3-Attachment B Drawings BID SET 9-09-25 (003).pdf
PDF 3 MB Posted
- Solicitation number
- Not on record
- Issued by
- Lehigh County, Pennsylvania
About this file
This document set represents a detailed engineering plan for the Proposed 4 Log Piping Improvements at the 41st Street Well Site in South Whitehall Township, Lehigh County, Pennsylvania, prepared by Spotts, Stevens & McCoy (SSM) engineering firm. The project involves water infrastructure improvements, specifically focusing on piping installations, with engineering drawings and erosion/sedimentation control plans. The documents are currently released for bidding, marked "NOT FOR CONSTRUCTION", and include comprehensive technical specifications for site preparation, piping installation, valve and thrust block details, and environmental management strategies.
The project includes specific technical requirements for water line installation, with detailed provisions for erosion control, seeding, mulching, and environmental due diligence. The engineering plans specify precise installation methods for air release valves, horizontal and vertical thrust blocks, and include comprehensive guidelines for site stabilization, including temporary and permanent seeding protocols. Environmental considerations are paramount, with strict guidelines for clean fill management, sediment control, and compliance with Pennsylvania Department of Environmental Protection regulations. The documents outline specific maintenance protocols, inspection requirements, and potential penalties for non-compliance, emphasizing a rigorous approach to infrastructure development and environmental protection.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N or th
1s t
St re et
Chew Street
R om a C or po ra te
C en te r, S ui te
N
C ed ar C re st
B lv d A lle nt ow n, P A
0.
9.
C re ek si de L an e
Li tit z, P
A
7.
8.
L E
H
IG
H V
A L
L E
Y
L A
N C
A S
T E
R
N or th P ar k
R oa d R ea di ng , P
A
-0
0.
1.
R E
A D
IN
G
E as t E va ns S tre et
W es t C he st er
, P A
0.
1.
W E
S T
C H
E S
T E
R
E ng in ee rs a nd C on su lta nt s
SP
O
TT
S, S
TE
VE
N S
M
C C
O Y ss m gr ou p.
co m
D
ES
C R
IP
TI
O N
N O
D
AT
E
M
AD
E C
H
KD
AP
VD
9/
/2
R
EL
EA
SE
D
F O
R B
ID
D
IN
G
TJ
R
JM
N
JM
N
DIGITAL FILENAMEDATE
WORK ORDER NUMBER
DRAWING NUMBER
DIGITAL FILENAMEDATE
WORK ORDER NUMBER
DRAWING NUMBER
DIGITAL FILENAMEDATE
WORK ORDER NUMBER
DRAWING NUMBER
DIGITAL FILENAMEDATE
WORK ORDER NUMBER
DRAWING NUMBER
DIGITAL FILENAMEDATE
WORK ORDER NUMBER
DRAWING NUMBER
DIGITAL FILENAMEDATE
WORK ORDER NUMBER
DRAWING NUMBER
DIGITAL FILENAMEDATE
WORK ORDER NUMBER
DRAWING NUMBER
C O
PY
R
IG
H
T
SP
O
TT
S, S
TE
VE
N S
M
C C
O Y
DIGITAL FILENAMEDATE
WORK ORDER NUMBER
DRAWING NUMBER
PR
O
PO
SE
D
L O
G P
IP
IN
G
IM
PR
O
VE
M
EN
TS
st
S
TR
EE
T
W
EL
L
SI
TE
LE
H
IG
H
C O
U N
TY
, P
EN
N
SY
LV
AN
IA
SO
U
TH
W
H
IT
EH
AL
L
TO
W N
SH
IP
W1-01 P:\103400.0101
2/19/24
103400.0101
W.1-01
R
EL
EA
SE
D F
O R
N O
T
FO
R C
O N
ST
R
U C
TI
O
N
PR
O
JE
C T
M
AN
AG
ER
D
AT
E:
N .B
BA
SE
B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C
H
KD
BI
D
D
IN
G
JM
N
9/
/2
H M
M
TJ
R
JM
N
JM
N
NOTE: ALL PIPING SHALL SLOPE
TO AIR RELEASE MH TO
ELIMINATE ISOLATED
LOW POINTS.
DETAIL
ATTACHMENT B
AutoCAD SHX Text Paved Drive
AutoCAD SHX Text 30"
AutoCAD SHX Text 30"
AutoCAD SHX Text 30"
AutoCAD SHX Text 30"
AutoCAD SHX Text 30"
AutoCAD SHX Text 30"
AutoCAD SHX Text 6" Waterline
AutoCAD SHX Text Gate
AutoCAD SHX Text San. MH C74C Top 436.65 Inv. 427.18
AutoCAD SHX Text Paved Drive
AutoCAD SHX Text W.C.S
AutoCAD SHX Text W.C.S
AutoCAD SHX Text Conc. Walk
AutoCAD SHX Text
MB
AutoCAD SHX Text Sign
AutoCAD SHX Text Paved Drive
AutoCAD SHX Text W.C.S
AutoCAD SHX Text
MB
AutoCAD SHX Text Sign
AutoCAD SHX Text H
AutoCAD SHX Text Y
AutoCAD SHX Text D
AutoCAD SHX Text
FH
AutoCAD SHX Text Sign
AutoCAD SHX Text W.V.
AutoCAD SHX Text W.V.
AutoCAD SHX Text Planter
AutoCAD SHX Text Planter
AutoCAD SHX Text Conc. Walk
AutoCAD SHX Text Pole
AutoCAD SHX Text Pole
AutoCAD SHX Text W.C.S
AutoCAD SHX Text W.C.S
AutoCAD SHX Text Conc. Walk
AutoCAD SHX Text Conc. Walk
AutoCAD SHX Text O/H Wires
AutoCAD SHX Text W.V.
AutoCAD SHX Text O/H Wires
AutoCAD SHX Text O/H Wires
AutoCAD SHX Text Concrete Walk
AutoCAD SHX Text Paved Drive
AutoCAD SHX Text Conc. Walk
AutoCAD SHX Text Sign
AutoCAD SHX Text W.V.
AutoCAD SHX Text W.V.
AutoCAD SHX Text Planter
AutoCAD SHX Text Paver Walk
AutoCAD SHX Text Elec. Meter
AutoCAD SHX Text Concrete Walk
AutoCAD SHX Text Sterling Well House No. 1 1 Story Brick Building
AutoCAD SHX Text Metal Lid
AutoCAD SHX Text Metal Lid on Conc. Pad
AutoCAD SHX Text 4" PVC Standpipe
AutoCAD SHX Text Gate Control w/UG Elec.
AutoCAD SHX Text Paved Area
AutoCAD SHX Text Paved Area
AutoCAD SHX Text Paved Drive
AutoCAD SHX Text 6"
AutoCAD SHX Text 4" PVC Standpipe
AutoCAD SHX Text
(3) Cleanout
AutoCAD SHX Text O/H Wires
AutoCAD SHX Text 1" Waterline
AutoCAD SHX Text O/H Wires
AutoCAD SHX Text San. MH C88A Top 436.73 Inv.(6") 428.58 Inv. 428.25
AutoCAD SHX Text Guy Wire
AutoCAD SHX Text O/H Wires
AutoCAD SHX Text 60'
AutoCAD SHX Text
5'-5" TYP.
AutoCAD SHX Text
24" DIP (3)
AutoCAD SHX Text
24" 90%%D BENDS
AutoCAD SHX Text
8" DIP
AutoCAD SHX Text 24"x12" RED.
AutoCAD SHX Text 12"x8" RED.
AutoCAD SHX Text 8"x6" RED.
AutoCAD SHX Text
6" 45%%D BEND
AutoCAD SHX Text 24"x12" RED.
AutoCAD SHX Text 12"x8" RED.
AutoCAD SHX Text
8" DIP
AutoCAD SHX Text
8" 45%%D BENDS
AutoCAD SHX Text 8"x6" RED.
AutoCAD SHX Text
6" GV
AutoCAD SHX Text
AIR RELEASE MANHOLE
AutoCAD SHX Text
8" 45%%D BENDS
AutoCAD SHX Text
SEE DETAIL THIS SHEET
AutoCAD SHX Text Sterling Well House No. 1 1 Story Brick Building
AutoCAD SHX Text Metal Lid on Conc. Pad
AutoCAD SHX Text 8"x6" RED.
AutoCAD SHX Text
6" 45%%D BEND
AutoCAD SHX Text
8" DIP
AutoCAD SHX Text
6" DIP
AutoCAD SHX Text
6" DIP
AutoCAD SHX Text
8" DIP
AutoCAD SHX Text
8" 45%%D BEND
AutoCAD SHX Text 8"x6" RED.
AutoCAD SHX Text
6" GV
AutoCAD SHX Text
TIE TO EXISTING TO BE FIELD LOCATED
AutoCAD SHX Text
TIE TO EXISTING TO BE FIELD LOCATED
AutoCAD SHX Text Scale 1"=20'
AutoCAD SHX Text 10'
AutoCAD SHX Text 15'
AutoCAD SHX Text 0'
AutoCAD SHX Text 5'
AutoCAD SHX Text 20'
AutoCAD SHX Text 40'
AutoCAD SHX Text
GRAPHIC SCALE
AutoCAD SHX Text 20'
AutoCAD SHX Text NOTES: 1. ALL PROPOSED PIPE SHALL BE CLASS 52 UNLESS OTHERWISE NOTED. ALL PROPOSED PIPE SHALL BE CLASS 52 UNLESS OTHERWISE NOTED. 2. ALL PIPE FITTINGS SHALL BE CLASS 153, COMPACT MECHANICAL JOINT ALL PIPE FITTINGS SHALL BE CLASS 153, COMPACT MECHANICAL JOINT FITTINGS. 3. CONTRACTOR TO VERIFY DEPTH AND LOCATION OF ALL UTILITIES PRIOR TO CONTRACTOR TO VERIFY DEPTH AND LOCATION OF ALL UTILITIES PRIOR TO CONSTRUCTION. 4. CONTRACTOR SHALL PROTECT ALL UTILITIES ABOVE AND BELOW GROUND, TO CONTRACTOR SHALL PROTECT ALL UTILITIES ABOVE AND BELOW GROUND, TO UTILITY OWNER'S SATISFACTION AT NO ADDITIONAL COST. 5. ANY UTILITY DISTURBED BY CONTRACTOR SHALL BE RESTORED TO THEIR ANY UTILITY DISTURBED BY CONTRACTOR SHALL BE RESTORED TO THEIR PRE-CONSTRUCTION CONDITION. 6. ALL FITTINGS AND VALVES SHALL UTILIZE MEGALUG JOINT RESTRAINT. ALL FITTINGS AND VALVES SHALL UTILIZE MEGALUG JOINT RESTRAINT. 7. A MINIMUM OF 2 JOINTS ON EACH SIDE OF A FITTING SHALL BE RESTRAINED A MINIMUM OF 2 JOINTS ON EACH SIDE OF A FITTING SHALL BE RESTRAINED WITH FIELD-LOK GASKETS. 8. CONTRACTOR SHALL VERIFY LINE SIZES, ELEVATIONS OF EXISTING WATER LINES CONTRACTOR SHALL VERIFY LINE SIZES, ELEVATIONS OF EXISTING WATER LINES PRIOR TO MAKING CONNECTIONS. 9. ALL EXISTING VALVES NO LONGER IN SERVICE SHALL BE ABANDONED IN PLACE ALL EXISTING VALVES NO LONGER IN SERVICE SHALL BE ABANDONED IN PLACE AND VALVE BOXES SHALL BE REMOVED AT NO ADDITIONAL COST.
