEWARD EMAIL: tsteward@ugi.com PHONE: 610-807-3162 VERIZON BUSINESS FORMERLY MCI 7000 WESTON PARKWAY CARY, NC 27513 CONTACT: VICTOR WOOD EMAIL: victor.s.wood@verizon.com PHONE: 919-414-2782
AutoCAD SHX Text CONSTRUCTION NOTES 1. THE CONTRACTOR SHALL CAREFULLY REVIEW ALL CONSTRUCTION PLANS AND THE CONTRACTOR SHALL CAREFULLY REVIEW ALL CONSTRUCTION PLANS AND TECHNICAL SPECIFICATIONS FOR CONSISTENCY WITHIN THE DOCUMENTS. IF ANY ASPECT OF THE WORK IS IN CONFLICT WITH ANOTHER SECTION OR CONTAINS AN OBVIOUS ERROR, CONTACT THE ENGINEER OR THE RESPECTIVE CONSULTANT, AND RESOLVE IT PRIOR TO PROCEEDING WITH THE WORK. 2. ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH SOUTH WHITEHALL ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH SOUTH WHITEHALL SOUTH WHITEHALL TOWNSHIP, LEHIGH COUNTY, PENNSYLVANIA, PENNSYLVANIA DEPARTMENT OF , PENNSYLVANIA DEPARTMENT OF ENVIRONMENTAL PROTECTION, AND PENNSYLVANIA DEPARTMENT OF TRANSPORTATION STANDARDS, SPECIFICATIONS, DETAILS AND REGULATIONS AS APPLICABLE AND IS SUBJECT TO INSPECTION AND APPROVAL BY THESE AGENCIES AS APPROPRIATE. 3. ALL TRAFFIC SIGNS SHALL BE CONSTRUCTED IN ACCORDANCE WITH PENNDOT ALL TRAFFIC SIGNS SHALL BE CONSTRUCTED IN ACCORDANCE WITH PENNDOT STANDARDS AND SHALL BE CONSTRUCTED WITH TYPE 'B' POSTS UNLESS OTHERWISE NOTED. 4. THE CONTRACTOR IS TO TAKE ANY PRECAUTIONS NECESSARY TO MAINTAIN THE CONTRACTOR IS TO TAKE ANY PRECAUTIONS NECESSARY TO MAINTAIN ADEQUATE COVER OVER THE EXISTING UTILITIES DURING CONSTRUCTION.
AutoCAD SHX Text
AutoCAD SHX Text
SCALE IN FEET
AutoCAD SHX Text
AutoCAD SHX Text
MeA
WaC
WaC
UmB
CONSTRUCTION PLANS
ADA CURB RAMPS AND TRAFFIC SIGNAL
UPGRADES
SOUTH WHITEHALL TOWNSHIP, LEHIGH COUNTY, PENNSYLVANIA
GRAPHIC SCALE:
SCALE:
DATE:
CHECKED BY:
DRAWN BY:
PROJECT NUMBER:
CAD FILE: SE_PLAN.dwg
REVISIONS
"Not Published; All Rights Reserved by The Pidcock Company."
SHEET NUMBER
FILE NUMBER
DATE DESCRIPTION
PROFESSIONAL SEAL
SWT-806
OF 3
SEPTEMBER 17, 2025
AFT
JGU
770.2401
Pl an
In fo rm at io n:
P :\7
S
W T\
0.
\C iv il\ C on st ru ct io n
Pl an s\
SE
_P
LA
N .d te d:
A ug
7,
- 8
:3 4a m
1"=25'
25' 0'12.5' 50'25'
NOTES:
1. THIS PLAN HAS BEEN PREPARED IN CONJUNCTION WITH MUNICIPAL
REGULATIONS AND ORDINANCES RELATING TO LAND USAGE AND
DIMENSIONAL REQUIREMENTS OF ZONING AND RELATED PERMITS.
HOWEVER, NOT CONSIDERED ARE PERIPHERAL ISSUES SUCH AS CLARITY OF
TITLE, SUBSURFACE CONDITIONS INCLUDING BUT NOT LIMITED TO SOIL AND
WATER CONTAMINATION, SINKHOLE ACTIVITY AND HISTORICAL AND
ARCHAEOLOGICAL ISSUES, OR OTHER SUCH ISSUES AS MAY AFFECT THE
MERCHANTABILITY OF THE LAND. THE PIDCOCK COMPANY MAKES NO
REPRESENTATION OR WARRANTY CONCERNING THESE ISSUES WHICH
SHOULD BE ADDRESSED BY QUALIFIED PROFESSIONALS ENGAGED IN THE
APPROPRIATE FIELDS OF PRACTICE.
2. THESE DOCUMENTS ARE PROVIDED FOR MUNICIPAL REVIEW ONLY AND ARE
NOT TO BE UTILIZED FOR ANY OTHER PURPOSE. THE DOCUMENTS ARE NOT
ISSUED FOR CONSTRUCTION UNLESS SPECIFICALLY NOTED AS SUCH BELOW.
CONTRACTOR'S OBLIGATION REGARDING COORDINATION OF
DOCUMENTS AND FIELD CONDITIONS
THE CONTRACT DOCUMENTS PRESENT THE DESIGN INTENT. IT SHALL BE THE
CONTRACTOR'S RESPONSIBILITY TO REVIEW ALL PLANS, SPECIFICATIONS,
ADDENDA, CONSTRUCTION SKETCHES AND OTHER CONTRACT DOCUMENTS FOR
CONSISTENCY. SIMILARLY, IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY
TO REVIEW FIELD CONDITIONS, INCLUDING COORDINATION WITH ALL UTILITIES.
THE CONTRACTOR SHALL COMPLETE ANY TEST EXCAVATIONS IN ADVANCE OF
ORDERING MATERIALS OR OF CONSTRUCTION IN AN AREA OF UTILITY
CROSSINGS OR POTENTIAL INVOLVEMENT. IT SHALL BE THE CONTRACTOR'S
RESPONSIBILITY TO BRING ANY INCONSISTENCIES IN THE DOCUMENTS OR ANY
APPARENT CONFLICTS TO THE ATTENTION OF THE ENGINEER BEFORE
ORDERING MATERIALS AND BEFORE PROCEEDING WITH CONSTRUCTION IN THE
AREA SO THAT THE ENGINEER MAY REVIEW THE CONDITIONS AND RECOMMEND
ANY ADJUSTMENTS TO THE DOCUMENTS THAT MAY BE NECESSARY, OR TO
RECOMMEND RELOCATION OF A UTILITY OR OTHER REMEDIAL WORK THAT MAY
BE REQUIRED.
REFER TO THE GENERAL NOTES ON SHEET 2 OF 3 FOR ALL PLAN NOTES.
SOIL EROSION AND SEDIMENTATION
CONTROL PLAN, NOTES AND DETAILS
NOTICE
THIS PLAN IS INTENDED FOR
SOIL EROSION AND SEDIMENTATION
PURPOSES ONLY
STANDARD CONSTRUCTION DETAIL #4-1
COMPOST FILTER SOCK
PLAN PREPARER:
ANTHONY F. TALLARIDA, P.E.
THE PIDCOCK COMPANY
2451 PARKWOOD DRIVE
ALLENTOWN, PA. 18103
TELEPHONE NO.: 610-791-2252
SR 0222 (HAMILTON BOULEVARD)
LIN
C
O
LN
A V
E N
U E
(T- 518)
LIN
C O
LN
A
V E
N U
E (T-481)
AutoCAD SHX Text
SOIL EROSION AND SEDIMENTATION CONTROL LEGEND
AutoCAD SHX Text
FILTER SOCK
AutoCAD SHX Text
SOIL TYPE
AutoCAD SHX Text
SOILS BOUNDARY
AutoCAD SHX Text
LIMIT OF DISTURBANCE
AutoCAD SHX Text
FILTER BAG INLET PROTECTION DEVICE
AutoCAD SHX Text
MH
AutoCAD SHX Text
INLET TOP 389.62 INV 387.14 S INV 383.48 E INV 383.28 N
AutoCAD SHX Text
INLET TOP 390.61 INV 387.74 N INV 387.74 SE
AutoCAD SHX Text
INLET TOP 387.89 INV 384.60
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
LIMITS OF DISTURBANCE
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
FILTER BAG INLET PROTECTION DEVICE
MULTICORELINK:INDEX-Layout1 MULTICORELINK:INDEX-Layout1 AutoCAD SHX Text NOTES: THE SOIL TYPES AND LOCATIONS ARE BASED UPON THE U. S. DEPARTMENT OF AGRICULTURE-NATIONAL RESOURCES CONSERVATION SERVICE (USDA-NRCS) WEB SOIL SURVEY OF LEHIGH COUNTY, PENNSYLVANIA, AVAILABLE ONLINE AT HTTP://WEBSOILSURVEY.SC.EGOV.USDA.GOV/. SOIL TYPE USE LIMITATIONS AND RESOLUTIONS THE SOIL USE LIMITATIONS THAT EXIST FOR THE ABOVE-MENTIONED SOILS AND THEIR RESOLUTIONS ARE AS FOLLOWS: 1. ACCORDING TO THE AFOREMENTIONED SOIL SURVEY, WASHINGTON SILT LOAM HAS FEW LIMITATIONS TO MOST ACCORDING TO THE AFOREMENTIONED SOIL SURVEY, WASHINGTON SILT LOAM HAS FEW LIMITATIONS TO MOST NON-FARM USES. ONE OF THESE LIMITATIONS IS THE POTENTIAL FOR SINKHOLES. THE POTENTIAL FOR THE FORMATIONS OF SINKHOLES WILL BE MINIMIZED THROUGH THE CONSTRUCTION OF A STORMWATER MANAGEMENT SYSTEM. HOWEVER, IN THE EVENT THAT A SINKHOLE DEVELOPS ON THE SITE, SURFACE WATER SHALL BE DIVERTED AWAY FROM THE AREA AND THE SINKHOLE SHALL BE REPAIRED IN ACCORDANCE WITH THE RECOMMENDATIONS OF A PROFESSIONAL ENGINEER OR GEOLOGIST. ANOTHER LIMITATION OF THE SOILS SERIES ARE THE POTENTIAL FOR PIPING. ANTI-SEEP COLLARS ARE PROPOSED IN THE BASINS TO PROVIDE PROTECTION FROM THIS RISK. 2. THE DUFFIELD SERIES IS LIMITED BY SLOW PERMEABILITY AND A SEASONABLY HIGH WATER TABLE. ALSO THE DUFFIELD SERIES IS LIMITED BY SLOW PERMEABILITY AND A SEASONABLY HIGH WATER TABLE. ALSO THESE SOILS EXHIBIT A MODERATE TO SEVERE EROSION HAZARD. A PUMPED WATER FILTER BAG HAS BEEN SPECIFIED TO ADEQUATELY FILTER ANY WATER THAT MAY BE ENCOUNTERED. FURTHER, STRUCTURAL EARTHWORK SHALL ONLY BE DONE WHEN THE SOIL IS AT THE OPTIMUM MOISTURE CONTENT FOR COMPACTION.
AutoCAD SHX Text
SOIL DESCRIPTION TABLE
AutoCAD SHX Text
CHARACTERISTICS
AutoCAD SHX Text
NAME
AutoCAD SHX Text
SYMBOL
AutoCAD SHX Text
SLOPE RANGE
AutoCAD SHX Text
HYDROLOGIC SOILS GROUP
AutoCAD SHX Text
WASHINGTON SILT LOAM
AutoCAD SHX Text B
AutoCAD SHX Text
WELL DRAINED, MODERATELY HIGH TO HIGH PERMEABILITY
AutoCAD SHX Text UmB
AutoCAD SHX Text 0-8%%%
AutoCAD SHX Text
URBAN LAND-DUFFIELD COMPLEX
AutoCAD SHX Text B
AutoCAD SHX Text
PAVEMENT, BUILDINGS, AND OTHER ARTIFICIALLY COVERED AREAS
AutoCAD SHX Text WaC
AutoCAD SHX Text 8-15%
AutoCAD SHX Text
WEB SOIL SURVEY
AutoCAD SHX Text STANDARD EROSION AND SEDIMENT CONTROL PLAN NOTES 1. ALL EARTH DISTURBANCES, INCLUDING CLEARING AND GRUBBING AS WELL AS CUTS AND FILLS SHALL BE ALL EARTH DISTURBANCES, INCLUDING CLEARING AND GRUBBING AS WELL AS CUTS AND FILLS SHALL BE DONE IN ACCORDANCE WITH THE APPROVED E&S PLAN. A COPY OF THE APPROVED DRAWINGS (STAMPED, SIGNED AND DATED BY THE REVIEWING AGENCY) MUST BE AVAILABLE AT THE PROJECT SITE AT ALL TIMES. THE REVIEWING AGENCY SHALL BE NOTIFIED OF ANY CHANGES TO THE APPROVED PLAN PRIOR TO IMPLEMENTATION OF THOSE CHANGES. THE REVIEWING AGENCY MAY REQUIRE A WRITTEN SUBMITTAL OF THOSE CHANGES FOR REVIEW AND APPROVAL AT ITS DISCRETION. 2. AT LEAST 7 DAYS PRIOR TO STARTING ANY EARTH DISTURBANCE ACTIVITIES, INCLUDING CLEARING AND AT LEAST 7 DAYS PRIOR TO STARTING ANY EARTH DISTURBANCE ACTIVITIES, INCLUDING CLEARING AND GRUBBING, THE OWNER AND/OR OPERATOR SHALL INVITE ALL CONTRACTORS, THE LANDOWNER, APPROPRIATE MUNICIPAL OFFICIALS, THE E&S PLAN PREPARER, THE PCSM PLAN PREPARER, THE LICENSED PROFESSIONAL RESPONSIBLE FOR OVERSIGHT OF CRITICAL STAGES OF IMPLEMENTATION OF THE PCSM PLAN, AND A REPRESENTATIVE FROM THE LOCAL CONSERVATION DISTRICT TO AN ON-SITE PRECONSTRUCTION MEETING. 3. AT LEAST 3 DAYS PRIOR TO STARTING ANY EARTH DISTURBANCE ACTIVITIES, OR EXPANDING INTO AN AREA AT LEAST 3 DAYS PRIOR TO STARTING ANY EARTH DISTURBANCE ACTIVITIES, OR EXPANDING INTO AN AREA PREVIOUSLY UNMARKED, THE PENNSYLVANIA ONE CALL SYSTEM INC. SHALL BE NOTIFIED AT 1-800-242-1776 FOR THE LOCATION OF EXISTING UNDERGROUND UTILITIES. 