3-Att.-B-Scope-of-Work.pdf
PDF 475 KB Posted
- Attached to
- Jack Fence for Little Hole Orchard and WRI
- Solicitation number
- KR26-6
- Issued by
- Utah
About this file
Summary
This is a Scope of Work for Solicitation #KR26-6 issued by the State of Utah Department of Natural Resources Division of Wildlife Resources. The project seeks to procure and deliver modular jack fencing materials for habitat restoration and wildlife management purposes at the Goslin Mountain Wildlife Management Area located in Daggett County, Utah. The scope includes 432 twelve-foot rails, 150 three-rail fence jacks, 8 three-piece jack corner sets, and 2 three-rail jack ravine adaptors. The fence specifications require 3 steel rails with a minimum outer diameter of 1¾ inches and 13 gauge minimum thickness, with the main body of each jack at 2 inches outer diameter and 50 inches tall. Rails must be positioned at approximately 17, 30, and 42 inches from the bottom to ensure wildlife-friendliness. The contractor must demonstrate extensive manufacturing and delivery experience for this fence type. All materials must be delivered to the Goslin Mountain WMA by March 31, 2026.
The total project budget, including fencing materials and delivery costs, is $27,650. This Request for Quotes is evaluated based on objective criteria outlined in the Utah Procurement Code, with the contract to be awarded to the responsive and responsible vendor submitting the lowest cost quote. The project supports habitat restoration efforts on both Bureau of Land Management and Division of Wildlife Resources-managed lands, specifically protecting a spring utilized by sage grouse, pronghorn, and mule deer that has sustained damage from active livestock grazing. The fence design allows for disassembly and relocation as needed, providing flexibility for future modifications to the orchard exclusion area on the Little Hole Wildlife Management Area.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 2-Att.-C-Jack-Rail specs.pdf | ||
| 1-Att.-A-Agency-Terms-and-Conditions-GS (3).docx | DOCX document | |
| 4-Vendor Prerequisites - Quotes Part 8 PS SP.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Scope of Work for Solicitation # KR26-6 Attachment : B
1. Introduction
1.1
To complement the habitat restoration work that is being done in the NER, we often build fences to exclude livestock or wildlife to give an area ample time to recover, or establish enough to function on its own. This SOW was written to obtain a significant amount of “Jack Fence,” which is a semi-permanent pipe fence design. This fence is wildlife- friendly, and is able to be expanded upon, or disassembled and utilised elsewhere as needed. A significant aspect of the design of this fence, is that it is able to be assembled without welding. We still build permanent fencing as needed on Wildlife Management Areas by welding pipe together, but we are often constrained by fire restrictions. Considering the average time for fire restrictions to be implemented has come earlier each year, this type of fence gives us the flexibility needed for projects.
Background
The habitat section of the Division of Wildlife Resources oversees the Wildlife Management Areas in our respective regions. To fully utilize these lands, we undertake habitat restoration work that will benefit the wildlife that use them. A portion of WRI project 7448 will take place on BLM-managed land that has no fencing boundary between BLM and DWR-managed lands, so a benefit to the BLM-managed land will in turn, benefit DWR lands. Specifically, there is a spring that sage grouse, pronghorn, and mule deer use that we are aiming to protect. This land is actively grazed by an operator and the spring has suffered a significant amount of damage that is slowly deteriorating the spring. We are also planning a restoration project on the spring that should result in a slow increase in the amount of riparian vegetation surrounding spring and connected strem. Having a fence that is able to be modified, or added to over time will allow us to react with flexibility to the changes over time that the area undergoes.
Another aspect of this project is to provide an exclusion fence around an orchard that is currently on our
Little Hole WMA. By using the proposed fence, we will be able to modify the footprint of the orchard if deemed necessary in the future.
Scope of Work
This SOW is to acquire the following:
- 432, 12’ Rails
- 150, 3 Rail Fence Jacks
- 8, 3-piece Jack Corner Sets
- 2, 3 Rail Jack Ravine Adaptors
- Delivery of materials to the Goslin Mountain WMA located in Daggett County by the end of
March, 2026.
Scope of Work for Solicitation # KR26-6 Attachment : B
1.2 Requirements
This Fence should consist of 3 steel rails that are at least 1 3/4” outer diameter, and are 13 gauge minimum.
The main body of a steel “Jack” should be 2 ⅜” outer diameter, and 50” tall. The internal sleeves that the rails will fit onto should be 1 ¼” outer diameter and 6” long. Rails must fit at approximately 17”, 30”, and 42” from the bottom of the jack to be wildlife-friendly.
Corners must be provided that are able to pivot 180-90 degrees.
Part of this project requires the fence to traverse a small stream. Some adaptors that are able to handle a drop in elevation and a crossing over the stream are needed.
2. Compliance
Delivery of the materials will be coordinated with the project manager to the Goslin Mountain WMA.
The provider of the materials must have extensive experience in manufacturing and arranging the delivery of this type of fence.
3. Project Deliverables
The awarded contractor will provide the materials as listed in the Scope of Work, and deliver them to the Goslin Mountain WMA.
4. Project Timeline
The materials as described in the Scope of Work Will be delivered by March 31, 2026.
5. Project Budget
The total budget for this project, including fencing materials and delivery, is $27,650