AutoCAD SHX Text
THE EARTH'S SURFACE
AutoCAD SHX Text
NOTIFICATION OF EXCAVATORS, DESIGNERS,
AutoCAD SHX Text
PENNSYLVANIA ACT 38
AutoCAD SHX Text
ANYWHERE
AutoCAD SHX Text
IN THE COMMONWEALTH.
AutoCAD SHX Text
OR ANY PERSON PREPARING TO DISTURB
AutoCAD SHX Text
(1991) REQUIRES
AutoCAD SHX Text
PROJECT SERIAL NUMBER: 20231591355
AutoCAD SHX Text No Scale
N or th
1s t
St re et
Chew Street
WgB2
WgB2
R om a C or po ra te
C en te r, S ui te
N
C ed ar C re st
B lv d A lle nt ow n, P A
0.
9.
C re ek si de L an e
Li tit z, P
A
7.
8.
L E
H
IG
H V
A L
L E
Y
L A
N C
A S
T E
R
N or th P ar k
R oa d R ea di ng , P
A
-0
0.
1.
R E
A D
IN
G
E as t E va ns S tre et
W es t C he st er
, P A
0.
1.
W E
S T
C H
E S
T E
R
E ng in ee rs a nd C on su lta nt s
SP
O
TT
S, S
TE
VE
N S
M
C C
O Y ss m gr ou p.
co m
D
ES
C R
IP
TI
O N
N O
D
AT
E
M
AD
E C
H
KD
AP
VD
9/
/2
R
EL
EA
SE
D
F O
R B
ID
D
IN
G
TJ
R
JM
N
JM
N
DIGITAL FILENAMEDATE
WORK ORDER NUMBER
DRAWING NUMBER
DIGITAL FILENAMEDATE
WORK ORDER NUMBER
DRAWING NUMBER
DIGITAL FILENAMEDATE
WORK ORDER NUMBER
DRAWING NUMBER
DIGITAL FILENAMEDATE
WORK ORDER NUMBER
DRAWING NUMBER
DIGITAL FILENAMEDATE
WORK ORDER NUMBER
DRAWING NUMBER
DIGITAL FILENAMEDATE
WORK ORDER NUMBER
DRAWING NUMBER
DIGITAL FILENAMEDATE
WORK ORDER NUMBER
DRAWING NUMBER
C O
PY
R
IG
TT
S, S
TE
VE
N S
M
C C
O Y
DIGITAL FILENAMEDATE
WORK ORDER NUMBER
DRAWING NUMBER
ER
O
SI
O
N A
N D
S
ED
IM
EN
TA
TI
O N
C O
N
TR
O L
PL
AN
PR
O
PO
SE
D
L O
G P
IP
IN
G
IM
PR
O
VE
M
EN
TS
st
S
TR
EE
T
W
EL
L
SI
TE
LE
H
IG
H
C O
U N
TY
, P
EN
N
SY
LV
AN
IA
SO
U
TH
W
H
IT
EH
AL
L
TO
W N
SH
IP
W2-50 P:\103400.0101
4/15/25
103400.0101
W.2-50
R
EL
EA
SE
D F
O R
N O
T
FO
R C
O N
ST
R
U C
TI
O
N
PR
O
JE
C T
M
AN
AG
ER
D
AT
E:
N .B
BA
SE
B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C
H
KD
BI
D
D
IN
G
JM
N
9/
/2
H M
M
TJ
R
JM
N
JM
N
ATTACHMENT B
AutoCAD SHX Text Paved Drive
AutoCAD SHX Text 30"
AutoCAD SHX Text 30"
AutoCAD SHX Text 30"
AutoCAD SHX Text 30"
AutoCAD SHX Text 30"
AutoCAD SHX Text 30"
AutoCAD SHX Text 6" Waterline
AutoCAD SHX Text Gate
AutoCAD SHX Text San. MH C74C Top 436.65 Inv. 427.18
AutoCAD SHX Text Paved Drive
AutoCAD SHX Text W.C.S
AutoCAD SHX Text W.C.S
AutoCAD SHX Text Conc. Walk
AutoCAD SHX Text
MB
AutoCAD SHX Text Sign
AutoCAD SHX Text Paved Drive
AutoCAD SHX Text W.C.S
AutoCAD SHX Text
MB
AutoCAD SHX Text Sign
AutoCAD SHX Text H
AutoCAD SHX Text Y
AutoCAD SHX Text D
AutoCAD SHX Text
FH
AutoCAD SHX Text Sign
AutoCAD SHX Text W.V.
AutoCAD SHX Text W.V.
AutoCAD SHX Text Planter
AutoCAD SHX Text Planter
AutoCAD SHX Text Conc. Walk
AutoCAD SHX Text Pole
AutoCAD SHX Text Pole
AutoCAD SHX Text W.C.S
AutoCAD SHX Text W.C.S
AutoCAD SHX Text Conc. Walk
AutoCAD SHX Text Conc. Walk
AutoCAD SHX Text O/H Wires
AutoCAD SHX Text W.V.
AutoCAD SHX Text O/H Wires
AutoCAD SHX Text O/H Wires
AutoCAD SHX Text Concrete Walk
AutoCAD SHX Text Paved Drive
AutoCAD SHX Text Conc. Walk
AutoCAD SHX Text Sign
AutoCAD SHX Text W.V.
AutoCAD SHX Text W.V.
AutoCAD SHX Text Planter
AutoCAD SHX Text Paver Walk
AutoCAD SHX Text Elec. Meter
AutoCAD SHX Text Concrete Walk
AutoCAD SHX Text Sterling Well House No. 1 1 Story Brick Building
AutoCAD SHX Text Metal Lid
AutoCAD SHX Text Metal Lid on Conc. Pad
AutoCAD SHX Text 4" PVC Standpipe
AutoCAD SHX Text Gate Control w/UG Elec.
AutoCAD SHX Text Paved Area
AutoCAD SHX Text Paved Area
AutoCAD SHX Text Paved Drive
AutoCAD SHX Text 6"
AutoCAD SHX Text 4" PVC Standpipe
AutoCAD SHX Text
(3) Cleanout
AutoCAD SHX Text O/H Wires
AutoCAD SHX Text 1" Waterline
AutoCAD SHX Text O/H Wires
AutoCAD SHX Text San. MH C88A Top 436.73 Inv.(6") 428.58 Inv. 428.25
AutoCAD SHX Text Guy Wire
AutoCAD SHX Text O/H Wires
AutoCAD SHX Text 60'
AutoCAD SHX Text
5'-5" TYP.
AutoCAD SHX Text
24" DIP (3)
AutoCAD SHX Text
24" 90%%D BENDS
AutoCAD SHX Text
8" DIP
AutoCAD SHX Text 24"x12" RED.
AutoCAD SHX Text 12"x8" RED.
AutoCAD SHX Text 8"x6" RED.
AutoCAD SHX Text
6" 45%%D BEND
AutoCAD SHX Text 24"x12" RED.
AutoCAD SHX Text 12"x8" RED.
AutoCAD SHX Text
8" DIP
AutoCAD SHX Text
8" 45%%D BENDS
AutoCAD SHX Text 8"x6" RED.
AutoCAD SHX Text
6" GV
AutoCAD SHX Text
AIR RELEASE MANHOLE
AutoCAD SHX Text
8" 45%%D BENDS
AutoCAD SHX Text
SEE DETAIL THIS SHEET
AutoCAD SHX Text
FS
AutoCAD SHX Text
FS
AutoCAD SHX Text
FS
AutoCAD SHX Text
LIMIT OF DISTURBANCE
AutoCAD SHX Text
SS
AutoCAD SHX Text
NOTE: TRUCKS SHALL BE REQUIRED TO WASH DOWN WHEELS PRIOR TO EXITING SITE
AutoCAD SHX Text Scale 1"=20'
AutoCAD SHX Text 10'
AutoCAD SHX Text 15'
AutoCAD SHX Text 0'
AutoCAD SHX Text 5'
AutoCAD SHX Text 20'
AutoCAD SHX Text 40'
AutoCAD SHX Text
GRAPHIC SCALE
AutoCAD SHX Text 20'
AutoCAD SHX Text
THE EARTH'S SURFACE
AutoCAD SHX Text
NOTIFICATION OF EXCAVATORS, DESIGNERS,
AutoCAD SHX Text
PENNSYLVANIA ACT 38
AutoCAD SHX Text
ANYWHERE
AutoCAD SHX Text
IN THE COMMONWEALTH.
AutoCAD SHX Text
OR ANY PERSON PREPARING TO DISTURB
AutoCAD SHX Text
(1991) REQUIRES
AutoCAD SHX Text
PROJECT SERIAL NUMBER: 20231591355
AutoCAD SHX Text
LOCATION MAP SCALE:1"=1000'
AutoCAD SHX Text
SITE
AutoCAD SHX Text
%%UE & S PLAN PREPARER:
AutoCAD SHX Text
ROMA CORP. CENTER
AutoCAD SHX Text
1605 N. CEDAR CREST BLVD, SUITE 106
AutoCAD SHX Text
(610) 849-9700
AutoCAD SHX Text
ALLENTOWN, PA 18104
AutoCAD SHX Text
SSM GROUP, INC.
AutoCAD SHX Text
JASON M. NEWHARD
AutoCAD SHX Text
%%UE & S LEGEND
AutoCAD SHX Text
LIMITS OF DISTURBANCE - 0.191 ACRES
AutoCAD SHX Text THE PROJECT SITE IS NOT LOCATED WITHIN ANY FLOOD PLAIN AREAS AS PER FEMA PANEL NUMBER 42077C0233F, EFF. 7-16-04.
AutoCAD SHX Text DATUM NOTE - COORDINATES ARE BASED ON NORTH AMERICAN DATUM OF 1983 AND ELEVATIONS ARE BASED ON NORTH AMERICAN VERTICAL DATUM OF 1988, OBTAINED BY A VIRTUAL REFERENCE SPATIAL SYSTEM.
