3-83500-110-1 JACOBS PARK SITE PLANS.pdf
PDF 2 MB Posted
- Attached to
- Morton Borough Sanitary Sewer Relining & Manhole Rehabilitation State and local contract opportunity
- Solicitation number
- Not on record
- Issued by
- Delaware County, Mount Aetna CDP, Pennsylvania
About this file
The document is a site development drawing for Jacobs Park, prepared for the Morton Borough, located at 500 Highland Avenue in Morton, PA 19070. The site plan details a comprehensive park development project, including site layout, parking areas, access roads, slope stabilization, and various infrastructure improvements. The plan shows a detailed site map with topographical features, proposed roadways, parking zones, and landscaping elements, with a focus on ADA accessibility, pavement restoration, and environmental considerations.
The drawing includes technical specifications for pavement restoration, concrete curbing, parking bumpers, handicapped parking signage, and slope stabilization. Specific design elements include a 1.5" HMA superpave wearing course, Class AA concrete, ADA ramp elevations, and geotextile slope stabilization techniques. The project appears to be a comprehensive park redevelopment effort that emphasizes accessibility, drainage management, and adherence to Pennsylvania Department of Transportation (PennDOT) standards. The site plan is prepared by CEA (Civil Engineering Associates) and covers detailed engineering specifications for site grading, parking, and infrastructure improvements.
View the file
Other files for this state and local contract opportunity
| File | Type | Posted |
|---|---|---|
| 4-83500-104-25 Specifications 7-28-26.pdf | ||
| 3-83500-112-II-SWSG-25 Drawings.pdf | ||
| 2-83500-112-II-SWSG-25 Bid Bond Form.pdf | ||
| 1-83500-104-25 REQUIRED Bid Documents.pdf | ||
| 2-83500-110-1-25 Bid Bond Form.pdf | ||
| 4-83500-110-1-25 Specifications 8-27-25.pdf | ||
| 1-83500-110-1-25 Required Bid Documents.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
HARDING AVENUE
CEA
SITE
THE LOCATIONS OF ALL UTILITIES SHOWN ON THE PLANS ARE APPROXIMATE AND MUST BE
VERIFIED IN THE FIELD BY THE CONTRACTOR PRIOR TO CONSTRUCTION. THE CONTRACTOR
SHALL CONTACT PA ONE-CALL AT 811 AT LEAST 3-DAYS BEFORE PROCEEDING WITH ANY
EXCAVATION. IT IS ALSO THE CONTRACTOR'S RESPONSIBILITY TO OBTAIN ACCURATE FIELD
LOCATIONS OF ALL EXISTING UNDERGROUND AND AERIAL UTILITIES FROM BOTH THE UTILITY
COMPANIES AND/OR BY TEST PITS PRIOR TO BEGINNING WORK. ALL UTILITY SERVICES WITHIN
THE LIMITS OF WORK MUST ALSO BE FIELD LOCATED PRIOR TO EXCAVATION WORK.
CONTRACTORS ARE TO IMMEDIATELY NOTIFY THE ENGINEER OF ANY DEVIATIONS FROM THE
PLAN INFORMATION. THE CONTRACTOR SHALL BE RESPONSIBLE TO TAKE ALL PREVENTIVE
MEASURES TO PROTECT THE LINES IN ACCORDANCE WITH THE PA ONE-CALL ACT.
GENERAL NOTES
CEA
File details come from the government source that posted it. Updated .