3-318-57 2026-01 Addendum No. 1.pdf
PDF 401 KB Posted
- Solicitation number
- Not on record
- Issued by
- Beaver County, Pennsylvania
About this file
This is Addendum No. 1 to Contract 2026-01 for the Creswell Heights Joint Authority in Beaver County, Pennsylvania, issued by KLH Engineers, Inc. on February 27, 2026, for the Agnew Avenue Waterline Replacement project. The addendum revises quantities for two line items: Item G (¾-inch Service Reconnection, Installed Complete) increased from 22 to 25 units, and Item H (¾-inch Type-K Copper Tube, Installed Complete) increased from 340 linear feet to 543 linear feet. Sealed bids were due by 10:00 A.M. local time on Monday, March 16, 2026, via the PennBid Program online portal. The addendum also introduces Standard Detail SD-041 for Valve Box Tracer Wire and clarifies that curb stops shall include stainless steel 24-inch extension rods with brass cotter pins. All bidders were required to acknowledge receipt of this addendum on the bid form.
The addendum establishes supplemental general conditions including comprehensive insurance requirements with minimum limits of $2,000,000 for commercial general liability and business auto coverage, owners and contractors protective liability insurance, and workers compensation coverage. The contractor must obtain a permit for work on Hopewell Township roads, with the owner assisting in the permitting process at no fee to the contractor, and must provide a $12,500 maintenance bond guaranteeing road conditions for twenty-four months. Additional requirements include pre-construction and post-construction photographic and video documentation in DVD and CD formats, with photographs to be cataloged and submitted with shop drawing submittals. The contract specifies a 10 percent bid surety requirement and 100 percent performance surety for the awarded contractor, with no bid withdrawals permitted for ninety days after opening.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 1-318-57 2026-01 Bid Specs.pdf | ||
| 2-318-57 Agnew Ave IFB Set.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
L1-1 318/2026-01
ADDENDUM NO. 1
Creswell Heights Joint Authority Contract 2026-01
Agnew Avenue Waterline Replacement
February 27, 2026
All prospective Bidders interested in the above construction work are herein advised of the following additions, deletions and/or modifications of the plans, specifications and Bidding Documents:
1. REVISION, PRICING SECTION: There has been a change in the quantity of the following:
a. Item G, ¾ inch Service Reconnection (Installed
Complete). The quantity has been updated to 25 from 22.
b. Item H, ¾ inch Type-K Copper Tube (Installed Complete). The quantity has been updated to 543LF from
340LF.
2. ADDITION, SPECIFICATION SECTION F, SUPPLEMENTAL CONDITIONS:
The following is now included as F3 Requirements of Hopewell Township: The CONTRACTOR shall obtain a permit for work on Hopewell Township roads. OWNER shall assist the CONTRACTOR in obtaining the permit. The Work shall be in accordance with the requirements of Hopewell Township.
There is no permit fee required. The CONTRACTOR shall provide Hopewell Township with a $12,500.00 maintenance bond guaranteeing the condition of the road(s) for twenty-four (24) months. This maintenance bond is for the sole purpose of meeting the requirements of the Township and shall have no bearing on the other bonds required in these Contract Documents.
3. ADDITION, STANDARD DETAILS: Detail SD-041 for Valve Box Tracer Wire included in this addendum.
4. CLARIFICATION, SPECIFICATION SECTION G-19, SERVICE
CONNECTIONS: Curb stop shall include stainless steel 24” extension rod with brass cotter pin.
All Bidders shall acknowledge receipt of this Addendum No. 1 in the space provided on the Bid Form corresponding to the appropriate Contract(s).
L1-2 318/2026-01
END OF ADDENDUM NO. 1
Creswell Heights Joint Authority Contract 2026-01
Agnew Avenue Waterline Replacement
KLH Engineers, Inc 5173 Campbells Run Road Pittsburgh, PA 15205 Phone: 412-494-0510 Fax: 412-494-0426
Copyright © 2026 KLH Engineers, Inc.
All Rights Reserved Worldwide
FR-1
Rev. Addendum #1
318/2026-01
Section F-R
SUPPLEMENTAL GENERAL CONDITIONS
F1 Required Contractors Insurance Coverages Under Section E5 of the General Conditions certain stipulations are set forth regarding Contractor's Liability Insurance, Property Insurance, Receipt and Application of Proceeds and Partial Utilization -- Property Insurance. All policies of insurance shall name the CONTRACTOR as the insured party. The CONTRACTOR and his insurance agent shall be required to complete the Certificate of Insurance appended in Section K of the Contract Documents prior to, or at the time that the Agreement is executed and the surety bonds are posted by the CONTRACTOR.
OWNER and KLH Engineers, Inc. shall be an additional insured with respect to liability arising out of and from the work performed by CONTRACTOR for OWNER. Insurer waives all right of subrogation against OWNER, its clients, its employees, and/or KLH Engineers, Inc. The insurance coverage under the insurance contract is primary to any comparable liability insurance carried by the OWNER or its agent. The specific coverages required to be provided prior to commencement of construction by the CONTRACTOR and any and all subcontractors on this project shall be as follows:
F1.0 INSURANCE
CONTRACTOR shall obtain insurance of the types and in the amounts described below. The insurance shall be written by insurance companies with an A. M. Best rating of A- or better and on forms acceptable by OWNER.
F1.1 COMMERCIAL GENERAL AND UMBRELLA LIABILITY INSURANCE
CONTRACTOR shall maintain commercial general liability (CGL) and, if necessary, commercial umbrella insurance with a limit of not less than $2,000,000 each occurrence. If such CGL insurance contains a general aggregate limit, it shall apply separately to the Project.
F1.1.1 CGL insurance shall be written on ISO occurrence form CG 00 01 (or a substitute form providing equivalent coverage) and shall cover liability arising from premises, operations, independent contractors, products-completed operations, and personal injury and advertising injury.
F1.1.2 OWNER and KLH Engineers, Inc. shall be added by endorsement as named additional insureds under the CGL and under the commercial umbrella, if any. This insurance, FR-2 including insurance provided under the commercial umbrella, if any, shall apply as primary insurance with respect to any other insurance or self-insurance programs providing coverage to Owner and/or KLH Engineers, Inc. and shall at a minimum provide to Owner and KLH Engineers, Inc. the same coverage, as that provided to Contractor, including completed operations coverage and shall provide coverage to Owner and KLH Engineers, Inc. for any liability arising from or in any way related to Contractor’s work, regardless of any alleged or actual apportionment of negligence or liability.
F1.1.3 There shall be no endorsement or modification of the CGL limiting the scope of coverage for liability arising from pollution, explosion, collapse, or underground property damage.
F1.1.4 Waiver of Subrogation Contractor waives all rights against Owner and/or KLH Engineers, Inc. and their agents, officers, directors, and employees for recovery of damages to the extent these damages are covered by the commercial general liability or commercial umbrella liability insurance maintained pursuant to paragraph F.1 of this Agreement.
F1.1.5 Continuing CGL Coverage Contractor shall maintain commercial general liability (CGL) and, if necessary, commercial umbrella liability insurance, with a limit of not less than $2,000,000 each occurrence for at least 3 years following substantial completion of the Work.
F1.1.5.1 Continuing CGL insurance shall be written on ISO occurrence form CG 00 01 (or substitute form providing equivalent coverage) and shall, at minimum, cover liability arising from products-completed operations and liability assumed under an insured contract.
F1.1.5.2 Continuing CGL insurance shall have a products-completed operations aggregate of a least two times its each occurrence limit or provide aggregate limits per location/project.
F1.1.5.3 Continuing commercial umbrella coverage, if any, shall include liability coverage for damage to the insured’s completed Work equivalent to that provided under ISO form CG 00 01.
FR-3
F1.2 OWNERS AND CONTRACTORS PROTECTIVE LIABILITY INSURANCE
The Contractor shall maintain Owners and Contractors Protective Liability (OCP) insurance on behalf of Owner, as named insured, with a limit of $2,000,000.
F1.3 PA DOT PROTECTIVE LIABILITY INSURANCE
If applicable to the Project, Contractor shall maintain PA DOT protective liability insurance on behalf of Creswell Heights Joint Authority, as named insured with a limit of the bid amount.
F1.4 BUSINESS AUTO AND UMBRELLA LIABILITY
Contractor shall maintain business auto liability and, if necessary, commercial umbrella liability insurance with a limit of not less than $2,000,000 each accident.
F1.4.1. Such insurance shall cover liability arising out of any auto (including owned, hired and non-owned autos).
F1.4.2 Business auto coverage shall be written on ISO form CA 00 01, CA 00 05, CA 00 12, CA 00 20, or a substitute form providing equivalent liability coverage. If necessary, the policy shall be endorsed to provide contractual liability coverage equivalent to that provided in the 1990 and later editions of CA 00 01.
F1.4.3 If the Contract Documents require Contractor to remove and haul hazardous waste from the Project site, or if the Project involves such similar environmental exposure, pollution liability coverage equivalent to that provided under the ISO Pollution Liability-Broadened Coverage for Covered Autos Endorsement (CA 99 48) shall be provided, and the Motor Carrier Act Endorsement (MCS 90) shall be attached.
F1.4.4 Waiver of Subrogation Contractor waives all rights against Owner and its agents, officers, directors, and employees for recovery of damages to the extent these damages are covered by the business auto liability or commercial umbrella liability insurance obtained by Contractor pursuant to Paragraph F1.4 of this Agreement or under any applicable auto physical damage coverage.
F1.5 WORKERS COMPENSATION INSURANCE
Contractor shall maintain workers compensation and employers’ liability insurance.
FR-4
F1.5.1 The employees’ liability, and if necessary commercial umbrella, limits shall not be less than $2,000,000 each accident for bodily injury by accident or $2,000,000 each employee for bodily injury by disease.
F1.5.2 Where applicable, U.S. Longshore and Harborworkers compensation Act Endorsement shall be attached to the policy.
F1.5.3 Where applicable, Outer Continental Shelf Lands Act
Endorsement shall be attached to the policy.
F1.5.4 Where applicable, Maritime Coverage Endorsement shall be attached to the policy.
F1.6 PROPERTY INSURANCE
F1.6.1 Contractor shall purchase and maintain in force property insurance for the entire Work. Such insurance shall be written in an amount at least equal to the initial contract sum as well as subsequent modifications of that sum. The insurance shall apply on a replacement cost basis.
If the insurance obtained in compliance with this Paragraph F1.6 is builders risk insurance, coverage shall be written on a completed value form.
F1.6.2 The insurance as required in Subparagraph F1.6.1 shall include the interests of the Owner, Contractor, and all subcontractors and sub-subcontractors on the Project.
The insurance policy shall contain a provision that the insurance will not be canceled or allowed to expire until at least 30 days prior written notice has been given to Owner.
F1.6.3 The insurance as required in Subparagraph F1.6.1 shall cover the entire Work at the site identified in this Agreement and shall also cover portions of the Work located away from the site but intended for use at the site and shall also cover portions of the Work in transit. The policy shall include as insured property scaffolding, false work, and temporary buildings located at the site. The policy shall cover the cost of removing debris, including demolition as may be made legally necessary by the operation of any law, ordinance, or regulation.
F1.6.4 Contractor shall purchase and maintain boiler and machinery insurance if such equipment is part of the Work identified in this Agreement required by the contract
FR-5
documents or by law, covering insured objects during installation and until final acceptance by Owner. This insurance shall include the interests of the Owner, Contractor and all subcontractors and sub-subcontractors in the Work.
F1.6.5 The insurance as required by paragraph F1.6 shall be written to cover all risks of physical loss except those specifically excluded in the policy, and shall inure at least against the perils of fire, lightning, explosion, windstorm or hail, smoke, aircraft or vehicles, riot or civil commotion, theft, vandalism, malicious mischief, and collapse.
F1.6.6 Any deductible applicable to the insurance purchased in compliance with this Paragraph 6.6 shall be paid by Contractor.
F1.6.7 The insurance as required by this Paragraph F.6 shall be maintained in effect, unless otherwise provided for in the contract documents, until the earliest of the following dates:
(a) The date on which all persons or organizations who are insureds under the policy agree that it shall be terminated;
(b) The date on which final payment, as provided for in this Agreement, has been made;
(c) The date on which the insurable interests in the property of all insureds other than Contractor have ceased.
F1.6.8 Before the commencement of Work, Contractor shall provide to Owner a copy of the insurance policy obtained in compliance with this Paragraph F.6.
F1.6.9 Before the commencement of Work, Owner may declare to Contractor any decision on its part that the Owner will obtain any or all of the insurance coverage as required in this Paragraph F.6. Upon such declaration, Owner shall then have the right to obtain insurance equivalent in coverage to that required in this Paragraph F.6 and by appropriate change order, charge the cost of such insurance to Contractor.
F1.6.10 Waiver of Subrogation Owner and Contractor waive all rights against each other and each of their subcontractors, sub-subcontractors, officers, directors, FR-6 agents, and employees for recovery for damages caused by fire and other perils to the extent covered by builders’ risk or property insurance applicable to the Work.
F1.6.11 Partial occupancy or use of the Work shall not commence until the insurance company or companies providing insurance as required in this Paragraph F.6 have consented to such partial occupancy or use. Owner and Contractor shall take reasonable steps to obtain consent of the insurance company or companies, and agree to take no action, other than upon mutual written consent, with respect to occupancy or use of the Work that could lead to cancellation, lapse, or reduction of insurance.
F1.7 EVIDENCE OF INSURANCE
Prior to commencing the Work, Contractor shall furnish Owner with a certificate(s) of insurance, executed by a duly authorized representative of each insurer, setting out compliance with the insurance requirements set forth above.
F1.7.1 All certificates shall evidence the addition by endorsement of Owner and KLH Engineers, Inc. as “Additional Insured with respect to any claims and/or liability arising from, or in any way related to, the work performed by the insured, regardless of any alleged or actual apportionment of negligence or liability.”
F1.7.2 All certificates shall provide for 30 days written notice to Owner prior to the cancellation or material change of any insurance referred to therein.
F1.7.3 The words “endeavor to” and “but failure to mail such notice shall impose no obligation or liability of any kind upon the company, its agents or representatives” shall be deleted from the cancellation provision of all certificates provided by Contractor.
F1.7.4 Failure of Owner to demand such certificate or other evidence of full compliance with these insurance requirements or failure of Owner to identify a deficiency from evidence that is provided shall not be construed as a waiver of Contractor’s obligation to maintain such insurance.
F1.7.5 Owner shall have the right, but not the obligation, to prohibit Contractor or any subcontractor from entering the Project site until such certificates or other evidence that insurance has been placed in complete compliance with these requirements is received and approved by Owner.
FR-7
F1.7.6 Failure to maintain the insurance as specified shall constitute an event of default pursuant to the terms of this Agreement and shall allow Owner to terminate this Agreement at Owner’s option. If Contractor fails to maintain the insurance as set forth herein, Owner shall have the right, but not the obligation, to purchase said insurance at Contractor’s expense.
F1.7.7 With respect to insurance maintained after final payment in compliance with a requirement above, an additional certificate(s) evidencing such coverage shall be promptly provided to Owner when requested.
F1.7.8 Contractor shall provide certified copies of all insurance policies required above with 10 days of Owner’s written request for said copies.
F1.8 GENERAL INSURANCE PROVISIONS
F1.8.1 No Representation of Coverage Adequacy By requiring the insurance as set out in F. Insurance, Owner does not represent that coverage and limits will necessarily be adequate to protect Contractor, and such coverage and limits shall not be deemed a limitation on Contractor’s liability under the indemnities provided to Owner in this Agreement, or any other provision of the Contract Documents.
F1.8.2 Cross-Liability Coverage If Contractor’s liability policies do not contain the standard ISO separation of insureds provision, or a substantially similar clause, they shall be endorsed to provide cross-liability coverage.
F1.8.3 The insurance requirements set out in this specification are independent from all other obligations of Contractor under this Agreement and apply whether or not required by any other provision of this Agreement.
F1.8.4 Subcontractor’s Insurance Contractor shall cause each subcontractor employed by Contractor to purchase and maintain insurance of the type specified. When requested by Owner, Contractor shall furnish to Owner copies of certificates of insurance evidencing coverage for each subcontractor.
FR-8
F2 Photographs Pre-construction and post construction video (DVD) records are required and are essential to completion of this project. Pre-construction photographs (CD) and video (DVD) shall be submitted with the shop drawing submittals. No payment shall be made until all preconstruction photographs and video (DVD) are provided to the OWNER. All photographs shall be submitted printed bound and in DVD and/or CD format.
CONTRACTOR shall take all still photographs of areas prior to, during, and at completion of project. Photographs are to be, identified and cataloged with a site plan indicating where the photograph was taken and which direction it was shot with a date and time stamp. Any notes the CONTRACTOR deems necessary should also be included on the photograph or on the photograph log.
CONTRACTOR shall video work area prior to, and at completion of the project. Documentation shall be color DVD format. Discs shall be submitted labeled (typewritten) as to their location, date and time of information filmed. All DVDs shall be numbered referenced to contract drawings identifying location and contract drawing number and shall include close inspection of all equipment, structures, and improved areas to be disturbed by construction activities, especially streets, roads, lanes, driveways, bridges, streams, improved scrubbed/planting bed, and lawns. Improved lawns are areas regularly maintained by a property owner regardless of the number of trees. Pre-construction video tapes of all construction through unimproved areas are required and shall be submitted prior to work commencing through those areas and shall include video along the alignment of the construction stake out and identify topographic features/wooded areas to be disturbed.
All videos and photographs taken during, or post construction shall be submitted at the conclusion of the project to the OWNER and will become the property of the OWNER.
F3 Requirements of Hopewell Township The CONTRACTOR shall obtain a permit for work in Hopewell Township roads. OWNER shall assist the CONTRACTOR in obtaining the permit. The work shall be in accordance with the requirements of Hopewell Township. There is no permit fee required. The CONTRACTOR shall provide Hopewell Township with a $12,500.00 maintenance bond guaranteeing the condition of the road(s) for twenty-four (24) months. This maintenance bond is for the sole purpose of meeting the requirements of the Township and shall have no bearing on the other bonds required in these Contract Documents.
FR-9
F4 Construction Inspection The day-to-day inspection work on this project will be performed by a Project Representative directly employed by the OWNER and/or the ENGINEER. Each contractor's superintendent shall coordinate all construction activities with that individual who shall refer such matters as he deems necessary to the OWNER and the ENGINEER, or others, as circumstances may be required.
F5 Progress Meetings on the Job Site Periodic job progress meetings will be scheduled on at least a monthly basis for the purpose of coordinating the work of all contractors, reconciling construction problems and/or discussing any other project related matters. The ENGINEER will call those meetings with advance notification of several days.
CONTRACTOR's superintendents and/or other authorized administrative personnel will be expected to be present.
F6 Prevailing Minimum Wage Predetermination The Pennsylvania State Department of Labor and Industry has made a minimum wage determination applicable to all construction work performed under this project. The "Decision of the Secretary";
the Contractor's or Subcontractor's Weekly Payroll Certification for Public Works Projects" form (which will be required to be properly sworn and submitted weekly to the OWNER during the Progress of the work); and the "Prevailing Minimum Wage Predetermination" dated, February 17, 2026, follows Section F.
F7 Contract Close-out Documents Upon completion of the contract, the CONTRACTOR and/or Contractor's surety shall be required to complete the following documents appended on Pages F-13 through F-17:
Affidavit of Payment and Release of Liens Acceptance of Final Payment and General Release Consent of Surety Company to Final Payment
F8 Claims for Damages Under this Contract, the CONTRACTOR shall not be entitled to seek additional compensation for delays, loss of anticipatory profits, or consequential damages.
F9 OWNER's Right of Audit If a claim arises by the CONTRACTOR against the OWNER, the OWNER shall have access to all of the CONTRACTOR's books and records for auditing. The CONTRACTOR shall be required to maintain accurate books and records regardless of whether any claims arise.
FR-10
F10 Substantial Completion The CONTRACTOR is hereby notified that the Contract Technical Specifications are specific to construction of the Contract No.
2026-01 and to that end, the interpretation for Substantial Completion for this Contract is a point where the whole of the work for all items specified in Section G, herein, have reached a point whereby the OWNER and/or ENGINEER recognize that all parts of the specified work have progressed for utilization for the purposes which it is intended.
F11 Right-to-Know The Pennsylvania Right-to-Know Law (the "RTKL"), 65 P.S, §§ 67.101-3104, applies to this Agreement.
Unless the Contractor provides the Owner, in writing, with the name and contact information of another person, the Owner shall notify the Contractor using the information provided by the Contractor in the contact information provided in this Agreement if the Owner needs the Contractor’s assistance in any matter arising out of the RTKL. The Contractor shall notify the Owner in writing of any change in the name or the contact information within a reasonable time prior to the change.
Upon notification to the Contractor that the Owner has received a request for records under the RTKL, the Contractor shall fully assist the Owner in responding to the request. Such assistance shall include providing the Owner within three (3) days, access to, and copies of, any document or information arising out of the Agreement in the Contractor’s possession that the Owner deems a Public Record (“Requested Information”) and providing such other assistance as the Owner may request in order to comply with the RTKL. If the Contractor is unable to provide the Requested Information within three (3) days for one of the reasons specified in the RTKL, the Contractor must immediately notify the Owner that it will need up to an additional twenty-five (25) days and must provide in writing the reason the additional time is needed. If the Contractor fails to provide the Requested Information to the Owner within the period specified in this provision, the failure shall be considered an event of default and the Contractor shall pay, indemnify, and hold the Owner harmless for any damages, penalties, detriment, or harm that the Owner may incur as a result of the Contractor’s failure. If the Office of Open Records or the Pennsylvania Courts determines that a record in the possession of the Contractor is a public record, liquidated damages of $200 per day will be assessed for each calendar day beyond the date the Contractor was required to provide the record by the Office of
FR-11
Open Records, or upon appeal, the Pennsylvania Courts.
The Owner’s determination as to whether the Requested Information is a public record is dispositive of the question as between the parties. Contractor agrees not to challenge the Owner’s decision to deem the Requested Information a Public Record. If the Contractor considers the Requested Information to be a Trade Secret or Confidential Proprietary Information, as those terms are defined by the RTKL, the Contractor will immediately notify the Owner as such, and will provide a written statement signed by a representative of the Contractor explaining why the requested material is exempt from public disclosure under the RTKL within five (5) days of being notified of the request by the Owner. If, upon review of the Contractor’s written statement, the Owner still decides to provide the Requested Information, Contractor will not challenge or in any way hold liable the Owner for such a decision.
The Owner will reimburse the Contractor for any costs associated with complying with this provision only to the extent allowed under the fee schedule established by the Office of Open Records or as otherwise provided by the RTKL if the fee schedule is inapplicable.
Contractor agrees to abide by any decision to release a record to the public made by the Office of Open Records, or by the Pennsylvania Courts. The Contractor agrees to waive all rights or remedies that may be available to it as a result of the Owner’s disclosure of Requested Information pursuant to the RTKL. Contractor’s duties relating to the RTKL are continuing duties that survive the expiration of this Agreement and shall continue as long as the Contractor has Requested Information in its possession.
End of Section F Supplemental General Conditions
FR-12
THIS PAGE LEFT INTENTIONALLY BLANK
FR-13
AFFIDAVIT OF PAYMENT
AND
RELEASE OF LIENS
TO:
I hereby certify that, to the best of my knowledge, all outstanding claims and indebtedness of any nature resulting from the performance of my contract have been fully paid, except for the following:
I hereby deliver to the OWNER, a complete release of all liens arising out of this Contract for unpaid material and labor, or other costs.
ATTEST: CONTRACTOR:
______________________ By __________________________
Title _______________________
FR-14
Commonwealth of Pennsylvania)
) SS:
County of )
Before me a Notary Public in and for said County and Commonwealth, personally agreed ____________________ who, being duly sworn according to law, deposes and says that the facts set forth in the foregoing Affidavit and Release are true and correct to the best of his/her knowledge, information and belief.
Sworn to and subscribed before me this
_____ day and ______________, 20____.
Notary Public
My Commission Expires:
Commonwealth of Pennsylvania)
) SS:
County of )
____________________, being duly sworn according to law, deposes and says that he/she is the _______________________ of
________________________________________________________________, a
Pennsylvania Corporation, and that he/she makes this Affidavit on its behalf, being authorized to do so; and that the facts set forth in the foregoing Affidavit and Release are true and correct to the best of his/her information, knowledge and belief.
____day of ___________________, 20___.
FR-15
ACCEPTANCE OF FINAL PAYMENT
AND
GENERAL RELEASE
KNOW ALL MEN BY THESE PRESENTS, THAT ___________________________
Contractor, of ___________________________________ Pennsylvania, by its acceptance of Final Payment of __________________ Dollars
($______________), to it in hand paid by ____________________ the receipt of which is hereby acknowledged, has remised, released, quit-claimed, and forever discharged, and by these presents for it, its successors and assigns, does remise, release, quit-claim and forever discharge, the said
_______________________ its successors and assigns, from all action and all manner of action, cause and causes of action, suits, debts, duties, sum or sums of money, variances, damages, claims and demands whatsoever, in law or equity or otherwise, which against _________________________________ it ever had, now has, or which it, its successors or assigns, hereafter can, shall, or may have, for or by reason of a certain contract between __________________________________ and _________________
__________________________ dated ________________________, designated as Contract ________________, _______________________
No payment, however, final or otherwise shall operate to release
_________________________________________, or its sureties from any obligation under said contract or under the Performance, Payment, and Maintenance Bonds furnished to the OWNER by it, under said contract.
ATTEST: CONTRACTOR:
________________________ By ______________________________
(SEAL) Title
FR-16
Commonwealth of Pennsylvania)
) SS:
County of )
Before me a Notary Public in and for said County and Commonwealth, personally agreed ____________________ who, being duly sworn according to law, deposes and says that the facts set forth in the foregoing Affidavit and Release are true and correct to the best of his/her knowledge, information and belief.
_____ day and ______________, 20____.
Commonwealth of Pennsylvania)
) SS:
County of )
____________________, being duly sworn according to law, deposes and says that he/she is the _______________________ of
_____________________________________________________________, a
Pennsylvania Corporation, and that he/she makes this Affidavit on its behalf, being authorized to do so; and that the facts set forth in the foregoing Affidavit and Release are true and correct to the best of his/her information, knowledge and belief.
Sworn to and subscribed before me this
____day of ___________________, 20___.
FR-17
CONSENT OF SURETY COMPANY TO FINAL PAYMENT
Bond No. _________________
Project ___________________________________
OWNER: __________________________________
CONTRACTOR: ________________________________
In accordance with the provisions of the Contract between the OWNER and CONTRACTOR as indicated above, the
(insert name and address of Surety Company)
_____________________________________, Surety Company, on bond of
(insert name and address of Contractor)
_____________________________________, CONTRACTOR, hereby approves of the final payment to the CONTRACTOR, and agrees that final payment to the CONTRACTOR shall not relieve the Surety Company of any of its obligations to:
(insert name and address of OWNER)
_____________________________________, OWNER, as set forth in the said
Surety Company's Bond.
IN WITNESS WHEREOF,
the Surety Company has hereunto set its hand this _____ day of _______ 20
Surety Company
Signature of Authorized Representative
ATTEST: ____________________________________
(SEAL) Title
FR-18
THIS PAGE LEFT INTENIONALLY BLANK
Not to scale Standard Detail SD-041
TRACE WIRE DETAIL
DRILL A HOLE 4 1/2"
FROM THE TOP OF
THE VALVE BOX
COIL ENOUGH WIRE
TO EXTEND 36"
ABOVE GROUND
KNOT
VALVE
CONNECT WITH APPROVED
DIRECT BURY LUG
VALVE BOX
SPIRAL TRACE WIRE
UP ON THE OUTSIDE
OF THE VALVE BOX
POLYWRAP
FINISHED GRADE
DIRECT BURY
WIRE NUT CONNECTION
KNOT
APPROVED
DIRECT BURY WIRE
CONNECTION
VALVE BOX
IF NEEDED
WIRE COLOR TO
MATCH UTILITY
INSTALLED
April 2022
3961 Jordan Street
CRESWELL HEIGHTS JOINT AUTHORITY
South Heights, Pa. 15081
| 318-57_2026-01 Addendum No. 1 |
| 318-57 Agnew_2026-01_07_Section F |
| F7 Contract Close-out Documents |
| F8 Claims for Damages |
| F9 OWNER's Right of Audit |
| Supplemental General Conditions |
| AND |
| RELEASE OF LIENS |
| ACCEPTANCE OF FINAL PAYMENT |
| sd-041-SD-041 |
| Sheets and Views |
| sd-041-SD-041 |