AutoCAD SHX Text
TOPSOIL
AutoCAD SHX Text
ROADFILL
AutoCAD SHX Text
WATERWAY
AutoCAD SHX Text
SITE
AutoCAD SHX Text
BUILDING
AutoCAD SHX Text
SOIL CONDITIONS FOR CONSTRUCTION
AutoCAD SHX Text
FROST
AutoCAD SHX Text
HEAVING
AutoCAD SHX Text
(LOW/HIGH)
AutoCAD SHX Text
DEPTH OF
AutoCAD SHX Text
WATERTABLE
AutoCAD SHX Text
(FEET)
AutoCAD SHX Text
YES/NO
AutoCAD SHX Text
GRADING
AutoCAD SHX Text
WINTER
AutoCAD SHX Text
COMPONENT
AutoCAD SHX Text
HYDRIC
AutoCAD SHX Text
SUITABILITY
AutoCAD SHX Text
HYDRIC
AutoCAD SHX Text
SLOPE %
AutoCAD SHX Text
TEXTURE
AutoCAD SHX Text
SYMBOL
AutoCAD SHX Text
SOIL
AutoCAD SHX Text
NAME
AutoCAD SHX Text
SOILS INFORMATION FACT SHEET
AutoCAD SHX Text
HYDROLOGIC
AutoCAD SHX Text
SOIL GROUP
AutoCAD SHX Text NOTES: 1. BECAUSE OF THE POSSIBLE SEASONALLY HIGH WATER TABLE ON SITE, A SEDIMENT FILTER BAG WILL BE USED TO FILTER ALL PUMPED WATER. 2. DUE TO THE NATURAL CHARACTERISTICS OF THE SOILS ON THIS SITE, THE POTENTIAL FOR SINKHOLES EXISTS. REMEDIATION OF ENCOUNTERED SINKHOLES SHALL BE DONE IN ACCORDANCE WITH THE DETAILS SHOWN ON W.2-56.
AutoCAD SHX Text
AutoCAD SHX Text WgB2
AutoCAD SHX Text
WASHINGTON SILT LOAM
AutoCAD SHX Text 3-8
AutoCAD SHX Text
AutoCAD SHX Text
NO
AutoCAD SHX Text 3'+
AutoCAD SHX Text
FAIR
AutoCAD SHX Text
LOW/MEDIUM
AutoCAD SHX Text
AutoCAD SHX Text
SINKS
AutoCAD SHX Text
POOR/FAIR
AutoCAD SHX Text
GOOD
AutoCAD SHX Text Soils from Lehigh County Soil Survey: Soil Type for Entire Site: WgB2, Washington Silt Loam, 3-8% slopes, moderately eroded
AutoCAD SHX Text
FILTER SOCK
AutoCAD SHX Text
FS
AutoCAD SHX Text S
AutoCAD SHX Text
FH
AutoCAD SHX Text Exist. Water Lateral
AutoCAD SHX Text Exist. Utility Pole & Pole w/Guy
AutoCAD SHX Text Exist. Water Line
AutoCAD SHX Text Exist. Storm Sewer Line
AutoCAD SHX Text Exist. Sanitary Line
AutoCAD SHX Text Exist. Light Pole
AutoCAD SHX Text W
AutoCAD SHX Text Exist. Water Valve
AutoCAD SHX Text Exist. Sign
AutoCAD SHX Text
%%ULEGEND
AutoCAD SHX Text Exist. Right-Of-Way Line
AutoCAD SHX Text
18" CPP
AutoCAD SHX Text Inlet
AutoCAD SHX Text
LP
AutoCAD SHX Text San. MH
AutoCAD SHX Text Tele. MH
AutoCAD SHX Text
WV
AutoCAD SHX Text Exist. Fire Hydrant
AutoCAD SHX Text Exist. Telephone Manhole
AutoCAD SHX Text Exist. Sanitary Manhole
AutoCAD SHX Text Exist. Storm Sewer Inlet
AutoCAD SHX Text Exist. Tree
AutoCAD SHX Text Exist. Property Line
AutoCAD SHX Text Exist. Curb
AutoCAD SHX Text Exist. Gas Line (Approx. Loc.)
AutoCAD SHX Text G
AutoCAD SHX Text Exist. Underground Electric Line
AutoCAD SHX Text E
AutoCAD SHX Text Exist. Water Curb Stop
AutoCAD SHX Text
CS
AutoCAD SHX Text Exist. Gas Valve
AutoCAD SHX Text
GV
AutoCAD SHX Text H
AutoCAD SHX Text Y
AutoCAD SHX Text D
AutoCAD SHX Text Exist. Underground Telephone Line
AutoCAD SHX Text Tel
AutoCAD SHX Text S
AutoCAD SHX Text Existing Features Have Slanted Text Labels
AutoCAD SHX Text Exist. 5' Contour
AutoCAD SHX Text Exist. 1' Contour
AutoCAD SHX Text Exist. Overhead Wires
AutoCAD SHX Text OH Wires
AutoCAD SHX Text
PROPOSED FEATURES HAVE VERTICAL TEXT LABLES
AutoCAD SHX Text
PROPOSED WATER LINE
AutoCAD SHX Text
SOIL STOCKPLIE
AutoCAD SHX Text
SS
AutoCAD SHX Text
LOCATED ON THE DOWNHILL SIDE OF THE PILE.
AutoCAD SHX Text
NO SCALE
AutoCAD SHX Text
2 (TYP.)
AutoCAD SHX Text
AutoCAD SHX Text
35' MAX.
AutoCAD SHX Text
EXISTING
AutoCAD SHX Text
GRADE
AutoCAD SHX Text
AND SLOPES MUST BE 2:1 OR FLATTER. FILTER FENCE SHALL BE
AutoCAD SHX Text
UPON STOCKPILING. STOCKPILE HEIGHTS MUST NOT EXCEED 35 FEET
AutoCAD SHX Text
STRIP AND STOCKPILE TOPSOIL. SEED THE TOPSOIL PILES IMMEDIATELY
AutoCAD SHX Text %%u TYPICAL SOIL STOCKPILE
AutoCAD SHX Text
NO SCALE
AutoCAD SHX Text
%%U FILTREXX SILTSOXX DETAIL
AutoCAD SHX Text
%%UPLAN VIEW
AutoCAD SHX Text
STAKE ON 10'
AutoCAD SHX Text
LINEAL SPACING
AutoCAD SHX Text
%%USECTION
AutoCAD SHX Text
%%UPLAN VIEW
AutoCAD SHX Text
WATER FLOW
AutoCAD SHX Text
WATER FLOW
AutoCAD SHX Text
AREA TO BE
AutoCAD SHX Text
PROTECTED
AutoCAD SHX Text
FILTREXX
AutoCAD SHX Text
COMPOST
AutoCAD SHX Text
WORK AREA
AutoCAD SHX Text 2" x 2"
AutoCAD SHX Text
WOODEN STAKE
AutoCAD SHX Text
SILTSOXX
AutoCAD SHX Text 3"-4"
AutoCAD SHX Text
AREA TO BE
AutoCAD SHX Text
PROTECTED
AutoCAD SHX Text
WORK AREA
AutoCAD SHX Text
FILTREXX
AutoCAD SHX Text
SILTSOXX
AutoCAD SHX Text
(12"-18" TYP.)
AutoCAD SHX Text
STAKE ON 10'
AutoCAD SHX Text
LINEAL SPACING
AutoCAD SHX Text
UPSLOPE
AutoCAD SHX Text
DOWNSLOPE
AutoCAD SHX Text
FILTREXX
AutoCAD SHX Text
COMPOST
AutoCAD SHX Text
SILTSOXX
AutoCAD SHX Text NOTES: 1. ALL MATERIAL TO MEET FILTREXX SPECIFICATIONS. 2. SILTSOXX COMPOST/SOIL/ROCK/SEED FILL TO MEET APPLICATION REQUIREMENTS. 3. SILTSOXX DEPICTED IS FOR MINIMUM SLOPES. GREATER SLOPES MAY REQUIRE LARGER SOCKS PER THE ENGINEER. 4. COMPOST MATERIAL TO BE DISPERSED ON SITE, AS DETERMINED BY ENGINEER.
AutoCAD SHX Text NOTES: 1. Filtrexx SiltSoxx are to be used in any area requiring sediment or erosion control where runoff is in the form of sheet flow or in areas that silt fence is normally considered acceptable. 2. Filtrexx SiltSoxx may be used on frozen ground; on pavement; on hard compact ground, and in areas where trenching is not allowed due to it causing additional sediment disturbing activities. 3. Place SiltSoxx on level contours to assist in dissipating flow into sheet flow rather than concentrated flows. Do not construct Soxx that concentrate runoff or channel water. Sheet flow of water should be perpendicular to the SiltSoxx at impact and relatively un-concentrated. 4. When possible, place SiltSoxx at 5' or greater distance away from the toe of the slopes in order for the water coming from the slopes to maximize space available for sediment deposit. 5. In order to prevent water flowing around the ends of SiltSoxx, the ends of the SiltSoxx must be constructed pointing upslope so the ends are at a higher elevation. Be sure to stake the ends of the Soxx to prevent movement during high flow events. 6. For permanent areas, seeded SiltSoxx allow vegetation to be established directly in the sock and immediately in front and back of the sock at a distance of 5 feet. 7. Sheet flow and runoff should not exceed height of SiltSoxx capacity in most storm events. If overflow of the Soxx is a possibility, larger Soxx should be constructed, or other possible sediment control tools may be used. Alternatively, a second set of Soxx may be constructed or used in combination with compost blankets to prevent sediment from moving. 8. Filtrexx SiltSoxx should be regularly inspected to make sure they hold their shape and are producing adequate flow through. If ponding becomes excessive, and sediment reaches the top of the Soxx, additional Soxx should be added in areas without disturbance of soil or collected sediment. 9. When construction is completed on site, the Soxx may be dispersed with a loader, rake, bulldozer or other device to be incorporated in the soil or left on top of the soil for final seeding to occur. The mesh netting material will be collected and disposed of in normal trash container or removed by the contractor. In cases where biodegradable or photodegradable products are used, they may be left on site at the direction of the engineer.
SUPPLIER INFO: GARDENIQUE LANDSCAPING 3234 ROUTE 309, BOX 340 OREFIELD, PA 18069
R om a C or po ra te
C en te r, S ui te
N
C ed ar C re st
B lv d A lle nt ow n, P A
0.
9.
C re ek si de L an e
Li tit z, P
A
7.
8.
L E
H
IG
H V
A L
L E
Y
L A
N C
A S
T E
R
N or th P ar k
R oa d R ea di ng , P
A
-0
0.
1.
R E
A D
IN
G
E as t E va ns S tre et
W es t C he st er
, P A
0.
1.
