3-Attachment B Scope of Work Vernal Building Demolition.docx

DOCX document 16 KB Posted

Attached to
NC26-76 Vernal Building Demo
Solicitation number
NC26-76
Issued by
Utah County, Utah

About this file

This is a Scope of Work document for Request for Quotes (RFQ) NC26-76 issued by the State of Utah Division of Purchasing, with the Division of Air Quality serving as the conducting procurement unit. The project involves the complete demolition of a 2,400 square foot State-owned building located at 70 E 100 S in Vernal, Utah. The vendor's responsibilities include demolishing the building and foundation, removing surface asphalt and concrete (excluding sidewalk), hauling all demolished materials off-site for proper disposal, and leaving the parcel ungradded without fill dirt. The Division of Air Quality will handle utility disconnections prior to demolition, provide asbestos inspection certification, coordinate with Vernal City for the demolition permit, and offer onsite visits for potential bidders during the bid posting period. All demolition work must be completed and materials removed by August 31, 2026.

The RFQ will be awarded to the responsive and responsible vendor submitting the lowest cost quote in compliance with the Utah Procurement Code. Quotes will be evaluated objectively according to the criteria and specifications outlined in the RFQ, and vendors may submit only one primary bid; multiple or alternate bids will not be accepted. Any exceptions to the RFQ specifications must be protested in writing to the Division of Purchasing prior to the closing date. The State reserves the right to solicit additional quotes via email, phone, or other methods permitted under the Utah Procurement Code or applicable Administrative Rules.

View the file

Other files

File Type Posted
2-Att.-A-PO-Terms-and-Conditions (3).docx DOCX document
1-Vendor Prerequisites - Quotes Part 8 PS SP.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment B Scope of Work

NC26-76

Vernal Building Demolition

Vendor Responsibilities:

· The vendor is expected to demolish the State of Utah-owned building at 70 E 100 S in Vernal, Utah.

· The building is a 2400 square foot building with no basement. Awarded vendor will demolish the building and foundation and remove surface asphalt and concrete (excluding sidewalk) from the parcel, carry all demolished materials off site and properly dispose. Vendor is asked to NOT add fill dirt nor regrade the parcel after building demolition Division of Air Quality Responsibilities:

· The Agency (Division of Air Quality) will ensure all utilities are disconnected prior to scheduled demolition. The agency will provide certification that the building has passed asbestos inspection. The agency will coordinate with Vernal City to acquire a demolition permit. The agency can provide a staff member to meet onsite with potential bidders for a brief site visit if needed during the time the bid is posted.

Deadline for completion of work:

· Full demolition and haul away of materials to be complete no later than August 31, 2026.

File details come from the government source that posted it. Updated .