This is a comprehensive electrical design drawing set prepared by Smith Seckman Reid, Inc. for the Texas Department of Criminal Justice (TDCJ) to replace the electrical system at the Memorial Unit in Rosharon, Texas (MWR #00715006). The project involves replacing the existing 4160V radial electrical power distribution system with a new 12.5KV/4160V system as Phase 1 of a two-phase electrical replacement initiative. The scope includes installation of two 2500 kVA transformers, 15KV pad-mounted switchgear, new 5KV loops replacing existing switchgear, unit substations (ST-A through ST-K), selector switches, sectionalizing switches, new cable tray systems, conduit installations both underground and overhead, grounding systems, and lighting fixtures throughout multiple areas including the boiler room, utility corridor, roof-mounted mechanical room, and five spline areas (A through E). The drawings are issued for proposal as of September 30, 2025, and include electrical one-line diagrams, site plans, equipment schedules, grounding riser diagrams, short-circuit analysis, and detailed installation specifications across multiple sheets (E-000 through E-605 and EP-100 through EP-207).

The design incorporates essential and critical load considerations, with essential loads including perimeter fencing, emergency lighting, medical facilities, water systems, wastewater, security locks, and communications, while critical loads include respite areas and restrictive housing blocks requiring temperature control below 88 degrees Fahrenheit. The contractor is required to maintain temporary power during load transfers, submit weekly coordination meeting schedules, provide construction schedules with power shutdown notifications, and limit shutdowns to same-day restoration with maximum extensions of 12-14 hours. Equipment shipping is constrained to 6 feet width and 9 feet height for spline installations, and the contractor must investigate and document the existing 120V/208V distribution system with certified as-built drawings, panel schedules, and equipment photographs. All decommissioned infrastructure must be removed before beneficial occupancy with no abandoned infrastructure permitted. The project requires coordination with TDCJ for perimeter fence modifications, underground utility location verification through daylighting where possible, and compliance with NFPA 70E arc flash requirements including hazard analysis labels and power system studies with selective coordination to 0.1 seconds.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VICINITY MAP

N.T.S.

TEXAS DEPARTMENT OF CRIMINAL JUSTICE

REPLACE ELECTRICAL

MEMORIAL UNIT

N

M.W.R. NO. 00715006

GPS COORDINATES

29.3996N / 95.4906W

ROSHARON, TEXAS 77583

SEPTEMBER 30,2025

ISSUED FOR PROPOSAL

FO

T

A X

S E

T A T

T H E

S

E

FACILITIES DIVISION

THE TEXAS DEPARTMENT OF CRIMINAL JUSTICE

(713) 784-8211 Houston, TX 77042

3700 W. Sam Houston Pkwy. S., Suite 200

Reid, Inc.

Seckman Smith www.ssr-inc.com

FAX: (713) 952-8655

Texas Firm No. 2874

S-401 DETAILS PHASE 1

S-400 DETAILS PHASE 1

S-301 DOOR AND FRAME TYPES PHASE 1

S-204 LEVEL 2 - SPLINE AREA E PHASE 1

S-202 LEVEL 2 - SPLINE AREA C PHASE 1

S-201 LEVEL 2 - SPLINE AREA A PHASE 1

S-104 CORRIDOR PHASE 1

S-102 BOILER ROOM - LEVEL 1 PHASE 1

S-101 SITE PLAN PHASE 1

S-001 GENERAL NOTES PHASE 1

M-500 MECHANICAL DETAILS - PHASE 1

M-203 SPLINE AREAS A&E - RENOVATION FLOOR PLAN - PHASE 1

M-000 MECHANICAL LEGEND, AND NOTES - PHASE 1

E-605 ELECTRICAL-SHORT CIRCUIT AND LOAD FLOW ANALYSIS - NORMAL POWER PHASE 1

E-604 GROUNDING RISER DIAGRAM PHASE 1

E-602 ELECTRICAL ONE-LINE DIAGRAM NORMAL PHASE 1

E-600 ELECTRICAL ONE-LINE DIAGRAM - EXISTING PHASE 1

E-501 ELECTRICAL DETAILS PHASE 1

E-500 ELECTRICAL DETAILS PHASE 1

EP-207 SPLINE AREA E PHASE 1

EP-206 SPLINE AREA D PHASE 1

EP-205 SPLINE AREA C PHASE 1

EP-204 SPLINE AREA B PHASE 1

EP-203 SPLINE AREA A PHASE 1

EP-108 ROOF TOP MECHANICAL ROOM PHASE 1

EP-107 UTILITY CORRIDOR PHASE 1

EP-106 BOILER ROOM - MEZZANINE PHASE 1

EP-105 BOILER ROOM - LEVEL 1 PHASE 1

EP-102 ELECTRICAL SITE PLAN RENOVATION PHASE 1

EP-101 LAYDOWN AREA PHASE 1

EP-100 ELECTRICAL SITE PLAN EXISTING PHASE 1

E-001 ELECTRICAL EQUIPMENT SCHEDULE PHASE 1

E-000 ELECTRICAL LEGEND AND NOTES PHASE 1

- COVER SHEET

NUMBER SHEET NAME

SHEET INDEX

PHOTO BOOK

ROSHARON, TX

MEMORIAL UNIT

SITE LOCATION

TYLER

HUNTSVILLE

AUSTIN

SAN

ANTONIO

HOUSTON

DALLAS

LUBBOCK

AMARILLO

EL

PASO

LAREDO

FT.

WORTH

pp p p p o p o o p p p o o

EXHIBIT 6

696-FD-26-P036

PANELBOARD

MISCELLANEOUS

JUNCTION BOX

DISCONNECT SWITCH

J

CONCRETE HATCHING

NO MANS LAND

REFER TO PHOTO BOOK

INDIVIDUAL LOADS

AFF

AFG

CLG

FBO

WP

ABOVE FINISHED FLOOR

ABOVE FINISHED GRADE

CEILING

FURNISHED BY OTHERS

WEATHERPROOF

ABBREVIATIONS

FLR FLOOR MOUNTED

TR TAMPER RESISTANT

BAS BUILDING AUTOMATION SYSTEM

OFOI OWNER FURNISH OWNER INSTALLED

OFCI OWNER FURNISH CONTRACTOR INSTALLED

GENERAL NOTES

2.

1.

6.

5.

4.

3.

EXISTING SERVICES INDICATED ON THESE DRAWINGS WERE DERIVED FROM EXISTING DRAWINGS AND LIMITED FIELD OBSERVATIONS. THESE DRAWINGS ARE NOT ALL INCLUSIVE OF SERVICES THAT EXIST IN THE PROJECT AREA. CONTRACTOR SHALL VERIFY SERVICES, LOCATION, TYPE, AND SIZES PRIOR TO ANY CONSTRUCTION. ANY DEVIATIONS IMPACTING WORK SHOWN ON THESE DOCUMENTS SHALL BE REPORTED TO THE ENGINEER FOR

COORDINATION PRIOR TO DEMOLITION.

NOT USED.

NOT USED.

NOT USED.

REMOVE ALL JUNCTION BOXES, CONDUIT, PIPE HANGERS, STRAPS OR TIE WIRES ANCHORED IN CONCRETE

SLAB ABOVE CEILING THAT ARE NO LONGER IN USE.

CONTRACTOR SHALL SUBMIT TO TDCJ PROJECT ADMINISTRATOR A COMPLETE LIST OF EQUIPMENT AND ITEMS TO BE REMOVED. ASSETS SUCH AS UNIT SUBSTATIONS, SWITCHGEAR, PANELS, ETC. WILL BE

RELOCATED TO THE LAYDOWN AREA.

THESE NOTES ARE APPLICABLE TO ENTIRE DRAWING SET. INDIVIDUAL DRAWINGS HAVE NOTES UNIQUE TO THE DRAWING ON WHICH THEY APPEAR. NOTES ON FLOOR PLANS AND SITE PLANS APPLY ONLY TO THE SHEET ON

WHICH THEY APPEAR.

9.

10.

11.

12.

13.

EQUIPMENT ROOM EXPOSED GROUND BUS BARS SHALL BE FABRICATED USING SOLID COPPER BUS BAR OF SUFFICIENT CROSS SECTION AREA TO MEET UL STANDARD 891. BUS BAR SHALL BE MOUNTED EXPOSED ON WALL USING 3" STANDOFFS. PREDRILL BUS BAR FOR 50 PERCENT ADDITIONAL SPARE CONNECTION CAPACITY.

REFER TO DETAIL 09 ON SHEET E-500 AND GROUNDING DIAGRAM ON SHEET E-604.

ESSENTIAL LOADS ARE LOADS THAT CANNOT HAVE OUTAGES INCLUDE:

1. PERIMETER FENCE

2. PERIMETER LIGHTING

3. EMERGENCY LIGHTING

4. MEDICAL

5. WATER WELL

6. WASTE WATER

7. SECURITY LOCKS WHEN REQUIRED BY WARDEN (COORDINATE WITH WARDEN)

8. TELEPHONE WHEN BATTERY BACKUP UPS NOT CONFIRMED TO BE WORKING (IT TO CHECK DAILY)

PROVIDE TEMPORARY POWER DURING LOAD TRANSFER.

14.

CONTRACTOR SHALL COORDINATE SHIPPING SPLITS IN ALL ELECTRICAL EQUIPMENT TO CONFIRM THAT IT

WILL FIT THROUGH PROVIDED OPENINGS.

CONTRACTOR SHALL PROVIDE SCHEDULE OF WEEKLY MEETINGS FOR COORDINATION OF CRITICAL SHUT-

DOWNS AND BIWEEKLY FOR CONSTRUCTION COORDINATION FOR THE ENTIRE DURATION OF

CONSTRUCTION. CONTRACTOR SHALL PROVIDE CONSTRUCTION SCHEDULE INCLUDING POWER SHUT- DOWNS. ADJUSTMENTS TO SCHEDULE MUST BE MADE WITH A MINIMUM OF 72 HOURS NOTICE. DAYS OF SHUT-DOWNS CAN BE EXTENDED 12-14 HOURS BUT POWER MUST BE RESTORED THE SAME DAY OF THE

SHUT-DOWN.

CRITICAL LOADS ARE LOADS THAT CANNOT HAVE OUTAGES FOR MORE THAN ONE HOUR IN A 24 HOUR PERIOD

AND INCLUDE:

1. RESPITE AREAS WHEN NECESSARY TO KEEP HEAT INDEX OF THESE AREAS LESS THAN 88 DEGREES F.

2. RESTRICTIVE HOUSING AREAS (BLOCKS A, B, C, D) WHEN NECESSARY TO KEEP HEAT INDEX OF THESE

AREAS LESS THAN 88 DEGREES F.

3. HVAC/ VENTILATION WHEN NECESSARY TO KEEP HEAT INDEX OF THESE AREAS LESS THAN 88 DEGREES

PROVIDE TEMPORARY POWER DURING LOAD TRANSFER.

MAXIMUM SIZE OF THE EQUIPMENT SHIPPING SPLIT FOR EQUIPMENT WHICH WILL BE INSTALLED IN THE SPLINE SHALL NOT EXCEED 6' WIDTH AND 9' HEIGHT. THE CONTRACTOR SHALL COORDINATE THE SHIPPING

SPLIT WITH THE EQUIPMENT VENDOR.

EQUIPMENT DESIGNATED TO BE "REMOVED AND RELOCATED" SHALL BE REMOVED FROM EXISTING

LOCATION AND RELOCATED TO LAYDOWN AREA SHOWN ON SHEET EP-101.

15. NOT USED.

NOT USED.

