3-482-11098 Attach Exhibit Package.pdf
PDF 3 MB Posted
- Solicitation number
- 260184
- Issued by
- Sedgwick County, Kansas
About this file
This is an exhibit package for a construction bid from the City of Wichita, Kansas, Public Works & Utilities Department for the removal and replacement of basketball courts at Buffalo Park and Minisa Park. The project involves demolishing existing asphalt basketball courts and installing new 5-inch reinforced concrete courts measuring 60 feet by 94 feet with a centered 50-foot by 84-foot playing surface at both locations. Additional work includes constructing concrete paths (6 feet wide, 4 inches thick), installing new basketball goal systems with clear acrylic backboards and white nets, replacing basketball poles, removing and replacing existing trees where necessary, installing benches on concrete bases, constructing trash receptacle stands, and performing site restoration with reseeding. The court striping must follow NCAA standards with dark blue 2-inch wide lines applied in two coats. The exhibits include detailed specifications for basketball court dimensions, basket pole locations and heights, striping requirements, concrete specifications, and tree protection measures to be implemented during construction.
The specifications require all basketball materials and construction methods to comply with U.S. Basketball Court Builders Association standards. Contractors must use City-approved concrete mix (6.6 sack City mix with maximum 5-inch slump), install welded wire fabric reinforcement (W-6X6), and employ medium broom finishing with a minimum three-day curing period before striping application. Basketball goal systems must be First Team Tyrant Select models with specific backboard dimensions and post specifications, subject to Park Department approval. Benches must be 6-foot Superior International models with specified materials and finishes, and seed mix must consist of annual rye and Bermuda grass "Yukon" variety applied via split or slice seeding with erosion control blanket protection. All costs for base work, slab construction, goal system installation, striping, sealing, and site work are considered subsidiary to bid items and not paid separately. Tree protection requirements mandate orange construction fencing at the dripline and surface protection measures within designated root zones.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 2-BP 482-11098.pdf | ||
| 1-260184 Bid Table.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EXHIBIT
CITY OF WICHITA |
DATE 06/26/2026
MINISA PARK 704 W. 13TH ST. N | BASKETBALL COURT RESTORATION
DEMO & INSTALL CONCRETE PATH,
ADD EXPANSION JOINT WHERE PATH
CONNECTS TO COURT,
6’ WIDE, 4” THICK, REINFORCED
WITH WWF (6"x 6" - W4.0 x W4.0)
FOR A WATER SOURCE, USE TAP
LOCATED THIS SIDE OF THE FACILITY
1. 7.5” EXISTING ASPHALT DEPTH, DEMO ASPHALTAND REPLACE WITH 5” REINFORCED CONCRETE BB COURT
2. COURT BASE DIMENSION: 60’x94’, COURT CENTERED ON BASE TO BE 50’x84’ with ~10’x9.4’ SAW CUT JOINT LINES
3. DEMO AND REPLACE BASKETBALL POLES
4. ANY REMOVAL OF ADJACENT ABANDONED INFRASTRUCTURE TO BE CONSIDERED SUBSIDIARY TO SITE DEMO
TOTAL SIDEWALK SQ’ INCLUDING BENCH BASE: APPROX. 794
KEYED JOINT ON HALF OF COURT (TYP)
W 14TH ST N
N
JE
A
N
ET
TE
A
V E
DEMO EXISTING TREES WEST OF COURT
ADD 6’ CONCRETE PATH 4” THICK, REINFORCED
WITH WWF (6"x 6" - W4.0 x W4.0) ALONG BACK
OF CURB AND CONNECT TO COURT
ADD 6’ BENCH ON
CONCRETE BASE, LOCATION TO BE
FIELD VERIFIED BY CITY
STA
G
IN
G
A R
EA
NEW COURT TO BE FIELD
LOCATED BY CITY, STRIPING TO
BE DARK BLUE
482-11098
EXISTING TRASH
RECEPTACLE TO BE
REMOVED AND DEMOLISHED
FURNISH & INSTALL A
TRASH RECEPTACLE STAND.
STAND TO BE FIELD
LOCATED BEFORE CONCRETE
POUR. CONCRETE PAD TO BE
4’ DEEP X 8’ WIDE.
BUFFALO PARK 10201 HARDTNER ST. | BASKETBALL COURT RESTORATION EXHIBIT
CITY OF WICHITA |
DATE 06/26/2026
FOR A WATER SOURCE, USE WATER CLOSET
LOCATED NORTH OF PARK RESTROOMS
DEMO TWO EXISTING SIDE PANELS,
CONSTRUCT NEW CONCRETE
PATH 4” THICK, REINFORCED WITH
WWF (6"x 6" - W4.0 x W4.0) TO COURT.
LOCATION TO BE FIELD VERIFIED BY CITY
STAGING
AREA
KEYED JOINT ON HALF OF COURT (TYP)
NEW COURT TO BE FIELD LOCATED BY CITY,
STRIPING TO BE DARK BLUE
1. 7.5”-8.5“ EXISTING ASPHALT DEPTH, DEMO ASPHALT AND REPLACE WITH 5” REINFORCED CONCRETE BB COURT
2. COURT BASE DIMENSION: 60’x94’, COURT CENTERED ON BASE TO BE 50’x84’ with ~10’x9.4’ SAW CUT JOINT LINES
3. DEMO AND REPLACE BASKETBALL POLES.
4. ANY REMOVAL OF ADJACENT ABANDONED INFRASTRUCTURE TO BE CONSIDERED SUBSIDIARY TO SITE DEMO
5. ACCESS POINT FROM 3RD ST N. TEMPORARILY REMOVE WOODEN BOLLARDS AND ADD TYPE 3 TRAFFIC BARRICADE
TOTAL SIDEWALK SQ’ INCLUDING BENCH BASE: APPROX. 64
N P
U
TT
ER
L
N
ACCESS POINT W 3RD ST N
482-11098
CITY OF WICHITA |
DATE 06/26/2026
BASKETBALL COURT STRIPING
ALL COURT LINEWORK SHALL BE TAPED AND PAINTED, LINEWORK WILL BE REJECTED IF PERFORMED OTHERWISE.
LINEWORK SHOULD BE CRISP AND CONSISTENT. SEE ABOVE FOR EXAMPLE OF EXPECTED RESULTS.
PLANEVIEW BB COURT COMPLETEPLANEVIEW BB COURT TAPED
CITY OF WICHITA |
EXHIBITCITY OF WICHITA |
DATE 06/26/2026
BASKETBALL COURT DIMENSIONS NCAA STANDARDS
HIGH QUALITY PDF OF 2025-2026 “FULL COURT DIAGRAM” LINEWORK MAY BE FOUND ON
THE NCAA’S WEBSITE OR VIA THIS URL:
https://ncaaorg.s3.amazonaws.com/championships/sports/basketball/rules/common/PRXBB_CourtDiagram.pdf
CITY OF WICHITA |
EXHIBITCITY OF WICHITA |
DATE 06/26/2026
BASKETBALL COURT BASKET POLES DIMENSIONS - TOP VIEW
94' END OF COURT
84' END LINE - MEASURED
INSIDE TO INSIDE
CENTER
OF RIM AT 63" IN
FRONT OF END
LINE
POLES SHALL BE 24" FROM THE COURT SIDE OF THE 2" WIDE END LINE TO THE FRONT OF THE 6-5/8" DIAMETER POST.
THIS MEASURES TO 27.3125" FROM THE COURT SIDE OF THE END LINE TO THE CENTER OF THE POST.
CITY OF WICHITA |
DATE 06/26/2026
BASKETBALL COURT BASKET POLES DIMENSIONS - SIDE VIEW
CITY OF WICHITA |
DATE 06/26/2026
MINISA AND BUFFALO PARKS BASKETBALL COURT SPECS
All basketball materials and methods used for these projects shall be in conformance with the latest standards for basketball court construction as prescribed by the U.S. Basketball Court Builders Association. The court striping for these courts shall be 50 feet in width to meet standard NCAA regulations, with the length adjusted to accommodate the existing footprint and the new basketball goal systems.
A. Basketball Court Demolition
1. Remove existing basketball courts and any mentioned panels of sidewalk in the exhibit.
2. Restore and seed as required (see Item G. Basketball Court Site Work for more detail.) All construction debris at all sites must be promptly removed from the site and left in a clean condition.
3. Verify all site access with the park department prior to construction activities and keep site disturbance to a minimum.
B. Basketball Court Base Work
1. The areas of the new reinforced concrete slab and sidewalks are to be cleared of vegetation, if any, and graded. If fill material is required, compact subsoil fill dirt to 95% proctor density. Any topsoil that is excavated shall be stockpiled for top dressing of the disturbed areas. The area of the concrete basketball court slab shall be excavated to a depth of 7 to 8 inches mini-mum or until all existing pavement has been removed. Compactable screenings or other City approved base material shall be placed and compacted to a finished depth of 2 to 3 inches as a base for the proposed slab.
2. The base material is to be graded to allow the top of the finished slab to meet existing surrounding sidewalk grades to remain. The grade of the concrete slab should create a slope to allow sheet drainage of the slab. New sidewalk slopes shall be set to ADA requirements to direct drainage away from the slab.
3. Costs for all base work items shall be considered subsidiary to the base work bid item and not bid or paid for separately.
C. Basketball Court Slab Construction
1. The court sizes, (including the pole bases) are 60 ft. by 94. A 5” thick, reinforced concrete slab, for the basketball court area, shall be constructed on the base material. The slab shall be reinforced with #6 rebar placed around the entire perimeter of the slab and secured with wire ties. The edge of the slab shall be thickened to 8” deep x 8” wide. The #6 rebar shall overlap a minimum of one foot. The bar shall be no more than 6 inches inside the edges of the slab. W-6X6 welded wire fabric rein-forcement shall be placed over the entire area of the slab, on beam bolster with plate (see here as an example: https://www.-daytonsuperior.com/products/accessories?name=bbp) such that the wire will be located halfway into the slab. The chairs shall be placed on 2 ft. centers. The plastic chairs shall be able to support the weight of a person of average weight. The surface of the slab shall be saw cut with a 1/8” thick saw blade to a depth of one (1) inch to control cracking. Court saw-cut sections not to exceed 10 ft. by 10 ft. A 6-mil polyethylene vapor barrier is to be installed over the base material prior to the construction of the reinforced concrete slab. Expansion joints shall be caulked and sealed with a gray colored BASF MasterSeal NP2 or approved equal.
2. Forms shall be used for the construction of the 5” thick, reinforced concrete slab where the adjacent sidewalk has been removed. All elevations and form work are to be verified and approved by the City prior to pouring concrete. City approved concrete (6.6 sack City mix with a maximum 5” slump) shall be placed within the slab forms. The concrete may be placed with an approved vibrating screed. A keyed construction joint shall be installed along the half court stripe.
3. The reinforced concrete slabs shall be medium broom finished and kept moist for a minimum of three (3) days. Covering the slab with a layer of polyethylene is acceptable.
4. Costs for all slab construction work items shall be considered subsidiary to the concrete slab construction bid item and not bid or paid for separately.
D. Basketball Goal Systems
1. New basketball goals shall be installed. The new goal system shall be of the following colors: nets are to be white in color, backboards are to be clear acrylic, and the support posts shall be galvanized in color. The goal system shall be of Park Department approved materials. Specifications for approved materials are included; however other goal materials meeting the specifications may be approved for use by the Park Department. The contractor shall contact city staff for necessary material approvals.
2. The basketball goal posts shall be the First Team Tyrant Select Basketball Goal with FT1910 Tyrant Post 6-5/8” OD, 72”-78” overhang. It shall have the FT1910 Nosecone, FT36-HFM Backboard Support Structure, FT220 36” X 60” Acrylic Backboard, First Team FT172D Fixed Basketball Rim and the Lifetime Unconditional Warranty. It shall be installed per manufacturer’s instructions. All round or square footings for post shall have a ½” expansion joint and sealant surround. Verify joint layout about post footings with city staff prior to concrete pour.
3. Costs for the basketball goal system items shall be considered subsidiary to the basketball goal system bid item and not bid or paid for separately.
E. Basketball Striping:
1. Only court striping and sealing shall be applied to the basketball court. The court shall be striped with dark blue 2” wide stripes in two coats over a clean and cured surface. (See color at Sherwood Glen Park.) The stripes shall meet NCAA guide-lines for basketball courts, with the length of the court shortened as necessary to accommodate the First Team Tyrant bas-ketball goal system.
2. Striping may be applied only after the court has cured for 6 calendar days or per manufacturer’s specifications. The concrete slab must have been completely dry for the 24-hour period prior to the application of any striping. After application of the striping and sealer, the surface shall be protected during the manufacturer recommended curing time. Orange plastic fencing on steel posts shall be erected around the court for this period with appropriate warning signs if necessary.
3. Costs for all basketball court striping and sealing items shall be considered subsidiary to the striping bid item and not bid or paid for separately.
EXHIBIT
CITY OF WICHITA |
DATE 06/26/2026
MINISA AND BUFFALO PARKS BASKETBALL COURT SPECS
F. Basketball Court Site Work:
1. The topsoil shall be placed and seeded as required to provide an even and gentle grade back to existing grades on all four sides of the slab and sidewalk areas. The topsoil shall be appropriately compacted and left 1” below the top of the slab and sidewalks to allow water to drain from the slab and walks.
2. Reseeding of all disturbed areas is required and shall be via plit or slice seeding methods. Broadcast seeding will not be approved. Seeding shall be done using 5lbs/1000 sq. ft annual rye (PLS) mixed with 3lbs/1000 sq.ft bermuda grass ‘Yukon’ (PLS), variety to be approved by city staff. Provide 100% NetFree Excelsior erosion control blanket to protect and maintain seedbed.
3. Benches to be 6’ Superior International, Model B6WBPLAYERINNVS: Seat and back surfaces to be 11GA punched steel, framing to be 3/4” ”x1/8”T, seat and back finished with 1/8” thick textured matte polyethylene (powder), and colored green.
Plastisol/PVC coatings are not acceptable. Frames to be 2-3/8” diameter x 11GA structural steel tubing, in-ground mounted, powder coat electro-statically applied and oven cured, and colored black. All hardware to be stainless steel.
G. Incidental Items:
1. There may be items to be constructed, removed, or relocated as directed by the project specifications that are not listed in the project quantities. The cost of providing such items complete and in place shall be considered subsidiary to other items of work and not bid or paid for separately. See plans for materials and labor required for these projects.
H. Submittals:
1. Concrete Mix
2. Seed mix
3. Basketball Goals
4. Striping material
5. Benches
6. Trash Receptacle Stand
EXHIBIT
CITY OF WICHITA |
DATE 06/26/2026
MINISA AND BUFFALO PARKS BASKETBALL COURT SPECS
482-11098
Trash Receptacle Stand
4” REINFORCED
CONCRETE
1/2” EXPANSION
JOINT AROUND
FOOTING
POWDER COAT
BLACK
4” TUBE, 1/8” WALL
THICKNESS
1 1/4” TUBE, 1/8”
WALL THICKNESS
CONTINUOUS WELD,
GRIND SMOOTH
CITY OF WICHITA |
DATE 06/26/2026
TREE PROTECTION DETAIL
FENCING/ROOT PROTECTION
SURFACE PROTECTION MEASURES
TRENCHING/EXCAVATION
ZONE A (CRITICAL ROOT ZONE)
ZONE B (DRIPLINE)
ZONE C (FEEDER ROOT ZONE)
ORANGE CONSTRUCTION FENCING TO BE PROVIDED AND MAINTAINED AT DRIPLINE. FENCE
TO BE INSTALLED BETWEEN TREE AND PROJECT AREA. IT IS NOT NECESSARY TO SURROUND
TREE(S) ENTIRELY IF CONSTRUCTION ACTIVITY WILL ONLY BE ON ONE SIDE OF TREE(S).
ENGINEER OR LANDSCAPE ARCHITECT'S APPROVAL REQUIRED FOR USE/ACCESS WITHIN
ZONE B. PERMISSION FOR USE/ACCESS REQUIRES SURFACE PROTECTION FOR ALL
UNFENCED, UNPAVED SURFACES WITHIN ZONE B
1. MULCH LAYER, 6"-8"DEPTH
2. 3/4"PLYWOOD
3. STEEL PLATES
4. ACKFLOW DEVICE, OR MASTER VALVE. PROTECT DURING CONSTRUCTION
1. NO DISTURBANCE ALLOWED WITHOUT SITE-SPECIFIC INSPECTION AND APPROVAL OF
METHODS TO MINIMIZE ROOT DAMAGE
2. SEVERANCE OF ROOTS LARGER THAN 2" DIA REQUIRES ENGINEER'S APPROVAL
3. TUNNELING REQUIRED TO INSTALL LINES 3'-0"BELOW GRADE OR DEEPER
1. OPERATION OF HEAVY EQUIPMENT AND/OR STOCKPILING OF MATERIALS SUBJECT TO
ENGINEERS APPROVAL. SURFACE PROTECTION* MEASURES REQUIRED
2. TRENCHING ALLOWED AS FOLLOWS:
i. EXCAVATION BY HAND OR WITH HAND-DRIVEN TRENCHER MAY BE REQUIRED
ii. LIMIT TRENCH WIDTH. DO NOT DISTURB ZONE A MAINTAIN 2/3 OR MORE OF ZONE B
IN UNDISTURBED CONDITION
3. TUNNELING MAY BE REQUIRED FOR TRENCHES DEEPER THAN 3'-0"
1. OPERATION OF HEAVY EQUIPMENT AND/OR STOCKPILING OF MATERIALS SUBJECT TO
ENGINEERS APPROVAL.
2. SURFACE PROTECTION* MEASURES MAY BE REQUIRED TRENCHING WITH HEAVY
EQUIPMENT ALLOWED AS FOLLOWS:
i. MINIMIZE TRENCH WIDTH
ii. MAINTAIN 2/3 OR MORE OF ZONE C IN UNDISTURBED CONDITION