W E
S T
C H
E S
T E
R
E ng in ee rs a nd C on su lta nt s
SP
O
TT
S, S
TE
VE
N S
M
C C
O Y ss m gr ou p.
co m
D
ES
C R
IP
TI
O N
N O
D
AT
E
M
AD
E C
H
KD
AP
VD
9/
/2
R
EL
EA
SE
D
F O
R B
ID
D
IN
G
TJ
R
JM
N
JM
N
DIGITAL FILENAMEDATE
WORK ORDER NUMBER
DRAWING NUMBER
DIGITAL FILENAMEDATE
WORK ORDER NUMBER
DRAWING NUMBER
DIGITAL FILENAMEDATE
WORK ORDER NUMBER
DRAWING NUMBER
DIGITAL FILENAMEDATE
WORK ORDER NUMBER
DRAWING NUMBER
DIGITAL FILENAMEDATE
WORK ORDER NUMBER
DRAWING NUMBER
DIGITAL FILENAMEDATE
WORK ORDER NUMBER
DRAWING NUMBER
DIGITAL FILENAMEDATE
WORK ORDER NUMBER
DRAWING NUMBER
C O
PY
R
IG
TT
S, S
TE
VE
N S
M
C C
O Y
DIGITAL FILENAMEDATE
WORK ORDER NUMBER
DRAWING NUMBER
ER
O
SI
O
N A
N D
S
ED
IM
EN
TA
TI
O N
C O
N
TR
O L
N
AR
R
AT
IV
E
PR
O
PO
SE
D
L O
G P
IP
IN
G
IM
PR
O
VE
M
EN
TS
st
S
TR
EE
T
W
EL
L
SI
TE
LE
H
IG
H
C O
U N
TY
, P
EN
N
SY
LV
AN
IA
SO
U
TH
W
H
IT
EH
AL
L
TO
W N
SH
IP
W2-51 P:\103400.0101
4/15/25
103400.0101
W.2-51
R
EL
EA
SE
D F
O R
N O
T
FO
R C
O N
ST
R
U C
TI
O
N
PR
O
JE
C T
M
AN
AG
ER
D
AT
E:
N .B
BA
SE
B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C
H
KD
BI
D
D
IN
G
JM
N
9/
/2
H M
M
TJ
R
JM
N
JM
N
SOILS INFORMATION
ACCORDING TO THE LEHIGH COUNTY SOIL SURVEY, SITE SOIL FOR THE ENTIRE
PROJECT SITE IS SHOWN ON THE PLANS.
LAND USES: PAST, PRESENT, AND PROPOSED
THE PROJECT SITE, AS IT IS TODAY, WILL REMAIN THE SAME AFTER
CONSTRUCTION ACTIVITIES ARE COMPLETED.
RECEIVING WATERS OF THE COMMONWEALTH CH. 93 CLASSIFICATION
THE PROJECT SITE DRAINS TO THE LITTLE LEHIGH CREEK, WHICH IS
CLASSIFIED AS HQ-CWF AND MF (HIGH QUALITY COLD WATER FISHES AND
MIGRATORY FISHES) ACCORDING TO PA CHAPTER 93 WATER QUALITY
STANDARDS. THE PROJECT SITE IS NOT LOCATED WITHIN ANY FEMA
FLOODPLAIN.
DESCRIPTION OF BMPS
BMPS USED PRIOR TO CONSTRUCTION
PRIOR TO THE START OF CONSTRUCTION, A STAGING AREA WILL BE
ESTABLISHED IN A LOCATION MUTUALLY AGREED UPON BY THE CONTRACTOR
AND THE OWNER. THE STAGING AREA SHALL BE MAINTAINED IN AN ORDERLY
FASHION AND WILL BE REQUIRED TO INSTALL ALL NECESSARY BMP MEASURES
IN ORDER TO ALLOW NON-SEDIMENT LADEN RUNOFF FROM THE STAGING
AREA. ROCK CONSTRUCTION ENTRANCES SHALL BE INSTALLED AS INDICATED
ON THE PLANS.
BMPS USED DURING CONSTRUCTION
DURING CONSTRUCTION, ALL EROSION AND SEDIMENTATION CONTROLS SHALL
BE INSTALLED IN ACCORDANCE WITH THE DETAILS AND SPECIFICATIONS
PROVIDED ON THE PLANS AND IN THIS REPORT. ALL EROSION AND
SEDIMENTATION CONTROLS SHALL BE INSTALLED AND STABILIZED PRIOR TO
SITE DISTURBANCE AND CONSTRUCTION. THE FOLLOWING TEMPORARY
CONTROL MEASURES WILL BE USED DURING CONSTRUCTION ACTIVITIES:
1. FILTER BAG INLET PROTECTION.
2. PUMPED WATER FILTER BAG.
BMPS USED AFTER CONSTRUCTION
AFTER ALL CONSTRUCTION ACTIVITIES ARE COMPLETE, ALL REMAINING
DISTURBED AREAS WILL BE STABILIZED WITH PERMANENT SEEDING. AFTER
FINAL STABILIZATION (MINIMUM UNIFORM 70% PERENNIAL VEGETATION COVER
OR PERMANENT NON-VEGETATIVE COVER WITH A DENSITY SUFFICIENT TO
RESIST ACCELERATED EROSION AND SEDIMENTATION) HAS BEEN ACHIEVED,
THE CONTRACTOR MUST REMOVE ALL TEMPORARY EROSION AND
SEDIMENTATION CONTROLS. ANY AREAS THAT ARE DISTURBED DURING
REMOVAL OF THE TEMPORARY CONTROL MEASURES MUST BE STABILIZED
IMMEDIATELY. ALL PERMANENT CONTROL MEASURES USED AFTER
CONSTRUCTION SHALL BE INSTALLED IN ACCORDANCE WITH THE DETAILS AND
SPECIFICATIONS PROVIDED ON THE PLANS AND IN THIS REPORT. THE
FOLLOWING PERMANENT CONTROL MEASURES WILL BE USED AFTER
CONSTRUCTION:
1. PERMANENT RESTORATION.
STAGING OF EARTHMOVING ACTIVITIES
GENERAL COMMENTS
1. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR THE INSTALLATION
AND MAINTENANCE OF ALL EROSION AND SEDIMENT CONTROLS
PROPOSED FOR THIS PROJECT. EROSION AND SEDIMENT CONTROLS
SHALL BE CONSTRUCTED, STABILIZED, AND FUNCTIONAL BEFORE SITE
DISTURBANCE WITHIN THE TRIBUTARY AREAS OF THOSE CONTROLS.
2. A COPY OF THE EROSION & SEDIMENT CONTROL PLANS SHALL BE
POSTED AT THE CONSTRUCTION SITE IN ACCORDANCE WITH
PENNSYLVANIA STATE LAW.
3. THE GENERAL CONTRACTOR SHALL NOTIFY THE BERKS COUNTY
CONSERVATION DISTRICT AT LEAST 72 HOURS PRIOR TO THE START OF
CONSTRUCTION.
4. ALL CONSTRUCTION VEHICLES SHALL BE ADEQUATELY CLEANED OF ALL
SEDIMENT PRIOR TO LEAVING THE SITE VIA THE MACADAM ROAD
SURFACE. OTHERWISE, ALL CONSTRUCTION VEHICLES SHALL LEAVE THE
SITE VIA A FLATBED TRAILER AND SHALL BE LOADED WITHIN THE LIMITS
OF DISTURBANCE. THE FLATBED TRAILER SHALL REMAIN ON THE
MACADAM ROAD SURFACE AT ALL TIMES.
5. CONSTRUCTION SHALL REMAIN WITHIN THE LIMITS OF DISTURBANCE
UNTIL THE WORK IS STABILIZED. AT NO TIME SHALL CONSTRUCTION
VEHICLES BE ALLOWED TO ENTER AREAS OUTSIDE THE LIMIT OF
DISTURBANCE BOUNDARIES SHOWN ON THE PLAN MAPS. THESE AREAS
MUST BE CLEARLY MARKED AND FENCED OFF BEFORE CLEARING AND
GRUBBING OPERATIONS BEGIN.
6. AREAS UTILIZED FOR CONSTRUCTION STAGING AND LAY DOWN SHALL BE
STABILIZED AT ALL TIMES DURING CONSTRUCTION.
7. ALL STRIPPING OF VEGETATION, GRADING, FILLING AND EXCAVATION
SHALL BE DONE IN SUCH A WAY AS TO MINIMIZE EROSION. WHEREVER
NOTED ON THE PLANS, NATURAL VEGETATION SHALL BE RETAINED,
PROTECTED AND SUPPLEMENTED. DISTURBED AREAS SHALL BE KEPT TO
A PRACTICAL MINIMUM AND STABILIZED AS QUICKLY AS POSSIBLE IN
ACCORDANCE WITH THE TEMPORARY OR PERMANENT MEASURES
OUTLINED IN THE SEEDING AND MULCHING SCHEDULES.
8. AREAS TO BE FILLED ARE TO BE CLEARED, GRUBBED, AND STRIPPED OF
TOPSOIL TO REMOVE TREES, VEGETATION, ROOTS, AND OTHER
OBJECTIONABLE MATERIAL.
9. TOPSOIL REQUIRED FOR THE ESTABLISHMENT OF VEGETATION SHALL BE
STOCKPILED AT THE LOCATION(S) SHOWN ON THE PLAN MAPS(S) IN THE
AMOUNT NECESSARY TO COMPLETE THE FINISH GRADING OF ALL
EXPOSED AREAS THAT ARE TO BE STABILIZED BY VEGETATION. EACH
STOCKPILE SHALL BE PROTECTED IN THE MANNER SHOWN ON THE PLAN
DRAWINGS. STOCKPILE HEIGHTS SHALL NOT EXCEED 35 FEET.
STOCKPILE SLOPES SHALL BE 2H:1V OR FLATTER. STOCKPILES SHALL BE
STABILIZED IMMEDIATELY.
10. ALL CONSTRUCTED AND DISTURBED SLOPES (3:1 OR STEEPER) SHALL BE
SEEDED AND STABILIZED WITH EROSION CONTROL BLANKET.
11. ALL EARTHEN FILLS SHALL BE PLACED IN COMPACTED LAYERS NOT TO
EXCEED 9 INCHES IN THICKNESS.
12. FILL MATERIALS SHALL BE FREE OF FROZEN PARTICLES, BRUSH, ROOTS,
SOD, OR OTHER FOREIGN OR OBJECTIONABLE MATERIALS THAT WOULD
INTERFERE WITH OR PREVENT CONSTRUCTION OF SATISFACTORY FILLS.
FROZEN MATERIALS OR SOFT, MUCKY, OR HIGHLY COMPRESSIBLE
MATERIALS SHALL NOT BE INCORPORATED INTO FILLS. FILL SHALL NOT
BE PLACED ON SATURATED OR FROZEN SURFACES.
13. ALL OFF-SITE WASTE AND BORROW AREAS MUST HAVE AN E&S PLAN
APPROVED BY A COUNTY CONSERVATION DISTRICT OR DEP FULLY
IMPLEMENTED PRIOR TO BEING ACTIVATED.
14. SEDIMENT REMOVED FROM EROSION AND SEDIMENT CONTROLS MAY BE
USED AS TOPSOIL, IF SUITABLE, OR SHALL BE PROPERLY DISPOSED OF IN
LANDSCAPED AREAS OUTSIDE OF STEEP SLOPES, WETLANDS,
FLOODPLAINS AND DRAINAGE SWALES, OR DISPOSED OF LEGALLY,
OFFSITE.
15. AREAS WHICH ARE TO BE TOPSOILED SHALL BE SCARIFIED TO A MINIMUM
DEPTH OF 4 INCHES PRIOR TO PLACEMENT OF TOPSOIL. AREAS TO BE
VEGETATED SHALL HAVE A MINIMUM 6 INCHES OF TOPSOIL IN PLACE
PRIOR TO SEEDING AND MULCHING. FILL 3:1 OR GREATER SHALL HAVE A
MINIMUM OF 2 INCHES OF TOPSOIL.
16. ALL PUMPING OF SEDIMENT LADEN WATER SHALL BE THROUGH A DIRT
BAG FILTRATION DEVICE (I.E.: PUMPED WATER FILTER BAG), OR
EQUIVALENT SEDIMENT REMOVAL FACILITY, OVER STABILIZED AREAS
DOWNSTREAM OF ANY EARTH DISTURBANCE. DISCHARGE POINTS
SHOULD BE ESTABLISHED TO PROVIDE FOR MAXIMUM DISTANCE TO
ACTIVE WATERWAYS.
17. SEEPS OR SPRINGS ENCOUNTERED DURING CONSTRUCTION SHALL BE
HANDLED IN ACCORDANCE WITH THE STANDARD AND SPECIFICATION
FOR SUBSURFACE DRAIN OR OTHER APPROVED METHOD.
18. STORMWATER RUNOFF SHALL BE PREVENTED FROM ENTERING STORM
SEWER FACILITIES VIA AN OPEN TRENCH. IF ANY EMERGENCY
REPAIRS/REPLACEMENT OF STORM SEWER FACILITIES MUST OCCUR,
RUNOFF SHALL BE PREVENTED FROM ENTERING THE FACILITIES AT THE
POINTS OF REPAIR/REPLACEMENT.
19. UPON REDUCTION, LOSS OR FAILURE OF THE EROSION AND SEDIMENT
CONTROLS, IMMEDIATE ACTION SHALL BE TAKEN TO RESTORE THE
CONTROLS OR PROVIDE AN ALTERNATIVE METHOD OF CONTROL.
20. WHERE EROSION AND SEDIMENT CONTROLS ARE FOUND TO BE
INOPERATIVE OR INEFFECTIVE DURING AN INSPECTION, OR ANY OTHER
TIME, THE GENERAL CONTRACTOR SHALL IMMEDIATELY CONTACT THE
BERKS COUNTY CONSERVATION DISTRICT, BY PHONE OR PERSONAL
CONTACT, FOLLOWED BY THE SUBMISSION OF A WRITTEN REPORT
WITHIN FIVE (5) DAYS OF THE INITIAL CONTACT.
21. IN THE EVENT THAT ARCHEOLOGICAL ARTIFACTS ARE DISCOVERED, THE
GENERAL CONTRACTOR SHALL ENSURE PROTECTION AND REPORT THE
DISCOVERY TO THE OWNER AND THE DIRECTOR OF THE BUREAU OF
HISTORIC PRESERVATION, HISTORICAL AND MUSEUM COMMISSION, P.O.
BOX 1026, HARRISBURG, PA 17120.
22. IF SINKHOLES ARE ENCOUNTERED DURING CONSTRUCTION, THE OWNER
SHALL RETAIN THE SERVICES OF A QUALIFIED GEOLOGIST OR
GEOTECHNICAL ENGINEER FOR THEIR PROFESSIONAL OPINION AND
REMEDIAL RECOMMENDATIONS.
23. ANY AND ALL SEDIMENT TRACKED ONTO ADJACENT ROADS OR PARKING
AREAS SHALL BE REMOVED AND RETURNED TO THE CONSTRUCTION
AREA, BY THE END OF EACH WORKING DAY. REMOVAL MAY BE
COMPLETED THROUGH USE OF MECHANICAL OR HAND TOOLS, BUT
SEDIMENT SHALL NEVER BE WASHED OFF THE ROAD SURFACE WITH
WATER.
24. UPON TEMPORARY CESSATION OF AN EARTH DISTURBANCE OR ANY
STAGE OR PHASE OF AN ACTIVITY WHERE A CESSATION OF EARTH
DISTURBANCE ACTIVITIES EXCEED 4 DAYS, THE SITE SHALL BE
IMMEDIATELY SEEDED, MULCHED, OR OTHERWISE PROTECTED FROM
ACCELERATED EROSION AND SEDIMENTATION PENDING FUTURE EARTH
DISTURBANCE ACTIVITIES.
25. UPON COMPLETION OF AN EARTH DISTURBANCE ACTIVITY OR ANY STAGE
OR PHASE OF AN ACTIVITY, THE OPERATOR SHALL IMMEDIATELY
STABILIZE THE DISTURBED AREAS SO AS TO PROTECT FROM
ACCELERATED EROSION. DURING NON-GERMINATING PERIODS, MULCH
MUST BE APPLIED AT THE SPECIFIED RATES. DISTURBED AREAS WHICH
ARE NOT AT FINISHED GRADE AND WHICH WILL BE RE-DISTURBED WITHIN
1 YEAR MAY BE STABILIZED IN ACCORDANCE WITH TEMPORARY SEEDING
SPECIFICATIONS. DISTURBED AREAS, WHICH ARE EITHER AT FINISHED
GRADE OR WILL NOT BE RE-DISTURBED WITHIN 1 YEAR, MUST BE
STABILIZED IN ACCORDANCE WITH PERMANENT SEEDING
SPECIFICATIONS.
26. UPON COMPLETION OF ALL EARTH DISTURBANCE ACTIVITIES AND
PERMANENT STABILIZATION OF ALL DISTURBED AREAS, THE OWNER
AND/OR OPERATORS SHALL CONTACT THE BERKS COUNTY
CONSERVATION DISTRICT FOR A FINAL INSPECTION PRIOR TO THE
REMOVAL OF TEMPORARY EROSION AND SEDIMENT CONTROLS.
27. AN AREA SHALL BE CONSIDERED TO HAVE ACHIEVED FINAL
STABILIZATION WHEN IT HAS A MINIMUM OF 70% UNIFORM PERENNIAL
VEGETATIVE COVER OR OTHER PERMANENT NON-VEGETATIVE COVER
WITH A DENSITY SUFFICIENT TO RESIST ACCELERATED SURFACE
EROSION AND SUBSURFACE CHARACTERISTICS SUFFICIENT TO RESIST
SLIDING OR OTHER MOVEMENTS. AFTER FINAL SITE STABILIZATION HAS
BEEN ACHIEVED, TEMPORARY EROSION AND SEDIMENT CONTROLS
SHALL BE REMOVED. AREAS DISTURBED DURING REMOVAL OF THE
CONTROLS SHALL BE STABILIZED IMMEDIATELY.
28. ALTERNATE PRODUCTS TO THOSE SPECIFIED ON THE DRAWINGS MUST
BE REVIEWED AND APPROVED AS EQUAL BY THE OWNER, ENGINEER AND
CONSERVATION DISTRICT.
29. THE OPERATOR SHALL REMOVE FROM THE SITE, RECYCLE OR DISPOSE
OF ALL BUILDING MATERIALS AND WASTES IN ACCORDANCE WITH THE
DEPARTMENT'S SOLID WASTE MANAGEMENT REGULATIONS AT 25 PA
CODE 260.1 ET SEQ., 271.1 E. SEQ. AND 287.1 ET SEQ.
30. BEFORE DISPOSING OF SOIL OR RECEIVING BORROW FOR THE SITE, THE
OPERATOR SHALL ASSURE THAT EACH SPOIL OR BORROW AREA HAS AN
EROSION AND SEDIMENT CONTROL PLAN APPROVED BY THE GOVERNING
CONSERVATION DISTRICT, AND WHICH IS BEING IMPLEMENTED AND
MAINTAINED IN ACCORDANCE WITH CHAPTER 102 REGULATIONS. THE
OPERATOR SHALL NOTIFY THE BERKS COUNTY CONSERVATION DISTRICT
IN WRITING OF ALL RECEIVING SPOIL AND BORROW AREAS ONCE THEY
HAVE BEEN IDENTIFIED.
31. E&S BMPS SHALL REMAIN FUNCTIONAL AS SUCH UNTIL ALL AREAS
TRIBUTARY TO THEM ARE PERMANENTLY STABILIZED OR UNTIL THEY ARE
REPLACED BY ANOTHER BMP APPROVED BY THE BERKS COUNTY
CONSERVATION DISTRICT OR DEP.
32. FAILURE TO CORRECTLY INSTALL E&S BMPS, FAILURE TO PREVENT
SEDIMENT-LADEN RUNOFF FROM LEAVING THE CONSTRUCTION SITE, OR
FAILURE TO TAKE IMMEDIATE CORRECTIVE ACTION TO RESOLVE FAILURE
OF E&S BMPS MAY RESULT IN ADMINISTRATIVE, CIVIL, AND/OR CRIMINAL
PENALTIES BEING INSTITUTED BY THE PENNSYLVANIA DEPARTMENT OF
ENVIRONMENTAL PROTECTION AS DEFINED IN SECTION 602 OF THE
PENNSYLVANIA CLEAN STREAMS LAW. THE CLEAN STREAMS LAW
PROVIDES FOR UP TO $10,000 PER DAY IN CIVIL PENALTIES, UP TO $10,000
IN SUMMARY CRIMINAL PENALTIES, AND UP TO $25,000 IN MISDEMEANOR
CRIMINAL PENALTIES FOR EACH VIOLATION.
CONSTRUCTION SEQUENCE
ALL EARTH DISTURBANCE ACTIVITIES SHALL PROCEED IN ACCORDANCE WITH
THE FOLLOWING SEQUENCE. EACH STAGE SHALL BE COMPLETED IN
COMPLIANCE WITH CHAPTER 102 REGULATIONS BEFORE ANY FOLLOWING
STAGE IS INITIATED. THE GENERAL CONTRACTOR SHALL TAKE INTO ACCOUNT
THE LOCAL WEATHER FORECAST PRIOR TO BEGINNING ANY EXCAVATION
ACTIVITIES.
