About this file
This is a comprehensive electrical design drawing set prepared by Smith Seckman Reid, Inc. for the Texas Department of Criminal Justice (TDCJ) to replace the electrical system at the Memorial Unit in Rosharon, Texas (MWR #00715006). The project involves replacing the existing 4160V radial electrical power distribution system with a new 12.5KV/4160V system as Phase 1 of a two-phase electrical replacement initiative. The scope includes installation of two 2500 kVA transformers, 15KV pad-mounted switchgear, new 5KV loops replacing existing switchgear, unit substations (ST-A through ST-K), selector switches, sectionalizing switches, new cable tray systems, conduit installations both underground and overhead, grounding systems, and lighting fixtures throughout multiple areas including the boiler room, utility corridor, roof-mounted mechanical room, and five spline areas (A through E). The drawings are issued for proposal as of September 30, 2025, and include electrical one-line diagrams, site plans, equipment schedules, grounding riser diagrams, short-circuit analysis, and detailed installation specifications across multiple sheets (E-000 through E-605 and EP-100 through EP-207).
The design incorporates essential and critical load considerations, with essential loads including perimeter fencing, emergency lighting, medical facilities, water systems, wastewater, security locks, and communications, while critical loads include respite areas and restrictive housing blocks requiring temperature control below 88 degrees Fahrenheit. The contractor is required to maintain temporary power during load transfers, submit weekly coordination meeting schedules, provide construction schedules with power shutdown notifications, and limit shutdowns to same-day restoration with maximum extensions of 12-14 hours. Equipment shipping is constrained to 6 feet width and 9 feet height for spline installations, and the contractor must investigate and document the existing 120V/208V distribution system with certified as-built drawings, panel schedules, and equipment photographs. All decommissioned infrastructure must be removed before beneficial occupancy with no abandoned infrastructure permitted. The project requires coordination with TDCJ for perimeter fence modifications, underground utility location verification through daylighting where possible, and compliance with NFPA 70E arc flash requirements including hazard analysis labels and power system studies with selective coordination to 0.1 seconds.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VICINITY MAP
N.T.S.
TEXAS DEPARTMENT OF CRIMINAL JUSTICE
REPLACE ELECTRICAL
MEMORIAL UNIT
N
M.W.R. NO. 00715006
GPS COORDINATES
29.3996N / 95.4906W
ROSHARON, TEXAS 77583
SEPTEMBER 30,2025
ISSUED FOR PROPOSAL
FO
T
A X
S E
T A T
T H E
S
E
FACILITIES DIVISION
THE TEXAS DEPARTMENT OF CRIMINAL JUSTICE
(713) 784-8211 Houston, TX 77042
3700 W. Sam Houston Pkwy. S., Suite 200
Reid, Inc.
Seckman Smith www.ssr-inc.com
FAX: (713) 952-8655
Texas Firm No. 2874
S-401 DETAILS PHASE 1
S-400 DETAILS PHASE 1
S-301 DOOR AND FRAME TYPES PHASE 1
S-204 LEVEL 2 - SPLINE AREA E PHASE 1
S-202 LEVEL 2 - SPLINE AREA C PHASE 1
S-201 LEVEL 2 - SPLINE AREA A PHASE 1
S-104 CORRIDOR PHASE 1
S-102 BOILER ROOM - LEVEL 1 PHASE 1
S-101 SITE PLAN PHASE 1
S-001 GENERAL NOTES PHASE 1
M-500 MECHANICAL DETAILS - PHASE 1
M-203 SPLINE AREAS A&E - RENOVATION FLOOR PLAN - PHASE 1
M-000 MECHANICAL LEGEND, AND NOTES - PHASE 1
E-605 ELECTRICAL-SHORT CIRCUIT AND LOAD FLOW ANALYSIS - NORMAL POWER PHASE 1
E-604 GROUNDING RISER DIAGRAM PHASE 1
E-602 ELECTRICAL ONE-LINE DIAGRAM NORMAL PHASE 1
E-600 ELECTRICAL ONE-LINE DIAGRAM - EXISTING PHASE 1
E-501 ELECTRICAL DETAILS PHASE 1
E-500 ELECTRICAL DETAILS PHASE 1
EP-207 SPLINE AREA E PHASE 1
EP-206 SPLINE AREA D PHASE 1
EP-205 SPLINE AREA C PHASE 1
EP-204 SPLINE AREA B PHASE 1
EP-203 SPLINE AREA A PHASE 1
EP-108 ROOF TOP MECHANICAL ROOM PHASE 1
EP-107 UTILITY CORRIDOR PHASE 1
EP-106 BOILER ROOM - MEZZANINE PHASE 1
EP-105 BOILER ROOM - LEVEL 1 PHASE 1
EP-102 ELECTRICAL SITE PLAN RENOVATION PHASE 1
EP-101 LAYDOWN AREA PHASE 1
EP-100 ELECTRICAL SITE PLAN EXISTING PHASE 1
E-001 ELECTRICAL EQUIPMENT SCHEDULE PHASE 1
E-000 ELECTRICAL LEGEND AND NOTES PHASE 1
- COVER SHEET
NUMBER SHEET NAME
SHEET INDEX
PHOTO BOOK
ROSHARON, TX
MEMORIAL UNIT
SITE LOCATION
TYLER
HUNTSVILLE
AUSTIN
SAN
ANTONIO
HOUSTON
DALLAS
LUBBOCK
AMARILLO
EL
PASO
LAREDO
FT.
WORTH
pp p p p o p o o p p p o o
EXHIBIT 6
696-FD-26-P036
PANELBOARD
MISCELLANEOUS
JUNCTION BOX
DISCONNECT SWITCH
J
CONCRETE HATCHING
NO MANS LAND
REFER TO PHOTO BOOK
INDIVIDUAL LOADS
AFF
AFG
CLG
FBO
WP
ABOVE FINISHED FLOOR
ABOVE FINISHED GRADE
CEILING
FURNISHED BY OTHERS
WEATHERPROOF
ABBREVIATIONS
FLR FLOOR MOUNTED
TR TAMPER RESISTANT
BAS BUILDING AUTOMATION SYSTEM
OFOI OWNER FURNISH OWNER INSTALLED
OFCI OWNER FURNISH CONTRACTOR INSTALLED
GENERAL NOTES
2.
1.
6.
5.
4.
3.
EXISTING SERVICES INDICATED ON THESE DRAWINGS WERE DERIVED FROM EXISTING DRAWINGS AND LIMITED FIELD OBSERVATIONS. THESE DRAWINGS ARE NOT ALL INCLUSIVE OF SERVICES THAT EXIST IN THE PROJECT AREA. CONTRACTOR SHALL VERIFY SERVICES, LOCATION, TYPE, AND SIZES PRIOR TO ANY CONSTRUCTION. ANY DEVIATIONS IMPACTING WORK SHOWN ON THESE DOCUMENTS SHALL BE REPORTED TO THE ENGINEER FOR
COORDINATION PRIOR TO DEMOLITION.
NOT USED.
NOT USED.
NOT USED.
REMOVE ALL JUNCTION BOXES, CONDUIT, PIPE HANGERS, STRAPS OR TIE WIRES ANCHORED IN CONCRETE
SLAB ABOVE CEILING THAT ARE NO LONGER IN USE.
CONTRACTOR SHALL SUBMIT TO TDCJ PROJECT ADMINISTRATOR A COMPLETE LIST OF EQUIPMENT AND ITEMS TO BE REMOVED. ASSETS SUCH AS UNIT SUBSTATIONS, SWITCHGEAR, PANELS, ETC. WILL BE
RELOCATED TO THE LAYDOWN AREA.
THESE NOTES ARE APPLICABLE TO ENTIRE DRAWING SET. INDIVIDUAL DRAWINGS HAVE NOTES UNIQUE TO THE DRAWING ON WHICH THEY APPEAR. NOTES ON FLOOR PLANS AND SITE PLANS APPLY ONLY TO THE SHEET ON
WHICH THEY APPEAR.
9.
10.
11.
12.
13.
EQUIPMENT ROOM EXPOSED GROUND BUS BARS SHALL BE FABRICATED USING SOLID COPPER BUS BAR OF SUFFICIENT CROSS SECTION AREA TO MEET UL STANDARD 891. BUS BAR SHALL BE MOUNTED EXPOSED ON WALL USING 3" STANDOFFS. PREDRILL BUS BAR FOR 50 PERCENT ADDITIONAL SPARE CONNECTION CAPACITY.
REFER TO DETAIL 09 ON SHEET E-500 AND GROUNDING DIAGRAM ON SHEET E-604.
ESSENTIAL LOADS ARE LOADS THAT CANNOT HAVE OUTAGES INCLUDE:
1. PERIMETER FENCE
2. PERIMETER LIGHTING
3. EMERGENCY LIGHTING
4. MEDICAL
5. WATER WELL
6. WASTE WATER
7. SECURITY LOCKS WHEN REQUIRED BY WARDEN (COORDINATE WITH WARDEN)
8. TELEPHONE WHEN BATTERY BACKUP UPS NOT CONFIRMED TO BE WORKING (IT TO CHECK DAILY)
PROVIDE TEMPORARY POWER DURING LOAD TRANSFER.
14.
CONTRACTOR SHALL COORDINATE SHIPPING SPLITS IN ALL ELECTRICAL EQUIPMENT TO CONFIRM THAT IT
WILL FIT THROUGH PROVIDED OPENINGS.
CONTRACTOR SHALL PROVIDE SCHEDULE OF WEEKLY MEETINGS FOR COORDINATION OF CRITICAL SHUT-
DOWNS AND BIWEEKLY FOR CONSTRUCTION COORDINATION FOR THE ENTIRE DURATION OF
CONSTRUCTION. CONTRACTOR SHALL PROVIDE CONSTRUCTION SCHEDULE INCLUDING POWER SHUT- DOWNS. ADJUSTMENTS TO SCHEDULE MUST BE MADE WITH A MINIMUM OF 72 HOURS NOTICE. DAYS OF SHUT-DOWNS CAN BE EXTENDED 12-14 HOURS BUT POWER MUST BE RESTORED THE SAME DAY OF THE
SHUT-DOWN.
CRITICAL LOADS ARE LOADS THAT CANNOT HAVE OUTAGES FOR MORE THAN ONE HOUR IN A 24 HOUR PERIOD
AND INCLUDE:
1. RESPITE AREAS WHEN NECESSARY TO KEEP HEAT INDEX OF THESE AREAS LESS THAN 88 DEGREES F.
2. RESTRICTIVE HOUSING AREAS (BLOCKS A, B, C, D) WHEN NECESSARY TO KEEP HEAT INDEX OF THESE
AREAS LESS THAN 88 DEGREES F.
3. HVAC/ VENTILATION WHEN NECESSARY TO KEEP HEAT INDEX OF THESE AREAS LESS THAN 88 DEGREES
PROVIDE TEMPORARY POWER DURING LOAD TRANSFER.
MAXIMUM SIZE OF THE EQUIPMENT SHIPPING SPLIT FOR EQUIPMENT WHICH WILL BE INSTALLED IN THE SPLINE SHALL NOT EXCEED 6' WIDTH AND 9' HEIGHT. THE CONTRACTOR SHALL COORDINATE THE SHIPPING
SPLIT WITH THE EQUIPMENT VENDOR.
EQUIPMENT DESIGNATED TO BE "REMOVED AND RELOCATED" SHALL BE REMOVED FROM EXISTING
LOCATION AND RELOCATED TO LAYDOWN AREA SHOWN ON SHEET EP-101.
15. NOT USED.
NOT USED.
CONTRACTOR TO INVESTIGATE THE 120V/208V DISTRIBUTION SYSTEM FROM UNIT SUBSTATIONS TO DISTRIBUTION PANELS. PANEL SCHEDULES AND FLOOR LAYOUTS DEPICTING DISTRIBUTION PANEL AND MOTOR CONTROL CENTER LOCATIONS ARE INCLUDED FOR REFERENCE. PANEL BRANCH CIRCUITS ARE EXCLUDED FROM THE INVESTIGATION. EQUIPMENT DISCONNECTS, INDIVIDUAL LOADS SUCH AS FANS AND HVAC UNITS DIRECTLY FED FROM UNIT SUB STATIONS ARE EXCLUDED FROM THE INVESTIGATION.
THE EXPECTED DELIVERABLE OF THE INVESTIGATION IS A CERTIFIED AS-BUILT ONE LINE, AS-BUILT PANEL
SCHEDULES, PHOTOS OF THE INSIDE OF THE PANELS, PERMANENT DESTINATION TAG ON EACH
SUBSTATION, DISTRIBUTION, BREAKER AND A TABLE SHOWING THE FOLLOWING INFORMATION:
PANEL NAME PANEL SOURCE MAIN FEEDER INFORMATION
CONDUIT TYPE/SIZE WIRE TYPE/SIZE NUMBER OF PHASES
ALL DECOMMISSIONED INFRASTRUCTURE SHALL BE REMOVED AND RELOCATED BEFORE CONSTRUCTION
BENEFICIAL OCCUPANCY. NO ABANDONED INFRASTRUCTURE SHALL REMAIN IN PLACE.
7.
8.
16.
17.
18.
SELECTIVE COORDINATION
POINT TO POINT FAULT CURRENT CALCULATION HAS BEEN PERFORMED BY SKM SOFTWARE FOR DESIGN PURPOSES. FAULT CURRENT LEVEL AT EACH POINT IS SHOWN ON DRAWING E-605 AND E-606. THE CONTRACTOR SHALL PROVIDE POWER SYSTEM ANALYSIS WITH SHORT CIRCUIT CALCULATION, COORDINATION OF UPSTREAM AND DOWNSTREAM CIRCUIT BREAKERS TO 0.1 SECONDS, AND ARC FLASH HAZARD STUDY. ARC FLASH HAZARD ANALYSIS LABELS SHALL BE PROVIDED IN ACCORDANCE TO NFPA 70E. REFER TO SPECIFICATION SECTION 26 05
73 FOR ADDITIONAL INFORMATION.
TEXAS FIRM REGISTRATION #: F-2874
(713) 784-8211 Houston, TX 77042
3700 West Sam Houston Parkway South, www.ssr-inc.com
FAX: (713) 952-8655
Suite 200
Reid, Inc.
Seckman Smith
CHECKED BY:
DRAWN BY:
DESIGNED BY:
R
EV
IS
IO
N S
C op yr ig ht
By
S m ith S ec km an R ei d, In c.
A ll rig ht s re se rv ed . T hi s do cu m en t, or p ar ts th er eo f, m ay n ot b e re pr od uc ed in a ny fo rm w ith ou t w rit te n pe rm is si on
SHEET TITLE
DATE
PROJECT STATUS
SHEET NUMBER
9/
/2
:3 2:
P
M C
:\U se rs \y be re m \D oc um en ts
\S
SR
_E
LE
C _T
D C
J_ D
AR
R
IN
G
TO
N
-2
2_ yb er em
.rv t
TD
C
J M
EM
O
R
IA
L U
N
IT
TD
C
J M
EM
O
R
IA
L U
N
IT
R
EP
LA
C E
EL
EC
TR
IC
AL
PR
O
JE
C T
M W
R
D
AR
R
IN
G
TO
N
R D
R
O
SH
AR
O
N , T
X
SSR Project #: 17230430
SG
ORM
HZ
E-000
ELECTRICAL LEGEND
AND NOTES PHASE 1
ISSUED FOR PROPOSAL
R
EV
D
AT
E D
ES
C
R
IP
TI
O
N
/0
5/
AD
D
EN
D U
M
09/30/2025
09/30/2025
TEXAS FIRM REGISTRATION #: F-2874
(713) 784-8211 Houston, TX 77042
3700 West Sam Houston Parkway South, www.ssr-inc.com
FAX: (713) 952-8655
Suite 200
Reid, Inc.
Seckman Smith
CHECKED BY:
DRAWN BY:
DESIGNED BY:
R E
V
IS
IO
N
S
C o p y ri g h t
B y S m it h S e c k m a n R e id
In c A ll ri g h ts r e s e rv e d T h is d o c u m e n t, o r p a rt s t h e re o f, m a y n o t b e r e p ro d u c e d i n a n y f o rm w it h o u t w ri tt e n p e rm is s io n
SHEET TITLE
DATE
PROJECT STATUS
SHEET NUMBER
/2
/2
:5
:5
P
M C
U s e rs
\o ro d ri g u e z \D o c u m e n ts
\S S
R
E L E
C T
D C
J D
A R
R
IN
G T
O N
-2 o ro d ri g u e z R
Q
B S
.r v t
T D
C J M
E M
O R
IA
L U
N
IT
T D
C J M
E M
O R
IA
L U
N
IT
R
E P
L A
C E
E L
E C
T R
IC
A
L P
R O
J E
C T
M W
R
D
A R
R
IN
G T
O N
R D
R
O S
H A
R O
N T
X
SSR Project #: 17230430
SG
ORM
HZ
E-001
ELECTRICAL
EQUIPMENT
SCHEDULE PHASE 1
09/30/2025
ISSUED FOR PROPOSAL
PBH Panel (REFER TO NOTE 17 ON E-000) E-600
SPLINE PNL P2 P3 Panel (REFER TO NOTE 17 ON E-000) E-600
P1 Panel (REFER TO NOTE 17 ON E-000) E-600
NN#1 Panel (REFER TO NOTE 17 ON E-000) E-600
NCC6 Panel (REFER TO NOTE 17 ON E-000) E-600
MCP9 Panel (REFER TO NOTE 17 ON E-000) SPLINE AREA D E-600 EP206
MCCL Motor Control Center E-600
MCCK Motor Control Center E-600
MCC44 Motor Control Center E-600
MCC43 Motor Control Center SPLINE AREA A E-600 EP203
MCC33 Motor Control Center SPLINE AREA D E-600 EP206
MCC29 Motor Control Center SPLINE AREA D E-600 EP206
MCC28 Motor Control Center SPLINE AREA D E-600 EP206
MCC2 Motor Control Center SPLINE AREA E E-600 EP207
MCC1 Motor Control Center SPLINE AREA E E-600 EP207
MAINTENANCE B Panel (REFER TO NOTE 17 ON E-000) MAINTENANCE E-600 EP102
MAINTENANCE A Panel (REFER TO NOTE 17 ON E-000) MAINTENANCE E-600 EP102
MAIN CAMERA Panel (REFER TO NOTE 17 ON E-000) E-600
LV1&2 Panel (REFER TO NOTE 17 ON E-000) E-600
LV-2 Panel (REFER TO NOTE 17 ON E-000) E-600
LV-1 Panel (REFER TO NOTE 17 ON E-000) E-600
KPI Panel (REFER TO NOTE 17 ON E-000) E-600
KP3B Panel (REFER TO NOTE 17 ON E-000) E-600
KP3 Panel (REFER TO NOTE 17 ON E-000) E-600
KP-2 Panel (REFER TO NOTE 17 ON E-000) E-600
KP Panel (REFER TO NOTE 17 ON E-000) E-600
KM Panel (REFER TO NOTE 17 ON E-000) E-600
KL Panel (REFER TO NOTE 17 ON E-000) E-600
KE Panel (REFER TO NOTE 17 ON E-000) E-600
KB Panel (REFER TO NOTE 17 ON E-000) E-600
KA Panel (REFER TO NOTE 17 ON E-000) E-600
K/L Panel (REFER TO NOTE 17 ON E-000) E-600
IP Panel (REFER TO NOTE 17 ON E-000) E-600
INVESTIGATION Panel (REFER TO NOTE 17 ON E-000) E-600
IEM2 Panel (REFER TO NOTE 17 ON E-000) E-600
I/J Panel (REFER TO NOTE 17 ON E-000) E-600
GFI-3C Panel (REFER TO NOTE 17 ON E-000) E-600
GFI-3A Panel (REFER TO NOTE 17 ON E-000) E-600
GFI-2C Panel (REFER TO NOTE 17 ON E-000) E-600
GFI-2A Panel (REFER TO NOTE 17 ON E-000) E-600
GFI-1C Panel (REFER TO NOTE 17 ON E-000) E-600
GFI-1A Panel (REFER TO NOTE 17 ON E-000) E-600
GB2 Panel (REFER TO NOTE 17 ON E-000) E-600
GB Panel (REFER TO NOTE 17 ON E-000) E-600
G/H Panel (REFER TO NOTE 17 ON E-000) E-600
EM3 Panel (REFER TO NOTE 17 ON E-000) E-600
EM2 Panel (REFER TO NOTE 17 ON E-000) E-600
EM Panel (REFER TO NOTE 17 ON E-000) E-600
EAST DORM Panel (REFER TO NOTE 17 ON E-000) E-600
E/F Panel (REFER TO NOTE 17 ON E-000) E-600
DR Panel (REFER TO NOTE 17 ON E-000) LEVEL 1 AREA B MAIN HALL E-600
DO Panel (REFER TO NOTE 17 ON E-000) E-600
DC-P3-K Panel (REFER TO NOTE 17 ON E-000) E-600
DC-P2-J Panel (REFER TO NOTE 17 ON E-000) E-600
DC-P2-B Panel (REFER TO NOTE 17 ON E-000) E-600
DC-P2-A Panel (REFER TO NOTE 17 ON E-000) E-600
DC-P1-C Panel (REFER TO NOTE 17 ON E-000) E-600
DC-D2 Panel (REFER TO NOTE 17 ON E-000) SPLINE AREA D EP206
DC-D1 Panel (REFER TO NOTE 17 ON E-000) SPLINE AREA A EP203
DC-1P-A Panel (REFER TO NOTE 17 ON E-000) E-600
CSM Panel (REFER TO NOTE 17 ON E-000) LEVEL 2 AREA B, CRAFT SHOP E-600
CS1B Panel (REFER TO NOTE 17 ON E-000) E-600
CS1A Panel (REFER TO NOTE 17 ON E-000) E-600
COMMESARY 2 Panel (REFER TO NOTE 17 ON E-000) E-600
COMMESARY Panel (REFER TO NOTE 17 ON E-000) E-600
CHILLER 2 Panel (REFER TO NOTE 17 ON E-000) E-600
CHILLER 1 Panel (REFER TO NOTE 17 ON E-000) E-600
CB-IM Panel (REFER TO NOTE 17 ON E-000) E-600
CB6L Panel (REFER TO NOTE 17 ON E-000) E-600
CB5P Panel (REFER TO NOTE 17 ON E-000) E-600
CB5L Panel (REFER TO NOTE 17 ON E-000) E-600
CB4P Panel (REFER TO NOTE 17 ON E-000) E-600
CB4L Panel (REFER TO NOTE 17 ON E-000) E-602
CB3P Panel (REFER TO NOTE 17 ON E-000) E-600
CB3L Panel (REFER TO NOTE 17 ON E-000) E-600
CB2CA Panel (REFER TO NOTE 17 ON E-000) E-600
CB2D Panel (REFER TO NOTE 17 ON E-000) E-600
CB2C Panel (REFER TO NOTE 17 ON E-000) E-600
CB2B Panel (REFER TO NOTE 17 ON E-000) E-600
CB2A(2) Panel (REFER TO NOTE 17 ON E-000) E-600
CB2A Panel (REFER TO NOTE 17 ON E-000) E-600
CB1D Panel (REFER TO NOTE 17 ON E-000) E-600
CB1C Panel (REFER TO NOTE 17 ON E-000) E-600
CB1B Panel (REFER TO NOTE 17 ON E-000) E-600
CB1A-2 Panel (REFER TO NOTE 17 ON E-000) E-600
CB1A Panel (REFER TO NOTE 17 ON E-000) E-600
CA CHAPEL Panel (REFER TO NOTE 17 ON E-000) E-602
BH Panel (REFER TO NOTE 17 ON E-000) E-600
A2B Panel (REFER TO NOTE 17 ON E-000) E-600
A2A Panel (REFER TO NOTE 17 ON E-000) E-600
A1C Panel (REFER TO NOTE 17 ON E-000) E-600
A1B Panel (REFER TO NOTE 17 ON E-000) E-600
A1A Panel (REFER TO NOTE 17 ON E-000) E-600
8 TANK Panel (REFER TO NOTE 17 ON E-000) E-600
1P Panel (REFER TO NOTE 17 ON E-000) E-600
1KL Panel (REFER TO NOTE 17 ON E-000) E-600
#3 PKT Panel (REFER TO NOTE 17 ON E-000) E-600
#2 PKT Panel (REFER TO NOTE 17 ON E-000) E-600
#1 PKT Panel (REFER TO NOTE 17 ON E-000) E-600
122 Panel (REFER TO NOTE 17 ON E-000) E-600
121 Panel (REFER TO NOTE 17 ON E-000) E-600
120 Panel (REFER TO NOTE 17 ON E-000) E-600
119 Panel (REFER TO NOTE 17 ON E-000) E-600
1 Panel (REFER TO NOTE 17 ON E-000) E-600
TAG ID DESCRIPTION LVL#/AREA# ONELINE PLAN
WEST DORM Panel (REFER TO NOTE 17 ON E-000) E-600
VISITING Panel (REFER TO NOTE 17 ON E-000) E-600
TX-TS 5KV/0.208KV Pad Mounted Transformer - Tire Shop OUTDOOR E-602 EP102
TX-PEM2 5KV/.48KV Pad Mounted Transformer - Docking Station BOILER ROOM E-600 EP105
TX-M 5KV/0.208KV Pad Mounted Transformer - Maintenance OUTDOOR E-602 EP102
TX-ED 5KV/0.208KV Pad Mounted Transformer - East Dorm OUTDOOR E-602 EP102
TX-CY 5KV/0.48KV Pad Mounted Transformer - Chiller Yard OUTDOOR E-602 EP102
TX2500-2 2500 kVA Transformer 12.5kV/5kV OUTSIDE THE FENCE E-602 EP102
TX2500-1 2500 kVA Transformer 12.5kV/5kV OUTSIDE THE FENCE E-602 EP102
TS-8 Spline E-600
TS-7 Spline E-600
TS-6 Spline SPLINE E-600 EP206
TS-5 Automatic Transfer Switch - EMP - SPD-2 E-600
TS-4 Automatic Transfer Switch - EMP - EDP-K EP206
TS-3 Automatic Transfer Switch - EMP - Generator Ctrl Pwr E-600
TS-2 Automatic Transfer Switch - EMP - EDP-C2 E-600
TS-1 Automatic Transfer Switch - EMP - EDP-C1 E-600
TMP-1 Panel (REFER TO NOTE 17 ON E-000) E-602
TPM-1 Panel (REFER TO NOTE 17 ON E-000) E-600
TP-4 Panel (REFER TO NOTE 17 ON E-000) E-602
TP-3 Panel (REFER TO NOTE 17 ON E-000) E-600
TP2 Panel (REFER TO NOTE 17 ON E-000) E-600&E-602
TE Panel (REFER TO NOTE 17 ON E-000) E-600
ST-K Unit Substation K ROOF TOP MECHANICAL ROOM E-602 EP108
ST-G Unit Substation G SPLINE E-602 EP206
ST-F Unit Substation F SPLINE E-602 EP203
ST-E Unit Substation E SPLINE E-602 EP205
ST-D Unit Substation D SPLINE E-602 EP207
ST-C Unit Substation C SPLINE E-602 EP105
STB-SB Panel (REFER TO NOTE 17 ON E-000) E-600
ST-B Unit Substation B SPLINE E-602 EP207
ST-A Unit Substation A SPLINE E-602
SS-WD 5KV Sectionalizing Switch - West Dorm OUTDOOR E-602 EP102
SS-TS 5KV Sectionalizing Switch - Tire Shop OUTDOOR E-602 EP102
SS-M 5KV Sectionalizing Switch - Maintenance OUTDOOR E-602 EP102
SS-G Selector Switch G SPLINE E-602 EP206
SS-F Selector Switch F MECHANCAL ROOM E-602 EP107
SS-ED 5KV Sectionalizing Switch - East Dorm OUTDOOR E-602 EP102
SS-CY 5KV Sectionalizing Switch - Chiller Yard OUTDOOR E-602 EP102
SS-C Selector Switch C SPLINE E-602 EP105
SS-B Selector Switch B MECHANCAL ROOM E-602 EP207
SS-A Selector Switch A MECHANCAL ROOM E-602 EP107
SPM 1 Panel (REFER TO NOTE 17 ON E-000) E-600
SPLINE OFFICE Panel (REFER TO NOTE 17 ON E-000) E-600
SP4 Panel (REFER TO NOTE 17 ON E-000) E-600
SP2 Panel (REFER TO NOTE 17 ON E-000) SPLINE AREA A E-602 EP203
SP1 Panel (REFER TO NOTE 17 ON E-000) E-600
SG5KV-2 5KV Pad Mounted Switchgear OUTSIDE THE FENCE E-602 EP102
SG5KV-1 5KV Pad Mounted Switchgear OUTSIDE THE FENCE E-602 EP102
PS Panel (REFER TO NOTE 17 ON E-000) E-600
PMCC43 Panel (REFER TO NOTE 17 ON E-000) SPLINE AREA A E-602 EP203
PLX Panel (REFER TO NOTE 17 ON E-000) E-600
PLN Panel (REFER TO NOTE 17 ON E-000) E-600
PLM Panel (REFER TO NOTE 17 ON E-000) E-600
PLL Panel (REFER TO NOTE 17 ON E-000) E-600
PMC-5 Panel (REFER TO NOTE 17 ON E-000) E-600
PMC-4 Panel (REFER TO NOTE 17 ON E-000) E-600
PMC-3 Panel (REFER TO NOTE 17 ON E-000) E-600
PMC-2 Panel (REFER TO NOTE 17 ON E-000) E-600
PMC-1 Panel (REFER TO NOTE 17 ON E-000) E-600
PL Panel (REFER TO NOTE 17 ON E-000) E-600
PK Panel (REFER TO NOTE 17 ON E-000) E-600
PI Panel (REFER TO NOTE 17 ON E-000) E-600
PG-2 Panel (REFER TO NOTE 17 ON E-000) E-600
PG-1 Panel (REFER TO NOTE 17 ON E-000) E-600
PEM2 Panel (REFER TO NOTE 17 ON E-000) E-600 EP105
PDR Panel (REFER TO NOTE 17 ON E-000) E-600
TAG ID DESCRIPTION LVL#/AREA# ONELINE PLAN
R E
V D
A T
E D
E S
C R
IP
T
IO
N
General Note:
Brand or manufacturer’s references are descriptive only, and indicate type and quality to be provided. All references to brand or manufacturer names shall be interpreted to include the language “or A/E approved equal”. Any brand or manufacturer meeting specifications will be considered, irrespective of the language “or A/E approved equal” appearing in conjunction with the brand or manufacturer name.
SELECTOR SWITCH SCHNEIDER HVLcc 26 13 16
5KV SECTIONALIZING SWITCH S&C MANUAL VISTA SWITCHGEAR 26 13 30.01
2,500 KVA TRANSFORMER 12.5kV/5kV SCHNEIDER PAD MOUNTED CLASS 7230 26 12 19
TYPE OF EQUIPMENT BASIS OF DESIGN SPECIFICATION SECTION
BASIS OF DESIGN
09/30/2025
WEST DORMEAST DORM
SEMINARY
REC YARD
ENTRANCE
CHAPEL
GYM
BOILER ROOM
LAUNDRY
DORM
OLD BUILDING
INFIRMARY
CHILLER YARD
EXISTING
XFMR
MAINTENANCE
CHILLER
TO 12.5KV
OVERHEAD
LINE.
12.5KV OVERHEAD LINE
WEST DORM
PANEL A
EAST DORM
PANEL A
EXISTING
BUS DUCT
TO BE
REMOVED
TO 12.5KV
OVERHEAD
LINE.
EXISTING CAN
CRUSHER
TIRE SHOP
LAUNDRY
STORAGE
ENTRANCE
LIBRARYC
EL
L
BL
O C
K 'K
C
EL
L
BL
O C
K 'L
C
EL
L
BL
O C
K 'J
C
EL
L
BL
O C
K 'I'
C
EL
L
BL
O C
K 'G
C
EL
L
BL
O C
K 'H
C
EL
L
BL
O C
K 'F
C
EL
L
BL
O C
K 'E
C
EL
L
BL
O C
K 'C
C
EL
L
BL
O C
K 'D
C
EL
L
BL
O
C K
'A
C
EL
L
BL
O C
K 'B
CHOW HALL
MAIN SWITCH
PHOTO
41,42,43 &44
PHOTO
#45
PHOTO
#46
PHOTO
#47
PHOTO
#48
CHILLER
SWITCHBOARD
PHOTO
#68
PHOTO
#67
PHOTO
#66
PHOTO
#63, 65
PHOTO
#64
ACCESS ROAD
MAIN PANEL
MAINTENANCE
PANELS A & B
EXISTING
WATER
TOWER
EXISTING 480V PANEL
TS-WT
EXISTING TRANSFER SWITCH TO BE REPLACED
EXISTING POLE WITH 12.4KV-208/120V
TRANSFORMER TO BE REUSED
COMM. ROOM
GEN-BR-500GEN-BR-350
TEXAS FIRM REGISTRATION #: F-2874
(713) 784-8211 Houston, TX 77042
3700 West Sam Houston Parkway South, www.ssr-inc.com
FAX: (713) 952-8655
Suite 200
Reid, Inc.
Seckman Smith
CHECKED BY:
DRAWN BY:
DESIGNED BY:
R
EV
IS
IO
N S
C op yr ig ht
By
S m ith S ec km an R ei d, In c.
A ll rig ht s re se rv ed . T hi s do cu m en t, or p ar ts th er eo f, m ay n ot b e re pr od uc ed in a ny fo rm w ith ou t w rit te n pe rm is si on
SHEET TITLE
DATE
PROJECT STATUS
SHEET NUMBER
9/
/2
:3 2:
P
M C
:\U se rs \y be re m \D oc um en ts
\S
SR
_E
LE
C _T
D C
J_ D
AR
R
IN
G
TO
N
-2
2_ yb er em
.rv t
TD
C
J M
EM
O
R
IA
L U
N
IT
TD
C
J M
EM
O
R
IA
L U
N
IT
R
EP
LA
C E
EL
EC
TR
IC
AL
PR
O
JE
C T
M W
R
D
AR
R
IN
G
TO
N
R D
R
O
SH
AR
O
N , T
X
SSR Project #: 17230430
SG
ORM
HZ
EP-100
ELECTRICAL SITE
PLAN EXISTING
PHASE 1
ISSUED FOR PROPOSAL
1 ELECTRICAL SITE PLAN EXISTING PHASE ONE
GENERAL NOTES
1.
EXISTING MAIN SWITCHGEAR TO BE REMOVED AND RELOCATED
AFTER NEW EQUIPMENT IS INSTALLED AND IN SERVICE. REFER TO
ONE-LINE DIAGRAM E-600 AND BOILER ROOM ENLARGED PLAN EP-105.
KEYED NOTES
EXISTING 12.5KV/4160V TRANSFORMER TO BE REMOVED AND
RELOCATED AFTER NEW EQUIPMENT IS INSTALLED AND PLACED IN
SERVICE. REFER TO ONE-LINE DIAGRAM.
EXISTING 300KVA/12.5KV/480V TRANSFORMER 400A/3P DISCONNECT
SWITCH AND MAIN DISTRIBUTION PANEL IN THE BUILDING TO REMAIN IN
PLACE.
POLE MOUNTED 75KVA, 12.5KV/240V TRANSFORMER.4
UNDERGROUND FEEDER TO BE REMOVED AFTER NEW FEEDER IS
INSTALLED AND PLACED IN SERVICE. REFER TO ONE-LINE DIAGRAM
E-602.
EXISTING 50KVA/12.5KV/208V TRANSFORMER.6
EXISTING 350KVA/208V GENERATOR TO REMAIN.7
EXISTING 4160V/480V, 500KVA TRANSFORMER AND DOWNSTREAM POWER
DISTRIBUTION FOR CHILLER INCLUDING SWITCHBOARD SHALL REMAIN AND
SHALL BE REUSED. REFER TO ONE-LINE DIAGRAM AND ELECTRICAL SITE
PLAN EP-102.
REFER TO BOILER ROOM - LEVEL 1, EP-105, FOR ADDITIONAL DETAILS.10
NOT USED.11
N
REMOVE AND RELOCATE EXISTING TRANSFORMER.14
UNDERGROUND FEEDER TO REMAIN.12
EXISTING POWER DISTRIBUTION SYSTEM FOR SEMINARY IS NOT IN THE
SCOPE OF WORK.
REFER TO ONE-LINE DIAGRAMS FOR INFORMATION REGARDING
EQUIPMENT RATING AND FEEDER CONNECTIONS.
2. LOCATING UNDERGROUND UTILITIES AROUND PERIMETER FENCE
SHALL BE COORDINATED WITH TDCJ AND UTILITY LOCATOR.
UNDERGROUND UTILITIES SUCH AS POWER TO PERIMETER LIGHTING,
FIBER TO PERIMETER CAMERAS, ETC. SHALL BE LOCATED BY
DAYLIGHTING AS MUCH AS POSIBLE.
EXISTING 500KW GENERATOR (GEN-BR-500) IS TO REMAIN.19
R
EV
D
AT
E D
ES
C
R
IP
TI
O
N
8 NOT USED.
NOT USED.
NOT USED.
NOT USED.
NOT USED.
NOT USED.20
09/30/2025
09/30/2025
WEST DORMEAST DORM
REC YARD
ENTRANCE
TIRE SHOP
MAINTENANCE
NO MAN'S LAND
16'-0" ACCESS GATE
BOILER ROOM
CHAPEL
GYM
INFIRMARY
LAUNDRY
STORAGE
ENTRANCE
LIBRARY
OLD BLDG
C
EL
L
BL
O C
K 'K
C
EL
L
BL
O C
K 'L
C
EL
L
BL
O C
K 'J
C
EL
L
BL
O C
K 'I'
C
EL
L
BL
O C
K 'G
C
EL
L
BL
O C
K 'H
C
EL
L
BL
O C
K 'F
C
EL
L
BL
O C
K 'E
C
EL
L
BL
O C
K 'C
C
EL
L
BL
O C
K 'D
C
EL
L
BL
O
C K
'A
C
EL
L
BL
O C
K 'B
CHOW HALL
SEMINARY
ACCESS ROAD
"DISPOSAL
CONTAINERS
LOCATION. INSTALL
NEW FENCE
16'-0" ACCESS GATE
70' - 0"
OUTSIDE
LAYDOWN
AREA
16'-0" ACCESS GATE
70' - 0"
2 3
FACILITY
LAYDOWN AREA
16'-0" ACCESS GATE
5 SHEET
EP-203
5 SHEET
EP-205A/B
5 SHEET
EP-206
5 SHEET
EP-207
5SHEET
EP-208
5SHEET
EP-107
10' - 0"
TEXAS FIRM REGISTRATION #: F-2874
(713) 784-8211 Houston, TX 77042
3700 West Sam Houston Parkway South, www.ssr-inc.com
FAX: (713) 952-8655
Suite 200
Reid, Inc.
Seckman Smith
CHECKED BY:
DRAWN BY:
DESIGNED BY:
R
EV
IS
IO
N S
C op yr ig ht
By
S m ith S ec km an R ei d, In c.
A ll rig ht s re se rv ed . T hi s do cu m en t, or p ar ts th er eo f, m ay n ot b e re pr od uc ed in a ny fo rm w ith ou t w rit te n pe rm is si on
SHEET TITLE
DATE
PROJECT STATUS
SHEET NUMBER
9/
/2
:3 2:
P
M C
:\U se rs \y be re m \D oc um en ts
\S
SR
_E
LE
C _T
D C
J_ D
AR
R
IN
G
TO
N
-2
2_ yb er em
.rv t
TD
C
J M
EM
O
R
IA
L U
N
IT
TD
C
J M
EM
O
R
IA
L U
N
IT
R
EP
LA
C E
EL
EC
TR
IC
AL
PR
O
JE
C T
M W
R
D
AR
R
IN
G
TO
N
R D
R
O
SH
AR
O
N , T
X
SSR Project #: 17230430
SG
ORM
HZ
EP-101
LAYDOWN AREA
PHASE 1
ISSUED FOR PROPOSAL
1 LAYDOWN/GENERATOR/CRANE PLAN
GENERAL NOTES
CONTRACTOR SHALL PROTECT ELECTRICAL EQUIPMENT FROM
WEATHER AND MOISTURE IN ACCORDANCE WITH MANUFACTURERS
INSTRUCTIONS AND GOOD PRACTICES.
1.
N
2.
KEYED NOTES
AREA AVAILABLE FOR PLACEMENT OF RIGGING EQUIPMENT TO BE
USED TO LIFT EQUIPMENT INTO SPLINE.
PRIOR TO PLACING RIGGING EQUIPMENT THE CONTRACTOR SHALL
VERIFY IF THE SOIL/ CONCRETE CAN SUPPORT WEIGHT OF RIGGING
EQUIPMENT WITH THE LOAD.
3.
CONTRACTOR TO USE FACILITY LAYDOWN AREA LOCATION FOR
REMOVED EQUIPMENT AND TRASH. NOTIFY THE TDCJ PROJECT
ADMINISTRATOR WHEN REMOVED ASSETS AND TRASH ARE READY FOR
DISPOSAL.
ALL EQUIPMENT REMOVED FROM THE FACILITY DURING WORKING
HOURS SHALL BE PLACED IN THE FACILITY LAYDOWN AREA.
AT THE END OF EACH WORKING DAY, EQUIPMENT STORED IN THE
FACILITY LAYDOWN AREA SHALL BE RELOCATED TO THE OUTSIDE
LAYDOWN AREA.
FENCE TO COMPLY WITH TDCJ REQUIREMENTS.4
THE DOOR IS INDICATED ON THIS DRAWING IN ORDER TO SHOW
RELATION OF THE DOOR LOCATION AND AVAILABLE LOCATION OF
RIGGING EQUIPMENT. ACTUAL LOCATION OF THE DOOR IS IN SPLINE .
SHEET NUMBER INDICATES DRAWING WHERE ACTUAL LOCATION OF
THE DOOR IS SHOWN.
OFOI.6
R
EV
D
AT
E D
ES
C
R
IP
TI
O
N
09/30/2025
09/30/2025
WEST
DORM
EAST
DORM
REC YARD
ENTRANCE
12.5KV OVERHEAD LINE
2 2
5 5
TIRE SHOP
CHILLER YARD
OLD BUILDING
MAINTENANCE
ACCESS ROAD
BOILER ROOM
CHAPEL
GYM
INFIRMARY
LAUNDRY
STORAGE
ENTRANCE
LIBRARYC
EL
L
BL
O C
K 'K
C
EL
L
BL
O C
K 'L
C
EL
L
BL
O C
K 'J
C
EL
L
BL
O C
K 'I'
C
EL
L
BL
O C
K 'G
C
EL
L
BL
O C
K 'H
C
EL
L
BL
O C
K 'F
C
EL
L
BL
O C
K 'E
C
EL
L
BL
O C
K 'C
C
EL
L
BL
O C
K 'D
C
EL
L
BL
O
C K
'A
C
EL
L
BL
O C
K 'B
CHOW HALL
TX2500-1
SG5KV-1 SG5KV-2
TX2500-2
SS-WDSS-EDSS-M
SS-TS
TX-TS
CAN
CRUSHER
SS-CY
TX-CY
PHOTO
#38
PHOTO
#39 & #40
SEMINARY
TX-CS
CB-TXTS-LV
EXISTING
WATER
TOWER
REFER TO DETAIL 05
ON SHEET E501 FOR
DIMENSIONS.
MAINTENANCE A
MAINTENANCE B
TO 12.5KV
OVERHEAD
LINE.
EXISTING
COMM. ROOM
KG KG
TO PANEL 123
FRONT FRONT
GEN-BR-500
GEN-BR-350
TEXAS FIRM REGISTRATION #: F-2874
(713) 784-8211 Houston, TX 77042
3700 West Sam Houston Parkway South, www.ssr-inc.com
FAX: (713) 952-8655
Suite 200
Reid, Inc.
Seckman Smith
CHECKED BY:
DRAWN BY:
DESIGNED BY:
R
EV
IS
IO
N S
C op yr ig ht
By
S m ith S ec km an R ei d, In c.
A ll rig ht s re se rv ed . T hi s do cu m en t, or p ar ts th er eo f, m ay n ot b e re pr od uc ed in a ny fo rm w ith ou t w rit te n pe rm is si on
SHEET TITLE
DATE
PROJECT STATUS
SHEET NUMBER
9/
/2
:3 2:
P
M C
:\U se rs \y be re m \D oc um en ts
\S
SR
_E
LE
C _T
D C
J_ D
AR
R
IN
G
TO
N
-2
2_ yb er em
.rv t
TD
C
J M
EM
O
R
IA
L U
N
IT
TD
C
J M
EM
O
R
IA
L U
N
IT
R
EP
LA
C E
EL
EC
TR
IC
AL
PR
O
JE
C T
M W
R
D
AR
R
IN
G
TO
N
R D
R
O
SH
AR
O
N , T
X
SSR Project #: 17230430
SG
ORM
HZ
EP-102
ELECTRICAL SITE
PLAN RENOVATION
PHASE 1
ISSUED FOR PROPOSAL
1" = 40'-0"1 ELECTRICAL SITE PLAN RENOVATION
GENERAL NOTES
1. REFER TO ONE-LINE DIAGRAM FOR ADDITIONAL INFORMATION.
2. REMOVE AND RELOCATE EXISTING TRANSFORMERS AS INDICATED.
3. ALL WORK REQUIRING POWER TO THE FENCE TO BE SHUT DOWN
MUST BE COMPLETE SAME DAY SO POWER CAN BE RESTORED BY
THE END OF THE DAY. COORDINATE FENCE SHUTDOWN WITH TDCJ
WEEKS IN ADVANCE.
4. WHERE POSSIBLE ROUTE CONDUIT OUTSIDE FENCE THEN
PERPENDICULAR TO FENCE TO DESTINATION INSIDE UNIT.
INSTALL NEW 12.5KV/4160V, 2500KVA TRANSFORMER. REFER TO
ELECTRICAL SPECIFICATIONS FOR TRANSFORMER DETAILS.
KEYED NOTES
PROVIDE AND INSTALL NEW TERMINAL POLE. REFER TO SHEET
E-500 DETAIL 03.
NEW 15KV PAD MOUNTED SWITCHGEAR.3
PROVIDE AND INSTALL 2 SETS OF (2) 4" DIRECT BURY PVC SCHEDULE
40 CONDUITS. ONE CONDUIT IN EACH SET TO BE USED FOR FEEDER
INSTALLATION AND 2ND CONDUIT TO BE USED AS SPARE. REFER TO
ONE-LINE DIAGRAM FOR FEEDER SIZE. PROVIDE PULL STRING IN
EMPTY CONDUITS. REFER TO SHEET E-500 DETAIL 11.
REFER TO DRAWING EP-105 FOR BOILER ROOM FLOOR PLAN.6
INSTALL PULL-BOX ON EXTERIOR WALL OF BOILER ROOM AT 20'
ELEVATION. RISE CONDUITS FROM THE GRADE UP ON EXTERIOR WALL
TO PULL-BOX PENETRATE WALL AND EXTEND CONDUITS FOR 5KV
FEEDERS IN TO BOILER ROOM. REFER TO SHEET EP-105 (NOTE 2) FOR
CONDUIT ROUTING CONTINUATION.
NOT USED. 10
NOT USED.11
EXISTING TRANSFORMER TO REMAIN.12
MANHOLE TO HAVE SECURED COVER TO ALLOW ACCESS TO
AUTHORIZED PERSONNEL ONLY.
REPLACE EXISTING BUS DUCT WITH NEW BUS DUCT.15
NEW SECTIONALIZING SWITCH.16
19 ENCASE CONDUIT IN CONCRETE UNDER ROAD ONLY. REFER TO DETAIL
07 ON SHEET E-500.
N
26 EXISTING SWITCHBOARD TO REMAIN.
REFER TO SHEET EP-602 FOR FEEDER RATING.30
28 EXISTING MAIN SERVICE DISCONNECT SWITCH AND MAIN DISTRIBUTION
PANEL TO REMAIN.UNDERGROUND FEEDER. REFER TO GENERAL NOTE 1.7
29 POWER DISTRIBUTION SYSTEM FOR SEMINARY IS NOT IN THE SCOPE OF WORK.
5. ALL OUTDOOR EQUIPMENT TO BE NEMA 4X.
18 FENCE IS TO BE EXTENDED TO PROVIDE SPACE FOR SWITCH INSTALLATION.
TO CAN CRUSHER. REFER TO SHEET E-602.34
R
EV
D
AT
E D
ES
C
R
IP
TI
O
N
/0
5/
AD
D
EN
D U
M
NOT USED.4
NOT USED.
NOT USED.
14 NOT USED.
NOT USED.17
NOT USED.
NOT USED.21
NOT USED.
NOT USED.
NOT USED.
NOT USED.27
NOT USED.
NOT USED.
NOT USED.
09/30/2025
09/30/2025
EM2
MAIN
CB
EXISTING
ST-C
ST-C
ST-B
ST-A
ST-E
ST-F
ST-G
ST-D
CHILLER
ST-E
ST-F
ST-G
ST-D
CHILLER
PHOTO
#56 MV-SS
EXISTING FEEDER
PHOTO
#25
PHOTO
#26
SS-C
SWITCH
PEM2
TX-PEM2
TEXAS FIRM REGISTRATION #: F-2874
(713) 784-8211 Houston, TX 77042
3700 West Sam Houston Parkway South, www.ssr-inc.com
FAX: (713) 952-8655
Suite 200
Reid, Inc.
Seckman Smith
CHECKED BY:
DRAWN BY:
DESIGNED BY:
R
EV
IS
IO
N S
C op yr ig ht
By
S m ith S ec km an R ei d, In c.
A ll rig ht s re se rv ed . T hi s do cu m en t, or p ar ts th er eo f, m ay n ot b e re pr od uc ed in a ny fo rm w ith ou t w rit te n pe rm is si on
SHEET TITLE
DATE
PROJECT STATUS
SHEET NUMBER
9/
/2
:3 2:
P
M C
:\U se rs \y be re m \D oc um en ts
\S
SR
_E
LE
C _T
D C
J_ D
AR
R
IN
G
TO
N
-2
2_ yb er em
.rv t
TD
C
J M
EM
O
R
IA
L U
N
IT
TD
C
J M
EM
O
R
IA
L U
N
IT
R
EP
LA
C E
EL
EC
TR
IC
AL
PR
O
JE
C T
M W
R
D
AR
R
IN
G
TO
N
R D
R
O
SH
AR
O
N , T
X
SSR Project #: 17230430
SG
ORM
HZ
EP-105
BOILER ROOM -
LEVEL 1 PHASE 1
ISSUED FOR PROPOSAL
1/8" = 1'-0"1 BOILER ROOM - PHASE 1
KEYED NOTES
DEMOLISH EXISTING MEDIUM VOLTAGE FEEDER BACK TO THE SOURCE.
PULL BOX IS FOR MAIN SERVICE MEDIUM VOLTAGE CABLE INSTALLED AT
AN ELEVATION OF 20' A.F.G. EXTEND (4) 4" CONDUITS TO SS-C
SWITCHES. REFER TO SITE PLAN (EP-102) FOR CONTINUATION.
INSTALL NEW SS-C SWITCH.
FEED SUBSTATION C FROM SS-C. REFER TO E-602 FOR FEEDER DETAILS.
REMOVE AND RELOCATE EXISTING SWITCHGEAR. PHOTO #57.
DISASSEMBLE AND REMOVE 5KV SWITCHGEAR AFTER ALL NORMAL
POWER 5KV LOADS HAVE BEEN TRANSFERRED TO NEW 5KV SYSTEM
AND THE INDOOR MEDIUM VOLTAGE LOOP HAS BEEN FULLY
COMMISSIONED.
REPLACE EXISTING DOOR WITH NEW 6'X9' DOUBLE DOOR. REFER TO
SPECIFICATION SECTION 016400 FOR REQUIREMENTS.
FEED TO SUBSTATION K FROM SS-C. REFER TO E-602 FOR FEEDER
DETAILS. RUN CONDUIT UP TO THE MEZZANINE. USE THE ROOF CAVITY
AS PATH TO THE ROOF TOP MECHANICAL ROOM. REFER TO PHOTO #12
FOR ROOF CAVITY VISUAL. REFER TO NOTE 3 ON EP-106 AND NOTE 12
ON EP-108 FOR CONTINUATION.
KEY PLAN
N
R
EV
D
AT
E D
ES
C
R
IP
TI
O
N
09/30/2025
09/30/2025
EP
-1
EP-107
LKE
LKE
LKE
LKE
LKE
LKE
'-0
(TYP.)
TEXAS FIRM REGISTRATION #: F-2874
(713) 784-8211 Houston, TX 77042
3700 West Sam Houston Parkway South, www.ssr-inc.com
FAX: (713) 952-8655
Suite 200
Reid, Inc.
Seckman Smith
CHECKED BY:
DRAWN BY:
DESIGNED BY:
R
EV
IS
IO
N S
C op yr ig ht
By
S m ith S ec km an R ei d, In c.
A ll rig ht s re se rv ed . T hi s do cu m en t, or p ar ts th er eo f, m ay n ot b e re pr od uc ed in a ny fo rm w ith ou t w rit te n pe rm is si on
SHEET TITLE
DATE
PROJECT STATUS
SHEET NUMBER
9/
/2
:3 2:
P
M C
:\U se rs \y be re m \D oc um en ts
\S
SR
_E
LE
C _T
D C
J_ D
AR
R
IN
G
TO
N
-2
2_ yb er em
.rv t
TD
C
J M
EM
O
R
IA
L U
N
IT
TD
C
J M
EM
O
R
IA
L U
N
IT
R
EP
LA
C E
EL
EC
TR
IC
AL
PR
O
JE
C T
M W
R
D
AR
R
IN
G
TO
N
R D
R
O
SH
AR
O
N , T
X
SSR Project #: 17230430
SG
ORM
HZ
EP-106
BOILER ROOM -
MEZZANINE PHASE 1
ISSUED FOR PROPOSAL
1/8" = 1'-0"1 BOILER ROOM - MEZZANINE - RENOVATION
RENOVATION KEYED NOTES
NOT USED.
NOT USED.
SUBSTATION K FEEDER FROM BOILER ROOM. REFER TO NOTE 8 ON
EP-105.
NOT USED.
NOT USED.
(4) 4" RIGID STEAL GALVANIZED CONDUITS FOR 5KV CABLES TO UTILITY
CORRIDOR. (2) 4" CONDUITS TO BE USED AS SPARE. REFER TO SHEET
EP-107 FOR CONTINUATION.
NOT USED.
NOT USED.
NOT USED.
NOT USED.
NOT USED.
NOT USED.
NOT USED.
NOT USED.
INSTALL 4' CHAIN HUNG LIGHT FIXTURES ABOVE MEZZANINE LEVEL. FEED
LIGHTING FROM STAND-BY POWER.
NOT USED.
KEY PLAN
N
NOT USED.17
NOT USED.18
R
EV
D
AT
E D
ES
C
R
IP
TI
O
N
1. WHERE FIXTURES ARE SHOWN WITH CHAIN HANGERS, PROVIDE LONGER CHAIN, IF NEEDED, TO MOUNT AROUND OBSTRUCTIONS (I.E. DUCTWORK, PIPING, STRUCTURE, ETC.) TO AVOID SHADOWING ON SPACE/EQUIPMENT
BELOW.
2. BRAND OR MANUFACTURER'S REFERENCES ARE DESCRIPTIVE ONLY, AND INDICATE TYPE AND QUALITY TO BE PROVIDED. ALL REFERENCES TO BRAND OR MANUFACTURER NAMES SHALL BE INTERPRETED TO INCLUDE...
GENERAL NOTES:
LUMINAIRE SCHEDULE
TYPE DESCRIPTION MANUFACTURER/SERIES LAMPS VOLTAGE BALLAST/DRIVER MOUNTINGQTY. LAMPS MIN. LUMENS COLOR INPUT WATTS
KG VANDAL PROOF RESISTANT, VAPOR TIGHT, WET LOCATION
LISTED BRACKET, CLEAR GLASS GLOBE, CAST ALUMINUM
GUARD, EDISON BASE SOCKET, WATTAGE RESTRICTION LABEL.
PROVIDE WITH BATTERY PACK AND PHOTOCELL CONTROL
PHILIPS/STONCO VWXL
HUBBELL VWGG
1 LED 3000 SEE
REMARKS
9.0 UNIV SELF-DRIVEN LED
REPLACEMENT LAMP
WALL MOUNTED
LKE 4'-0" INDUSTRIAL FIXTURE, STEEL HOUSING, STEEL REFLECTOR,
WIRE GUARD, CHAIN HANGER SET, PAINTED AFTER
FABRICATION
LITHONIA ZL1F
METALUX 4 ILED
COLUMBIA LCR
-- LED 5000 4000K 48.0 UNIV CHAIN HUNG AT 9'-0"
09/30/2025
09/30/2025
BOILER ROOM BELOW
ELEVATION 40' ABOVE BOILER ROOM FLOOR.
SS-A
SWITCHES
SS-F
SWITCHES
SP4
PHOTO #2
PHOTO #20
PHOTO #21
5' - 0"
EP-105
EP-206
LKE LKE
15 (TYP.)
TEXAS FIRM REGISTRATION #: F-2874
(713) 784-8211 Houston, TX 77042
3700 West Sam Houston Parkway South, www.ssr-inc.com
FAX: (713) 952-8655
Suite 200
Reid, Inc.
Seckman Smith
CHECKED BY:
DRAWN BY:
DESIGNED BY:
R
EV
IS
IO
N S
C op yr ig ht
By
S m ith S ec km an R ei d, In c.
A ll rig ht s re se rv ed . T hi s do cu m en t, or p ar ts th er eo f, m ay n ot b e re pr od uc ed in a ny fo rm w ith ou t w rit te n pe rm is si on
SHEET TITLE
DATE
PROJECT STATUS
SHEET NUMBER
9/
/2
:3 2:
P
M C
:\U se rs \y be re m \D oc um en ts
\S
SR
_E
LE
C _T
D C
J_ D
AR
R
IN
G
TO
N
-2
2_ yb er em
.rv t
TD
C
J M
EM
O
R
IA
L U
N
IT
TD
C
J M
EM
O
R
IA
L U
N
IT
R
EP
LA
C E
EL
EC
TR
IC
AL
PR
O
JE
C T
M W
R
D
AR
R
IN
G
TO
N
R D
R
O
SH
AR
O
N , T
X
SSR Project #: 17230430
SG
ORM
HZ
EP-107
UTILITY CORRIDOR
PHASE 1
ISSUED FOR PROPOSAL
KEYED NOTES
NEW CABLE TRAY TO BE INSTALLED AGAINST WALL IN NEW SWITCH
ROOM AT 100" AFF.
KEY PLAN
1/16" = 1'-0"1 UTILITY CORRIDOR FROM BOILER ROOM TO SPLINE
INSTALL NEW CABLE TRAY AT ELEVATION OF 2' ABOVE EXISTING CABLE
TRAY.
3 RELOCATE ALL EXISTING CONDUIT AND EQUIPMENT FROM NORTH
WALL AND RELOCATE AS NEEDED TO SOUTH WALL. REFER TO
PHOTO #19 & #59.
4 REFER TO MEZZANINE FLOOR PLAN FOR CONTINUATION, EP-106.
5 (4) 4" RIGID STEAL GALVANIZED CONDUITS FOR 5KV CABLES TO BE
ATTACHED TO THE CEILING. (2) 4" CONDUITS TO BE USED AS SPARE.
6 TERMINATE CONDUITS AT CABLE TRAY USE PROPER BUSHINGS.
REFER TO ELECTRICAL SPECIFICATION #260536 FOR DETAILS.
7 REFER TO SPLINE FLOOR PLANS FOR CONTINUATION, EP-206.
8 REMOVE EXISTING CONCRETE PADS FROM THIS ROOM. PROVIDE NEW
PADS FOR SWITCHES.
9 USE DOOR TO MOVE EQUIPMENT INTO ROOM. REPLACE THE DOOR
WITH 4'X8' NEW DOOR. REFER TO SHEET S-301 FOR REQUIREMENTS.
REFER TO DRAWING EP-108 FOR ROUTE FOR EQUIPMENT TRANSPORT.
10 NOT USED.
NOT USED.
12 NOT USED.
N
13 NOT USED.
14 NOT USED.
15 PROVIDE AND INSTALL LIGHTING FIXTURES. REFER TO DRAWING EP-106
FOR FIXTURE TYPE. CONNECT LIGHTING TO PANEL PEM-2 ON
MEZZANINE IN BOILER ROOM. LIGHTING CIRCUIT TO BE UNSWITCHED.
R
EV
D
AT
E D
ES
C
R
IP
TI
O
N
09/30/2025
09/30/2025
EXISTING
ST-K
EXISTING
KP-3B EXISTING
KP-2
EXISTING
MCCM
EXISTING
MCCK
PHOTO
#5
PHOTO
#9
PHOTO
#10
PHOTO
#11
PHOTO
#12
PHOTO
#12
PHOT
O
#13
BOILER
ROOM
MECH
ROOM
EXISTING
ST-K
6 9
LKE LKE LKE LKE
LKE
LKE
(TYP.)
PHOTO
#12
EXISTING
MCCK
EXISTING
MCCM
TEXAS FIRM REGISTRATION #: F-2874
(713) 784-8211 Houston, TX 77042
3700 West Sam Houston Parkway South, www.ssr-inc.com
FAX: (713) 952-8655
Suite 200
Reid, Inc.
Seckman Smith
CHECKED BY:
DRAWN BY:
DESIGNED BY:
R
EV
IS
IO
N S
C op yr ig ht
By
S m ith S ec km an R ei d, In c.
A ll rig ht s re se rv ed . T hi s do cu m en t, or p ar ts th er eo f, m ay n ot b e re pr od uc ed in a ny fo rm w ith ou t w rit te n pe rm is si on
SHEET TITLE
DATE
PROJECT STATUS
SHEET NUMBER
9/
/2
:3 2:
P
M C
:\U se rs \y be re m \D oc um en ts
\S
SR
_E
LE
C _T
D C
J_ D
AR
R
IN
G
TO
N
-2
2_ yb er em
.rv t
TD
C
J M
EM
O
R
IA
L U
N
IT
TD
C
J M
EM
O
R
IA
L U
N
IT
R
EP
LA
C E
EL
EC
TR
IC
AL
PR
O
JE
C T
M W
R
D
AR
R
IN
G
TO
N
R D
R
O
SH
AR
O
N , T
X
SSR Project #: 17230430
SG
ORM
HZ
EP-108
ROOF TOP
MECHANICAL ROOM
PHASE 1
ISSUED FOR PROPOSAL
1/8" = 1'-0"2 ROOF TOP MECHANICAL ROOM DEMO
DEMOLITION KEYED NOTES
NOT USED.
NOT USED.
NOT USED.
NOT USED.
NOT USED.
NOT USED.
REPLACE EXISTING SINGLE DOOR WITH NEW 6'X9' DOUBLE DOOR.
REFER TO SPECIFICATION SECTION 016400 FOR REQUIREMENTS.
NOT USED.
NOT USED.
DEMOLISH MEDIUM VOLTAGE FEED BACK TO SOURCE.
KEY PLAN
RENOVATION KEYED NOTES
NOT USED.
NOT USED.
NOT USED.
NOT USED.
NOT USED.
ELECTRICAL ROOM IN THE UTILITY CORRIDOR. REFER TO DRAWING
EP-107 FOR ADDITIONAL INFORMATION.
NOT USED.
NOT USED.
AVAILABLE ROUTE TO MOVE NEW EQUIPMENT INTO ELECTRICAL ROOM
IN THE UTILITY CORRIDOR. REFER TO DRAWING EP-107 FOR ADDITIONAL
INFORMATION.
AREA OF SPACE CAVITY EXTENDING TO WALL OF THE BOILER ROOM.
REFER TO PHOTOS #81, 82, 83.
INSTALL MEDIUM VOLTAGE FEED (IN CONDUIT) FROM THE LOAD
TERMINALS OF SS-C LOCATED IN THE BOILER ROOM TO THE LINE
TERMINALS OF ST-K
NOT USED.
1/8" = 1'-0"1 ROOF TOP MECHANICAL ROOM RENO
N
R
EV
D
AT
E D
ES
C
R
IP
TI
O
N
09/30/2025
09/30/2025
ST-F
EXISTING
MCC44
EXISTING
MCC43
EXISTING
SP2
ST-F
4'
2"
18' - 0"
4' - 5"
114' - 0"
4'
/8
REFER TO PHOTO #
PHOTO
#23
PHOTO
#24
FRONT
EP
-2
DC-D1
PMCC43
PHOTO
#79
NEW LOUVER OF EQUAL SIZE OF
CLOSED LOUVER. REFER TO
MECHANICAL DRAWINGS. SEE
KEYED NOTE 2 ON THIS DRAWING
FUTURE
DEMO NOTE
THIS DRAWING INDICATES THE LOCATION OF THE EXISTING EQUIPMENT
AND LOCATION OF THE REPLACEMENT EQUIPMENT. EXISTING EQUIPMENT
TO BE REMOVED AND RELOCATED AFTER NEW EQUIPMENT IS INSTALLED,
PLACED IN SERVICE AND ALL EXISTING CIRCUITS TRANSFERRED TO NEW
EQUIPMENT.
TEXAS FIRM REGISTRATION #: F-2874
(713) 784-8211 Houston, TX 77042
3700 West Sam Houston Parkway South, www.ssr-inc.com
FAX: (713) 952-8655
Suite 200
Reid, Inc.
Seckman Smith
CHECKED BY:
DRAWN BY:
DESIGNED BY:
R
EV
IS
IO
N S
C op yr ig ht
By
S m ith S ec km an R ei d, In c.
A ll rig ht s re se rv ed . T hi s do cu m en t, or p ar ts th er eo f, m ay n ot b e re pr od uc ed in a ny fo rm w ith ou t w rit te n pe rm is si on
SHEET TITLE
DATE
PROJECT STATUS
SHEET NUMBER
9/
/2
:3 2:
P
M C
:\U se rs \y be re m \D oc um en ts
\S
SR
_E
LE
C _T
D C
J_ D
AR
R
IN
G
TO
N
-2
2_ yb er em
.rv t
TD
C
J M
EM
O
R
IA
L U
N
IT
TD
C
J M
EM
O
R
IA
L U
N
IT
R
EP
LA
C E
EL
EC
TR
IC
AL
PR
O
JE
C T
M W
R
D
AR
R
IN
G
TO
N
R D
R
O
SH
AR
O
N , T
X
SSR Project #: 17230430
SG
ORM
HZ
EP-203
SPLINE AREA A
PHASE 1
ISSUED FOR PROPOSAL
3/16" = 1'-0"1 ELECTRICAL - SPLINE AREA A
KEYED NOTES
1 RELOCATION OF EXISTING CONDENSATE AND STEAM EXPANSION LOOP
FOR NEW GEAR. REFER TO MECHANICAL PLANS.
BLOCK OFF EXISTING OUTSIDE AIR LOUVER. REFER TO MECHANICAL
PLANS.
NEW 6'X9' TALL DOUBLE DOOR WILL BE INSTALLED FOR REMOVAL AND
REPLACEMENT OF ELECTRICAL EQUIPMENT. REFER TO DRAWING S-301
FOR REQUIREMENTS.
EXISTING MECHANICAL EQUIPMENT.
NEW CABLE TRAY FOR 5KV CABLE TO ST-F. INSTALL AT 80" AFF.
COORDINATE WITH OTHER EQUIPMENT.
NOT USED.
NOT USED.
NOT USED.
INSTALL 5KV CABLE FROM CABLE TRAY TO ST-F IN 4" CONDUIT.
NOT USED.
NOT USED.
NOT USED.
NOT USED.
NOT USED.
NOT USED.
NOT USED.
NOT USED.
KEY PLAN
N
GENERAL NOTES
CLEARANCE IN FRONT OF UNIT SUBSTATIONS MUST BE A
MINIMUM OF 5'.
1.
2. INSTALL NEW LIGHTING FIXTURES 12 FT APART. COORDINATE
INSTALLATION WITH ELECTRICAL AND MECHANICAL EQUIPMENT.
REFER TO SHEET EP-106 FOR FIXTURE TYPE.
INSTALL MAXIMUM OF 10 FIXTURES ON ONE 120V/20A CIRCUIT. USE #
10 CONDUCTORS.
WHERE OBSTRUCTION ON THE CEILING DOES NOT ALLOW
INSTALLATION OF THE FIXTURES, INSTALL FIXTURES ON THE WALL
AT 9FT ABOVE FINISHED FLOOR.
CONNECT LIGHTING CIRCUITS TO EXISTING SP2. PROVIDE 20A/1P
CIRCUIT BREAKERS.
3.
4.
5.
R
EV
D
AT
E D
ES
C
R
IP
TI
O
N
09/30/2025
09/30/2025
4 5 3
EP
-2
EP
-2
TEXAS FIRM REGISTRATION #: F-2874
(713) 784-8211 Houston, TX 77042
3700 West Sam Houston Parkway South, www.ssr-inc.com
FAX: (713) 952-8655
Suite 200
Reid, Inc.
Seckman Smith
CHECKED BY:
DRAWN BY:
DESIGNED BY:
R
EV
IS
IO
N S
C op yr ig ht
By
S m ith S ec km an R ei d, In c.
A ll rig ht s re se rv ed . T hi s do cu m en t, or p ar ts th er eo f, m ay n ot b e re pr od uc ed in a ny fo rm w ith ou t w rit te n pe rm is si on
SHEET TITLE
DATE
PROJECT STATUS
SHEET NUMBER
9/
/2
:3 2:
P
M C
:\U se rs \y be re m \D oc um en ts
\S
SR
_E
LE
C _T
D C
J_ D
AR
R
IN
G
TO
N
-2
2_ yb er em
.rv t
TD
C
J M
EM
O
R
IA
L U
N
IT
TD
C
J M
EM
O
R
IA
L U
N
IT
R
EP
LA
C E
EL
EC
TR
IC
AL
PR
O
JE
C T
M W
R
D
AR
R
IN
G
TO
N
R D
R
O
SH
AR
O
N , T
X
SSR Project #: 17230430
SG
ORM
HZ
EP-204
SPLINE AREA B
PHASE 1
ISSUED FOR PROPOSAL
3/16" = 1'-0"1 ELECTRICAL - SPLINE AREA B
KEY PLAN
EXISTING DUCT WORK TO REMAIN. LIMITED SPACE FOR CIRCULATION OR
CONSTRUCTION ACTIVITIES. CONTACTOR TO GAIN COMPLETE
KNOWLEDGE OF THE SPACE PRIOR TO PLANNING. REFER TO
MECHANICAL PLANS FOR ADDITIONAL INFORMATION ON RELOCATION
DURING CONSTRUCTION.
KEYED NOTES
EXISTING AIR HANDLING UNIT TO REMAIN.1
N
GENERAL NOTES
CLEARANCE IN FRONT OF UNIT SUBSTATIONS MUST BE A MINIMUM OF 5'.1.
2. INSTALL NEW LIGHTING FIXTURES 12 FT APART. COORDINATE
INSTALLATION WITH ELECTRICAL AND MECHANICAL EQUIPMENT.
REFER TO SHEET EP-106 FOR FIXTURE TYPE.
INSTALL MAXIMUM OF 10 FIXTURES ON ONE 120V/20A CIRCUIT. USE #
10 CONDUCTORS.
WHERE OBSTRUCTION ON THE CEILING DOES NOT ALLOW
INSTALLATION OF THE FIXTURES, INSTALL FIXTURES ON THE WALL AT
9FT ABOVE FINISHED FLOOR.
CONNECT LIGHTING CIRCUITS TO PANELS SP2. PROVIDE 20A/1P
CIRCUIT BREAKERS.
3.
4.
5.
CONNECT NEW CABLE TRAY WITH EXISTING CABLE TRAY.
EXISTING CABLE TRAY.
NEW CABLE TRAY.
R
EV
D
AT
E D
ES
C
R
IP
TI
O
N
09/30/2025
09/30/2025
ST-E FUTURE
ST-E
EXISTING
SP1
6'
5/
EP
-2
EP
-2
EXISTING
MECHANICAL
EQUIPMENT
PHOTO
#78
EXISTING
ST-A
DEMO NOTE
THIS DRAWING INDICATES THE LOCATION OF THE EXISTING EQUIPMENT
AND LOCATION OF THE REPLACEMENT EQUIPMENT. EXISTING EQUIPMENT
TO BE REMOVED AND RELOCATED AFTER NEW EQUIPMENT IS INSTALLED,
PLACED IN SERVICE AND ALL EXISTING CIRCUITS TRANSFERRED TO NEW
EQUIPMENT.
TEXAS FIRM REGISTRATION #: F-2874
(713) 784-8211 Houston, TX 77042
3700 West Sam Houston Parkway South, www.ssr-inc.com
FAX: (713) 952-8655
Suite 200
Reid, Inc.
Seckman Smith
CHECKED BY:
DRAWN BY:
DESIGNED BY:
R
EV
IS
IO
N S
C op yr ig ht
By
S m ith S ec km an R ei d, In c.
A ll rig ht s re se rv ed . T hi s do cu m en t, or p ar ts th er eo f, m ay n ot b e re pr od uc ed in a ny fo rm w ith ou t w rit te n pe rm is si on
SHEET TITLE
DATE
PROJECT STATUS
SHEET NUMBER
9/
/2
:3 2:
P
M C
:\U se rs \y be re m \D oc um en ts
\S
SR
_E
LE
C _T
D C
J_ D
AR
R
IN
G
TO
N
-2
2_ yb er em
.rv t
TD
C
J M
EM
O
R
IA
L U
N
IT
TD
C
J M
EM
O
R
IA
L U
N
IT
R
EP
LA
C E
EL
EC
TR
IC
AL
PR
O
JE
C T
M W
R
D
AR
R
IN
G
TO
N
R D
R
O
SH
AR
O
N , T
X
SSR Project #: 17230430
SG
ORM
HZ
EP-205
SPLINE AREA C
PHASE 1
ISSUED FOR PROPOSAL
3/16" = 1'-0"1 ELECTRICAL - SPLINE AREA C
KEYED NOTES
NOT USED.2
NOT USED.1
NOT USED.3
NOT USED.4
EXISTING OUTSIDE AIR LOUVER.5
KEY PLAN
EXISTING AIR HANDLING UNITS AND DUCT WORK..6
NOT USED.7
NOT USED.8
N
CONNECT NEW CABLE TRAY WITH EXISTING CABLE TRAY.9
NEW CABLE TRAY. MAKE CONNECTION TO EXISTING CABLE TRAY.10
NOT USED.11
NOT USED.12
REPLACE EXISTING DOUBLE DOOR WITH NEW 6' X 9' DOOR. REFER TO
DRAWING S-301 FOR REQUIREMENTS.
GENERAL NOTES
1.
2.
INSTALL NEW LIGHTING FIXTURES 12 FT APART. COORDINATE
INSTALLATION WITH ELECTRICAL AND MECHANICAL EQUIPMENT.
REFER TO SHEET EP-106 FOR FIXTURE TYPE.
INSTALL MAXIMUM OF 10 FIXTURES ON ONE 120V/20A CIRCUIT. USE #
10 CONDUCTORS.
WHERE OBSTRUCTION ON THE CEILING DOES NOT ALLOW
INSTALLATION OF THE FIXTURES, INSTALL FIXTURES ON THE WALL
AT 9FT ABOVE FINISHED FLOOR.
CONNECT LIGHTING CIRCUITS TO EXISTING PANEL SP1. PROVIDE
20A/1P CIRCUIT BREAKERS.
3.
4.
NOT USED.14
R
EV
D
AT
E D
ES
C
R
IP
TI
O
N
DISCONNECT EXISTING MEDIUM VOLTAGE FEEDER. REFEED
TRANSFORMER PRIMARY FROM SS-A.
09/30/2025
09/30/2025
TS-3
EXISTING
ST-G
EXISTING
BAS
EXISTING
MCP9
EXISTING
MCC33
MCC28
EXISTING
MCC29
EXISTING
0' - 0" 77' - 5 1/16"
8' - 4 11/16"
6'
/1 6"
5' - 8 7/32"
SS-G
PHOTO
#31
PHOTO
#32 & 60
UTILITY
CORRIDOR
EP
-2
7EP
-2
A /B
2820 20
A B
PANEL A
3'
EXISTING
PIPES
40" WIDE
RAISED
PLATFORM
EXISTING
TS-4
3'
4"
PHOTO
#70
PHOTO
#69
PHOTO
#80
DC-D2
DC-D2
EXISTING DOOR 27
C
DEMO NOTE
THIS DRAWING INDICATES THE LOCATION OF THE EXISTING EQUIPMENT
AND LOCATION OF THE REPLACEMENT EQUIPMENT. EXISTING EQUIPMENT
TO BE REMOVED AND RELOCATED AFTER NEW EQUIPMENT IS INSTALLED,
PLACED IN SERVICE AND ALL EXISTING CIRCUITS TRANSFERRED TO NEW
EQUIPMENT.
TEXAS FIRM REGISTRATION #: F-2874
(713) 784-8211 Houston, TX 77042
3700 West Sam Houston Parkway South, www.ssr-inc.com
FAX: (713) 952-8655
Suite 200
Reid, Inc.
Seckman Smith
CHECKED BY:
DRAWN BY:
DESIGNED BY:
R
EV
IS
IO
N S
C op yr ig ht
By
S m ith S ec km an R ei d, In c.
A ll rig ht s re se rv ed . T hi s do cu m en t, or p ar ts th er eo f, m ay n ot b e re pr od uc ed in a ny fo rm w ith ou t w rit te n pe rm is si on
SHEET TITLE
DATE
PROJECT STATUS
SHEET NUMBER
9/
/2
:3 2:
P
M C
:\U se rs \y be re m \D oc um en ts
\S
SR
_E
LE
C _T
D C
J_ D
AR
R
IN
G
TO
N
-2
2_ yb er em
.rv t
TD
C
J M
EM
O
R
IA
L U
N
IT
TD
C
J M
EM
O
R
IA
L U
N
IT
R
EP
LA
C E
EL
EC
TR
IC
AL
PR
O
JE
C T
M W
R
D
AR
R
IN
G
TO
N
R D
R
O
SH
AR
O
N , T
X
SSR Project #: 17230430
SG
ORM
HZ
EP-206
SPLINE AREA D
PHASE 1
ISSUED FOR PROPOSAL
3/16" = 1'-0"1 ELECTRICAL - SPLINE AREA D
KEY PLAN
NOT USED.
NOT USED.
NOT USED.
NOT USED.
INSTALL NEW 5KV CABLE ON CABLE TRAY.
NOT USED.
NOT USED.
NOT USED.
PRIMARY SWITCH.
NOT USED.
NOT USED.
ATTACH ALL CONDUITS TO THE WALL AT 100" AFF. COORDINATE WITH
EXISTING UTILITIES.
INSTALL NEW 5KV FEEDER FOR ST-G ON CABLE TRAY.
SEQUENCE OF RENOVATION
ST-A
INSTALL NEW CABLE TRAY AT100" AFF. SEE KEYED NOTE 3.
INSTALL NEW CABLES FOR UNIT SUBSTATION A.
REMOVE CONDENSATE EXPANSION LOOP.
A.
B.
C.
N
24LIGHTING GENERAL NOTES
CONNECT LIGHTING CIRCUITS TO SUBSTATION ST-D. PROVIDE
20A/1P CIRCUIT BREAKERS.
1.
2. INSTALL NEW LIGHTING FIXTURES 12 FT APART. COORDINATE
INSTALLATION WITH ELECTRICAL AND MECHANICAL EQUIPMENT.
REFER TO SHEET EP-106 FOR FIXTURE TYPE.
INSTALL MAXIMUM OF 10 FIXTURES ON ONE 120V/20A CIRCUIT. USE #
10 CONDUCTORS.
WHERE OBSTRUCTION ON THE CEILING DOES NOT ALLOW
INSTALLATION OF THE FIXTURES, INSTALL FIXTURES ON THE WALL
AT 9FT ABOVE FINISHED FLOOR.
3.
4.
KEYED NOTES
NEW CABLE TRAY.
INSTALL NEW CABLE TRAY WITH EXISTING CABLE TRAY.
INSTALL NEW CABLE TRAY AT ELEVATION OF 100" AFF.
NOT USED.
EXISTING AIR HANDLING UNITS AND DUCT.
COORDINATE WITH DIVISION 22 FOR RELOCATION OF CONDENSATE
EXPANSION LOOP FOR NEW GEAR.
NEW DOORS, 6' X 9', TO BE INSTALLED FOR REMOVAL AND
REPLACEMENT OF ELECTRICAL EQUIPMENT. REFER TO DRAWING S-301.
NOT USED.
EXISTING TO REMAIN.
NOT USED.
NOT USED.
NOT USED.
NOT USED.
NOT USED.
NOT USED.
R
EV
D
AT
E D
ES
C
R
IP
TI
O
N
09/30/2025
09/30/2025
ST-D
EXISTING
ST-B
EXISTING
MCC1
EXISTING
MCC2
6'
/1 6"
10' - 10"
3'
2"
15' - 0"
6'
/2
C D
SS-B
PHOTO
#3
PHOTO
#27
PHOTO
#29, 77
PHOTO
#37
END OF CABLE TRAY
EP
-2
EP
-2
PHOTO
#74, 75,76
DEMO NOTE
THIS DRAWING INDICATES THE LOCATION OF THE EXISTING EQUIPMENT
AND LOCATION OF THE NEW EQUIPMENT WHICH WILL REPLACE EXISTING
EQUIPMENT. EXISTING EQUIPMENT TO BE REMOVED AND RELOCATED
AFTER NEW EQUIPMENT IS INSTALLED, PLACED IN SERVICE AND ALL
EXISTING CIRCUITS TRANSFERRED TO NEW EQUIPMENT. TEXAS FIRM REGISTRATION #: F-2874
(713) 784-8211 Houston, TX 77042
3700 West Sam Houston Parkway South, www.ssr-inc.com
FAX: (713) 952-8655
Suite 200
Reid, Inc.
Seckman Smith
CHECKED BY:
DRAWN BY:
DESIGNED BY:
R
EV
IS
IO
N S
C op yr ig ht
By
S m ith S ec km an R ei d, In c.
A ll rig ht s re se rv ed . T hi s do cu m en t, or p ar ts th er eo f, m ay n ot b e re pr od uc ed in a ny fo rm w ith ou t w rit te n pe rm is si on
SHEET TITLE
DATE
PROJECT STATUS
SHEET NUMBER
9/
/2
:3 2:
P
M C
:\U se rs \y be re m \D oc um en ts
\S
SR
_E
LE
C _T
D C
J_ D
AR
R
IN
G
TO
N
-2
2_ yb er em
.rv t
TD
C
J M
EM
O
R
IA
L U
N
IT
TD
C
J M
EM
O
R
IA
L U
N
IT
R
EP
LA
C E
EL
EC
TR
IC
AL
PR
O
JE
C T
M W
R
D
AR
R
IN
G
TO
N
R D
R
O
SH
AR
O
N , T
X
SSR Project #: 17230430
SG
ORM
HZ
EP-207
SPLINE AREA E
PHASE 1
ISSUED FOR PROPOSAL
3/16" = 1'-0"1 ELECTRICAL - SPLINE AREA E
KEY PLAN
NOT USED.
NOT USED.
NOT USED.
NOT USED.
INSTALL NEW CABLE TRAY AT 100" A.F.F.
NOT USED.
ATTACH ALL CONDUITS TO THE WALL AT 100" AFF. COORDINATE WITH
EXISTING UTILITIES.
EXISTING NETWORK AND 208/120V CABLES SHARING THE EXISTING 5KV
FEEDERS NEED TO BE REROUTED IN CONDUIT TO CONTINUE TO SERVE
EXISTING LOADS.
ADD (2) NEW 20A BREAKERS TO SERVE NEW LIGHTING CIRCUITS.
INSTALL SS-B AND REFEED EXISTING SUBSTATIONS AS SHOWN IN E602.
REMOVE EXISTING CABLE TRAY FROM THE ENTRANCE OF THE UTILITY
CORRIDOR TO THE END OF THE TRAY. REFER TO EP-107.
N
GENERAL NOTES
1.
2.
INSTALL NEW LIGHTING FIXTURES 12 FT APART. COORDINATE
INSTALLATION WITH ELECTRICAL AND MECHANICAL EQUIPMENT.
REFER TO SHEET EP-106 FOR FIXTURE TYPE.
INSTALL MAXIMUM OF 10 FIXTURES ON ONE 120V/20A CIRCUIT. USE #
10 CONDUCTORS.
WHERE OBSTRUCTION ON THE CEILING DOES NOT ALLOW
INSTALLATION OF THE FIXTURES, INSTALL FIXTURES ON THE WALL
AT 9FT ABOVE FINISHED FLOOR.
CONNECT LIGHTING CIRCUITS TO SUBSTATION D DISTRIBUTIJON
SECTION. PROVIDE NEW 20A/1P CIRCUIT BREAKERS.
3.
4.
KEYED NOTES
NEW 6'X9' DOUBLE DOORS TO BE INSTALLED IN THIS LOCATION FOR NEW
ENTRY/ EXIT OF NEW ELECTRICAL EQUIPMENT. REFER TO DRAWING S-301.
NOT USED.
NOT USED.
NOT USED.
CABLE TRAY IN THIS AREA TO BE REMOVED, ENERGIZED CABLE AND LOW
VOLTAGE TO REMAIN. PULL EXISTING NETWORK CABLES IN NEW CONDUIT.
NOT USED.
NOT USED.
NOT USED.
NOT USED.
NOT USED.
NOT USED.
MAKE FEEDERS 5kV CONNECTION TO UNIT SUBSTATION ST-B. REFER TO
ONE LINE DIAGRAM FOR FEEDER SIZES.
R
EV
D
AT
E D
ES
C
R
IP
TI
O
N
09/30/2025
09/30/2025
CABLE TRAY
CABLE TRAY
FLAT TEE
CABLE TRAY 01
SEAL AT BOTH ENDS SO AS
TO MAINTAIN RATING OF
WALL FOR FIRE PROOFING.
CONTINUOUS
CONDUIT
PENETRATION.
FIRE RATED
WALL
SEAL PENETRATIONS SO AS
TO MAINTAIN RATING OF
WALL FOR FIRE PROOFING.
CONDUIT SLEEVE
6"
RATED WALL PENETRATIONS 04
1-4" PVC SCHEDULE 40
CONDUIT. FURNISHED AND
INSTALLED BY CONTRACTOR.
CONDUIT
SUPPORTS
(TYPICAL)
FINISHED PAVED
SURFACE ABOVE
GRADE
PATCH TRENCH TO MATCH
EXISTING PAVED AREA WHERE
APPLICABLE.BACKFILL AS REQUIRED
TO MATCH EXISTING
" M
IN
4" 4"
4"
6"8"6"
UNDER ROAD SERVICE DUCT BANK 05
SPARE CONDUIT
1. DUCT SHALL BE CONCRETE INCASED
UNDER PAVED AREAS AND IN AREAS
WHERER ROUTE CROSSES FENCE LINE.
MAIN
LIGHTNING
PROTECTION
CONDUCTOR
BELOW GRADE
APPROXIMATE
FINISHED GRADE
CAST BRONZE CABLE
TO STEEL CONNECTOR.
CADWELD TO STEEL
COLUMN
TYPICAL STEEL
COLUMN
NOTE: GROUND CONNECTIONS
SHALL BE
MADE AT APPROXIMATELY EVERY
OTHER
STEEL COLUMN AROUND THE
PERIMETER, AND SHALL NOT
AVERAGE
OVER 60 FEET APART.
CAST BRONZE CABLE TO
GROUND ROD CLAMP.
1/2 " X 10' COPPERCLAD STEEL
CLASS 1 GROUND TERMINAL.
STEEL COLUMN GROUNDING DETAIL 03
UNISTRUT SUPPORT
CHANNELS TYPE
P-3357A WITH
UNDERGROUND DEVICES
INCLUDING #35R3
SADDLE RACKS.
SET IN 4" GRAVEL
BASE TAMP TO 95%
COMPACTION
SECTION A-A
[18"x18"x24"] SUMP WELL
CONCRETE ENCASEMENT
[AT
MANHOLE ENTRANCE ONLY]
DUCTBANK
CONCRETE
MATERIAL
PULLING
EYES
(TYPICAL)
[2'-0" X 2'-0"]
WINDOWS
ON
FOUR SIDES
BACKFILL TO 95%
CONCRETE SPACER
RINGS TO BUILD UP
TO GRADE
MANHOLE COVER [36"°]
ASTM A48 CAST IRON,
TRAFFIC RATED WITH
PROVISION FOR
PADLOCK. PRECAST CONCRETE
MANHOLE. AT
ASSEMBLY JOINTS,
FURNISH AND INSTALL
CONCRETE SEALANT
"CONSEAL" OR EQUAL
BELL ENDS.
TYPICAL ALL
CONDUIT
6" [3'-0"]
[7'-0"]
SEE SPECIFICATIONS FOR ADDITIONAL
REQUIREMENTS AND DETAILS.
NOTE:
A
CONDUIT ENTRANCE (TYPICAL
FOR NUMBER AND SIDE OF
MANHOLE)
TYPICAL CABLE
RACKS (AS
REQUIRED)
DRAINAGE
GRATE &
FRAME
MANHOLE
COVER ABOVE
STEEL LADDER
BOLTED IN
WALL
TYPICAL PULLING
IRON
4'-0"4'-0" 10'-0"
A
MANHOLE DETAIL 08
BRAND OR MANUFACTURER'S REFERENCES ARE DESCRIPTIVE ONLY, AND INDICATE TYPE AND QUALITY TO BE PROVIDED. ALL REFERENCES TO BRAND OR MANUFACTURER NAMES SHALL BE INTERPRETED TO INCLUDE THE LANGUAGE "OR A/E APPROVED EQUAL". ANY BRAND OR MANUFACTURER MEETING SPECIFICATIONS WILL BE CONSIDERED. IRRESPECTIVE OF THE LANGUAGE "OR A/E APPROVED EQUAL" APPEARING IN
CONJUNCTION WITH THE BRAND OR MANUFACTURER NAME.
CONDUIT WITH
GROUNDING
BUSHING EACH
END.
(TYPICAL)
THOMAS AND
BETTS
#31000 SERIES
COPPER
CABLE LUG
OR EQUAL
#1/0 AWG
1/4 " X 1" X 3'-0" COPPER
BAR. 16 HOLES 2" O.C.
EACH WAY DRILLED
AND
TAPPED 1/4 " X #20
2" W X 1/4 " GALVANIZED STEEL
STANDOFF STRAPS. EXPANSION
BOLT INTO CMU WALL
7200 VOLT INSULATORS
GROUND CONDUCTOR
(TYPICAL)
#1/0 AWG
#6 AWG TO
CONDUCTIVE
CABLETRAY & ALL
SURFACES AND
EQUIPMENT WITHIN
ROOM. (TYPICAL)
TO BUILDING STEEL
TO SERVICE
ENTRANCE
GROUNDING BUS
GROUND BUS DETAIL 07
BRAND OR MANUFACTURER'S REFERENCES ARE DESCRIPTIVE ONLY, AND INDICATE TYPE AND QUALITY TO BE PROVIDED. ALL REFERENCES TO BRAND OR MANUFACTURER NAMES SHALL BE INTERPRETED TO INCLUDE THE LANGUAGE "OR A/E APPROVED EQUAL". ANY BRAND OR MANUFACTURER MEETING SPECIFICATIONS WILL BE CONSIDERED. IRRESPECTIVE OF THE LANGUAGE "OR A/E APPROVED EQUAL" APPEARING IN
CONJUNCTION WITH THE BRAND OR MANUFACTURER NAME.
UNDERGROUND CONDUIT ROUTING 09
FINISHED
GRADE LEVEL
UNDERGROND PVC SCHEDULE 40 CONDUIT.
LISTED FOR DIRECT BURIAL. RISERS AND
ELBOWS TO BE RIGID GALVANIZED
CONDUITS.
WARNING
TAPE
FINE WASHED SAND
18"
36" MIN.
CAST BRONZE PARALLEL
COMBINATION CABLE
SPLICER
BONDING CABLE
TYPICAL GROUNDING CABLE SPLICE 10
TRANSFORMER INSTALLATION DETAIL 02
PROVIDE S&C
OMNIRUPTER
SWITCH OR
EQUAL.
SWITCH
HANDLE IN ON
AND OFF
POSITION
M
REFER TO NEC 250-52.
NOTE:
TRIPOD GROUND ROD
METAL WATER
MAIN
BUILDING STEEL
EQUIPMENT
GROUNDING
BAR
GROUNDING
ELECTRODE
CONDUCTORS
GROUNDING ELECTRODE 06
TEXAS FIRM REGISTRATION #: F-2874
(713) 784-8211 Houston, TX 77042
3700 West Sam Houston Parkway South, www.ssr-inc.com
FAX: (713) 952-8655
Suite 200
Reid, Inc.
Seckman Smith
CHECKED BY:
DRAWN BY:
DESIGNED BY:
R
EV
IS
IO
N S
C op yr ig ht
By
S m ith S ec km an R ei d, In c.
A ll rig ht s re se rv ed .
This is the start of the file's text. The full file is on GovTribe.