CONTRACTOR TO INVESTIGATE THE 120V/208V DISTRIBUTION SYSTEM FROM UNIT SUBSTATIONS TO DISTRIBUTION PANELS. PANEL SCHEDULES AND FLOOR LAYOUTS DEPICTING DISTRIBUTION PANEL AND MOTOR CONTROL CENTER LOCATIONS ARE INCLUDED FOR REFERENCE. PANEL BRANCH CIRCUITS ARE EXCLUDED FROM THE INVESTIGATION. EQUIPMENT DISCONNECTS, INDIVIDUAL LOADS SUCH AS FANS AND HVAC UNITS DIRECTLY FED FROM UNIT SUB STATIONS ARE EXCLUDED FROM THE INVESTIGATION.

THE EXPECTED DELIVERABLE OF THE INVESTIGATION IS A CERTIFIED AS-BUILT ONE LINE, AS-BUILT PANEL

SCHEDULES, PHOTOS OF THE INSIDE OF THE PANELS, PERMANENT DESTINATION TAG ON EACH

SUBSTATION, DISTRIBUTION, BREAKER AND A TABLE SHOWING THE FOLLOWING INFORMATION:

PANEL NAME PANEL SOURCE MAIN FEEDER INFORMATION

CONDUIT TYPE/SIZE WIRE TYPE/SIZE NUMBER OF PHASES

ALL DECOMMISSIONED INFRASTRUCTURE SHALL BE REMOVED AND RELOCATED BEFORE CONSTRUCTION

BENEFICIAL OCCUPANCY. NO ABANDONED INFRASTRUCTURE SHALL REMAIN IN PLACE.

7.

8.

16.

17.

18.

SELECTIVE COORDINATION

POINT TO POINT FAULT CURRENT CALCULATION HAS BEEN PERFORMED BY SKM SOFTWARE FOR DESIGN PURPOSES. FAULT CURRENT LEVEL AT EACH POINT IS SHOWN ON DRAWING E-605 AND E-606. THE CONTRACTOR SHALL PROVIDE POWER SYSTEM ANALYSIS WITH SHORT CIRCUIT CALCULATION, COORDINATION OF UPSTREAM AND DOWNSTREAM CIRCUIT BREAKERS TO 0.1 SECONDS, AND ARC FLASH HAZARD STUDY. ARC FLASH HAZARD ANALYSIS LABELS SHALL BE PROVIDED IN ACCORDANCE TO NFPA 70E. REFER TO SPECIFICATION SECTION 26 05

73 FOR ADDITIONAL INFORMATION.

TEXAS FIRM REGISTRATION #: F-2874

(713) 784-8211 Houston, TX 77042

3700 West Sam Houston Parkway South, www.ssr-inc.com

FAX: (713) 952-8655

Suite 200

Reid, Inc.

Seckman Smith

CHECKED BY:

DRAWN BY:

DESIGNED BY:

R

EV

IS

IO

N S

C op yr ig ht

By

S m ith S ec km an R ei d, In c.

A ll rig ht s re se rv ed . T hi s do cu m en t, or p ar ts th er eo f, m ay n ot b e re pr od uc ed in a ny fo rm w ith ou t w rit te n pe rm is si on

SHEET TITLE

DATE

PROJECT STATUS

SHEET NUMBER

9/

/2

:3 2:

P

M C

:\U se rs \y be re m \D oc um en ts

\S

SR

_E

LE

C _T

D C

J_ D

AR

R

IN

G

TO

N

-2

2_ yb er em

.rv t

TD

C

J M

EM

O

R

IA

L U

N

IT

TD

C

J M

EM

O

R

IA

L U

N

IT

R

EP

LA

C E

EL

EC

TR

IC

AL

PR

O

JE

C T

M W

R

D

AR

R

IN

G

TO

N

R D

R

O

SH

AR

O

N , T

X

SSR Project #: 17230430

SG

ORM

HZ

E-000

ELECTRICAL LEGEND

AND NOTES PHASE 1

ISSUED FOR PROPOSAL

R

EV

D

AT

E D

ES

C

R

IP

TI

O

N

/0

5/

AD

D

EN

D U

M

09/30/2025

09/30/2025

TEXAS FIRM REGISTRATION #: F-2874

(713) 784-8211 Houston, TX 77042

3700 West Sam Houston Parkway South, www.ssr-inc.com

FAX: (713) 952-8655

Suite 200

Reid, Inc.

Seckman Smith

CHECKED BY:

DRAWN BY:

DESIGNED BY:

R E

V

IS

IO

N

S

C o p y ri g h t

B y S m it h S e c k m a n R e id

In c A ll ri g h ts r e s e rv e d T h is d o c u m e n t, o r p a rt s t h e re o f, m a y n o t b e r e p ro d u c e d i n a n y f o rm w it h o u t w ri tt e n p e rm is s io n

SHEET TITLE

DATE

PROJECT STATUS

SHEET NUMBER

/2

/2

:5

:5

P

M C

U s e rs

\o ro d ri g u e z \D o c u m e n ts

\S S

R

E L E

C T

D C

J D

A R

R

IN

G T

O N

-2 o ro d ri g u e z R

Q

B S

.r v t

T D

C J M

E M

O R

IA

L U

N

IT

T D

C J M

E M

O R

IA

L U

N

IT

R

E P

L A

C E

E L

E C

T R

IC

A

L P

R O

J E

C T

M W

R

D

A R

R

IN

G T

O N

R D

R

O S

H A

R O

N T

X

SSR Project #: 17230430

SG

ORM

HZ

E-001

ELECTRICAL

EQUIPMENT

SCHEDULE PHASE 1

09/30/2025

ISSUED FOR PROPOSAL

PBH Panel (REFER TO NOTE 17 ON E-000) E-600

SPLINE PNL P2 P3 Panel (REFER TO NOTE 17 ON E-000) E-600

P1 Panel (REFER TO NOTE 17 ON E-000) E-600

NN#1 Panel (REFER TO NOTE 17 ON E-000) E-600

NCC6 Panel (REFER TO NOTE 17 ON E-000) E-600

MCP9 Panel (REFER TO NOTE 17 ON E-000) SPLINE AREA D E-600 EP206

MCCL Motor Control Center E-600

MCCK Motor Control Center E-600

MCC44 Motor Control Center E-600

MCC43 Motor Control Center SPLINE AREA A E-600 EP203

MCC33 Motor Control Center SPLINE AREA D E-600 EP206

MCC29 Motor Control Center SPLINE AREA D E-600 EP206

MCC28 Motor Control Center SPLINE AREA D E-600 EP206

MCC2 Motor Control Center SPLINE AREA E E-600 EP207

MCC1 Motor Control Center SPLINE AREA E E-600 EP207

MAINTENANCE B Panel (REFER TO NOTE 17 ON E-000) MAINTENANCE E-600 EP102

MAINTENANCE A Panel (REFER TO NOTE 17 ON E-000) MAINTENANCE E-600 EP102

MAIN CAMERA Panel (REFER TO NOTE 17 ON E-000) E-600

LV1&2 Panel (REFER TO NOTE 17 ON E-000) E-600

LV-2 Panel (REFER TO NOTE 17 ON E-000) E-600

LV-1 Panel (REFER TO NOTE 17 ON E-000) E-600

KPI Panel (REFER TO NOTE 17 ON E-000) E-600

KP3B Panel (REFER TO NOTE 17 ON E-000) E-600

KP3 Panel (REFER TO NOTE 17 ON E-000) E-600

KP-2 Panel (REFER TO NOTE 17 ON E-000) E-600

KP Panel (REFER TO NOTE 17 ON E-000) E-600

KM Panel (REFER TO NOTE 17 ON E-000) E-600

KL Panel (REFER TO NOTE 17 ON E-000) E-600

KE Panel (REFER TO NOTE 17 ON E-000) E-600

KB Panel (REFER TO NOTE 17 ON E-000) E-600

KA Panel (REFER TO NOTE 17 ON E-000) E-600

K/L Panel (REFER TO NOTE 17 ON E-000) E-600

IP Panel (REFER TO NOTE 17 ON E-000) E-600

INVESTIGATION Panel (REFER TO NOTE 17 ON E-000) E-600

IEM2 Panel (REFER TO NOTE 17 ON E-000) E-600

I/J Panel (REFER TO NOTE 17 ON E-000) E-600

GFI-3C Panel (REFER TO NOTE 17 ON E-000) E-600

GFI-3A Panel (REFER TO NOTE 17 ON E-000) E-600

GFI-2C Panel (REFER TO NOTE 17 ON E-000) E-600

GFI-2A Panel (REFER TO NOTE 17 ON E-000) E-600

GFI-1C Panel (REFER TO NOTE 17 ON E-000) E-600

GFI-1A Panel (REFER TO NOTE 17 ON E-000) E-600

GB2 Panel (REFER TO NOTE 17 ON E-000) E-600

GB Panel (REFER TO NOTE 17 ON E-000) E-600

G/H Panel (REFER TO NOTE 17 ON E-000) E-600

EM3 Panel (REFER TO NOTE 17 ON E-000) E-600

EM2 Panel (REFER TO NOTE 17 ON E-000) E-600

EM Panel (REFER TO NOTE 17 ON E-000) E-600

EAST DORM Panel (REFER TO NOTE 17 ON E-000) E-600

E/F Panel (REFER TO NOTE 17 ON E-000) E-600

DR Panel (REFER TO NOTE 17 ON E-000) LEVEL 1 AREA B MAIN HALL E-600

DO Panel (REFER TO NOTE 17 ON E-000) E-600

DC-P3-K Panel (REFER TO NOTE 17 ON E-000) E-600

DC-P2-J Panel (REFER TO NOTE 17 ON E-000) E-600

DC-P2-B Panel (REFER TO NOTE 17 ON E-000) E-600

DC-P2-A Panel (REFER TO NOTE 17 ON E-000) E-600

DC-P1-C Panel (REFER TO NOTE 17 ON E-000) E-600

DC-D2 Panel (REFER TO NOTE 17 ON E-000) SPLINE AREA D EP206

DC-D1 Panel (REFER TO NOTE 17 ON E-000) SPLINE AREA A EP203

DC-1P-A Panel (REFER TO NOTE 17 ON E-000) E-600

CSM Panel (REFER TO NOTE 17 ON E-000) LEVEL 2 AREA B, CRAFT SHOP E-600

CS1B Panel (REFER TO NOTE 17 ON E-000) E-600

CS1A Panel (REFER TO NOTE 17 ON E-000) E-600

COMMESARY 2 Panel (REFER TO NOTE 17 ON E-000) E-600

COMMESARY Panel (REFER TO NOTE 17 ON E-000) E-600

CHILLER 2 Panel (REFER TO NOTE 17 ON E-000) E-600

CHILLER 1 Panel (REFER TO NOTE 17 ON E-000) E-600

CB-IM Panel (REFER TO NOTE 17 ON E-000) E-600

CB6L Panel (REFER TO NOTE 17 ON E-000) E-600

CB5P Panel (REFER TO NOTE 17 ON E-000) E-600

CB5L Panel (REFER TO NOTE 17 ON E-000) E-600

CB4P Panel (REFER TO NOTE 17 ON E-000) E-600

CB4L Panel (REFER TO NOTE 17 ON E-000) E-602

CB3P Panel (REFER TO NOTE 17 ON E-000) E-600

CB3L Panel (REFER TO NOTE 17 ON E-000) E-600

CB2CA Panel (REFER TO NOTE 17 ON E-000) E-600

CB2D Panel (REFER TO NOTE 17 ON E-000) E-600

CB2C Panel (REFER TO NOTE 17 ON E-000) E-600

CB2B Panel (REFER TO NOTE 17 ON E-000) E-600

CB2A(2) Panel (REFER TO NOTE 17 ON E-000) E-600

CB2A Panel (REFER TO NOTE 17 ON E-000) E-600

CB1D Panel (REFER TO NOTE 17 ON E-000) E-600

CB1C Panel (REFER TO NOTE 17 ON E-000) E-600

CB1B Panel (REFER TO NOTE 17 ON E-000) E-600

CB1A-2 Panel (REFER TO NOTE 17 ON E-000) E-600

CB1A Panel (REFER TO NOTE 17 ON E-000) E-600

CA CHAPEL Panel (REFER TO NOTE 17 ON E-000) E-602

BH Panel (REFER TO NOTE 17 ON E-000) E-600

A2B Panel (REFER TO NOTE 17 ON E-000) E-600

A2A Panel (REFER TO NOTE 17 ON E-000) E-600

A1C Panel (REFER TO NOTE 17 ON E-000) E-600

A1B Panel (REFER TO NOTE 17 ON E-000) E-600

A1A Panel (REFER TO NOTE 17 ON E-000) E-600

8 TANK Panel (REFER TO NOTE 17 ON E-000) E-600

1P Panel (REFER TO NOTE 17 ON E-000) E-600

1KL Panel (REFER TO NOTE 17 ON E-000) E-600

#3 PKT Panel (REFER TO NOTE 17 ON E-000) E-600

#2 PKT Panel (REFER TO NOTE 17 ON E-000) E-600

#1 PKT Panel (REFER TO NOTE 17 ON E-000) E-600

122 Panel (REFER TO NOTE 17 ON E-000) E-600

121 Panel (REFER TO NOTE 17 ON E-000) E-600

120 Panel (REFER TO NOTE 17 ON E-000) E-600

119 Panel (REFER TO NOTE 17 ON E-000) E-600

1 Panel (REFER TO NOTE 17 ON E-000) E-600

TAG ID DESCRIPTION LVL#/AREA# ONELINE PLAN

WEST DORM Panel (REFER TO NOTE 17 ON E-000) E-600

VISITING Panel (REFER TO NOTE 17 ON E-000) E-600

TX-TS 5KV/0.208KV Pad Mounted Transformer - Tire Shop OUTDOOR E-602 EP102

TX-PEM2 5KV/.48KV Pad Mounted Transformer - Docking Station BOILER ROOM E-600 EP105

TX-M 5KV/0.208KV Pad Mounted Transformer - Maintenance OUTDOOR E-602 EP102

TX-ED 5KV/0.208KV Pad Mounted Transformer - East Dorm OUTDOOR E-602 EP102

TX-CY 5KV/0.48KV Pad Mounted Transformer - Chiller Yard OUTDOOR E-602 EP102

TX2500-2 2500 kVA Transformer 12.5kV/5kV OUTSIDE THE FENCE E-602 EP102

TX2500-1 2500 kVA Transformer 12.5kV/5kV OUTSIDE THE FENCE E-602 EP102

TS-8 Spline E-600

TS-7 Spline E-600

TS-6 Spline SPLINE E-600 EP206

TS-5 Automatic Transfer Switch - EMP - SPD-2 E-600

TS-4 Automatic Transfer Switch - EMP - EDP-K EP206

TS-3 Automatic Transfer Switch - EMP - Generator Ctrl Pwr E-600

TS-2 Automatic Transfer Switch - EMP - EDP-C2 E-600

TS-1 Automatic Transfer Switch - EMP - EDP-C1 E-600

TMP-1 Panel (REFER TO NOTE 17 ON E-000) E-602

TPM-1 Panel (REFER TO NOTE 17 ON E-000) E-600

TP-4 Panel (REFER TO NOTE 17 ON E-000) E-602

TP-3 Panel (REFER TO NOTE 17 ON E-000) E-600

TP2 Panel (REFER TO NOTE 17 ON E-000) E-600&E-602

TE Panel (REFER TO NOTE 17 ON E-000) E-600

ST-K Unit Substation K ROOF TOP MECHANICAL ROOM E-602 EP108

ST-G Unit Substation G SPLINE E-602 EP206

ST-F Unit Substation F SPLINE E-602 EP203

ST-E Unit Substation E SPLINE E-602 EP205

ST-D Unit Substation D SPLINE E-602 EP207

ST-C Unit Substation C SPLINE E-602 EP105

STB-SB Panel (REFER TO NOTE 17 ON E-000) E-600

ST-B Unit Substation B SPLINE E-602 EP207

ST-A Unit Substation A SPLINE E-602

SS-WD 5KV Sectionalizing Switch - West Dorm OUTDOOR E-602 EP102

SS-TS 5KV Sectionalizing Switch - Tire Shop OUTDOOR E-602 EP102

SS-M 5KV Sectionalizing Switch - Maintenance OUTDOOR E-602 EP102

SS-G Selector Switch G SPLINE E-602 EP206

SS-F Selector Switch F MECHANCAL ROOM E-602 EP107

SS-ED 5KV Sectionalizing Switch - East Dorm OUTDOOR E-602 EP102

SS-CY 5KV Sectionalizing Switch - Chiller Yard OUTDOOR E-602 EP102

SS-C Selector Switch C SPLINE E-602 EP105

SS-B Selector Switch B MECHANCAL ROOM E-602 EP207

SS-A Selector Switch A MECHANCAL ROOM E-602 EP107

SPM 1 Panel (REFER TO NOTE 17 ON E-000) E-600

SPLINE OFFICE Panel (REFER TO NOTE 17 ON E-000) E-600

SP4 Panel (REFER TO NOTE 17 ON E-000) E-600

SP2 Panel (REFER TO NOTE 17 ON E-000) SPLINE AREA A E-602 EP203

SP1 Panel (REFER TO NOTE 17 ON E-000) E-600

SG5KV-2 5KV Pad Mounted Switchgear OUTSIDE THE FENCE E-602 EP102

SG5KV-1 5KV Pad Mounted Switchgear OUTSIDE THE FENCE E-602 EP102

PS Panel (REFER TO NOTE 17 ON E-000) E-600

PMCC43 Panel (REFER TO NOTE 17 ON E-000) SPLINE AREA A E-602 EP203

PLX Panel (REFER TO NOTE 17 ON E-000) E-600

PLN Panel (REFER TO NOTE 17 ON E-000) E-600

PLM Panel (REFER TO NOTE 17 ON E-000) E-600

PLL Panel (REFER TO NOTE 17 ON E-000) E-600

PMC-5 Panel (REFER TO NOTE 17 ON E-000) E-600

PMC-4 Panel (REFER TO NOTE 17 ON E-000) E-600

PMC-3 Panel (REFER TO NOTE 17 ON E-000) E-600

PMC-2 Panel (REFER TO NOTE 17 ON E-000) E-600

PMC-1 Panel (REFER TO NOTE 17 ON E-000) E-600

PL Panel (REFER TO NOTE 17 ON E-000) E-600

PK Panel (REFER TO NOTE 17 ON E-000) E-600

PI Panel (REFER TO NOTE 17 ON E-000) E-600

PG-2 Panel (REFER TO NOTE 17 ON E-000) E-600

PG-1 Panel (REFER TO NOTE 17 ON E-000) E-600

PEM2 Panel (REFER TO NOTE 17 ON E-000) E-600 EP105

PDR Panel (REFER TO NOTE 17 ON E-000) E-600

TAG ID DESCRIPTION LVL#/AREA# ONELINE PLAN

R E

V D

A T

E D

E S

C R

IP

T

IO

N

General Note:

Brand or manufacturer’s references are descriptive only, and indicate type and quality to be provided. All references to brand or manufacturer names shall be interpreted to include the language “or A/E approved equal”. Any brand or manufacturer meeting specifications will be considered, irrespective of the language “or A/E approved equal” appearing in conjunction with the brand or manufacturer name.

SELECTOR SWITCH SCHNEIDER HVLcc 26 13 16

5KV SECTIONALIZING SWITCH S&C MANUAL VISTA SWITCHGEAR 26 13 30.01

2,500 KVA TRANSFORMER 12.5kV/5kV SCHNEIDER PAD MOUNTED CLASS 7230 26 12 19

TYPE OF EQUIPMENT BASIS OF DESIGN SPECIFICATION SECTION

BASIS OF DESIGN

09/30/2025

WEST DORMEAST DORM

SEMINARY

REC YARD

ENTRANCE

CHAPEL

GYM

BOILER ROOM

LAUNDRY

DORM

OLD BUILDING

INFIRMARY

CHILLER YARD

EXISTING

XFMR

MAINTENANCE

CHILLER

TO 12.5KV

OVERHEAD

LINE.

12.5KV OVERHEAD LINE

WEST DORM

PANEL A

EAST DORM

PANEL A

EXISTING

BUS DUCT

TO BE

REMOVED

TO 12.5KV

OVERHEAD

LINE.

EXISTING CAN

CRUSHER

TIRE SHOP

LAUNDRY

STORAGE

ENTRANCE

LIBRARYC

EL

L

BL

O C

K 'K

C

EL

L

BL

O C

K 'L

C

EL

L

BL

O C

K 'J

C

EL

L

BL

O C

K 'I'

C

EL

L

BL

O C

K 'G

C

EL

L

BL

O C

K 'H

C

EL

L

BL

O C

K 'F

C

EL

L

BL

O C

K 'E

C

EL

L

BL

O C

K 'C

C

EL

L

BL

O C

K 'D

C

EL

L

BL

O

C K

'A

C

EL

L

BL

O C

K 'B

CHOW HALL

MAIN SWITCH

PHOTO

41,42,43 &44

PHOTO

#45

PHOTO

#46

PHOTO

#47

PHOTO

#48

CHILLER

SWITCHBOARD

PHOTO

#68

PHOTO

#67

PHOTO

#66

PHOTO

#63, 65

PHOTO

#64

ACCESS ROAD

MAIN PANEL

MAINTENANCE

PANELS A & B

EXISTING

WATER

TOWER

EXISTING 480V PANEL

TS-WT

EXISTING TRANSFER SWITCH TO BE REPLACED

EXISTING POLE WITH 12.4KV-208/120V

TRANSFORMER TO BE REUSED

COMM. ROOM

GEN-BR-500GEN-BR-350

TEXAS FIRM REGISTRATION #: F-2874

(713) 784-8211 Houston, TX 77042

3700 West Sam Houston Parkway South, www.ssr-inc.com

FAX: (713) 952-8655

Suite 200

Reid, Inc.

Seckman Smith

CHECKED BY:

DRAWN BY:

DESIGNED BY:

R

EV

IS

IO

N S

C op yr ig ht

By

S m ith S ec km an R ei d, In c.

A ll rig ht s re se rv ed . T hi s do cu m en t, or p ar ts th er eo f, m ay n ot b e re pr od uc ed in a ny fo rm w ith ou t w rit te n pe rm is si on

SHEET TITLE

DATE

PROJECT STATUS

SHEET NUMBER

9/

/2

:3 2:

P

M C

:\U se rs \y be re m \D oc um en ts

\S

SR

_E

LE

C _T

D C

J_ D

AR

R

IN

G

TO

N

-2

2_ yb er em

.rv t

TD

C

J M

EM

O

R

IA

L U

N

IT

TD

C

J M

EM

O

R

IA

L U

N

IT

R

EP

LA

C E

EL

EC

TR

IC

AL

PR

O

JE

C T

M W

R

D

AR

R

IN

G

TO

N

R D

R

O

SH

AR

O

N , T

X

SSR Project #: 17230430

SG

ORM

HZ

EP-100

ELECTRICAL SITE

PLAN EXISTING

PHASE 1

ISSUED FOR PROPOSAL

1 ELECTRICAL SITE PLAN EXISTING PHASE ONE

GENERAL NOTES

1.

EXISTING MAIN SWITCHGEAR TO BE REMOVED AND RELOCATED

AFTER NEW EQUIPMENT IS INSTALLED AND IN SERVICE. REFER TO

ONE-LINE DIAGRAM E-600 AND BOILER ROOM ENLARGED PLAN EP-105.

KEYED NOTES

EXISTING 12.5KV/4160V TRANSFORMER TO BE REMOVED AND

RELOCATED AFTER NEW EQUIPMENT IS INSTALLED AND PLACED IN

SERVICE. REFER TO ONE-LINE DIAGRAM.

EXISTING 300KVA/12.5KV/480V TRANSFORMER 400A/3P DISCONNECT

SWITCH AND MAIN DISTRIBUTION PANEL IN THE BUILDING TO REMAIN IN

PLACE.

POLE MOUNTED 75KVA, 12.5KV/240V TRANSFORMER.4

UNDERGROUND FEEDER TO BE REMOVED AFTER NEW FEEDER IS

INSTALLED AND PLACED IN SERVICE. REFER TO ONE-LINE DIAGRAM

E-602.

EXISTING 50KVA/12.5KV/208V TRANSFORMER.6

EXISTING 350KVA/208V GENERATOR TO REMAIN.7

EXISTING 4160V/480V, 500KVA TRANSFORMER AND DOWNSTREAM POWER

DISTRIBUTION FOR CHILLER INCLUDING SWITCHBOARD SHALL REMAIN AND

SHALL BE REUSED. REFER TO ONE-LINE DIAGRAM AND ELECTRICAL SITE

PLAN EP-102.

REFER TO BOILER ROOM - LEVEL 1, EP-105, FOR ADDITIONAL DETAILS.10

NOT USED.11

N

REMOVE AND RELOCATE EXISTING TRANSFORMER.14

UNDERGROUND FEEDER TO REMAIN.12

EXISTING POWER DISTRIBUTION SYSTEM FOR SEMINARY IS NOT IN THE

SCOPE OF WORK.

REFER TO ONE-LINE DIAGRAMS FOR INFORMATION REGARDING

EQUIPMENT RATING AND FEEDER CONNECTIONS.

2. LOCATING UNDERGROUND UTILITIES AROUND PERIMETER FENCE

SHALL BE COORDINATED WITH TDCJ AND UTILITY LOCATOR.

UNDERGROUND UTILITIES SUCH AS POWER TO PERIMETER LIGHTING,

FIBER TO PERIMETER CAMERAS, ETC. SHALL BE LOCATED BY

DAYLIGHTING AS MUCH AS POSIBLE.

EXISTING 500KW GENERATOR (GEN-BR-500) IS TO REMAIN.19

R

EV

D

AT

E D

ES

C

R

IP

TI

O

N

8 NOT USED.

NOT USED.

NOT USED.

NOT USED.

NOT USED.

NOT USED.20

09/30/2025

09/30/2025

WEST DORMEAST DORM

REC YARD

ENTRANCE

TIRE SHOP

MAINTENANCE

NO MAN'S LAND

16'-0" ACCESS GATE

BOILER ROOM

CHAPEL

GYM

INFIRMARY

LAUNDRY

STORAGE

ENTRANCE

LIBRARY

OLD BLDG

C

EL

L

BL

O C

K 'K

C

EL

L

BL

O C

K 'L

C

EL

L

BL

O C

K 'J

C

EL

L

BL

O C

K 'I'

C

EL

L

BL

O C

K 'G

C

EL

L

BL

O C

K 'H

C

EL

L

BL

O C

K 'F

C

EL

L

BL

O C

K 'E

C

EL

L

BL

O C

K 'C

C

EL

L

BL

O C

K 'D

C

EL

L

BL

O

C K

'A

C

EL

L

BL

O C

K 'B

CHOW HALL

SEMINARY

ACCESS ROAD

"DISPOSAL

CONTAINERS

LOCATION. INSTALL

NEW FENCE

16'-0" ACCESS GATE

70' - 0"

OUTSIDE

LAYDOWN

AREA

16'-0" ACCESS GATE

70' - 0"

2 3

FACILITY

LAYDOWN AREA

16'-0" ACCESS GATE

5 SHEET

EP-203

5 SHEET

EP-205A/B

5 SHEET

EP-206

5 SHEET

EP-207

5SHEET

EP-208

5SHEET

EP-107

10' - 0"

TEXAS FIRM REGISTRATION #: F-2874

(713) 784-8211 Houston, TX 77042

3700 West Sam Houston Parkway South, www.ssr-inc.com

FAX: (713) 952-8655

Suite 200

Reid, Inc.

Seckman Smith

CHECKED BY:

DRAWN BY:

DESIGNED BY:

R

EV

IS

IO

N S

C op yr ig ht

By

S m ith S ec km an R ei d, In c.

A ll rig ht s re se rv ed . T hi s do cu m en t, or p ar ts th er eo f, m ay n ot b e re pr od uc ed in a ny fo rm w ith ou t w rit te n pe rm is si on

SHEET TITLE

DATE

PROJECT STATUS

SHEET NUMBER

9/

/2

:3 2:

P

M C

:\U se rs \y be re m \D oc um en ts

\S

SR

_E

LE

C _T

D C

J_ D

AR

R

IN

G

TO

N

-2

2_ yb er em

.rv t

TD

C

J M

EM

O

R

IA

L U

N

IT

TD

C

J M

EM

O

R

IA

L U

N

IT

R

EP

LA

C E

EL

EC

TR

IC

AL

PR

O

JE

C T

M W

R

D

AR

R

IN

G

TO

N

R D

R

O

SH

AR

O

N , T

X

SSR Project #: 17230430

SG

ORM

HZ

EP-101

LAYDOWN AREA

PHASE 1

ISSUED FOR PROPOSAL

1 LAYDOWN/GENERATOR/CRANE PLAN

GENERAL NOTES

CONTRACTOR SHALL PROTECT ELECTRICAL EQUIPMENT FROM

WEATHER AND MOISTURE IN ACCORDANCE WITH MANUFACTURERS

INSTRUCTIONS AND GOOD PRACTICES.

1.

N

2.

KEYED NOTES

AREA AVAILABLE FOR PLACEMENT OF RIGGING EQUIPMENT TO BE

USED TO LIFT EQUIPMENT INTO SPLINE.

PRIOR TO PLACING RIGGING EQUIPMENT THE CONTRACTOR SHALL

VERIFY IF THE SOIL/ CONCRETE CAN SUPPORT WEIGHT OF RIGGING

EQUIPMENT WITH THE LOAD.

3.

CONTRACTOR TO USE FACILITY LAYDOWN AREA LOCATION FOR

REMOVED EQUIPMENT AND TRASH. NOTIFY THE TDCJ PROJECT

ADMINISTRATOR WHEN REMOVED ASSETS AND TRASH ARE READY FOR

DISPOSAL.

ALL EQUIPMENT REMOVED FROM THE FACILITY DURING WORKING

HOURS SHALL BE PLACED IN THE FACILITY LAYDOWN AREA.

AT THE END OF EACH WORKING DAY, EQUIPMENT STORED IN THE

FACILITY LAYDOWN AREA SHALL BE RELOCATED TO THE OUTSIDE

LAYDOWN AREA.

FENCE TO COMPLY WITH TDCJ REQUIREMENTS.4

THE DOOR IS INDICATED ON THIS DRAWING IN ORDER TO SHOW

RELATION OF THE DOOR LOCATION AND AVAILABLE LOCATION OF

RIGGING EQUIPMENT. ACTUAL LOCATION OF THE DOOR IS IN SPLINE .

SHEET NUMBER INDICATES DRAWING WHERE ACTUAL LOCATION OF

THE DOOR IS SHOWN.

OFOI.6

R

EV

D

AT

E D

ES

C

R

IP

TI

O

N

09/30/2025

09/30/2025

WEST

DORM

EAST

DORM

REC YARD

ENTRANCE

12.5KV OVERHEAD LINE

2 2

5 5

TIRE SHOP

CHILLER YARD

OLD BUILDING

MAINTENANCE

ACCESS ROAD

BOILER ROOM

CHAPEL

GYM

INFIRMARY

LAUNDRY

STORAGE

ENTRANCE

LIBRARYC

EL

L

BL

O C

K 'K

C

EL

L

BL

O C

K 'L

C

EL

L

BL

O C

K 'J

C

EL

L

BL

O C

K 'I'

C

EL

L

BL

O C

K 'G

C

EL

L

BL

O C

K 'H

C

EL

L

BL

O C

K 'F

C

EL

L

BL

O C

K 'E

C

EL

L

BL

O C

K 'C

C

EL

L

BL

O C

K 'D

C

EL

L

BL

O

C K

'A

C

EL

L

BL

O C

K 'B

CHOW HALL

TX2500-1

SG5KV-1 SG5KV-2

TX2500-2

SS-WDSS-EDSS-M

SS-TS

TX-TS

CAN

CRUSHER

SS-CY

TX-CY

PHOTO

#38

PHOTO

#39 & #40

SEMINARY

TX-CS

CB-TXTS-LV

EXISTING

WATER

TOWER

REFER TO DETAIL 05

ON SHEET E501 FOR

DIMENSIONS.

MAINTENANCE A

MAINTENANCE B

TO 12.5KV

OVERHEAD

LINE.

EXISTING

COMM. ROOM

KG KG

TO PANEL 123

FRONT FRONT

GEN-BR-500

GEN-BR-350

TEXAS FIRM REGISTRATION #: F-2874

(713) 784-8211 Houston, TX 77042

3700 West Sam Houston Parkway South, www.ssr-inc.com

FAX: (713) 952-8655

Suite 200

Reid, Inc.

Seckman Smith

CHECKED BY:

DRAWN BY:

DESIGNED BY:

R

EV

IS

IO

N S

C op yr ig ht

By

S m ith S ec km an R ei d, In c.

A ll rig ht s re se rv ed . T hi s do cu m en t, or p ar ts th er eo f, m ay n ot b e re pr od uc ed in a ny fo rm w ith ou t w rit te n pe rm is si on

SHEET TITLE

DATE

PROJECT STATUS

SHEET NUMBER

9/

/2

:3 2:

P

M C

:\U se rs \y be re m \D oc um en ts

\S

SR

_E

LE

C _T

D C

J_ D

AR

R

IN

G

TO

N

-2

2_ yb er em

.rv t

TD

C

J M

EM

O

R

IA

L U

N

IT

TD

C

J M

EM

O

R

IA

L U

N

IT

R

EP

LA

C E

EL

EC

TR

IC

AL

PR

O

JE

C T

M W

R

D

AR

R

IN

G

TO

N

R D

R

O

SH

AR

O

N , T

X

SSR Project #: 17230430

SG

ORM

HZ

EP-102

ELECTRICAL SITE

PLAN RENOVATION

PHASE 1

ISSUED FOR PROPOSAL

1" = 40'-0"1 ELECTRICAL SITE PLAN RENOVATION

GENERAL NOTES

1. REFER TO ONE-LINE DIAGRAM FOR ADDITIONAL INFORMATION.

2. REMOVE AND RELOCATE EXISTING TRANSFORMERS AS INDICATED.

3. ALL WORK REQUIRING POWER TO THE FENCE TO BE SHUT DOWN

MUST BE COMPLETE SAME DAY SO POWER CAN BE RESTORED BY

THE END OF THE DAY. COORDINATE FENCE SHUTDOWN WITH TDCJ

WEEKS IN ADVANCE.

4. WHERE POSSIBLE ROUTE CONDUIT OUTSIDE FENCE THEN

PERPENDICULAR TO FENCE TO DESTINATION INSIDE UNIT.

INSTALL NEW 12.5KV/4160V, 2500KVA TRANSFORMER. REFER TO

ELECTRICAL SPECIFICATIONS FOR TRANSFORMER DETAILS.

KEYED NOTES

PROVIDE AND INSTALL NEW TERMINAL POLE. REFER TO SHEET

E-500 DETAIL 03.

NEW 15KV PAD MOUNTED SWITCHGEAR.3

PROVIDE AND INSTALL 2 SETS OF (2) 4" DIRECT BURY PVC SCHEDULE

40 CONDUITS. ONE CONDUIT IN EACH SET TO BE USED FOR FEEDER

INSTALLATION AND 2ND CONDUIT TO BE USED AS SPARE. REFER TO

ONE-LINE DIAGRAM FOR FEEDER SIZE. PROVIDE PULL STRING IN

EMPTY CONDUITS. REFER TO SHEET E-500 DETAIL 11.

REFER TO DRAWING EP-105 FOR BOILER ROOM FLOOR PLAN.6

INSTALL PULL-BOX ON EXTERIOR WALL OF BOILER ROOM AT 20'

ELEVATION. RISE CONDUITS FROM THE GRADE UP ON EXTERIOR WALL

TO PULL-BOX PENETRATE WALL AND EXTEND CONDUITS FOR 5KV

FEEDERS IN TO BOILER ROOM. REFER TO SHEET EP-105 (NOTE 2) FOR

CONDUIT ROUTING CONTINUATION.

NOT USED. 10

NOT USED.11

EXISTING TRANSFORMER TO REMAIN.12

MANHOLE TO HAVE SECURED COVER TO ALLOW ACCESS TO

AUTHORIZED PERSONNEL ONLY.

REPLACE EXISTING BUS DUCT WITH NEW BUS DUCT.15

NEW SECTIONALIZING SWITCH.16

19 ENCASE CONDUIT IN CONCRETE UNDER ROAD ONLY. REFER TO DETAIL

07 ON SHEET E-500.

N

26 EXISTING SWITCHBOARD TO REMAIN.

REFER TO SHEET EP-602 FOR FEEDER RATING.30

28 EXISTING MAIN SERVICE DISCONNECT SWITCH AND MAIN DISTRIBUTION

PANEL TO REMAIN.UNDERGROUND FEEDER. REFER TO GENERAL NOTE 1.7

29 POWER DISTRIBUTION SYSTEM FOR SEMINARY IS NOT IN THE SCOPE OF WORK.

5. ALL OUTDOOR EQUIPMENT TO BE NEMA 4X.

18 FENCE IS TO BE EXTENDED TO PROVIDE SPACE FOR SWITCH INSTALLATION.

TO CAN CRUSHER. REFER TO SHEET E-602.34

R

EV

D

AT

E D

ES

C

R

IP

TI

O

N

/0

5/

AD

D

EN

D U

M

NOT USED.4

NOT USED.

NOT USED.

14 NOT USED.

NOT USED.17

NOT USED.

NOT USED.21

NOT USED.

NOT USED.

NOT USED.

NOT USED.27

NOT USED.

NOT USED.

NOT USED.

09/30/2025

09/30/2025

EM2

MAIN

CB

EXISTING

ST-C

ST-C

ST-B

ST-A

ST-E

ST-F

ST-G

ST-D

CHILLER

ST-E

ST-F

ST-G

ST-D

CHILLER

PHOTO

#56 MV-SS

EXISTING FEEDER

PHOTO

#25

PHOTO

#26

SS-C

SWITCH

PEM2

TX-PEM2

TEXAS FIRM REGISTRATION #: F-2874

(713) 784-8211 Houston, TX 77042

3700 West Sam Houston Parkway South, www.ssr-inc.com

FAX: (713) 952-8655

Suite 200

Reid, Inc.

Seckman Smith

CHECKED BY:

DRAWN BY:

DESIGNED BY:

R

EV

IS

IO

N S

C op yr ig ht

By

S m ith S ec km an R ei d, In c.

A ll rig ht s re se rv ed . T hi s do cu m en t, or p ar ts th er eo f, m ay n ot b e re pr od uc ed in a ny fo rm w ith ou t w rit te n pe rm is si on

SHEET TITLE

DATE

PROJECT STATUS

SHEET NUMBER

9/

/2

:3 2:

P

M C

:\U se rs \y be re m \D oc um en ts

\S

SR

_E

LE

C _T

D C

J_ D

AR

R

IN

G

TO

N

-2

2_ yb er em

.rv t

TD

C

J M

EM

O

R

IA

L U

N

IT

TD

C

J M

EM

O

R

IA

L U

N

IT

R

EP

LA

C E

EL

EC

TR

IC

AL

PR

O

JE

C T

M W

R

D

AR

R

IN

G

TO

N

R D

R

O

SH

AR

O

N , T

X

SSR Project #: 17230430

SG

ORM

HZ

EP-105

BOILER ROOM -

LEVEL 1 PHASE 1

ISSUED FOR PROPOSAL

1/8" = 1'-0"1 BOILER ROOM - PHASE 1

KEYED NOTES

DEMOLISH EXISTING MEDIUM VOLTAGE FEEDER BACK TO THE SOURCE.

PULL BOX IS FOR MAIN SERVICE MEDIUM VOLTAGE CABLE INSTALLED AT

AN ELEVATION OF 20' A.F.G. EXTEND (4) 4" CONDUITS TO SS-C

SWITCHES. REFER TO SITE PLAN (EP-102) FOR CONTINUATION.

INSTALL NEW SS-C SWITCH.

FEED SUBSTATION C FROM SS-C. REFER TO E-602 FOR FEEDER DETAILS.

REMOVE AND RELOCATE EXISTING SWITCHGEAR. PHOTO #57.

DISASSEMBLE AND REMOVE 5KV SWITCHGEAR AFTER ALL NORMAL

POWER 5KV LOADS HAVE BEEN TRANSFERRED TO NEW 5KV SYSTEM

AND THE INDOOR MEDIUM VOLTAGE LOOP HAS BEEN FULLY

COMMISSIONED.

REPLACE EXISTING DOOR WITH NEW 6'X9' DOUBLE DOOR. REFER TO

SPECIFICATION SECTION 016400 FOR REQUIREMENTS.

FEED TO SUBSTATION K FROM SS-C. REFER TO E-602 FOR FEEDER

DETAILS. RUN CONDUIT UP TO THE MEZZANINE. USE THE ROOF CAVITY

AS PATH TO THE ROOF TOP MECHANICAL ROOM. REFER TO PHOTO #12

FOR ROOF CAVITY VISUAL. REFER TO NOTE 3 ON EP-106 AND NOTE 12

ON EP-108 FOR CONTINUATION.

KEY PLAN

N

R

EV

D

AT

E D

ES

C

R

IP

TI

O

N

09/30/2025

09/30/2025

EP

-1

EP-107

LKE

LKE

LKE

LKE

LKE

LKE

'-0

(TYP.)

TEXAS FIRM REGISTRATION #: F-2874

(713) 784-8211 Houston, TX 77042

3700 West Sam Houston Parkway South, www.ssr-inc.com

FAX: (713) 952-8655

Suite 200

Reid, Inc.

Seckman Smith

CHECKED BY:

DRAWN BY:

DESIGNED BY:

R

EV

IS

IO

N S

C op yr ig ht

By

S m ith S ec km an R ei d, In c.

A ll rig ht s re se rv ed . T hi s do cu m en t, or p ar ts th er eo f, m ay n ot b e re pr od uc ed in a ny fo rm w ith ou t w rit te n pe rm is si on

SHEET TITLE

DATE

PROJECT STATUS

SHEET NUMBER

9/

/2

:3 2:

P

M C

:\U se rs \y be re m \D oc um en ts

\S

SR

_E

LE

C _T

D C

J_ D

AR

R

IN

G

TO

N

-2

2_ yb er em

.rv t

TD

C

J M

EM

O

R

IA

L U

N

IT

TD

C

J M

EM

O

R

IA

L U

N

IT

R

EP

LA

C E

EL

EC

TR

IC

AL

PR

O

JE

C T

M W

R

D

AR

R

IN

G

TO

N

R D

R

O

SH

AR

O

N , T

X

SSR Project #: 17230430

SG

ORM

HZ

EP-106

BOILER ROOM -

MEZZANINE PHASE 1

ISSUED FOR PROPOSAL

1/8" = 1'-0"1 BOILER ROOM - MEZZANINE - RENOVATION

RENOVATION KEYED NOTES

NOT USED.

NOT USED.

SUBSTATION K FEEDER FROM BOILER ROOM. REFER TO NOTE 8 ON

EP-105.

NOT USED.

NOT USED.

(4) 4" RIGID STEAL GALVANIZED CONDUITS FOR 5KV CABLES TO UTILITY

CORRIDOR. (2) 4" CONDUITS TO BE USED AS SPARE. REFER TO SHEET

EP-107 FOR CONTINUATION.

NOT USED.

NOT USED.

NOT USED.

NOT USED.

NOT USED.

NOT USED.

NOT USED.

NOT USED.

INSTALL 4' CHAIN HUNG LIGHT FIXTURES ABOVE MEZZANINE LEVEL. FEED

LIGHTING FROM STAND-BY POWER.

NOT USED.

KEY PLAN

N

NOT USED.17

NOT USED.18

R

EV

D

AT

E D

ES

C

R

IP

TI

O

N

1. WHERE FIXTURES ARE SHOWN WITH CHAIN HANGERS, PROVIDE LONGER CHAIN, IF NEEDED, TO MOUNT AROUND OBSTRUCTIONS (I.E. DUCTWORK, PIPING, STRUCTURE, ETC.) TO AVOID SHADOWING ON SPACE/EQUIPMENT

BELOW.

2. BRAND OR MANUFACTURER'S REFERENCES ARE DESCRIPTIVE ONLY, AND INDICATE TYPE AND QUALITY TO BE PROVIDED. ALL REFERENCES TO BRAND OR MANUFACTURER NAMES SHALL BE INTERPRETED TO INCLUDE...

GENERAL NOTES:

LUMINAIRE SCHEDULE

TYPE DESCRIPTION MANUFACTURER/SERIES LAMPS VOLTAGE BALLAST/DRIVER MOUNTINGQTY. LAMPS MIN. LUMENS COLOR INPUT WATTS

KG VANDAL PROOF RESISTANT, VAPOR TIGHT, WET LOCATION

LISTED BRACKET, CLEAR GLASS GLOBE, CAST ALUMINUM

GUARD, EDISON BASE SOCKET, WATTAGE RESTRICTION LABEL.

PROVIDE WITH BATTERY PACK AND PHOTOCELL CONTROL

PHILIPS/STONCO VWXL

HUBBELL VWGG

1 LED 3000 SEE

REMARKS

9.0 UNIV SELF-DRIVEN LED

REPLACEMENT LAMP

WALL MOUNTED

LKE 4'-0" INDUSTRIAL FIXTURE, STEEL HOUSING, STEEL REFLECTOR,

WIRE GUARD, CHAIN HANGER SET, PAINTED AFTER

FABRICATION

LITHONIA ZL1F

METALUX 4 ILED

COLUMBIA LCR

-- LED 5000 4000K 48.0 UNIV CHAIN HUNG AT 9'-0"

09/30/2025

09/30/2025

BOILER ROOM BELOW

ELEVATION 40' ABOVE BOILER ROOM FLOOR.

SS-A

SWITCHES

SS-F

SWITCHES

SP4

PHOTO #2

PHOTO #20

PHOTO #21

5' - 0"

EP-105

EP-206

LKE LKE

15 (TYP.)

TEXAS FIRM REGISTRATION #: F-2874

(713) 784-8211 Houston, TX 77042

3700 West Sam Houston Parkway South, www.ssr-inc.com

FAX: (713) 952-8655

Suite 200

Reid, Inc.

Seckman Smith

CHECKED BY:

DRAWN BY:

DESIGNED BY:

R

EV

IS

IO

N S

C op yr ig ht

By

S m ith S ec km an R ei d, In c.

A ll rig ht s re se rv ed . T hi s do cu m en t, or p ar ts th er eo f, m ay n ot b e re pr od uc ed in a ny fo rm w ith ou t w rit te n pe rm is si on

SHEET TITLE

DATE

PROJECT STATUS

SHEET NUMBER

9/

/2

:3 2:

P

M C

:\U se rs \y be re m \D oc um en ts

\S

SR

_E

LE

C _T

D C

J_ D

AR

R

IN

G

TO

N

-2

2_ yb er em

.rv t

TD

C

J M

EM

O

R

IA

L U

N

IT

TD

C

J M

EM

O

R

IA

L U

N

IT

R

EP

LA

C E

EL

EC

TR

IC

AL

PR

O

JE

C T

M W

R

D

AR

R

IN

G

TO

N

R D

R

O

SH

AR

O

N , T

X

SSR Project #: 17230430

SG

ORM

HZ

EP-107

UTILITY CORRIDOR

PHASE 1

ISSUED FOR PROPOSAL

KEYED NOTES

NEW CABLE TRAY TO BE INSTALLED AGAINST WALL IN NEW SWITCH

ROOM AT 100" AFF.

KEY PLAN

1/16" = 1'-0"1 UTILITY CORRIDOR FROM BOILER ROOM TO SPLINE

INSTALL NEW CABLE TRAY AT ELEVATION OF 2' ABOVE EXISTING CABLE

TRAY.

3 RELOCATE ALL EXISTING CONDUIT AND EQUIPMENT FROM NORTH

WALL AND RELOCATE AS NEEDED TO SOUTH WALL. REFER TO

PHOTO #19 & #59.

4 REFER TO MEZZANINE FLOOR PLAN FOR CONTINUATION, EP-106.

5 (4) 4" RIGID STEAL GALVANIZED CONDUITS FOR 5KV CABLES TO BE

ATTACHED TO THE CEILING. (2) 4" CONDUITS TO BE USED AS SPARE.

6 TERMINATE CONDUITS AT CABLE TRAY USE PROPER BUSHINGS.

REFER TO ELECTRICAL SPECIFICATION #260536 FOR DETAILS.

7 REFER TO SPLINE FLOOR PLANS FOR CONTINUATION, EP-206.

8 REMOVE EXISTING CONCRETE PADS FROM THIS ROOM. PROVIDE NEW

PADS FOR SWITCHES.

9 USE DOOR TO MOVE EQUIPMENT INTO ROOM. REPLACE THE DOOR

WITH 4'X8' NEW DOOR. REFER TO SHEET S-301 FOR REQUIREMENTS.

REFER TO DRAWING EP-108 FOR ROUTE FOR EQUIPMENT TRANSPORT.

10 NOT USED.

NOT USED.

12 NOT USED.

N

13 NOT USED.

14 NOT USED.

15 PROVIDE AND INSTALL LIGHTING FIXTURES. REFER TO DRAWING EP-106

FOR FIXTURE TYPE. CONNECT LIGHTING TO PANEL PEM-2 ON

MEZZANINE IN BOILER ROOM. LIGHTING CIRCUIT TO BE UNSWITCHED.

R

EV

D

AT

E D

ES

C

R

IP

TI

O

N

09/30/2025

09/30/2025

EXISTING

ST-K

EXISTING

KP-3B EXISTING

KP-2

EXISTING

MCCM

EXISTING

MCCK

PHOTO

#5

PHOTO

#9

PHOTO

#10

PHOTO

#11

PHOTO

#12

PHOTO

#12

PHOT

O

#13

BOILER

ROOM

MECH

ROOM

EXISTING

ST-K

6 9

LKE LKE LKE LKE

LKE

LKE

(TYP.)

PHOTO

#12

EXISTING

MCCK

EXISTING

MCCM

TEXAS FIRM REGISTRATION #: F-2874

(713) 784-8211 Houston, TX 77042

3700 West Sam Houston Parkway South, www.ssr-inc.com

FAX: (713) 952-8655

Suite 200

Reid, Inc.

Seckman Smith

CHECKED BY:

DRAWN BY:

DESIGNED BY:

R

EV

IS

IO

N S

C op yr ig ht

By

S m ith S ec km an R ei d, In c.

A ll rig ht s re se rv ed . T hi s do cu m en t, or p ar ts th er eo f, m ay n ot b e re pr od uc ed in a ny fo rm w ith ou t w rit te n pe rm is si on

SHEET TITLE

DATE

PROJECT STATUS

SHEET NUMBER

9/

/2

:3 2:

P

M C

:\U se rs \y be re m \D oc um en ts

\S

SR

_E

LE

C _T

D C

J_ D

AR

R

IN

G

TO

N

-2

2_ yb er em

.rv t

TD

C

J M

EM

O

R

IA

L U

N

IT

TD

C

J M

EM

O

R

IA

L U

N

IT

R

EP

LA

C E

EL

EC

TR

IC

AL

PR

O

JE

C T

M W

R

D

AR

R

IN

G

TO

N

R D

R

O

SH

AR

O

N , T

X

SSR Project #: 17230430

SG

ORM

HZ

EP-108

ROOF TOP

MECHANICAL ROOM

PHASE 1

ISSUED FOR PROPOSAL

1/8" = 1'-0"2 ROOF TOP MECHANICAL ROOM DEMO

DEMOLITION KEYED NOTES

NOT USED.

NOT USED.

NOT USED.

NOT USED.

NOT USED.

NOT USED.

REPLACE EXISTING SINGLE DOOR WITH NEW 6'X9' DOUBLE DOOR.

REFER TO SPECIFICATION SECTION 016400 FOR REQUIREMENTS.

NOT USED.

NOT USED.

DEMOLISH MEDIUM VOLTAGE FEED BACK TO SOURCE.

KEY PLAN

RENOVATION KEYED NOTES

NOT USED.

NOT USED.

NOT USED.

NOT USED.

NOT USED.

ELECTRICAL ROOM IN THE UTILITY CORRIDOR. REFER TO DRAWING

EP-107 FOR ADDITIONAL INFORMATION.

NOT USED.

NOT USED.

AVAILABLE ROUTE TO MOVE NEW EQUIPMENT INTO ELECTRICAL ROOM

IN THE UTILITY CORRIDOR. REFER TO DRAWING EP-107 FOR ADDITIONAL

INFORMATION.

AREA OF SPACE CAVITY EXTENDING TO WALL OF THE BOILER ROOM.

REFER TO PHOTOS #81, 82, 83.

INSTALL MEDIUM VOLTAGE FEED (IN CONDUIT) FROM THE LOAD

TERMINALS OF SS-C LOCATED IN THE BOILER ROOM TO THE LINE

TERMINALS OF ST-K

NOT USED.

1/8" = 1'-0"1 ROOF TOP MECHANICAL ROOM RENO

N

R

EV

D

AT

E D

ES

C

R

IP

TI

O

N

09/30/2025

09/30/2025

ST-F

EXISTING

MCC44

EXISTING

MCC43

EXISTING

SP2

ST-F

4'

2"

18' - 0"

4' - 5"

114' - 0"

4'

/8

REFER TO PHOTO #

PHOTO

#23

PHOTO

#24

FRONT

EP

-2

DC-D1

PMCC43

PHOTO

#79

NEW LOUVER OF EQUAL SIZE OF

CLOSED LOUVER. REFER TO

MECHANICAL DRAWINGS. SEE

KEYED NOTE 2 ON THIS DRAWING

FUTURE

DEMO NOTE

THIS DRAWING INDICATES THE LOCATION OF THE EXISTING EQUIPMENT

AND LOCATION OF THE REPLACEMENT EQUIPMENT. EXISTING EQUIPMENT

TO BE REMOVED AND RELOCATED AFTER NEW EQUIPMENT IS INSTALLED,

PLACED IN SERVICE AND ALL EXISTING CIRCUITS TRANSFERRED TO NEW

EQUIPMENT.

TEXAS FIRM REGISTRATION #: F-2874

(713) 784-8211 Houston, TX 77042

3700 West Sam Houston Parkway South, www.ssr-inc.com

FAX: (713) 952-8655

Suite 200

Reid, Inc.

Seckman Smith

CHECKED BY:

DRAWN BY:

DESIGNED BY:

R

EV

IS

IO

N S

C op yr ig ht

By

S m ith S ec km an R ei d, In c.

A ll rig ht s re se rv ed . T hi s do cu m en t, or p ar ts th er eo f, m ay n ot b e re pr od uc ed in a ny fo rm w ith ou t w rit te n pe rm is si on

SHEET TITLE

DATE

PROJECT STATUS

SHEET NUMBER

9/

/2

:3 2:

P

M C

:\U se rs \y be re m \D oc um en ts

\S

SR

_E

LE

C _T

D C

J_ D

AR

R

IN

G

TO

N

-2

2_ yb er em

.rv t

TD

C

J M

EM

O

R

IA

L U

N

IT

TD

C

J M

EM

O

R

IA

L U

N

IT

R

EP

LA

C E

EL

EC

TR

IC

AL

PR

O

JE

C T

M W

R

D

AR

R

IN

G

TO

N

R D

R

O

SH

AR

O

N , T

X

SSR Project #: 17230430

SG

ORM

HZ

EP-203

SPLINE AREA A

PHASE 1

ISSUED FOR PROPOSAL

3/16" = 1'-0"1 ELECTRICAL - SPLINE AREA A

KEYED NOTES

1 RELOCATION OF EXISTING CONDENSATE AND STEAM EXPANSION LOOP

FOR NEW GEAR. REFER TO MECHANICAL PLANS.

BLOCK OFF EXISTING OUTSIDE AIR LOUVER. REFER TO MECHANICAL

PLANS.

NEW 6'X9' TALL DOUBLE DOOR WILL BE INSTALLED FOR REMOVAL AND

REPLACEMENT OF ELECTRICAL EQUIPMENT. REFER TO DRAWING S-301

FOR REQUIREMENTS.

EXISTING MECHANICAL EQUIPMENT.

NEW CABLE TRAY FOR 5KV CABLE TO ST-F. INSTALL AT 80" AFF.

COORDINATE WITH OTHER EQUIPMENT.

NOT USED.

NOT USED.

NOT USED.

INSTALL 5KV CABLE FROM CABLE TRAY TO ST-F IN 4" CONDUIT.

NOT USED.

NOT USED.

NOT USED.

NOT USED.

NOT USED.

NOT USED.

NOT USED.

NOT USED.

KEY PLAN

N

GENERAL NOTES

CLEARANCE IN FRONT OF UNIT SUBSTATIONS MUST BE A

MINIMUM OF 5'.

1.

2. INSTALL NEW LIGHTING FIXTURES 12 FT APART. COORDINATE

INSTALLATION WITH ELECTRICAL AND MECHANICAL EQUIPMENT.

REFER TO SHEET EP-106 FOR FIXTURE TYPE.

INSTALL MAXIMUM OF 10 FIXTURES ON ONE 120V/20A CIRCUIT. USE #

10 CONDUCTORS.

WHERE OBSTRUCTION ON THE CEILING DOES NOT ALLOW

INSTALLATION OF THE FIXTURES, INSTALL FIXTURES ON THE WALL

AT 9FT ABOVE FINISHED FLOOR.

CONNECT LIGHTING CIRCUITS TO EXISTING SP2. PROVIDE 20A/1P

CIRCUIT BREAKERS.

3.

4.

5.

R

EV

D

AT

E D

ES

C

R

IP

TI

O

N

09/30/2025

09/30/2025

4 5 3

EP

-2

EP

-2

TEXAS FIRM REGISTRATION #: F-2874

(713) 784-8211 Houston, TX 77042

3700 West Sam Houston Parkway South, www.ssr-inc.com

FAX: (713) 952-8655

Suite 200

Reid, Inc.

Seckman Smith

CHECKED BY:

DRAWN BY:

DESIGNED BY:

R

EV

IS

IO

N S

C op yr ig ht

By

S m ith S ec km an R ei d, In c.

A ll rig ht s re se rv ed . T hi s do cu m en t, or p ar ts th er eo f, m ay n ot b e re pr od uc ed in a ny fo rm w ith ou t w rit te n pe rm is si on

SHEET TITLE

DATE

PROJECT STATUS

SHEET NUMBER

9/

/2

:3 2:

P

M C

:\U se rs \y be re m \D oc um en ts

\S

SR

_E

LE

C _T

D C

J_ D

AR

R

IN

G

TO

N

-2

2_ yb er em

.rv t

TD

C

J M

EM

O

R

IA

L U

N

IT

TD

C

J M

EM

O

R

IA

L U

N

IT

R

EP

LA

C E

EL

EC

TR

IC

AL

PR

O

JE

C T

M W

R

D

AR

R

IN

G

TO

N

R D

R

O

SH

AR

O

N , T

X

SSR Project #: 17230430

SG

ORM

HZ

EP-204

SPLINE AREA B

PHASE 1

ISSUED FOR PROPOSAL

3/16" = 1'-0"1 ELECTRICAL - SPLINE AREA B

KEY PLAN

EXISTING DUCT WORK TO REMAIN. LIMITED SPACE FOR CIRCULATION OR

CONSTRUCTION ACTIVITIES. CONTACTOR TO GAIN COMPLETE

KNOWLEDGE OF THE SPACE PRIOR TO PLANNING. REFER TO

MECHANICAL PLANS FOR ADDITIONAL INFORMATION ON RELOCATION

DURING CONSTRUCTION.

KEYED NOTES

EXISTING AIR HANDLING UNIT TO REMAIN.1

N

GENERAL NOTES

CLEARANCE IN FRONT OF UNIT SUBSTATIONS MUST BE A MINIMUM OF 5'.1.

2. INSTALL NEW LIGHTING FIXTURES 12 FT APART. COORDINATE

INSTALLATION WITH ELECTRICAL AND MECHANICAL EQUIPMENT.

REFER TO SHEET EP-106 FOR FIXTURE TYPE.

INSTALL MAXIMUM OF 10 FIXTURES ON ONE 120V/20A CIRCUIT. USE #

10 CONDUCTORS.

WHERE OBSTRUCTION ON THE CEILING DOES NOT ALLOW

INSTALLATION OF THE FIXTURES, INSTALL FIXTURES ON THE WALL AT

9FT ABOVE FINISHED FLOOR.

CONNECT LIGHTING CIRCUITS TO PANELS SP2. PROVIDE 20A/1P

CIRCUIT BREAKERS.

3.

4.

5.

CONNECT NEW CABLE TRAY WITH EXISTING CABLE TRAY.

EXISTING CABLE TRAY.

NEW CABLE TRAY.

R

EV

D

AT

E D

ES

C

R

IP

TI

O

N

09/30/2025

09/30/2025

ST-E FUTURE

ST-E

EXISTING

SP1

6'

5/

EP

-2

EP

-2

EXISTING

MECHANICAL

EQUIPMENT

PHOTO

#78

EXISTING

ST-A

DEMO NOTE

THIS DRAWING INDICATES THE LOCATION OF THE EXISTING EQUIPMENT

AND LOCATION OF THE REPLACEMENT EQUIPMENT. EXISTING EQUIPMENT

TO BE REMOVED AND RELOCATED AFTER NEW EQUIPMENT IS INSTALLED,

PLACED IN SERVICE AND ALL EXISTING CIRCUITS TRANSFERRED TO NEW

EQUIPMENT.

TEXAS FIRM REGISTRATION #: F-2874

(713) 784-8211 Houston, TX 77042

3700 West Sam Houston Parkway South, www.ssr-inc.com

FAX: (713) 952-8655

Suite 200

Reid, Inc.

Seckman Smith

CHECKED BY:

DRAWN BY:

DESIGNED BY:

R

EV

IS

IO

N S

C op yr ig ht

By

S m ith S ec km an R ei d, In c.

A ll rig ht s re se rv ed . T hi s do cu m en t, or p ar ts th er eo f, m ay n ot b e re pr od uc ed in a ny fo rm w ith ou t w rit te n pe rm is si on

SHEET TITLE

DATE

PROJECT STATUS

SHEET NUMBER

9/

/2

:3 2:

P

M C

:\U se rs \y be re m \D oc um en ts

\S

SR

_E

LE

C _T

D C

J_ D

AR

R

IN

G

TO

N

-2

2_ yb er em

.rv t

TD

C

J M

EM

O

R

IA

L U

N

IT

TD

C

J M

EM

O

R

IA

L U

N

IT

R

EP

LA

C E

EL

EC

TR

IC

AL

PR

O

JE

C T

M W

R

D

AR

R

IN

G

TO

N

R D

R

O

SH

AR

O

N , T

X

SSR Project #: 17230430

SG

ORM

HZ

EP-205

SPLINE AREA C

PHASE 1

ISSUED FOR PROPOSAL

3/16" = 1'-0"1 ELECTRICAL - SPLINE AREA C

KEYED NOTES

NOT USED.2

NOT USED.1

NOT USED.3

NOT USED.4

EXISTING OUTSIDE AIR LOUVER.5

KEY PLAN

EXISTING AIR HANDLING UNITS AND DUCT WORK..6

NOT USED.7

NOT USED.8

N

CONNECT NEW CABLE TRAY WITH EXISTING CABLE TRAY.9

NEW CABLE TRAY. MAKE CONNECTION TO EXISTING CABLE TRAY.10

NOT USED.11

NOT USED.12

REPLACE EXISTING DOUBLE DOOR WITH NEW 6' X 9' DOOR. REFER TO

DRAWING S-301 FOR REQUIREMENTS.

GENERAL NOTES

1.

2.

INSTALL NEW LIGHTING FIXTURES 12 FT APART. COORDINATE

INSTALLATION WITH ELECTRICAL AND MECHANICAL EQUIPMENT.

REFER TO SHEET EP-106 FOR FIXTURE TYPE.

INSTALL MAXIMUM OF 10 FIXTURES ON ONE 120V/20A CIRCUIT. USE #

10 CONDUCTORS.

WHERE OBSTRUCTION ON THE CEILING DOES NOT ALLOW

INSTALLATION OF THE FIXTURES, INSTALL FIXTURES ON THE WALL

AT 9FT ABOVE FINISHED FLOOR.

CONNECT LIGHTING CIRCUITS TO EXISTING PANEL SP1. PROVIDE

20A/1P CIRCUIT BREAKERS.

3.

4.

NOT USED.14

R

EV

D

AT

E D

ES

C

R

IP

TI

O

N

DISCONNECT EXISTING MEDIUM VOLTAGE FEEDER. REFEED

TRANSFORMER PRIMARY FROM SS-A.

09/30/2025

09/30/2025

TS-3

EXISTING

ST-G

EXISTING

BAS

EXISTING

MCP9

EXISTING

MCC33

MCC28

EXISTING

MCC29

EXISTING

0' - 0" 77' - 5 1/16"

8' - 4 11/16"

6'

/1 6"

5' - 8 7/32"

SS-G

PHOTO

#31

PHOTO

#32 & 60

UTILITY

CORRIDOR

EP

-2

7EP

-2

A /B

2820 20

A B

PANEL A

3'

EXISTING

PIPES

40" WIDE

RAISED

PLATFORM

EXISTING

TS-4

3'

4"

PHOTO

#70

PHOTO

#69

PHOTO

#80

DC-D2

DC-D2

EXISTING DOOR 27

C

DEMO NOTE

THIS DRAWING INDICATES THE LOCATION OF THE EXISTING EQUIPMENT

AND LOCATION OF THE REPLACEMENT EQUIPMENT. EXISTING EQUIPMENT

TO BE REMOVED AND RELOCATED AFTER NEW EQUIPMENT IS INSTALLED,

PLACED IN SERVICE AND ALL EXISTING CIRCUITS TRANSFERRED TO NEW

EQUIPMENT.

TEXAS FIRM REGISTRATION #: F-2874

(713) 784-8211 Houston, TX 77042

3700 West Sam Houston Parkway South, www.ssr-inc.com

FAX: (713) 952-8655

Suite 200

Reid, Inc.

Seckman Smith

CHECKED BY:

DRAWN BY:

DESIGNED BY:

R

EV

IS

IO

N S

C op yr ig ht

By

S m ith S ec km an R ei d, In c.

A ll rig ht s re se rv ed . T hi s do cu m en t, or p ar ts th er eo f, m ay n ot b e re pr od uc ed in a ny fo rm w ith ou t w rit te n pe rm is si on

SHEET TITLE

DATE

PROJECT STATUS

SHEET NUMBER

9/

/2

:3 2:

P

M C

:\U se rs \y be re m \D oc um en ts

\S

SR

_E

LE

C _T

D C

J_ D

AR

R

IN

G

TO

N

-2

2_ yb er em

.rv t

TD

C

J M

EM

O

R

IA

L U

N

IT

TD

C

J M

EM

O

R

IA

L U

N

IT

R

EP

LA

C E

EL

EC

TR

IC

AL

PR

O

JE

C T

M W

R

D

AR

R

IN

G

TO

N

R D

R

O

SH

AR

O

N , T

X

SSR Project #: 17230430

SG

ORM

HZ

EP-206

SPLINE AREA D

PHASE 1

ISSUED FOR PROPOSAL

3/16" = 1'-0"1 ELECTRICAL - SPLINE AREA D

KEY PLAN

NOT USED.

NOT USED.

NOT USED.

NOT USED.

INSTALL NEW 5KV CABLE ON CABLE TRAY.

NOT USED.

NOT USED.

NOT USED.

PRIMARY SWITCH.

NOT USED.

NOT USED.

ATTACH ALL CONDUITS TO THE WALL AT 100" AFF. COORDINATE WITH

EXISTING UTILITIES.

INSTALL NEW 5KV FEEDER FOR ST-G ON CABLE TRAY.

SEQUENCE OF RENOVATION

ST-A

INSTALL NEW CABLE TRAY AT100" AFF. SEE KEYED NOTE 3.

INSTALL NEW CABLES FOR UNIT SUBSTATION A.

REMOVE CONDENSATE EXPANSION LOOP.

A.

B.

C.

N

24LIGHTING GENERAL NOTES

CONNECT LIGHTING CIRCUITS TO SUBSTATION ST-D. PROVIDE

20A/1P CIRCUIT BREAKERS.

1.

2. INSTALL NEW LIGHTING FIXTURES 12 FT APART. COORDINATE

INSTALLATION WITH ELECTRICAL AND MECHANICAL EQUIPMENT.

REFER TO SHEET EP-106 FOR FIXTURE TYPE.

INSTALL MAXIMUM OF 10 FIXTURES ON ONE 120V/20A CIRCUIT. USE #

10 CONDUCTORS.

WHERE OBSTRUCTION ON THE CEILING DOES NOT ALLOW

INSTALLATION OF THE FIXTURES, INSTALL FIXTURES ON THE WALL

AT 9FT ABOVE FINISHED FLOOR.

3.

4.

KEYED NOTES

NEW CABLE TRAY.

INSTALL NEW CABLE TRAY WITH EXISTING CABLE TRAY.

INSTALL NEW CABLE TRAY AT ELEVATION OF 100" AFF.

NOT USED.

EXISTING AIR HANDLING UNITS AND DUCT.

COORDINATE WITH DIVISION 22 FOR RELOCATION OF CONDENSATE

EXPANSION LOOP FOR NEW GEAR.

NEW DOORS, 6' X 9', TO BE INSTALLED FOR REMOVAL AND

REPLACEMENT OF ELECTRICAL EQUIPMENT. REFER TO DRAWING S-301.

NOT USED.

EXISTING TO REMAIN.

NOT USED.

NOT USED.

NOT USED.

NOT USED.

NOT USED.

NOT USED.

R

EV

D

AT

E D

ES

C

R

IP

TI

O

N

09/30/2025

09/30/2025

ST-D

EXISTING

ST-B

EXISTING

MCC1

EXISTING

MCC2

6'

/1 6"

10' - 10"

3'

2"

15' - 0"

6'

/2

C D

SS-B

PHOTO

#3

PHOTO

#27

PHOTO

#29, 77

PHOTO

#37

END OF CABLE TRAY

EP

-2

EP

-2

PHOTO

#74, 75,76

DEMO NOTE

THIS DRAWING INDICATES THE LOCATION OF THE EXISTING EQUIPMENT

AND LOCATION OF THE NEW EQUIPMENT WHICH WILL REPLACE EXISTING

EQUIPMENT. EXISTING EQUIPMENT TO BE REMOVED AND RELOCATED

AFTER NEW EQUIPMENT IS INSTALLED, PLACED IN SERVICE AND ALL

EXISTING CIRCUITS TRANSFERRED TO NEW EQUIPMENT. TEXAS FIRM REGISTRATION #: F-2874

(713) 784-8211 Houston, TX 77042

3700 West Sam Houston Parkway South, www.ssr-inc.com

FAX: (713) 952-8655

Suite 200

Reid, Inc.

Seckman Smith

CHECKED BY:

DRAWN BY:

DESIGNED BY:

R

EV

IS

IO

N S

C op yr ig ht

By

S m ith S ec km an R ei d, In c.

A ll rig ht s re se rv ed . T hi s do cu m en t, or p ar ts th er eo f, m ay n ot b e re pr od uc ed in a ny fo rm w ith ou t w rit te n pe rm is si on

SHEET TITLE

DATE

PROJECT STATUS

SHEET NUMBER

9/

/2

:3 2:

P

M C

:\U se rs \y be re m \D oc um en ts

\S

SR

_E

LE

C _T

D C

J_ D

AR

R

IN

G

TO

N

-2

2_ yb er em

.rv t

TD

C

J M

EM

O

R

IA

L U

N

IT

TD

C

J M

EM

O

R

IA

L U

N

IT

R

EP

LA

C E

EL

EC

TR

IC

AL

PR

O

JE

C T

M W

R

D

AR

R

IN

G

TO

N

R D

R

O

SH

AR

O

N , T

X

SSR Project #: 17230430

SG

ORM

HZ

EP-207

SPLINE AREA E

PHASE 1

ISSUED FOR PROPOSAL

3/16" = 1'-0"1 ELECTRICAL - SPLINE AREA E

KEY PLAN

NOT USED.

NOT USED.

NOT USED.

NOT USED.

INSTALL NEW CABLE TRAY AT 100" A.F.F.

NOT USED.

ATTACH ALL CONDUITS TO THE WALL AT 100" AFF. COORDINATE WITH

EXISTING UTILITIES.

EXISTING NETWORK AND 208/120V CABLES SHARING THE EXISTING 5KV

FEEDERS NEED TO BE REROUTED IN CONDUIT TO CONTINUE TO SERVE

EXISTING LOADS.

ADD (2) NEW 20A BREAKERS TO SERVE NEW LIGHTING CIRCUITS.

INSTALL SS-B AND REFEED EXISTING SUBSTATIONS AS SHOWN IN E602.

REMOVE EXISTING CABLE TRAY FROM THE ENTRANCE OF THE UTILITY

CORRIDOR TO THE END OF THE TRAY. REFER TO EP-107.

N

GENERAL NOTES

1.

2.

INSTALL NEW LIGHTING FIXTURES 12 FT APART. COORDINATE

INSTALLATION WITH ELECTRICAL AND MECHANICAL EQUIPMENT.

REFER TO SHEET EP-106 FOR FIXTURE TYPE.

INSTALL MAXIMUM OF 10 FIXTURES ON ONE 120V/20A CIRCUIT. USE #

10 CONDUCTORS.

WHERE OBSTRUCTION ON THE CEILING DOES NOT ALLOW

INSTALLATION OF THE FIXTURES, INSTALL FIXTURES ON THE WALL

AT 9FT ABOVE FINISHED FLOOR.

CONNECT LIGHTING CIRCUITS TO SUBSTATION D DISTRIBUTIJON

SECTION. PROVIDE NEW 20A/1P CIRCUIT BREAKERS.

3.

4.

KEYED NOTES

NEW 6'X9' DOUBLE DOORS TO BE INSTALLED IN THIS LOCATION FOR NEW

ENTRY/ EXIT OF NEW ELECTRICAL EQUIPMENT. REFER TO DRAWING S-301.

NOT USED.

NOT USED.

NOT USED.

CABLE TRAY IN THIS AREA TO BE REMOVED, ENERGIZED CABLE AND LOW

VOLTAGE TO REMAIN. PULL EXISTING NETWORK CABLES IN NEW CONDUIT.

NOT USED.

NOT USED.

NOT USED.

NOT USED.

NOT USED.

NOT USED.

MAKE FEEDERS 5kV CONNECTION TO UNIT SUBSTATION ST-B. REFER TO

ONE LINE DIAGRAM FOR FEEDER SIZES.

R

EV

D

AT

E D

ES

C

R

IP

TI

O

N

09/30/2025

09/30/2025

CABLE TRAY

CABLE TRAY

FLAT TEE

CABLE TRAY 01

SEAL AT BOTH ENDS SO AS

TO MAINTAIN RATING OF

WALL FOR FIRE PROOFING.

CONTINUOUS

CONDUIT

PENETRATION.

FIRE RATED

WALL

SEAL PENETRATIONS SO AS

TO MAINTAIN RATING OF

WALL FOR FIRE PROOFING.

CONDUIT SLEEVE

6"

RATED WALL PENETRATIONS 04

1-4" PVC SCHEDULE 40

CONDUIT. FURNISHED AND

INSTALLED BY CONTRACTOR.

CONDUIT

SUPPORTS

(TYPICAL)

FINISHED PAVED

SURFACE ABOVE

GRADE

PATCH TRENCH TO MATCH

EXISTING PAVED AREA WHERE

APPLICABLE.BACKFILL AS REQUIRED

TO MATCH EXISTING

" M

IN

4" 4"

4"

6"8"6"

UNDER ROAD SERVICE DUCT BANK 05

SPARE CONDUIT

1. DUCT SHALL BE CONCRETE INCASED

UNDER PAVED AREAS AND IN AREAS

WHERER ROUTE CROSSES FENCE LINE.

MAIN

LIGHTNING

PROTECTION

CONDUCTOR

BELOW GRADE

APPROXIMATE

FINISHED GRADE

CAST BRONZE CABLE

TO STEEL CONNECTOR.

CADWELD TO STEEL

COLUMN

TYPICAL STEEL

COLUMN

NOTE: GROUND CONNECTIONS

SHALL BE

MADE AT APPROXIMATELY EVERY

OTHER

STEEL COLUMN AROUND THE

PERIMETER, AND SHALL NOT

AVERAGE

OVER 60 FEET APART.

CAST BRONZE CABLE TO

GROUND ROD CLAMP.

1/2 " X 10' COPPERCLAD STEEL

CLASS 1 GROUND TERMINAL.

STEEL COLUMN GROUNDING DETAIL 03

UNISTRUT SUPPORT

CHANNELS TYPE

P-3357A WITH

UNDERGROUND DEVICES

INCLUDING #35R3

SADDLE RACKS.

SET IN 4" GRAVEL

BASE TAMP TO 95%

COMPACTION

SECTION A-A

[18"x18"x24"] SUMP WELL

CONCRETE ENCASEMENT

[AT

MANHOLE ENTRANCE ONLY]

DUCTBANK

CONCRETE

MATERIAL

PULLING

EYES

(TYPICAL)

[2'-0" X 2'-0"]

WINDOWS

ON

FOUR SIDES

BACKFILL TO 95%

CONCRETE SPACER

RINGS TO BUILD UP

TO GRADE

MANHOLE COVER [36"°]

ASTM A48 CAST IRON,

TRAFFIC RATED WITH

PROVISION FOR

PADLOCK. PRECAST CONCRETE

MANHOLE. AT

ASSEMBLY JOINTS,

FURNISH AND INSTALL

CONCRETE SEALANT

"CONSEAL" OR EQUAL

BELL ENDS.

TYPICAL ALL

CONDUIT

6" [3'-0"]

[7'-0"]

SEE SPECIFICATIONS FOR ADDITIONAL

REQUIREMENTS AND DETAILS.

NOTE:

A

CONDUIT ENTRANCE (TYPICAL

FOR NUMBER AND SIDE OF

MANHOLE)

TYPICAL CABLE

RACKS (AS

REQUIRED)

DRAINAGE

GRATE &

FRAME

MANHOLE

COVER ABOVE

STEEL LADDER

BOLTED IN

WALL

TYPICAL PULLING

IRON

4'-0"4'-0" 10'-0"

A

MANHOLE DETAIL 08

BRAND OR MANUFACTURER'S REFERENCES ARE DESCRIPTIVE ONLY, AND INDICATE TYPE AND QUALITY TO BE PROVIDED. ALL REFERENCES TO BRAND OR MANUFACTURER NAMES SHALL BE INTERPRETED TO INCLUDE THE LANGUAGE "OR A/E APPROVED EQUAL". ANY BRAND OR MANUFACTURER MEETING SPECIFICATIONS WILL BE CONSIDERED. IRRESPECTIVE OF THE LANGUAGE "OR A/E APPROVED EQUAL" APPEARING IN

CONJUNCTION WITH THE BRAND OR MANUFACTURER NAME.

CONDUIT WITH

GROUNDING

BUSHING EACH

END.

(TYPICAL)

THOMAS AND

BETTS

#31000 SERIES

COPPER

CABLE LUG

OR EQUAL

#1/0 AWG

1/4 " X 1" X 3'-0" COPPER

BAR. 16 HOLES 2" O.C.

EACH WAY DRILLED

AND

TAPPED 1/4 " X #20

2" W X 1/4 " GALVANIZED STEEL

STANDOFF STRAPS. EXPANSION

BOLT INTO CMU WALL

7200 VOLT INSULATORS

GROUND CONDUCTOR

(TYPICAL)

#1/0 AWG

#6 AWG TO

CONDUCTIVE

CABLETRAY & ALL

SURFACES AND

EQUIPMENT WITHIN

ROOM. (TYPICAL)

TO BUILDING STEEL

TO SERVICE

ENTRANCE

GROUNDING BUS

GROUND BUS DETAIL 07

BRAND OR MANUFACTURER'S REFERENCES ARE DESCRIPTIVE ONLY, AND INDICATE TYPE AND QUALITY TO BE PROVIDED. ALL REFERENCES TO BRAND OR MANUFACTURER NAMES SHALL BE INTERPRETED TO INCLUDE THE LANGUAGE "OR A/E APPROVED EQUAL". ANY BRAND OR MANUFACTURER MEETING SPECIFICATIONS WILL BE CONSIDERED. IRRESPECTIVE OF THE LANGUAGE "OR A/E APPROVED EQUAL" APPEARING IN

CONJUNCTION WITH THE BRAND OR MANUFACTURER NAME.

UNDERGROUND CONDUIT ROUTING 09

FINISHED

GRADE LEVEL

UNDERGROND PVC SCHEDULE 40 CONDUIT.

LISTED FOR DIRECT BURIAL. RISERS AND

ELBOWS TO BE RIGID GALVANIZED

CONDUITS.

WARNING

TAPE

FINE WASHED SAND

18"

36" MIN.

CAST BRONZE PARALLEL

COMBINATION CABLE

SPLICER

BONDING CABLE

TYPICAL GROUNDING CABLE SPLICE 10

TRANSFORMER INSTALLATION DETAIL 02

PROVIDE S&C

OMNIRUPTER

SWITCH OR

EQUAL.

SWITCH

HANDLE IN ON

AND OFF

POSITION

M

REFER TO NEC 250-52.

NOTE:

TRIPOD GROUND ROD

METAL WATER

MAIN

BUILDING STEEL

EQUIPMENT

GROUNDING

BAR

GROUNDING

ELECTRODE

CONDUCTORS

GROUNDING ELECTRODE 06

TEXAS FIRM REGISTRATION #: F-2874

(713) 784-8211 Houston, TX 77042

3700 West Sam Houston Parkway South, www.ssr-inc.com

FAX: (713) 952-8655

Suite 200

Reid, Inc.

Seckman Smith

CHECKED BY:

DRAWN BY:

DESIGNED BY:

R

EV

IS

IO

N S

C op yr ig ht

By

S m ith S ec km an R ei d, In c.

A ll rig ht s re se rv ed .

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .