This document is an Addendum (#1) for a Request for Quotation (RFQ# 2025025-RFQ5300) issued by the Columbia County Board of Commissioners for Landfill Post Closure Care & Corrective Action Plan Operation & Maintenance. The solicitation covers a site visit conducted on 7/9/2025 and provides key details about the landfill property. The landfill spans 154 acres, with approximately 93 acres being maintainable, and includes 37 Methane Monitoring Wells (MM-#) and additional compliance wells. The document notes that landfill phases 1 and 2 are not lined, while phase 3 is lined, and current leachate discharge volumes range from 2,100 to 5,467 gallons per day. Mowing is currently performed every 6-8 weeks, and 4-H utilizes the site for training and competitions.
The solicitation is specifically for basic maintenance and compliance, with special projects to be bid separately. The site visit sign-in sheet indicates participation from county procurement and engineering departments, as well as several vendor representatives from companies like Piedmont. Attached methane monitoring data from 6-24-25 shows extensive testing across multiple monitoring points (MM-1 through MM-37, MMM-A through MMM-M, and DOT-1 through DOT-12), with all readings showing minimal methane levels (predominantly 0.0) and varying oxygen levels. The site plan includes detailed topographical information, well locations, and elevation contours, demonstrating a comprehensive approach to environmental monitoring and management.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 1-1 - Request for Proposal Packet.pdf | ||
| 4-Addendum 2.pdf | ||
| 5-Addendum 3.pdf | ||
| 2-2 - NONCOLLUSION AFFIDAVIT.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PLEASE NOTE THE FOLLOWING INFORMATION FROM THE 7/9/2025 SITE VISIT:
• Please see the attached report and site plan.
• There are 37 Methane Monitoring Wells (designated as “MM-#”) that are reported on the “Periodic Methane Monitoring Report”
• Other wells are intended to show compliance in certain areas of the landfill vs.
perimeter so that the County could get a minor modification approval for select activities (designated “MMM-#”, “DOT-#”, and by structure).
• Regarding leachate, the “Wastewater Discharge Volumes” over the last year range from 2100 gal/day to 5467 gal/day.
• The landfill property contains 154 acres, however the maintainable area is roughly 93 acres.
• Mowing frequency: Currently once every 6-8 weeks, depending on season.
• Landfill phases 1 & 2 are not lined, phase 3 is lined.
• Fencing damage – County will decide the best route for repairs, and this will be a special project the County would seek quotes for after contracting with a vendor.
• 4-H utilizes the landfill for certain training/competitions.
• This solicitation is to contract for basic maintenance and compliance. Other special projects for the landfill will be bid/quoted separately.
• Equipment currently on site is the property of the current vendor.
End of Addendum #1
COLUMBIA COUNTYBOARD OF COMMISSIONERS
RFQ# 2025025-RFQ5300
Landfill Post Closure Care & Corrective Action Plan Operation & Maintenance
ADDENDUM #1 – 7/14/2025
LEGEND
270280
300310320330
350 340
BCortelloni Callout
BHP-12B
BCortelloni Callout
BHP-13A