4. ALL EARTH DISTURBANCE ACTIVITIES SHALL PROCEED IN ACCORDANCE WITH THE SEQUENCE PROVIDED ON ALL EARTH DISTURBANCE ACTIVITIES SHALL PROCEED IN ACCORDANCE WITH THE SEQUENCE PROVIDED ON THE PLAN DRAWINGS. DEVIATION FROM THAT SEQUENCE MUST BE APPROVED IN WRITING FROM THE LOCAL CONSERVATION DISTRICT OR BY THE DEPARTMENT PRIOR TO IMPLEMENTATION. 5. AREAS TO BE FILLED ARE TO BE CLEARED, GRUBBED, AND STRIPPED OF TOPSOIL TO REMOVE TREES, AREAS TO BE FILLED ARE TO BE CLEARED, GRUBBED, AND STRIPPED OF TOPSOIL TO REMOVE TREES, VEGETATION, ROOTS AND OTHER OBJECTIONABLE MATERIAL. 6. CLEARING, GRUBBING, AND TOPSOIL STRIPPING SHALL BE LIMITED TO THOSE AREAS DESCRIBED IN EACH CLEARING, GRUBBING, AND TOPSOIL STRIPPING SHALL BE LIMITED TO THOSE AREAS DESCRIBED IN EACH STAGE OF THE CONSTRUCTION SEQUENCE. GENERAL SITE CLEARING, GRUBBING AND TOPSOIL STRIPPING MAY NOT COMMENCE IN ANY STAGE OR PHASE OF THE PROJECT UNTIL THE E&S BMPS SPECIFIED BY THE BMP SEQUENCE FOR THAT STAGE OR PHASE HAVE BEEN INSTALLED AND ARE FUNCTIONING AS DESCRIBED IN THIS E&S PLAN. 7. AT NO TIME SHALL CONSTRUCTION VEHICLES BE ALLOWED TO ENTER AREAS OUTSIDE THE LIMIT OF AT NO TIME SHALL CONSTRUCTION VEHICLES BE ALLOWED TO ENTER AREAS OUTSIDE THE LIMIT OF DISTURBANCE BOUNDARIES SHOWN ON THE PLAN MAPS. THESE AREAS MUST BE CLEARLY MARKED AND FENCED OFF BEFORE CLEARING AND GRUBBING OPERATIONS BEGIN. 8. TOPSOIL REQUIRED FOR THE ESTABLISHMENT OF VEGETATION SHALL BE STOCKPILED AT THE LOCATION(S) TOPSOIL REQUIRED FOR THE ESTABLISHMENT OF VEGETATION SHALL BE STOCKPILED AT THE LOCATION(S) SHOWN ON THE PLAN MAP(S) IN THE AMOUNT NECESSARY TO COMPLETE THE FINISH GRADING OF ALL EXPOSED AREAS THAT ARE TO BE STABILIZED BY VEGETATION. EACH STOCKPILE SHALL BE PROTECTED IN THE MANNER SHOWN ON THE PLAN DRAWINGS. STOCKPILE HEIGHTS SHALL NOT EXCEED 35 FEET. STOCKPILE SLOPES SHALL BE 2H:1V OR FLATTER. 9. IMMEDIATELY UPON DISCOVERING UNFORESEEN CIRCUMSTANCES POSING THE POTENTIAL FOR ACCELERATED IMMEDIATELY UPON DISCOVERING UNFORESEEN CIRCUMSTANCES POSING THE POTENTIAL FOR ACCELERATED EROSION AND/OR SEDIMENT POLLUTION, THE OPERATOR SHALL IMPLEMENT APPROPRIATE BEST MANAGEMENT PRACTICES TO MINIMIZE THE POTENTIAL FOR EROSION AND SEDIMENT POLLUTION AND NOTIFY THE LOCAL CONSERVATION DISTRICT AND/OR THE REGIONAL OFFICE OF THE DEPARTMENT. 10. ALL BUILDING MATERIALS AND WASTES SHALL BE REMOVED FROM THE SITE AND RECYCLED OR DISPOSED ALL BUILDING MATERIALS AND WASTES SHALL BE REMOVED FROM THE SITE AND RECYCLED OR DISPOSED OF IN ACCORDANCE WITH THE DEPARTMENT'S SOLID WASTE MANAGEMENT REGULATIONS AT 25 PA. CODE 260.1 ET SEQ., 271.1, AND 287.1 ET. SEQ. NO BUILDING MATERIALS OR WASTES OR UNUSED BUILDING MATERIALS SHALL BE BURNED, BURIED, DUMPED, OR DISCHARGED AT THIS SITE. 11. ALL OFF-SITE WASTE AND BORROW AREAS MUST HAVE AN E&S PLAN APPROVED BY THE LOCAL ALL OFF-SITE WASTE AND BORROW AREAS MUST HAVE AN E&S PLAN APPROVED BY THE LOCAL CONSERVATION DISTRICT OR THE DEPARTMENT FULLY IMPLEMENTED PRIOR TO BEING ACTIVATED. 12. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ANY MATERIAL BROUGHT ON SITE IS CLEAN FILL. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ANY MATERIAL BROUGHT ON SITE IS CLEAN FILL. FORM FP-001 MUST BE RETAINED BY THE PROPERTY OWNER FOR ANY FILL MATERIAL AFFECTED BY A SPILL OR RELEASE OF A REGULATED SUBSTANCE BUT QUALIFYING AS CLEAN FILL DUE TO ANALYTICAL TESTING. 13. ALL PUMPING OF WATER FROM ANY WORK AREA SHALL BE DONE ACCORDING TO THE PROCEDURE ALL PUMPING OF WATER FROM ANY WORK AREA SHALL BE DONE ACCORDING TO THE PROCEDURE DESCRIBED IN THIS PLAN, OVER UNDISTURBED VEGETATED AREAS. ALL PUMPING OF SEDIMENT LADEN WATER SHALL BE THROUGH A SEDIMENT CONTROL BMP, SUCH AS A PUMPED WATER FILTER BAG DISCHARGING OVER NON-DISTURBED AREAS. 14. VEHICLES AND EQUIPMENT MAY NEITHER ENTER DIRECTLY NOR EXIT DIRECTLY FROM THE SITE ONTO ANY VEHICLES AND EQUIPMENT MAY NEITHER ENTER DIRECTLY NOR EXIT DIRECTLY FROM THE SITE ONTO ANY ADJACENT ROADWAYS. VEHICLES AND EQUIPMENT MAY ONLY ENTER AND EXIT THE CONSTRUCTION SITE VIA A STABILIZED ROCK CONSTRUCTION ENTRANCE. 15. UNTIL THE SITE IS STABILIZED, ALL EROSION AND SEDIMENT BMPS SHALL BE MAINTAINED PROPERLY. UNTIL THE SITE IS STABILIZED, ALL EROSION AND SEDIMENT BMPS SHALL BE MAINTAINED PROPERLY. MAINTENANCE SHALL INCLUDE INSPECTIONS OF ALL EROSION AND SEDIMENT BMPS AFTER EACH RUNOFF EVENT AND ON A WEEKLY BASIS. THE OPERATOR WILL MAINTAIN AND MAKE AVAILABLE TO LEHIGH COUNTY LEHIGH COUNTY CONSERVATION DISTRICT COMPLETE, WRITTEN INSPECTION LOGS OF ALL THOSE INSPECTIONS. ALL COMPLETE, WRITTEN INSPECTION LOGS OF ALL THOSE INSPECTIONS. ALL PREVENTATIVE AND REMEDIAL MAINTENANCE WORK, INCLUDING CLEAN OUT, REPAIR, REPLACEMENT, REGRADING, RESEEDING, REMULCHING AND RENETTING MUST BE PERFORMED IMMEDIATELY. IF THE E&S BMPS FAIL TO PERFORM AS EXPECTED, REPLACEMENT BMPS, OR MODIFICATIONS OF THOSE INSTALLED WILL BE REQUIRED. 16. A LOG SHOWING DATES THAT E&S BMPS WERE INSPECTED AS WELL AS ANY DEFICIENCIES FOUND AND THE A LOG SHOWING DATES THAT E&S BMPS WERE INSPECTED AS WELL AS ANY DEFICIENCIES FOUND AND THE DATE THEY WERE CORRECTED SHALL BE MAINTAINED ON THE SITE AND BE MADE AVAILABLE TO REGULATORY AGENCY OFFICIALS AT THE TIME OF INSPECTION. 17. SEDIMENT TRACKED ONTO ANY PUBLIC ROADWAY OR SIDEWALK SHALL BE RETURNED TO THE CONSTRUCTION SEDIMENT TRACKED ONTO ANY PUBLIC ROADWAY OR SIDEWALK SHALL BE RETURNED TO THE CONSTRUCTION SITE BY THE END OF EACH WORK DAY AND DISPOSED IN THE MANNER DESCRIBED IN THIS PLAN. IN NO CASE SHALL THE SEDIMENT BE WASHED, SHOVELED, OR SWEPT INTO ANY ROADSIDE DITCH, STORM SEWER, OR SURFACE WATER. 18. ALL SEDIMENT REMOVED FROM BMPS SHALL BE DISPOSED OF IN THE MANNER DESCRIBED ON THE PLAN ALL SEDIMENT REMOVED FROM BMPS SHALL BE DISPOSED OF IN THE MANNER DESCRIBED ON THE PLAN DRAWINGS. SEDIMENT REMOVED FROM BMPS SHALL BE DISPOSED OF IN LANDSCAPED AREAS OUTSIDE OF STEEP SLOPES, WETLANDS, FLOODPLAINS OR DRAINAGE SWALES AND IMMEDIATELY STABILIZED, OR PLACED IN TOPSOIL STOCKPILES. 19. AREAS WHICH ARE TO BE TOPSOILED SHALL BE SCARIFIED TO A MINIMUM DEPTH OF 3 TO 5 INCHES - 6 AREAS WHICH ARE TO BE TOPSOILED SHALL BE SCARIFIED TO A MINIMUM DEPTH OF 3 TO 5 INCHES - 6 TO 12 INCHES ON COMPACTED SOILS - PRIOR TO PLACEMENT OF TOPSOIL. AREAS TO BE VEGETATED SHALL HAVE A MINIMUM 4 INCHES OF TOPSOIL IN PLACE PRIOR TO SEEDING AND MULCHING. FILL OUTSLOPES SHALL HAVE A MINIMUM OF 2 INCHES OF TOPSOIL. 20. ALL FILLS SHALL BE COMPACTED AS REQUIRED TO REDUCE EROSION, SLIPPAGE, SETTLEMENT, SUBSIDENCE ALL FILLS SHALL BE COMPACTED AS REQUIRED TO REDUCE EROSION, SLIPPAGE, SETTLEMENT, SUBSIDENCE OR OTHER RELATED PROBLEMS. FILL INTENDED TO SUPPORT BUILDINGS, STRUCTURES AND CONDUITS, ETC. SHALL BE COMPACTED IN ACCORDANCE WITH LOCAL REQUIREMENTS OR CODES. 21. ALL EARTHEN FILLS SHALL BE PLACED IN COMPACTED LAYERS NOT TO EXCEED 9 INCHES IN THICKNESS. ALL EARTHEN FILLS SHALL BE PLACED IN COMPACTED LAYERS NOT TO EXCEED 9 INCHES IN THICKNESS. 22. FILL MATERIALS SHALL BE FREE OF FROZEN PARTICLES, BRUSH, ROOTS, SOD, OR OTHER FOREIGN OR FILL MATERIALS SHALL BE FREE OF FROZEN PARTICLES, BRUSH, ROOTS, SOD, OR OTHER FOREIGN OR OBJECTIONABLE MATERIALS THAT WOULD INTERFERE WITH OR PREVENT CONSTRUCTION OF SATISFACTORY FILLS. 23. FROZEN MATERIALS OR SOFT, MUCKY, OR HIGHLY COMPRESSIBLE MATERIALS SHALL NOT BE INCORPORATED FROZEN MATERIALS OR SOFT, MUCKY, OR HIGHLY COMPRESSIBLE MATERIALS SHALL NOT BE INCORPORATED INTO FILLS. 24. FILL SHALL NOT BE PLACED ON SATURATED OR FROZEN SURFACES. FILL SHALL NOT BE PLACED ON SATURATED OR FROZEN SURFACES. 25. SEEPS OR SPRINGS ENCOUNTERED DURING CONSTRUCTION SHALL BE HANDLED IN ACCORDANCE WITH THE SEEPS OR SPRINGS ENCOUNTERED DURING CONSTRUCTION SHALL BE HANDLED IN ACCORDANCE WITH THE STANDARD AND SPECIFICATION FOR SUBSURFACE DRAIN OR OTHER APPROVED METHOD. 26. ALL GRADED AREAS SHALL BE PERMANENTLY STABILIZED IMMEDIATELY UPON REACHING FINISHED GRADE. CUT ALL GRADED AREAS SHALL BE PERMANENTLY STABILIZED IMMEDIATELY UPON REACHING FINISHED GRADE. CUT SLOPES IN COMPETENT BEDROCK AND ROCK FILLS NEED NOT BE VEGETATED. SEEDED AREAS WITHIN 50 FEET OF A SURFACE WATER, OR AS OTHERWISE SHOWN ON THE PLAN DRAWINGS, SHALL BE BLANKETED ACCORDING TO THE STANDARDS OF THIS PLAN. 27. IMMEDIATELY AFTER EARTH DISTURBANCE ACTIVITIES CEASE IN ANY AREA OR SUBAREA OF THE PROJECT, IMMEDIATELY AFTER EARTH DISTURBANCE ACTIVITIES CEASE IN ANY AREA OR SUBAREA OF THE PROJECT, THE OPERATOR SHALL STABILIZE ALL DISTURBED AREAS. DURING NON-GERMINATING MONTHS, MULCH OR OTHER PROTECTIVE BLANKETING SHALL BE APPLIED AS DESCRIBED IN THE PLAN. AREAS NOT AT FINISHED GRADE, WHICH WILL BE REACTIVATED WITHIN 1 YEAR, MAY BE STABILIZED IN ACCORDANCE WITH THE TEMPORARY STABILIZATION SPECIFICATIONS. THOSE AREAS WHICH WILL NOT BE REACTIVATED WITHIN 1 YEAR SHALL BE STABILIZED IN ACCORDANCE WITH THE PERMANENT STABILIZATION SPECIFICATIONS. 