DEVIATION FROM THAT SEQUENCE MUST BE APPROVED BY THE BERKS
COUNTY CONSERVATION DISTRICT OR BY THE DEPARTMENT PRIOR TO
IMPLEMENTATION. EACH STEP OF THE SEQUENCE SHALL BE COMPLETED
BEFORE PROCEEDING TO THE NEXT STEP, EXCEPT WHERE NOTED.
AT LEAST SEVEN (7) DAYS BEFORE STARTING ANY EARTH DISTURBANCE
ACTIVITIES, THE OPERATOR SHALL CONTACT ALL CONTRACTORS INVOLVED IN
THOSE ACTIVITIES, THE LANDOWNER, ALL APPROPRIATE MUNICIPAL OFFICIALS,
THE EROSION AND SEDIMENT CONTROL PLAN PREPARER, AND A
REPRESENTATIVE OF THE BERKS COUNTY CONSERVATION DISTRICT TO
SCHEDULE AN ON-SITE PRECONSTRUCTION MEETING. ALSO, AT LEAST THREE
(3) DAYS BEFORE STARTING ANY EARTH DISTURBANCE ACTIVITIES, ALL
CONTRACTORS INVOLVED IN THOSE ACTIVITIES SHALL NOTIFY THE
PENNSYLVANIA ONE CALL SYSTEM, INC. AT 1-800-242-1776 FOR BURIED
UTILITIES LOCATION.
1. DUE TO THE NATURE OF THIS PROJECT, NO ROCK CONSTRUCTION
ENTRANCES ARE PROPOSED. INSTEAD, ALL CONSTRUCTION VEHICLES
SHALL LEAVE THE SITE VIA A FLATBED TRAILER AND SHALL BE LOADED
WITHIN THE LIMITS OF DISTURBANCE. ALL CONSTRUCTION VEHICLES
SHALL BE ADEQUATELY CLEANED OF ALL SEDIMENT PRIOR TO LEAVING
THE LIMIT OF DISTURBANCE. THE FLATBED TRAILER SHALL REMAIN ON
THE MACADAM ROAD SURFACE AT ALL TIMES.
2. DELINEATE AND MARK THE LIMIT OF DISTURBANCE (I.E. SURVEY STAKES,
POST AND ROPE, ORANGE CONSTRUCTION FENCE, ETC.). ALL
CONSTRUCTION ACTIVITIES SHALL REMAIN WITHIN THIS LIMIT AT ALL
TIMES.
3. INSTALL FILTER BAG INLET PROTECTION, AS INDICATED.
4. COMMENCE EXCAVATION AND WATER LINE INSTALLATION. EXCAVATE
TRENCH TO PROPOSED ELEVATION. THE QUANTITY OF EXCAVATION
COMPLETED IN ONE (1) DAYS' TIME SHALL BE LIMITED TO THE AMOUNT OF
PIPING WHICH CAN BE INSTALLED IN ONE (1) WORKING DAYS' TIME
PERIOD. ALL EXCAVATED MATERIALS SHALL BE DEPOSITED UPSLOPE OF
THE TRENCH. AS SOON AS THE PIPE IS INSTALLED, PLACE DESIGNATED
DIRECT COVER AND DESIGNATED TRENCH BACKFILL, AND RESTORE
TRENCH TO NEAR ORIGINAL ELEVATION. BACKFILL TRENCH AT END OF
EACH WORK DAY. INITIAL GRADE MAY BE SLIGHTLY LOWER THAN
SURROUNDING ELEVATIONS TO MINIMIZE RUNOFF. IN THE EVENT
EXCESS FILL REMAINS AFTER BACKFILLING AND COMPACTION IS
COMPLETED, STOCKPILE SOIL AND INSTALL SILT FENCE DOWNSLOPE OF
STOCKPILE AREA. TEMPORARILY STABILIZE STOCKPILE. TEMPORARY
STOCKPILES SHALL BE LOCATED WITHIN THE LIMIT OF DISTURBANCE. AT
EARLIEST CONVENIENCE, DISPOSE OF EXCESS FILL LEGALLY OFFSITE.
5. BACKFILL ANY SETTLED AREAS OF THE TRENCH TO MATCH
SURROUNDING GRADES. PERMANENTLY STABILIZE DISTURBED AREAS.
6. AFTER FINAL SITE STABILIZATION HAS BEEN ACHIEVED, TEMPORARY
EROSION AND SEDIMENT CONTROLS SHALL BE REMOVED. AREAS
DISTURBED DURING REMOVAL OF THE CONTROLS SHALL BE STABILIZED
IMMEDIATELY. AN AREA SHALL BE CONSIDERED TO HAVE ACHIEVED
FINAL STABILIZATION WHEN IT HAS A MINIMUM OF 70% UNIFORM
PERENNIAL VEGETATIVE COVER OR OTHER PERMANENT
NON-VEGETATIVE COVER WITH A DENSITY SUFFICIENT TO RESIST
ACCELERATED SURFACE EROSION AND SUBSURFACE CHARACTERISTICS
SUFFICIENT TO RESIST SLIDING OR OTHER MOVEMENTS.
BMP MAINTENANCE AND OPERATION PROGRAM
1. THE GENERAL CONTRACTOR WILL BE RESPONSIBLE FOR THE COMPLETE
CONSTRUCTION, STABILIZATION AND MAINTENANCE OF ALL EROSION AND
SEDIMENT CONTROL FACILITIES.
2. STOCKPILES OF WOOD CHIPS, CRUSHED STONE, AND OTHER MULCHES
SHALL BE READILY AVAILABLE AT THE PROJECT SITE AT ALL TIMES.
3. UNTIL THE SITE HAS ACHIEVED FINAL STABILIZATION, THE GENERAL
CONTRACTOR SHALL PROPERLY IMPLEMENT, OPERATE AND MAINTAIN
ALL EROSION AND SEDIMENT CONTROLS. MAINTENANCE SHALL INCLUDE
INSPECTIONS OF ALL EROSION AND SEDIMENT CONTROLS FOR
CONDITION AND INTEGRITY AFTER EACH STORM EVENT, AND ON A
WEEKLY BASIS. ALL PREVENTATIVE AND REMEDIAL MAINTENANCE WORK,
INCLUDING CLEANOUT, REPAIR, REPLACEMENT, REGRADING, RESEEDING,
REMULCHING, AND RENETTING SHALL BE PERFORMED IMMEDIATELY. A
WRITTEN REPORT MUST BE COMPLETED TO DOCUMENT EACH
INSPECTION AND ALL BMP REPAIR, REPLACEMENT, AND MAINTENANCE
ACTIVITIES. EROSION AND SEDIMENT CONTROLS SHALL BE MAINTAINED
IN THE FOLLOWING MANNER:
FILTER BAG INLET PROTECTION:
A. FILTER BAGS SHALL TRAP ALL PARTICLES LARGER THAN 150
MICRONS.
B. INSTALL FILTER BAGS ACCORDING TO THE MANUFACTURER'S
SPECIFICATIONS.
C. INSPECT INLET FILTER BAGS ON A WEEKLY BASIS AND AFTER EACH
RUNOFF EVENT.
D. REMOVE SEDIMENT FROM INLET FILTER BAGS AFTER EACH STORM
EVENT, OR WHEN THE DISTANCE BETWEEN THE GRATE AND THE
SEDIMENT LEVEL IS REDUCED TO 18".
E. CLEAN AND/OR REPLACE FILTER BAGS WHEN THE BAG IS ONE-HALF
FULL.
F. REPLACE DAMAGED FILTER BAGS.
G. COMPLETE NEEDED REPAIRS IMMEDIATELY AFTER THE INSPECTION.
PUMPED WATER FILTER BAG:
A. FILTER BAGS SHALL BE MADE FROM NON-WOVEN GEOTEXTILE
MATERIAL WITH HIGH STRENGTH, DOUBLE STITCHED "J" TYPE
SEAMS.
B. GEOTEXTILE MATERIAL SHALL BE CAPABLE OF TRAPPING
PARTICLES LARGER THAN 150 MICRONS.
C. REPLACE FILTER BAGS WHEN THEY BECOME ONE-HALF FULL.
D. PLACE BAGS ON 6" AASHTO #57 STONE IN A WELL-VEGETATED
AREA.
E. BAGS SHALL NOT BE PLACED ON SLOPES GREATER THAN 5%.
4. IF CONCENTRATED FLOWS ARE IDENTIFIED THAT ARE NOT ADDRESSED IN
THIS REPORT, THE APPROPRIATE STEPS SHALL BE TAKEN TO MITIGATE
THE CONDITION. CHANGES TO THE DESIGN, CONFIGURATION OR TIMING
OF ELEMENTS DESCRIBED IN THIS REPORT MUST BE REPORTED TO THE
APPROPRIATE REGULATORY AUTHORITIES. THE FOLLOWING
INSTRUCTIONS SHALL BE FOLLOWED:
A. SHOULD UNFORESEEN EROSIVE CONDITIONS DEVELOP DURING
CONSTRUCTION, THE APPROPRIATE ACTION SHALL BE TAKEN TO
REMEDY SUCH CONDITIONS AND TO PREVENT DAMAGE TO
ADJACENT PROPERTIES AS A RESULT OF INCREASED RUNOFF
AND/OR SEDIMENT DISPLACEMENT. STOCKPILES OF WOOD CHIPS,
CRUSHED STONE AND OTHER MULCHES SHALL BE HELD ONSITE TO
DEAL IMMEDIATELY WITH EMERGENCY PROBLEMS OF EROSION.
B. THE GENERAL CONTRACTOR IS ADVISED TO BECOME THOROUGHLY
FAMILIAR WITH THE PROVISIONS OF APPENDIX 64, EROSION
CONTROL RULES AND REGULATIONS, TITLE 25, PART 1,
DEPARTMENT OF ENVIRONMENTAL PROTECTION, SUB-PART C,
PROTECTION OF NATURAL RESOURCES, ARTICLE III, WATER
RESOURCES, CHAPTER 102, EROSION CONTROL.
C. A COPY OF THIS EROSION AND SEDIMENT CONTROL REPORT AND
PLANS SHALL BE POSTED AT THE CONSTRUCTION SITE IN
ACCORDANCE WITH PENNSYLVANIA STATE LAW.
PROCEDURES FOR DISPOSAL OF MATERIALS
POTENTIAL CONSTRUCTION WASTES ANTICIPATED FROM THIS PROJECT
INCLUDE BUT ARE NOT LIMITED TO: TOPSOIL/FILL MATERIAL, BUILDING
MATERIALS, AND EXCAVATED ROCK. ALL BUILDING MATERIALS AND WASTES
SHALL BE REMOVED FROM THE SITE, RECYCLED, OR DISPOSED OF IN
ACCORDANCE WITH THE DEPARTMENT OF SOLID WASTE MANAGEMENT
REGULATIONS AT 25 PA CODE 260.1 ET SEQ., 271.1 ET SEQ., AND 287.1 ET SEQ.
EXCAVATED MATERIAL SHALL BE PLACED DIRECTLY INTO CONSTRUCTION
VEHICLES. ANY SOIL OR ROCK THAT IS REMOVED FROM THE SITE WILL
REQUIRE A SEPARATE EROSION AND SEDIMENTATION CONTROL PLAN
PROVIDED BY THE CONTRACTOR. ALL SOILS REMOVED FROM AN E&S BMP
DURING ROUTINE MAINTENANCE SHALL BE REMOVED FROM THE PROJECT
AREA AND TAKEN AS SOIL STOCKPILE TO THE OFF-SITE STOCKPILE AREA.
GEOLOGIC CONDITIONS WITH POTENTIAL TO CAUSE POLLUTION
BASED ON SITE GEOLOGY, THERE ARE NO KNOWN GEOLOGIC CONDITIONS
WITH THE POTENTIAL TO CAUSE POLLUTION.
POTENTIAL THERMAL IMPACTS
SINCE THIS PROJECT ONLY INCLUDES TRENCHING FOR A WATER LINE
INSTALLATION, THERE IS NO POTENTIAL FOR THERMAL IMPACTS ON SURFACE
WATERS DURING OR AFTER CONSTRUCTION.
SEEDING AND MULCHING SCHEDULES
1. TEMPORARY SEEDING
A. TEMPORARY SEEDING SHALL BE DONE IN DISTURBED AREAS
WHERE NO ACTIVE WORK WILL BE PERFORMED. ANY DISTURBED
AREA ON WHICH ACTIVITY HAS CEASED MUST BE SEEDED AND
MULCHED IMMEDIATELY.
B. DURING NON-GERMINATING PERIODS, ONLY MULCH SHOULD BE
APPLIED AT THE RECOMMENDED RATES.
C. DISTURBED AREAS WHICH ARE NOT AT FINISHED GRADE AND
WHICH WILL BE RE-DISTURBED WITHIN ONE (1) YEAR MAY BE
SEEDED AND MULCHED WITH A QUICK GROWING TEMPORARY SEED
MIXTURE.
D. DISTURBED AREAS WHICH ARE EITHER AT FINISHED GRADE OR
WILL NOT BE DISTURBED AGAIN WITHIN ONE (1) YEAR MUST BE
SEEDED WITH A PERMANENT SEED MIXTURE AND MULCHED.
E. TEMPORARY SEEDING STEPS:
(1) APPLY AGRICULTURAL LIMESTONE OR HYDRATED LIME AT A
RATE OF ONE (1) TON PER ACRE.
(2) APPLY FERTILIZER AT THE APPLICATION RATE OF 50-50-50
(N-P2O5-K2O) POUNDS PER ACRE (LBS./ACRE).
(3) WORK THE LIMESTONE AND FERTILIZER INTO THE SOIL.
(4) UTILIZE THE FOLLOWING SEEDING TYPES, RATES AND TIME
SCHEDULE:
TEMPORARY SEEDING
SEASON RATE TYPE
MARCH 1 TO AUGUST 15 40 LBS./ACRE ANNUAL RYEGRASS
AUGUST 16 TO OCTOBER 15 168 LBS./ACRE WINTER RYE
(5) APPLY HAY OR STRAW MULCH (IN ACCORDANCE WITH
SECTION NO. 5) AT A RATE OF THREE (3) TONS PER ACRE.
F. ALL SEED SHALL BE LABELED, DATED AND THE QUALITY
CONSISTENT WITH SECTION NO. 2.
2. PERMANENT SEEDING
A. DISTURBED AREAS WHICH ARE EITHER AT FINISHED GRADE OR
WILL NOT BE DISTURBED AGAIN WITHIN ONE (1) YEAR MUST BE
SEEDED WITH A PERMANENT SEED MIXTURE AND MULCHED.
B. SEEDING SHALL BE DONE DURING PERIODS FROM APRIL 15TH TO
OCTOBER 1ST, UNLESS OTHERWISE DIRECTED. IF SEEDING IS
DONE AFTER OCTOBER 1ST, DORMANT SEED MUST BE USED AND
DISTURBED AREAS MUST BE MULCHED.
C. DISTURBED FINAL GRADED AREAS SHALL BE PERMANENTLY
SEEDED AS FOLLOWS:
(1) AREAS WHICH ARE TO BE TOPSOILED SHALL BE SCARIFIED TO
A MINIMUM DEPTH OF 4 INCHES PRIOR TO PLACEMENT OF
TOPSOIL. AREAS TO BE VEGETATED SHALL HAVE A MINIMUM 6
INCHES OF TOPSOIL IN PLACE PRIOR TO SEEDING AND
MULCHING. FILL 3:1 OR GREATER SHALL HAVE A MINIMUM OF
2 INCHES OF TOPSOIL.
(2) A SOIL ANALYSIS IS RECOMMENDED, BUT IN LIEU OF AN
ANALYSIS APPLY GROUND LIMESTONE OR HYDRATED LIME
AND FERTILIZER AT RATES RECOMMENDED IN SECTION NO. 3
(OR AS SUGGESTED BY THE SOILS TEST RESULTS [ONE (1)
TEST PER 25 ACRES]).
(3) THE LIMESTONE AND FERTILIZER SHALL BE WORKED INTO THE
SOIL TO A MINIMUM DEPTH OF 6 INCHES.
(4) SEED SHALL NOT BE PLANTED AFTER HEAVY RAIN OR
WATERING.
(5) ALL SEED USED SHALL BE LABELED IN ACCORDANCE WITH
THE U.S. DEPARTMENT OF AGRICULTURE RULES AND
REGULATIONS UNDER THE FEDERAL SEED ACT IN EFFECT AT
THE TIME OF PURCHASE. INERT MATTER SHALL NOT EXCEED
15% AND BLUE TAG CERTIFIED SEED SHALL BE SUPPLIED
WHEREVER POSSIBLE.
(6) SMOOTH AND FIRM SEED BED WITH CULTIPACKER OR SIMILAR
EQUIPMENT PRIOR TO SEEDING. APPLY SEED UNIFORMLY BY
HYDROSEEDING. COVER SEEDS WITH ½" OF SOIL (MINIMUM)
WITH SUITABLE EQUIPMENT.
(7) APPLY MULCH (IN ACCORDANCE WITH SECTION NO. 5) AT A
RATE OF THREE (3) TONS PER ACRE.
PERMANENT SEEDING
SEASON RATE TYPE
MARCH 1 TO JUNE 1 & 4 LBS./1000 S.F. WINTER RYE 70%
AUGUST 15 TO OCTOBER 1 TALL FESCUE 22%
RED TOP 2%
BIRDSFOOT TREFOIL 6%
OCTOBER 1 TO MARCH 1 & 3 LBS./1000 S.F. WINTER RYE 47%
JUNE 1 TO AUGUST 15 RED TOP* 53%
[(*)USE DORMANT SEED, UNIFORMLY APPLIED, WORKED INTO A DEPTH OF
¼ INCH. THE USE OF MULCH IS REQUIRED. THE USE OF NETTING OR
EROSION CONTROL MATS MAY BE REQUIRED.]
NOTE: SEEDING PERIODS AND SPECIFICATIONS MAY VARY DUE TO SITE
CONDITIONS AND VARIANCES FROM THE TIME THIS REPORT IS
WRITTEN AND APPROVED. IT MAY BE NECESSARY TO ADAPT SEED
SPECIFICATION, VARIETIES, AND QUANTITIES. FOR SPECIAL
CONDITIONS CONSULT "GUIDELINES FOR RECLAMATION OF
SEVERELY DISTURBED AREAS", PENNSYLVANIA STATE UNIVERSITY.
3. FERTILIZER: APPLY GROUND LIMESTONE OR HYDRATED LIME AT A RATE
OF 4 TONS PER ACRE AND 100-200-200 POUNDS PER ACRE (LBS./ACRE)
FERTILIZER. THESE MATERIALS WILL BE UNIFORMLY APPLIED AND
WORKED INTO THE TOPSOIL TO A MINIMUM DEPTH OF 6 INCHES.
4. HYDROSEEDING: AGRICULTURAL GRADE LIMESTONE AND WATER (4000
LBS. LIMESTONE/1000 GALLONS OF H2O PER ACRE) ALONG WITH THE
SEED SHALL BE AS SPECIFIED ABOVE, AND FERTILIZER SHALL BE APPLIED
AT A RATE OF 50-100-100 POUNDS PER ACRE (LBS./ACRE). SHOULD
FERTILIZER BE APPLIED WITH AN INOCULANT, THE MIXTURE SHALL NOT
REMAIN IN A SLURRY FOR MORE THAN ONE HOUR. SYNTHETIC MULCH
BINDER, SUCH AS CURASOL, DCA-70 OR TERRE-TACK SHALL BE USED PER
THE MANUFACTURER'S INSTRUCTIONS TO ANCHOR THE MULCH. THE
CONTRACTOR IS RESPONSIBLE FOR PROPER STABILIZATION. IF SEVERAL
APPLICATIONS OF HYDROSEEDING ARE REQUIRED TO OBTAIN PROPER
STABILIZATION, THE CONTRACTOR SHALL BE RESPONSIBLE TO ENSURE
THAT RE-APPLICATION IS DONE.
5. MULCHING: MULCHING SHALL BE APPLIED AS FOLLOWS:
A. STRAW
APPLY STRAW MULCH, FREE FROM UNDESIRABLE SEEDS AND
COARSE MATERIAL, AT A RATE OF THREE (3) TONS PER ACRE.
CHECK MULCHED AREAS PERIODICALLY AND IMMEDIATELY AFTER
STORMS AND HIGH WINDS. REPLACE DAMAGED OR MISSING
MULCH. APPLY A TACKIFIER AFTER APPLYING THE STRAW MULCH.
THE TACKIFIER MAY BE CUT-BACK ASPHALT OR POLYMER SPRAY.
APPLY THE TACKIFIER AT A RATE OF 100-150 GALLONS PER ACRE
WITH SUITABLE EQUIPMENT.
B. FLEXTERRA FLEXIBLE GROWTH MEDIUM (FGM)
ALL CONSTRUCTED AND DISTURBED SLOPES (3:1 OR GREATER)
SHALL BE SEEDED AND STABILIZED WITH FLEXTERRA FLEXIBLE
GROWTH MEDIUM (FGM), AS INDICATED, AT THE END OF EACH
WORKING DAY. FGM SHALL BE APPLIED IN ACCORDANCE WITH THE
MANUFACTURER'S SPECIFICATIONS.
C. EROSION CONTROL BLANKETS
THE USE AND INSTALLATION OF EROSION CONTROL BLANKETS OR
NETTING SHALL BE IN ACCORDANCE WITH THE MANUFACTURER'S
SPECIFICATION AND SHALL BE SELECTED FOR THE PROPER
APPLICATION AND CONDITIONS.
CLEAN FILL AND ENVIRONMENTAL DUE DILIGENCE
1. APPLICANTS AND/OR OPERATORS MUST USE ENVIRONMENTAL DUE
DILIGENCE TO ENSURE THAT THE FILL MATERIAL ASSOCIATED WITH THIS
PROJECT QUALIFIES AS CLEAN FILL. DEFINITIONS OF CLEAN FILL AND
ENVIRONMENTAL DUE DILIGENCE ARE PROVIDED BELOW. ALL FILL
MATERIAL MUST BE USED IN ACCORDANCE WITH THE DEPARTMENT'S
POLICY "MANAGEMENT OF FILL", DOCUMENT NUMBER 258-2182-773. A
COPY OF THIS POLICY IS AVAILABLE ONLINE AT
WWW.DEPWEB.STATE.PA.US. UNDER THE HEADING QUICK ACCESS ON
THE LEFT SIDE OF THE SCREEN, CLICK "FORMS AND PUBLICATIONS." ON
THE LEFT SIDE OF THE SCREEN CLICK "TECHNICAL GUIDANCE
DOCUMENTS - FINAL." THEN TYPE THE DOCUMENT NUMBER 258-2182-773
INTO THE SEARCH WINDOW AND CONDUCT THE SEARCH. CLICK ON
"MANAGEMENT OF FILL."
2. CLEAN FILL IS DEFINED AS: UNCONTAMINATED, NON-WATER SOLUBLE,
NON-DECOMPOSABLE, INERT, SOLID MATERIAL. THE TERM INCLUDES
SOIL, ROCK, STONE, DREDGED MATERIAL, USED ASPHALT, AND BRICK,
BLOCK OR CONCRETE FROM CONSTRUCTION AND DEMOLITION
ACTIVITIES THAT IS SEPARATE FROM OTHER WASTE AND IS
RECOGNIZABLE AS SUCH. THE TERM DOES NOT INCLUDE MATERIALS
PLACED IN OR ON THE WATERS OF THE COMMONWEALTH UNLESS
OTHERWISE AUTHORIZED. (THE TERM "USED ASPHALT" DOES NOT
INCLUDE MILLED ASPHALT OR ASPHALT THAT HAS BEEN PROCESSED FOR
RE-USE.)
3. CLEAN FILL AFFECTED BY A SPILL OR RELEASE OF A REGULATED
SUBSTANCE: FILL MATERIALS AFFECTED BY A SPILL OR RELEASE OF A
REGULATED SUBSTANCE STILL QUALIFIES AS CLEAN FILL PROVIDED THE
TESTING REVEALS THAT THE FILL MATERIAL CONTAINS
CONCENTRATIONS OF REGULATED SUBSTANCES THAT ARE BELOW THE
RESIDENTIAL LIMITS IN TABLES FP-1A AND FP-1B FOUND IN THE
DEPARTMENT'S POLICY "MANAGEMENT OF FILL."
4. ANY PERSON PLACING CLEAN FILL THAT HAS BEEN AFFECTED BY A SPILL
OR RELEASE OF A REGULATED SUBSTANCE MUST USE FORM F-001 TO
CERTIFY THE ORIGIN OF THE FILL MATERIAL AND THE RESULTS OF THE
ANALYTICAL TESTING TO QUALIFY THE MATERIAL AS CLEAN FILL. FORM
F-001 MUST BE RETAINED BY THE OWNER OF THE PROPERTY RECEIVING
THE FILL. A COPY OF FORM FP-001 CAN BE FOUND ONLINE.
5. ENVIRONMENTAL DUE DILIGENCE: INVESTIGATIVE TECHNIQUES,
INCLUDING, BUT NOT LIMITED TO, VISUAL PROPERTY INSPECTIONS,
ELECTRONIC DATA BASE SEARCHES, REVIEW OF PROPERTY OWNERSHIP,
REVIEW OF PROPERTY USE HISTORY, SANBORN MAPS, ENVIRONMENTAL
QUESTIONNAIRES, TRANSACTION SCREENS, ANALYTICAL TESTING,
ENVIRONMENTAL ASSESSMENTS OR AUDITS. ANALYTICAL TESTING IS
NOT A REQUIRED PART OF DUE DILIGENCE UNLESS VISUAL INSPECTION
AND/OR REVIEW OF THE PAST LAND USE OF THE PROPERTY INDICATES
THAT THE FILL MAY HAVE BEEN SUBJECTED TO A SPILL OR RELEASE OF
REGULATED SUBSTANCE. IF THE FILL MAY HAVE BEEN AFFECTED BY A
SPILL OR RELEASE OF A REGULATED SUBSTANCE, IT MUST BE TESTED TO
DETERMINE IF IT QUALIFIES AS CLEAN FILL. TESTING SHALL BE
PERFORMED IN ACCORDANCE WITH APPENDIX A OF THE DEPARTMENT'S
POLICY "MANAGEMENT OF FILL." FILL MATERIAL THAT DOES NOT QUALIFY
AS CLEAN FILL IS REGULATED FILL. REGULATED FILL IS WASTE AND MUST
BE MANAGED IN ACCORDANCE WITH THE DEPARTMENT'S MUNICIPAL OR
RESIDUAL WASTE REGULATIONS BASED ON 25 PA. CODE CHAPTERS 287
RESIDUAL WASTE MANAGEMENT OR 271 MUNICIPAL WASTE
MANAGEMENT, WHICHEVER IS APPLICABLE.
ATTACHMENT B
R om a C or po ra te
C en te r, S ui te
N
C ed ar C re st
B lv d A lle nt ow n, P A
0.
9.
C re ek si de L an e
Li tit z, P
A
7.
8.
L E
H
IG
H V
A L
L E
Y
L A
N C
A S
T E
R
N or th P ar k
R oa d R ea di ng , P
A
-0
0.
1.
R E
A D
IN
G
E as t E va ns S tre et
W es t C he st er
, P A
0.
1.
W E
S T
C H
E S
T E
R
E ng in ee rs a nd C on su lta nt s
SP
O
TT
S, S
TE
VE
N S
M
C C
O Y ss m gr ou p.
co m
D
ES
C R
IP
TI
O N
N O
D
AT
E
M
AD
E C
H
KD
AP
VD
9/
/2
R
EL
EA
SE
D
F O
R B
ID
D
IN
G
TJ
R
JM
N
JM
N
DIGITAL FILENAMEDATE
WORK ORDER NUMBER
DRAWING NUMBER
DIGITAL FILENAMEDATE
WORK ORDER NUMBER
DRAWING NUMBER
DIGITAL FILENAMEDATE
WORK ORDER NUMBER
DRAWING NUMBER
DIGITAL FILENAMEDATE
WORK ORDER NUMBER
DRAWING NUMBER
DIGITAL FILENAMEDATE
WORK ORDER NUMBER
DRAWING NUMBER
DIGITAL FILENAMEDATE
WORK ORDER NUMBER
DRAWING NUMBER
DIGITAL FILENAMEDATE
WORK ORDER NUMBER
DRAWING NUMBER
C O
PY
R
IG
TT
S, S
TE
VE
N S
M
C C
O Y
DIGITAL FILENAMEDATE
WORK ORDER NUMBER
DRAWING NUMBER
C O
N
ST
R U
C
TI
O N
D
ET
AI
LS
PR
O
PO
SE
D
L O
G P
IP
IN
G
IM
PR
O
VE
M
EN
TS
st
S
TR
EE
T
W
EL
L
SI
TE
LE
H
IG
H
C O
U N
TY
, P
EN
N
SY
LV
AN
IA
SO
U
TH
W
H
IT
EH
AL
L
TO
W N
SH
IP
W6-01 P:\103400.0101
11/22/24
103400.0101
W.6-01
R
EL
EA
SE
D F
O R
N O
T
FO
R C
O N
ST
R
U C
TI
O
N
PR
O
JE
C T
M
AN
AG
ER
D
AT
E:
N .B
BA
SE
B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C
H
KD
BI
D
D
IN
G
JM
N
9/
/2
H M
M
TJ
R
JM
N
JM
N
ATTACHMENT B
AutoCAD SHX Text
VALVE AND VALVE BOX
AutoCAD SHX Text
NO SCALE
AutoCAD SHX Text
%%UAIR RELEASE VALVE INSTALLATION DETAIL
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text 12"
AutoCAD SHX Text 12"
AutoCAD SHX Text 24"
AutoCAD SHX Text
4'-0" MIN.
AutoCAD SHX Text
6" MIN.
AutoCAD SHX Text %%uSECTION VIEW
AutoCAD SHX Text %%uPLAN VIEW
AutoCAD SHX Text
MIN.
AutoCAD SHX Text
WATER MAIN
AutoCAD SHX Text
WATER MAIN
AutoCAD SHX Text CAST IRON MANHOLE FRAME AND COVER 30" DIA. MIN. WITH SELF-SEALING GASKET, NEENAH MODEL R-1582, QUIRIN MACHINE SHOP CAT. NO. MHR-431-6 , OR 12, OR APPROVED EQUAL
AutoCAD SHX Text
GRADE
AutoCAD SHX Text
MANHOLE STEPS @ 12" C.C.
AutoCAD SHX Text
72" DIA. MANHOLE
AutoCAD SHX Text 30" I.D.
AutoCAD SHX Text AIR RELEASE VALVE, AS MANUFACTURED BY APCO, SIZED IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS
AutoCAD SHX Text
CORPORATION STOP - FORD METER BOX CO., MOD. FB1600, OR APPROVED EQUAL
AutoCAD SHX Text
UNION
AutoCAD SHX Text
1" DRAIN HOLE
AutoCAD SHX Text
MASONRY SUPPORT
AutoCAD SHX Text
2B CRUSHED STONE DRAIN
AutoCAD SHX Text
UNDISTURBED EARTH
NOTES: 1. ALL NON-CONFLICTING ALL NON-CONFLICTING PROVISIONS OF TYPICAL PRECAST CONCRETE CHAMBER STANDARD DETAIL G-16 APPLY TO THIS DRAWING. 2. BRASS FITTINGS AND NIPPLES BRASS FITTINGS AND NIPPLES REQUIRED. NO SOLDER JOINTS ALLOWED. 3. IF WATER MAIN IS LESS THAN IF WATER MAIN IS LESS THAN CLASS 52 DIP OR UNKNOWN, PROVIDE SADDLE WITH BALL VALVE IN PLACE OF CORPORATION STOP.
File details come from the government source that posted it. Updated .