3-Attachment B Scope of Work.pdf

PDF 352 KB Posted

Attached to
UDOT I-70 Concrete Panel Replacement Sevier County
Solicitation number
UDOT260180CN
Issued by
Tooele County, Utah

About this file

This Scope of Work document outlines the requirements for the Utah Department of Transportation (UDOT) I-70 Concrete Panel Replacement project in Sevier County near Richfield, Utah. The project involves removing and replacing approximately 20 fractured concrete panels located on I-70 between mileposts 20 to 24, mileposts 32 to 34, and mileposts 40 to 47. The work must be completed before June 30, 2026. Contractors are required to submit a traffic control plan prior to commencing work, as they will be responsible for all traffic control measures throughout the project. The pay items include mobilization (one lump sum), traffic control (one lump sum covering the full project length), and remove and replace PCCP panel (approximately 20 panels at a per-unit rate). Qualified contractors must demonstrate prior experience performing this type of work.

The project is governed by all applicable UDOT standards and specifications, including detailed requirements for pavement cutting (Section 02705), Portland cement concrete pavement (Section 02752), and full-depth slab replacement for concrete pavements (Section 02753). Contractors are responsible for the disposal of removed panels, which is included in the "Remove and Replace PCCP Panel" item cost. The solicitation is issued as an Invitation for Bid (IFB) under Solicitation #UDOT260180CN in accordance with the State of Utah Procurement Code and Utah Administrative Code. The contract will be awarded to the lowest responsive and responsible bidder and may result in a single contract award.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Scope of Work

UDOT is accepting bids from qualified contractors to remove and replace fractured concrete panels on I-70 in Sevier County near Richfield, Utah.

Approximately 20 panels are to be replaced. The panels are located on I-70 between mileposts 20 to 24, milepost 32 to 34 and mileposts 40 to 47. All UDOT standards and specifications apply. Specific standards attached.

The contractor will be responsible for disposal of the old panels. That will be included in the “Remove and Replace PCCP Panel” item. The contractor will be responsible for traffic control.

A traffic control plan must be submitted prior to work.

The work MUST be completed before June30, 2026.

The pay items are as follows:

Mobilization: One

Traffic Control: One (covers full project length)

Remove and Replace PCCP Panel: Each (20 Estimated)

Scope of work.pdf
02705-PavementCutting (1)
SECTION 02705
PAVEMENT CUTTING
PART 1 GENERAL
1.1 SECTION INCLUDES
1.2 RELATED SECTIONS
1.3 REFERENCES Not Used
1.4 DEFINITIONS Not Used
1.5 SUBMITTALS Not Used
1.6 PAYMENT PROCEDURES
PART 2 PRODUCTS Not Used
PART 3 EXECUTION
3.1 PROCEDURE – CONCRETE SURFACES
3.2 PROCEDURE – ASPHALT SURFACES
02752-PortlandCementConcretePavement
SECTION 02752
PORTLAND CEMENT CONCRETE PAVEMENT
PART 1 GENERAL
1.1 SECTION INCLUDES
1.2 RELATED SECTIONS
1.3 REFERENCES
1.4 DEFINITIONS
1.5 SUBMITTALS
1.6 ACCEPTANCE
PART 2 PRODUCTS
2.1 CONCRETE
2.2 CONCRETE CURING COMPOUND
2.3 EXPANSION JOINT MATERIALS
2.4 JOINT SEALERS
2.5 STEEL REINFORCEMENT
2.6 BATCH PLANT
2.7 CYLINDER STORAGE DEVICE
2.8 VEHICLES FOR HAULING
2.9 SLIP FORM PAVER
2.10 FINISHING/TEXTURING EQUIPMENT
PART 3 EXECUTION
3.1 LINE AND GRADE CONTROL
3.2 BATCH AND MIX
3.3 PLACE CONCRETE
3.4 HANDLE AND PLACE REINFORCING STEEL
3.5 FINISH
3.6 PAVEMENT TEXTURE
3.7 CURE
3.8 PROTECTION
3.9 JOINTS
3.10 DEFECTIVE PAVEMENT PANELS
3.11 LIMITATIONS – GENERAL
3.12 LIMITATIONS – COLD WEATHER
3.13 LIMITATIONS – HOT WEATHER
02753-FullDepthSlabReplacementforConcretePavements (1)
SECTION 02753
FULL DEPTH SLAB REPLACEMENT
FOR CONCRETE PAVEMENTS
PART 1 GENERAL
1.1 SECTION INCLUDES
1.2 RELATED SECTIONS
1.3 REFERENCES
1.4 DEFINITIONS Not Used
1.5 SUBMITTALS
PART 2 PRODUCTS
2.1 FULL DEPTH CONCRETE PAVEMENT REPAIR MATERIAL
PART 3 EXECUTION
3.1 PREPARATION
3.2 PLACE CONCRETE
3.3 FINISH CONCRETE
3.4 CURE AND PROTECT CONCRETE
3.5 LIMITATIONS
PV03
PV04