This is a Schedule of Values document for the Orchard Road Phase 2 Project, a road reconstruction initiative in Arizona involving approximately 1 mile of roadway improvements. The project encompasses a comprehensive range of construction activities including mobilization, surveying, erosion control, roadway excavation totaling 1,301 cubic yards, and the installation of drainage infrastructure consisting of 18-inch and 24-inch galvanized corrugated metal pipes spanning 490 and 130 linear feet respectively. Additional work includes aggregate base placement of 5,943 tons, asphalt emulsion applications using three grades of material totaling 89 tons, seal coat cover aggregate of 600 tons, and pavement markings covering approximately 15,714 linear feet with supplemental raised pavement markers totaling 156 units. Site restoration includes seeding, fertilizing, and mulching across 7 acres, with the project scheduled for completion by November 30, 2025.

The document establishes a detailed breakdown of material quantities and unit costs for each construction item, serving as the basis for contractor pricing and project budgeting. Quantities are specified in various units of measure including lump sum items for mobilization, surveys, erosion control, and temporary traffic control, with measurable components identified by unit pricing for aggregate materials, asphalt products, drainage pipe sections, and finishing work. The Schedule of Values provides the framework for invoice processing and progress payments throughout the construction phase of this Arizona infrastructure project.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

11/30/2025

ITEM NUMBER QUANTITY DESCRIPTION

TOTAL

QUANTITY

UNIT

UNIT

COST

COST

15101 Mobilization 1 L.S.

15201 Construction Survey & Staking 1 L.S.

15202 As Built Survey 1 L.S.

15714 Soil Erosion Control-Includes SWPPP Plan 1 L.S.

20401 Roadway Excavation 1301 C.Y.

30101 Aggregate base, grading special 5943 Tons

40905 Emulsified Asphalt, grade CRS-2P 35 Tons

40906 Emulsified Asphalt, grade MC-250 40 Tons

40907 Emulsified Asphalt, grade SS-1h (diluted 1:1) 14 Tons

40909 Cover aggregate, 3/8 inch, grading special, seal coat 300 Tons

40908 Cover aggregate, 1/2 inch, grading special, seal coat 300 Tons

60211a End sections for 18" CMP 22 Each

60211b End sections for 24" CMP 6 Each

60212a 18" Galvanized CMP 16ga 490 L.F.

60212b 24" Galvanized CMP 16ga 130 L.F.

62501 Seeding, fertilizing and multching, dry method 7 Acre

63401a Pavement markings, type H, 4 inch solid yellow 1000 L.F.

63401b Pavement markings, type H, 4 inch broken yellow 4225 L.F.

63401c Pavement merkings, type H, 4 inch solid white 10450 L.F.

63401d Pavement markings, type H, 18 inch solid white 39 L.F.

63401e Raised Pavement Markers, Type D 156 Each

63411 Temporary Traffic Control 1 LS

1/2 Sack Slurry Mix for Culvert Backfill 38 C.Y.

Contractor Quality Control 1 LS

Total=