28. PERMANENT STABILIZATION IS DEFINED AS A MINIMUM UNIFORM, PERENNIAL 70% VEGETATIVE COVER OR PERMANENT STABILIZATION IS DEFINED AS A MINIMUM UNIFORM, PERENNIAL 70% VEGETATIVE COVER OR OTHER PERMANENT NON-VEGETATIVE COVER WITH A DENSITY SUFFICIENT TO RESIST ACCELERATED EROSION. CUT AND FILL SLOPES SHALL BE CAPABLE OF RESISTING FAILURE DUE TO SLUMPING, SLIDING, OR OTHER MOVEMENTS. 29. EROSION AND SEDIMENT BMPS MUST BE CONSTRUCTED, STABILIZED, AND FUNCTIONAL BEFORE SITE EROSION AND SEDIMENT BMPS MUST BE CONSTRUCTED, STABILIZED, AND FUNCTIONAL BEFORE SITE DISTURBANCE BEGINS WITHIN THE TRIBUTARY AREAS OF THOSE BMPS. E&S BMPS SHALL REMAIN FUNCTIONAL AS SUCH UNTIL ALL AREAS TRIBUTARY TO THEM ARE PERMANENTLY STABILIZED OR UNTIL THEY ARE REPLACED BY ANOTHER BMP APPROVED BY THE LOCAL CONSERVATION DISTRICT OR THE DEPARTMENT. 30. UPON COMPLETION OF ALL EARTH DISTURBANCE ACTIVITIES AND PERMANENT STABILIZATION OF ALL UPON COMPLETION OF ALL EARTH DISTURBANCE ACTIVITIES AND PERMANENT STABILIZATION OF ALL DISTURBED AREAS, THE OWNER AND/OR OPERATOR SHALL CONTACT THE LOCAL CONSERVATION DISTRICT FOR AN INSPECTION PRIOR TO REMOVAL/CONVERSION OF THE E&S BMPS. 31. AFTER FINAL SITE STABILIZATION HAS BEEN ACHIEVED, TEMPORARY EROSION AND SEDIMENT BMPS MUST BE AFTER FINAL SITE STABILIZATION HAS BEEN ACHIEVED, TEMPORARY EROSION AND SEDIMENT BMPS MUST BE REMOVED OR CONVERTED TO PERMANENT POST CONSTRUCTION STORMWATER MANAGEMENT BMPS. AREAS DISTURBED DURING REMOVAL OR CONVERSION OF THE BMPS SHALL BE STABILIZED IMMEDIATELY. IN ORDER TO ENSURE RAPID REVEGETATION OF DISTURBED AREAS, SUCH REMOVAL/CONVERSIONS ARE TO BE DONE ONLY DURING THE GERMINATING SEASON. 32. UPON COMPLETION OF ALL EARTH DISTURBANCE ACTIVITIES AND PERMANENT STABILIZATION OF ALL UPON COMPLETION OF ALL EARTH DISTURBANCE ACTIVITIES AND PERMANENT STABILIZATION OF ALL DISTURBED AREAS, THE OWNER AND/OR OPERATOR SHALL CONTACT THE LOCAL CONSERVATION DISTRICT TO SCHEDULE A FINAL INSPECTION. 33. FAILURE TO CORRECTLY INSTALL E&S BMPS, FAILURE TO PREVENT SEDIMENT-LADEN RUNOFF FROM LEAVING FAILURE TO CORRECTLY INSTALL E&S BMPS, FAILURE TO PREVENT SEDIMENT-LADEN RUNOFF FROM LEAVING THE CONSTRUCTION SITE OR FAILURE TO TAKE IMMEDIATE CORRECTIVE ACTION TO RESOLVE FAILURE OF E&S BMPS MAY RESULT IN ADMINISTRATIVE, CIVIL, AND/OR CRIMINAL PENALTIES BEING INSTITUTED BY THE DEPARTMENT AS DEFINED IN SECTION 602 OF THE CLEAN STREAMS LAW. THE CLEAN STREAMS LAW PROVIDES FOR UP TO $10,000 PER DAY IN CIVIL PENALTIES, UP TO $10,000 IN SUMMARY CRIMINAL PENALTIES, AND UP TO $25,000 IN MISDEMEANOR CRIMINAL PENALTIES FOR EACH VIOLATION. 34. IN THE EVENT OF SINKHOLE DISCOVERY A PROFESSIONAL GEOLOGIST OR ENGINEER WILL BE CONTACTED IN THE EVENT OF SINKHOLE DISCOVERY A PROFESSIONAL GEOLOGIST OR ENGINEER WILL BE CONTACTED CONCERNING MITIGATION. ADDITIONALLY, THE LEHIGH COUNTY CONSERVATION DISTRICT WILL BE MADE AWARE LEHIGH COUNTY CONSERVATION DISTRICT WILL BE MADE AWARE WILL BE MADE AWARE OF THE SINKHOLE DISCOVERY IMMEDIATELY. 35. THE OPERATOR SHALL ASSURE THAT THE APPROVED EROSION AND SEDIMENT CONTROL PLAN IS PROPERLY THE OPERATOR SHALL ASSURE THAT THE APPROVED EROSION AND SEDIMENT CONTROL PLAN IS PROPERLY AND COMPLETELY IMPLEMENTED. 36. THE CONTRACTOR IS ADVISED TO BECOME THOROUGHLY FAMILIAR WITH THE PROVISIONS OF THE APPENDIX THE CONTRACTOR IS ADVISED TO BECOME THOROUGHLY FAMILIAR WITH THE PROVISIONS OF THE APPENDIX 64, EROSION CONTROL RULES AND REGULATIONS, TITLE 25, PART 1, DEPARTMENT OF ENVIRONMENTAL PROTECTION, SUBPART C, PROTECTION OF NATURAL RESOURCES, ARTICLE III, WATER RESOURCES, CHAPTER 102, EROSION CONTROL. 37. THE E&S CONTROL PLAN MAPPING MUST DISPLAY A PA ONE CALL SYSTEM INCORPORATED SYMBOL THE E&S CONTROL PLAN MAPPING MUST DISPLAY A PA ONE CALL SYSTEM INCORPORATED SYMBOL INCLUDING THE SITE IDENTIFICATION NUMBER. (THIS IS A NUMBERED SYMBOL NOT A NOTE.) 38. AT STREAM CROSSINGS, 50' BUFFER AREAS SHOULD BE MAINTAINED. ON BUFFERS, CLEARING, SOD AT STREAM CROSSINGS, 50' BUFFER AREAS SHOULD BE MAINTAINED. ON BUFFERS, CLEARING, SOD DISTURBANCES, EXCAVATION, AND EQUIPMENT TRAFFIC SHOULD BE MINIMIZED. ACTIVITIES SUCH AS STACKING LOGS, BURNING CLEARED BRUSH, DISCHARGING RAINWATER FROM TRENCHES, WELDING PIPE SECTIONS, REFUELING AND MAINTAINING EQUIPMENT SHOULD BE ACCOMPLISHED OUTSIDE OF BUFFERS. 39. ALL WETLANDS MUST BE DELINEATED AND PROTECTED WITH ORANGE SAFETY FENCE PRIOR TO ANY ALL WETLANDS MUST BE DELINEATED AND PROTECTED WITH ORANGE SAFETY FENCE PRIOR TO ANY EARTHMOVING ACTIVITY. 40. STRAW MULCH SHALL BE APPLIED IN LONG STRANDS, NOT CHOPPED OR FINELY BROKEN.STRAW MULCH SHALL BE APPLIED IN LONG STRANDS, NOT CHOPPED OR FINELY BROKEN.
AutoCAD SHX Text TEMPORARY CONTROL MEASURES TEMPORARY EROSION CONTROL MEASURES TO BE USED DURING EARTHMOVING ACTIVITIES INCLUDE: 1. INSTALLING FILTER SOCK AND ROCK FILTERS TO PROVIDE FILTRATION OF SILT-LADEN RUNOFF. INSTALLING FILTER SOCK AND ROCK FILTERS TO PROVIDE FILTRATION OF SILT-LADEN RUNOFF. 2. KEEPING DISTURBED AREAS TO A MINIMUM AND SEEDING DURING GERMINATION PERIODS, IF KEEPING DISTURBED AREAS TO A MINIMUM AND SEEDING DURING GERMINATION PERIODS, IF THE OPERATIONS CEASE FOR MORE THAN 20 DAYS. 3. PLACING STONE SUBBASE MATERIAL AS SOON AS POSSIBLE AFTER THE COMPLETION OF PLACING STONE SUBBASE MATERIAL AS SOON AS POSSIBLE AFTER THE COMPLETION OF SUBGRADE PREPARATION AND CONSTRUCTION OF UNDERGROUND UTILITIES. 4. KEEPING TOPSOIL STOCKPILES LESS THAN 35 FEET HIGH AND SIDE SLOPES OF THESE KEEPING TOPSOIL STOCKPILES LESS THAN 35 FEET HIGH AND SIDE SLOPES OF THESE STOCKPILES AND EARTH BERMS LESS THAN 2:1. 5. IMMEDIATELY APPLYING TEMPORARY SEED AND MULCH TO STOCKPILES, BERMS, AND IMMEDIATELY APPLYING TEMPORARY SEED AND MULCH TO STOCKPILES, BERMS, AND DISTURBED AREAS. 6. INSTALLING ROCK CONSTRUCTION ENTRANCES WITH TIRE CLEANING FACILITIES TO REMOVE MUD INSTALLING ROCK CONSTRUCTION ENTRANCES WITH TIRE CLEANING FACILITIES TO REMOVE MUD AND DEBRIS FROM CONSTRUCTION VEHICLES PRIOR TO EXITING THE SITE ONTO THE ROADWAY. 7. INSTALLING EROSION CONTROL BLANKETS AT CHANNELS AND AT SLOPES GREATER THAN 3:1 INSTALLING EROSION CONTROL BLANKETS AT CHANNELS AND AT SLOPES GREATER THAN 3:1 IN ORDER TO PREVENT EROSIVE FLOWS. 8. PLACING STONE RIPRAP AT THE STORM SEWER DISCHARGE POINTS TO ACT AS ENERGY PLACING STONE RIPRAP AT THE STORM SEWER DISCHARGE POINTS TO ACT AS ENERGY DISSIPATERS, THEREBY PREVENTING EROSIVE FLOWS. 9. INSTALLING EROSION CONTROL BLANKETS AT SWALES IN ORDER TO PREVENT EROSIVE FLOWS. INSTALLING EROSION CONTROL BLANKETS AT SWALES IN ORDER TO PREVENT EROSIVE FLOWS. 10. CONSTRUCTING SEDIMENT BASINS TO COLLECT AND TREAT CHANNELIZED AND OVERLAND CONSTRUCTING SEDIMENT BASINS TO COLLECT AND TREAT CHANNELIZED AND OVERLAND SEDIMENT LADEN RUNOFF PRIOR TO LEAVING THE SITE. 11. INSTALLATION OF INLET PROTECTION DEVICES FOR ALL INLETS WHICH WILL NOT DISCHARGE TO INSTALLATION OF INLET PROTECTION DEVICES FOR ALL INLETS WHICH WILL NOT DISCHARGE TO THE SEDIMENT BASINS OR TRAPS. REFER TO THE EROSION AND SEDIMENTATION CONTROL PLAN FOR FACILITY LOCATIONS AND DETAILS.
AutoCAD SHX Text PERMANENT CONTROL MEASURES AFTER THE COMPLETION OF EARTHMOVING ACTIVITIES, PERMANENT SEEDING AND GROUND COVER SHALL BE ESTABLISHED. WHEN THESE AREAS ARE STABILIZED, SEDIMENT BASINS SHALL BE CONVERTED TO PERMANENT BASINS. STAGING AREAS, ROCK CONSTRUCTION ENTRANCES, ALL FILTER SOCKS, ALL ROCK FILTERS, INLET PROTECTION DEVICES, AND ANY ACCUMULATED SEDIMENT IN THE AREAS OF THE EROSION CONTROL DEVICES SHALL BE REMOVED FROM THE SITE.
AutoCAD SHX Text MAINTENANCE SCHEDULE DURING CONSTRUCTION, IT WILL BE THE RESPONSIBILITY OF THE CONTRACTOR TO CLEAN AND MAINTAIN IN GOOD WORKING CONDITION ALL EROSION CONTROL DEVICES IN ACCORDANCE WITH THE FOLLOWING MAINTENANCE SCHEDULE. 1. SEDIMENT MUST BE REMOVED WHERE ACCUMULATIONS REACH ONE-HALF THE ABOVEGROUND SEDIMENT MUST BE REMOVED WHERE ACCUMULATIONS REACH ONE-HALF THE ABOVEGROUND HEIGHT OF THE FILTER SOCK AND ROCK FILTERS.; 2. SEDIMENT MUST BE REMOVED FROM A FILTER BAG WHEN IT IS ONE-HALF FULL. FILTER BAGS SEDIMENT MUST BE REMOVED FROM A FILTER BAG WHEN IT IS ONE-HALF FULL. FILTER BAGS SHOULD TRAP ALL PARTICLES LARGER THAN 150 MICRONS AND SHOULD BE REPLACED WHEN DAMAGED. 3. SEDIMENT MUST BE REMOVED FROM STONE INLET PROTECTION WHEN IT REACHES ONE-HALF SEDIMENT MUST BE REMOVED FROM STONE INLET PROTECTION WHEN IT REACHES ONE-HALF THE HEIGHT OF THE STONE. DAMAGED OR CLOGGED INSTALLATIONS SHALL BE REPAIRED/REPLACED IMMEDIATELY. 4. ACCUMULATED MATERIALS MUST BE REMOVED FROM A CONCRETE WASHOUT WHEN IT IS 75% ACCUMULATED MATERIALS MUST BE REMOVED FROM A CONCRETE WASHOUT WHEN IT IS 75% FULL. PLASTIC LINERS SHOULD BE REPLACED WITH EACH CLEANING OF THE WASHOUT FACILITY. DAMAGED OR LEAKING WASHOUTS MUST BE REPAIRED/REPLACED BEFORE FURTHER USE. 5. TEMPORARY RISER MUST BE RESEALED, REPAIRED, OR REPLACED IF DAMAGED OR LEAKING. TEMPORARY RISER MUST BE RESEALED, REPAIRED, OR REPLACED IF DAMAGED OR LEAKING. 6. ROCK CONSTRUCTION ENTRANCES MUST BE MAINTAINED TO THE SPECIFIED DIMENSIONS BY ROCK CONSTRUCTION ENTRANCES MUST BE MAINTAINED TO THE SPECIFIED DIMENSIONS BY ADDING ROCK. A STOCKPILE OF ROCK MATERIAL MUST BE MAINTAINED ON THE SITE FOR THIS PURPOSE. AT THE END OF EACH CONSTRUCTION DAY, ALL SEDIMENT DEPOSITED ON PUBLIC ROADWAYS WILL BE REMOVED AND RETURNED TO THE CONSTRUCTION SITE. 7. SEDIMENT REMOVED FROM THE FACILITIES MAY BE INCORPORATED BACK INTO THE EARTHWORK SEDIMENT REMOVED FROM THE FACILITIES MAY BE INCORPORATED BACK INTO THE EARTHWORK AS FILL OR WASTE ON THE SITE AS DIRECTED BY THE OWNER OR OWNER'S REPRESENTATIVE. 8. SEDIMENT MUST BE REMOVED FROM THE SEDIMENTATION BASINS ONCE IT REACHES THE SEDIMENT MUST BE REMOVED FROM THE SEDIMENTATION BASINS ONCE IT REACHES THE CLEANOUT STAKE ELEVATION. CHECK ALL OUTLETS FOR FUNCTIONALITY. UNTIL THE SITE IS STABILIZED, ALL EROSION AND SEDIMENTATION CONTROLS MUST BE MAINTAINED PROPERLY. MAINTENANCE MUST INCLUDE INSPECTIONS OF ALL EROSION AND SEDIMENTATION CONTROLS AFTER EACH RUNOFF EVENT AND ON A WEEKLY BASIS. ALL PREVENTATIVE AND REMEDIAL MAINTENANCE WORK, INCLUDING CLEANOUT, REPAIR, REPLACEMENT, REGRADING, RESEEDING, REMULCHING AND RENETTING MUST BE PERFORMED IMMEDIATELY.
AutoCAD SHX Text TABLE 4.1 - COMPOST SOCK FABRIC MINIMUM SPECIFICATIONS HEAVY DUTY MULTI-FILAMENT MULTI-FILAMENT MULTI-FILAMENT 3 MIL 5 MIL 5 MIL POLYPROPYLENE POLYPROPYLENE 5 MIL 5 MIL POLYPROPYLENE POLYPROPYLENE 5 MIL POLYPROPYLENE POLYPROPYLENE POLYPROPYLENE POLYPROPYLENE POLYPROPYLENE MATERIAL TYPE HDPE HDPE HDPE (MFPP) (HDMFPP) HDPE HDPE HDPE (MFPP) (HDMFPP) HDPE HDPE (MFPP) (HDMFPP) HDPE (MFPP) (HDMFPP) (MFPP) (HDMFPP) (HDMFPP) MATERIAL PHOTO- PHOTO- BIO- PHOTO- PHOTO- PHOTO- PHOTO- BIO- PHOTO- PHOTO- PHOTO- BIO- PHOTO- PHOTO- BIO- PHOTO- PHOTO- PHOTO- PHOTO- PHOTO- CHARACTERISTICS DEGRADABLE DEGRADABLE DEGRADABLE DEGRADABLE DEGRADABLE DEGRADABLE DEGRADABLE DEGRADABLE DEGRADABLE DEGRADABLE DEGRADABLE DEGRADABLE DEGRADABLE DEGRADABLE DEGRADABLE DEGRADABLE DEGRADABLE DEGRADABLE DEGRADABLE DEGRADABLE SOCK 12” 12” 12” 12” 12” 12” 12” 12” 12” 12” 12” 12” 12” 12” 12” 12” 12” 12” 12” 12” DIAMETERS 18” 18” 18” 18” 18” 18” 18” 18” 18” 18” 18” 18” 18” 18” 18” 18” 18” 18” 18” 18” 24” 24” 24” 24” 24” 24” 24” 24” 24” 24” 32” 32” 32” 32” 32” 32” 32” 32” 32” 32” MESH OPENING 3/8” 3/8” 3/8” 3/8” 1/8” 3/8” 3/8” 3/8” 3/8” 1/8” 3/8” 3/8” 3/8” 1/8” 3/8” 3/8” 1/8” 3/8” 1/8” 1/8” TENSILE STRENGTH 26 PSI 26 PSI 44 PSI 202 PSI 26 PSI 26 PSI 44 PSI 202 PSI 26 PSI 44 PSI 202 PSI 44 PSI 202 PSI 202 PSI ULTRAVIOLET STABILITY 23% AT 23% AT 100% AT 100% AT 23% AT 23% AT 100% AT 100% AT 23% AT 100% AT 100% AT 100% AT 100% AT 100% AT % ORIGINAL STRENGTH 1000 HR. 1000 HR. 1000 HR. 1000 HR. 1000 HR. 1000 HR. 1000 HR. 1000 HR. 1000 HR. 1000 HR. 1000 HR. 1000 HR. 1000 HR. 1000 HR. (ASTM G-155) MINIMUM FUNCTIONAL 6 MONTHS 9 MONTHS 6 MONTHS 1 YEAR 2 YEARS 6 MONTHS 9 MONTHS 6 MONTHS 1 YEAR 2 YEARS 9 MONTHS 6 MONTHS 1 YEAR 2 YEARS 6 MONTHS 1 YEAR 2 YEARS 1 YEAR 2 YEARS 2 YEARS LONGEVITY TWO-PLY SYSTEMS INNER CONTAINMENT NETTING HDPE BIAXIAL NET HDPE BIAXIAL NET CONTINUOUSLY WOUND FUSION-WELDED JUNCTURES 3/4" X 3/4" MAX. APERTURE SIZE OUTER FILTRATION MESH COMPOSITE POLYPROPYLENE FABRIC COMPOSITE POLYPROPYLENE FABRIC (WOVEN LAYER AND NON-WOVEN FLEECE MECHANICALLY FUSED VIA NEEDLE PUNCH) 3/16” MAX. APERTURE SIZE MAX. APERTURE SIZE SOCK FABRICS COMPOSED OF BURLAP MAY BE USED ON PROJECTS LASTING 6 MONTHS OR LESS. TABLE 4.2 - COMPOST STANDARDS ORGANIC MATTER CONTENT 25% - 100% (DRY WEIGHT BASIS) 25% - 100% (DRY WEIGHT BASIS) ORGANIC PORTION FIBROUS AND ELONGATED FIBROUS AND ELONGATED PH 5.5 - 8.5 5.5 - 8.5 MOISTURE CONTENT 30% - 60% 30% - 60% PARTICLE SIZE 30% - 50% PASS THROUGH 3/8" SIEVE 30% - 50% PASS THROUGH 3/8" SIEVE SOLUBLE SALT CONCENTRATION 5.0 DS/M (MMHOS/CM) MAXIMUM 5.0 DS/M (MMHOS/CM) MAXIMUM
AutoCAD SHX Text CONTRACTOR TO USE FILTREXX BRAND FILTER SOCK MEETING SPECIFICATION HIGHLIGHTED ABOVE. CONTRACTOR SHOULD PROVIDE TEST RESULTS OF THE COMPOST MATERIAL TO COUNTY CONSERVATION DISTRICT PRIOR TO PLACEMENT OF FILTER SOCKS IN THE FIELD. LOCAL INSTALLER INFORMATION: HILLTOP SERVICES, INC. 16403 POTTSVILLE PIKE HAMBURG, PA. 19526 610-562-3124
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
FLOW
AutoCAD SHX Text
FLOW
AutoCAD SHX Text
DISTURBED AREA
AutoCAD SHX Text
UNDISTURBED AREA
AutoCAD SHX Text
%%USECTION
AutoCAD SHX Text
%%UPLAN VIEW
AutoCAD SHX Text
EXISTING CONTOURS
AutoCAD SHX Text
COMPOST FILTER SOCK
AutoCAD SHX Text 2 IN. x 2 IN. WOODEN STAKES PLACED 10 FT ON CENTER
AutoCAD SHX Text 2 IN. x 2 IN. WOODEN STAKES PLACED 10 FT ON CENTER
AutoCAD SHX Text
COMPOST FILTER SOCK
AutoCAD SHX Text
BLOWN/PLACED FILTER MEDIA
AutoCAD SHX Text
DISTURBED AREA
AutoCAD SHX Text
UNDISTURBED AREA
AutoCAD SHX Text NOTES: SOCK FABRIC SHALL MEET STANDARDS OF TABLE 4.1 OF THE PA DEP EROSION CONTROL MANUAL. COMPOST SHALL MEET THE STANDARDS OF TABLE 4.2 OF THE PA DEP EROSION CONTROL MANUAL. COMPOST FILTER SOCK SHALL BE PLACED AT EXISTING LEVEL GRADE. BOTH ENDS OF THE BARRIER SHALL BE EXTENDED AT LEAST 8 FEET UP SLOPE AT 45 DEGREES TO THE MAIN BARRIER ALIGNMENT. MAXIMUM SLOPE LENGTH ABOVE ANY BARRIER SHALL NOT EXCEED THAT SPECIFIED FOR THE SIZE OF THE SOCK AND THE SLOPE OF ITS TRIBUTARY AREA. TRAFFIC SHALL NOT BE PERMITTED TO CROSS COMPOST FILTER SOCKS. ACCUMULATED SEDIMENT SHALL BE REMOVED WHEN IT REACHES 1/2 THE ABOVE GROUND HEIGHT OF THE BARRIER AND DISPOSED IN THE MANNER DESCRIBED ELSEWHERE IN THE PLAN. COMPOST FILTER SOCKS SHALL BE INSPECTED WEEKLY AND AFTER EACH RUNOFF EVENT. DAMAGED SOCKS SHALL BE REPAIRED ACCORDING TO MANUFACTURER’S SPECIFICATIONS OR REPLACED WITHIN S SPECIFICATIONS OR REPLACED WITHIN 24 HOURS OF INSPECTION. BIODEGRADABLE COMPOST FILTER SOCKS SHALL BE REPLACED AFTER 6 MONTHS; PHOTODEGRADABLE SOCKS AFTER 1 YEAR. POLYPROPYLENE SOCKS SHALL BE REPLACED ACCORDING TO MANUFACTURER’S S RECOMMENDATIONS. UPON STABILIZATION OF THE AREA TRIBUTARY TO THE SOCK, STAKES SHALL BE REMOVED. THE SOCK MAY BE LEFT IN PLACE AND VEGETATED OR REMOVED. IN THE LATTER CASE, THE MESH SHALL BE CUT OPEN AND THE MULCH SPREAD AS A SOIL SUPPLEMENT.
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
FILTER SOCK DETAIL
AutoCAD SHX Text
FILTER SOCK
AutoCAD SHX Text
FILTER SOCK LOCATION
AutoCAD SHX Text
SOCK SIZE
AutoCAD SHX Text
FS-1
AutoCAD SHX Text
AutoCAD SHX Text
NORTHWEST CORNER OF SR 0222 (HAMILTON BOULEVARD) AND LINCOLN AVENUE (T- 518)
AutoCAD SHX Text
FS-2
AutoCAD SHX Text
FS-3
AutoCAD SHX Text
SOUTHWEST CORNER OF SR 0222 (HAMILTON BOULEVARD) AND LINCOLN AVENUE (T-481)
AutoCAD SHX Text
FS-4
AutoCAD SHX Text
SOUTHEAST CORNER OF SR 0222 (HAMILTON BOULEVARD) AND LINCOLN AVENUE (T-481)
AutoCAD SHX Text
NORTHEAST CORNER OF SR 0222 (HAMILTON BOULEVARD) AND LINCOLN AVENUE (T- 518)
AutoCAD SHX Text
AutoCAD SHX Text
INTERSTATE476
INTERSTATE78
INTERSTATE78
309 INTERSTATE78
309 INTERSTATE78
SR 0222
(HAMILTON
BOULEVARD)
SOUTH WHITEHALL
TOWNSHIP
CITY OF
ALLENTOWN
SALISBURY
TOWNSHIP
LOWER
MACUNGIE
TOWNSHIP
PE
N
N D
O T
SU
BM
IS
SI
O N
N
O
VE
M
BE
R
9, Know what's below.
before you dig.Call
R
HOP 5-0
THE PIDCOCK COMPANY
CIVIL ENGINEERING AND LAND PLANNING ARCHITECTURE LAND SURVEYING
OXFORD DRIVE AT FISH HATCHERY ROAD
2451 PARKWOOD DRIVE ALLENTOWN, PENNSYLVANIA 18103-9608
TELEPHONE: 610-791-2252
TELEFACSIMILE: 610-791-1256
E-MAIL: INFO@PIDCOCKCOMPANY.COM
Pl an
In fo rm at io n:
P :\7
S
W T\
0.
\C iv il\ H
O P
Pl an s\ C ov er
.d te d:
N ov
9,
- 9 :5
1a m
ADA CURB RAMPS AND TRAFFIC SIGNAL UPGRADES
SR 0222 (HAMILTON BOULEVARD)
SOUTH WHITEHALL TOWNSHIP, LEHIGH COUNTY, PENNSYLVANIA
FOR
HIGHWAY OCCUPANCY PERMIT PLANS
SOUTH WHITEHALL TOWNSHIP
APPLICANT:
444 WALBERT AVENUE
ALLENTOWN, PA. 18104
ENGINEERING AND LAND PLANNING AR NG AND LAND PLANNING ARCHITECTURE LAND SURVEYING ENGINEERING AND LAND PLANNING A ENGINEERING AND LAND PLANNING A ENGINEERING…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .