3-ATT B Scope of Work BD26-39.pdf

PDF 3 MB Posted

Attached to
BD26-39 New Floating Breakwater for Strawberry Marina
Solicitation number
BD26-39
Issued by
Utah

About this file

The document is a Scope of Work (SOW) for the Utah Division of Wildlife Resources, detailing a breakwater replacement and installation project at Strawberry Marina, Strawberry Reservoir, Utah. The project involves constructing and installing a new breakwater section approximately 160 feet long and 8 feet wide to replace an existing broken breakwater. The project performance time is from 10/25/2025 to 06/15/2026, with the contractor responsible for design, fabrication, delivery, and installation of the new breakwater. The final product must adhere to the provided Forest Service-approved engineering specifications, originally engineered for Flaming Gorge Recreation Area.

The project requires the contractor to fabricate a breakwater using primarily wood framing, incorporating a hinged design and larger plate steel as specified in the engineering plans. The decking and fascia shall use Trex-style material matching existing courtesy docks, with the option to salvage and reuse existing Trex-style decking from the current breakwater. The new breakwater should utilize existing underwater anchors and anchoring winches. The project will be considered complete upon verification of compliance with design specifications, passing a pre-installation inspection by the Utah Division of Wildlife Resources, confirming the 160-foot length and 8-foot width, and ensuring proper installation and anchoring. A comprehensive maintenance plan must be provided, ensuring a minimum service life of 10 years for the newly installed breakwater.

View the file

Other files

File Type Posted
2-maps and design.pdf PDF
1-Vendor Prerequisites - IFB Agency.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment B (cont.)

Scope of Work (SOW)

Project Title: Strawberry Marina Breakwater Replacement and Installation Location: Strawberry Marina, Strawberry Reservoir, Utah

Procurement Unit: Division of Wildlife Resources

Date: 10/17/2025

Project Performance Time: 10/25/2025 - 06/15/2026

1. Project Goal

Utah Division of Wildlife Resources is acquiring services in this contract to construct and install a new breakwater section approximately 160’ x 8’ at the Strawberry Marina, Strawberry Reservoir, Utah, to replace the existing broken breakwater. The final product must adhere strictly to the provided engineering designs and specifications. Project must be completed by June 15th, 2026.

2. Project Scope and Deliverables

The Contractor shall be responsible for the design, fabrication, delivery, and installation of the new breakwater.

ID Deliverable Description

2.1 Fabrication

Fabricate a breakwater section totaling a minimum of 160 linear feet (LF) and 8 feet wide, in accordance with Section 3 (Design and Material Requirements).

2.2 Delivery

Deliver the completed breakwater sections to the Strawberry Marina site. Project completion deadline is June 15th, 2026.

ID Deliverable Description

2.3 Installation

Install the fabricated breakwater sections into the final location as shown on the attached Site Map and anchor them as specified in Section 4 (Site and Salvage Requirements).

2.4 Maintenance Plan

Provide a comprehensive maintenance plan that will be incorporated into the final specifications for the bidding process.

This plan must ensure a minimum service life of 10 years for the newly installed breakwater.

3. Design and Material Requirements

The breakwater must be constructed using the attached design specifications (originally engineered for Flaming Gorge Recreation Area) and meet all Forest Service approved engineering specifications.

ID Requirement Description

3.1 Design Match

The new breakwater should be identical to the older breakwater and to the existing breakwater surrounding the boat slips.

3.2 Core Construction

Construction shall primarily utilize wood framing in full compliance with the attached Forest Service approved engineering specifications.

3.3 Durability Features

The design must incorporate the specified hinged design and use larger plate steel as defined in the attached engineering plans.

3.4 Decking and Fascia

The decking and fascia shall be Trex style material to match the appearance of the existing adjacent courtesy docks. The existing Trex style decking and fascia from the current breakwater is approved for removal and can be salvaged and reused on the newly constructed breakwater sections.

4. Site and Salvage Requirements

ID Requirement Description

4.1 Salvaged Decking

The existing Trex style decking and fascia from the broken breakwater is approved for removal and shall be salvaged and reused on the newly constructed breakwater sections.

4.2 Anchoring Winches

The existing anchoring winches from the broken breakwater may be salvaged and reused on the new breakwater.

4.3 Anchors

The new breakwater should utilize the existing anchors that are currently in place underwater.

5. Acceptance Criteria

The project will be considered complete and accepted upon verification of the following:

ID

Acceptance Criteria

Responsible Party

5.1 Compliance

The finished breakwater and all installed components must be fully compliant with the attached Design Specifications and Engineering Plans.

5.2 Pre-Installation Inspection

The finished product must pass an inspection by the Utah Division of Wildlife Resources (UDWR) prior to installation to ensure compliance with all designs and specifications.

5.3 Quantity and Dimension

Verification that the installed breakwater is 160 LF in length and 8 feet in width.

5.4 Installation

Verification of secure and proper installation, attachment, and anchoring to the existing infrastructure and anchors.

6. References and Appendices

The following documents are integral to this Scope of Work:

1. [ATTACHED] Breakwater Design and Engineering Specifications (Flaming Gorge/Forest Service Approved)

2. [ATTACHED] Site Map showing the location for the new breakwater installation.

C am

Sc an ne r

CamScanner

Sc an

Sc an

Sc an

Sc an

Sc an

maps and design.pdf
BD26-39 Site Map.pdf
bw draw1
bw draw2
bw draw3
bw draw4
bw draw5
bw draw6
bw draw7