This is a Kansas Department of Transportation (KDOT) Highway Permit (1-2026-1125) issued to the City of Olathe for fiber optic communications network relocation associated with the planned I-35/Santa Fe Street interchange reconstruction project. The City of Olathe proposes to install new underground fiber optic conduit, 288-count fiber optic cable, junction boxes, splice enclosures, tracer wire, and related facilities to establish a new communications route outside the future interchange construction limits. The project includes installation of new fiber optic conduit and cable along the west side of Rogers Road adjacent to I-35 and installation of new fiber optic cable within existing conduit crossing I-35 on the 127th Street bridge. Construction will consist primarily of directional boring with existing conduit utilized where available. Handholes are to be Type III 24" x 36". The permit was approved on October 7, 2026, and expires on January 5, 2027. All work must be completed within 90 calendar days of approval. Contractors must notify KDOT Utilities Coordinator Kort StClair at least one working day prior to starting work.
The permittee must provide GPS documentation for all installed, existing, and modified devices and facilities within KDOT right-of-way, with coordinates recorded to a minimum of six decimal places and accuracy within three feet. GPS data shall be collected at intervals not exceeding 100 feet for trenched or plowed conduit and 20 feet for bored conduit. The contractor must maintain General Liability insurance with a minimum combined single limit of $2,000,000, Worker's Compensation insurance complying with Kansas Statute, and Automobile Liability insurance with a minimum combined single limit of $1,000,000. Key stipulations include that Olathe Fiber and Lumen contractors shall not work simultaneously, and the City of Olathe assumes all risk and liability for the fiber installation within the construction limits. All work must comply with KDOT Utility Accommodation Policy and applicable standards. The petitioner is responsible for all costs associated with the project, including right-of-way restoration, maintenance of installed facilities, and removal or abandonment of facilities upon permit expiration.
View the file
Other files
Show 40 more
Latest 50 of 54 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
121 S.W. 21st Street Topeka, KS 66612
Phone: 785-296-3881 Fax: 785-296-1162 kdot#publicinfo@ks.gov http://www.ksdot.org
Laura Kelly, Governor
October 7, 2026
Attached is your approved copy of the above referenced Highway Permit granting permission to The City of Olathe proposes to relocate and reroute portions of its fiber optic communications network in advance of the planned I-35/Santa Fe Street interchange reconstruction project. The project includes installation of new underground fiber optic conduit, 288-count fiber optic cable, junction boxes, splice enclosures, tracer wire, and related facilities to establish a new communications route outside the future interchange construction limits. The improvements will maintain continuous operation of the City's traffic signal and communications network during interchange construction while providing a permanent fiber optic alignment for the corridor.
Work within KDOT right-of-way includes installation of new fiber optic conduit and cable along the west side of Rogers Road adjacent to I-35 and installation of new fiber optic cable within existing conduit crossing I-35 on the 127th Street bridge. Construction will consist primarily of directional boring, with existing conduit utilized where available. Handholes to be Type III 24" x 36".
KSC & MM 9/30/26: With this fiber line going in after KDOT's advertisement of the 35-46 KA 6540-05 I-35 project and being in the construction limits, there will be a few stipulations put in the permit. There will be locates given to depths and we will not want Olathe Fiber and Lumen working at the same time.
We will state in the KDOT I-35 Prebid meeting today that if the contractor does not negligently hit the Olathe Fiber that the work to do any repairs will be on Olathe, since we at this time plan to approve the location of the Olathe Fiber. Olathe will be taking the risk on the installation inside the construction limits.
The Contractor shall provide GPS documentation for all installed, existing, and modified devices and facilities within KDOT right-of-way, including pull boxes, splice vaults, junction boxes, conduit runs, and cable runs. GPS coordinates shall be recorded as latitude and longitude in decimal degrees to a minimum of six decimal places. GPS data shall be collected using equipment capable of submeter accuracy, with GPS readings accurate to within 3 feet.
The Contractor shall document all GPS locations using an Excel spreadsheet and provide GPS-enabled photographs of all structures. Submit the completed package to KDOT including the spreadsheet in Excel format and a PDF copy. If available, also submit GIS-compatible files, such as shapefiles, KMZ files, or other applicable geospatial file formats, with associated photographs.
For conduit runs, GPS coordinates shall be collected at intervals not exceeding 100 feet for trenched or plowed conduit and 20 feet for bored conduit. At a minimum, documentation for each GPS point shall include the latitude and longitude; associated structure or facility and its size; depth below ground level; and elevation relative to the applicable datum.. This permit expires 1/5/2027.
City of Olathe 1385 S Robinson Drive, Olathe, KS 66061
Dear Sir/Madam:
Highway Permit 1-2026-1125 Route I-35 JOHNSON County
Michael E. Rinehart, P.E., District Engineer
District 1
Calvin E. Reed, P.E., Secretary
Date: 10/7/2026 4:07 PM Angel Fitzgerald District Coordinator
Once you have downloaded your permit, please notify our Utilities Coordinator, "Kort StClair" using our Kansas Utilities Permit System at least one working day prior to starting any work on the highway so that arrangements can be made for the necessary inspection.
When you commence the work authorized by this permit, it will signify that you agree to any and all changes, additions and/or stipulations made to the original request and attachments. Contractors performing the work will be advised of the requirement to ensure work conforms to this permit. The work performed on the KDOT right of way will be strictly in accordance with this approved permit. Deviation from this permit with attachments (unless approved by KDOT prior to construction) will be cause for non-acceptance of the work and remedial action.
When you have completed all work connected with this permit, please let them know so that the permit can be released.
Yours Truly, Attachment c: File Dale Kirmer – via email Kort StClair – via email Angel Fitzgerald – via email
Michael E. Rinehart, P.E., District Engineer
THIS AGREEMENT, made and entered into, between the Secretary of Transportation of the State of Kansas, referred to as
“Secretary” and
KANSAS DEPARTMENT OF TRANSPORTATION
Bureau of Maintenance
HIGHWAY PERMIT
USE OF RIGHT OF WAY
Route I-35
Co. JOHNSON
City Olathe
913-971-9245
City of Olathe
Name of Firm or Individual)
9139719245
(Tel. No.)
Olathe
1385 S Robinson Drive , Olathe KS 66061
Address referred to as “Petitioner” and the City of, City Name or N/A
, referred to as “City”.
Secretary has jurisdiction over highway right-of-ways within the State Highway System of Kansas, and
Secretary (and City) believe it is in the interest of the Citizens of the State of Kansas to permit certain work or projects to be performed upon Highway right-of-ways, and
Petitioner requests permission and authority from Secretary (and City) to perform certain work, described as follows:
The City of Olathe proposes to relocate and reroute portions of its fiber optic communications network in advance of the planned I-35/Santa Fe Street interchange reconstruction project. The project includes installation of new underground fiber optic conduit, 288-count fiber optic cable, junction boxes, splice enclosures, tracer wire, and related facilities to establish a new communications route outside the future interchange construction limits. The improvements will maintain continuous operation of the City's traffic signal and communications network during interchange construction while providing a permanent fiber optic alignment for the corridor.
Work within KDOT right-of-way includes installation of new fiber optic conduit and cable along the west side of Rogers Road adjacent to I-35 and installation of new fiber optic cable within existing conduit crossing I-35 on the 127th Street bridge. Construction will consist primarily of directional boring, with existing conduit utilized where available. Handholes to be Type III 24" x 36".
KSC & MM 9/30/26: With this fiber line going in after KDOT's advertisement of the 35-46 KA 6540-05 I-35 project and being in the construction limits, there will be a few stipulations put in the permit. There will be locates given to depths and we will not want Olathe Fiber and Lumen working at the same time.
We will state in the KDOT I-35 Prebid meeting today that if the contractor does not negligently hit the Olathe Fiber that the work to do any repairs will be on Olathe, since we at this time plan to approve the location of the Olathe Fiber. Olathe will be taking the risk on the installation inside the construction limits.
The Contractor shall provide GPS documentation for all installed, existing, and modified devices and facilities within KDOT right-of-way, including pull boxes, splice vaults, junction boxes, conduit runs, and cable runs. GPS coordinates shall be recorded as latitude and longitude in decimal degrees to a minimum of six decimal places. GPS data shall be collected using equipment capable of submeter accuracy, with GPS readings accurate to within 3 feet.
The Contractor shall document all GPS locations using an Excel spreadsheet and provide GPS-enabled photographs of all structures. Submit the completed package to KDOT including the spreadsheet in Excel format and a PDF copy. If available, also submit GIS-compatible files, such as shapefiles, KMZ files, or other applicable geospatial file formats, with associated photographs.
For conduit runs, GPS coordinates shall be collected at intervals not exceeding 100 feet for trenched or plowed conduit and 20 feet for bored conduit. At a minimum, documentation for each GPS point shall include the latitude and longitude; associated structure or facility and its size; depth below ground level; and elevation relative to the applicable datum.
Emergency Contact Leslie Donnelly
Point # Label Latitude Longitude Main Line Mile Point Offset
Emergency Phone
Each crew or subcontractor working off of this permit must have a copy of the permit in their vehicle with them at any time they are working, and proof that proper notification was given to the appropriate KDOT representative. Proper notification must be given to the appropriate KDOT representative shown on the attached list at least 1 working day prior to starting each work instance on the highway right-of- way. Any work encountered without proof of prior notification or an approved permit will be shut down.
Traffic Control Devices and Safety Vests will be Utilized on KDOT Right-of-Way.— All “New Installations” are Required to have a Permit issued.— All work shall be within 7’ from KDOT R\W line.— All cable will be placed at a minimum depth of 42”.— Petitioner will use recognized best practices for soil erosion control.—
Conditions:
Notifying the appropriate KDOT representative at least 1 day prior to starting work on the highway right of way is MANDATORY. Work encountered without prior notification will be shut down and right of way vacated.
*** Permit may be REVOKED. ***
Permit 1-2026-1125
Said work is located on public right-of-way in, upon or along State Highway Route I-35 , Reference Point 218.32
(or City Connecting Link Route Olathe RangeI-35 on St. in Sec. TWP
Secretary has delegated full and complete authority to the District Engineers of the Kansas Department of Transportation (KDOT) to execute Highway Permit Agreements, referred to as “Permits,” for and on Secretary’s behalf.
In consideration of the permission granted by the Secretary (and City) to utilize Highway right-of-way(s) in the manner described above, the following terms and conditions are mutually agreed to by the Petitioner, the Secretary (and the City).
1.0 PLANS: Petitioner shall furnish two (2) sets of comprehensive plan sets or detailed drawings 11” x 17”, and/or electronic pdf copy of the proposed work. Sketches, cut sheets, and/or documentation may be submitted on 8 1/2" x 11".
1.1 Plans for utility installations must include a description of the size, type, and method of installation for the proposed Facilities to be located within highway right-of-ways, and adequate detailed drawings indicating the location of the proposed installation with respect to the traveled way of the highway, the right-of-way lines and, where applicable, the control of access lines,
1.2 An accurate “As Built” Construction Plan shall be provided for deviation from the approved Plan.
2.0 MATERIAL AND METHODS: All requests to perform work in, upon or along Highway right-of-ways must be approved by the District Engineer (and City).
In Cities, Petitioner will obtain additional Permits, as required by City.
2.1 The Petitioner shall furnish all material, do all work and pay all costs for the work described on this Permit,
2.2 All utility installations shall comply with the conditions and applicable requirements of the KDOT Utility Accommodation Policy, current edition, which is incorporated by reference in its entirety (and City standards when they exceed those of KDOT).
2.3 Drainage structure requirements shall be determined by Petitioner, but requirements are subject to review and approval by the District Engineer (and City).
2.4 All materials and construction methods used on work within the limits of the right-of-way shall meet or exceed the requirements of the “Standard Specifications for State Road and Bridge Construction,” current edition. The Standard Specifications are available at www.ksdot.org.
3.0 INITIATION AND COMPLETION OF WORK: Petitioner agrees to notify the District Engineer (and City) or their duly authorized KDOT representative Kansas Dept. of Transportation,9139423135 Kort.StClair@ks.gov before work is initiated and again when the work is completed.
3.1 An approved signed copy of this Permit shall be on the premises at the start and during the period any work is performed.
3.2 All-work, including right-of-way restoration, shall be completed within 90 calendar days of APPROVAL DATE, otherwise this Permit is rescinded. If work has not been started within the completion time, this Permit becomes null and void.
4.0 INSPECTION: Petitioner will be responsible for supervising construction to insure compliance with KDOT (and City) policies and standards.
5.0 ACCEPTANCE: KDOT will be responsible for acceptance of restored right-of-way.
6.0 RIGHT-OF-WAY: Except for authorized changes, Petitioner shall restore the right-of-way to a condition equal to or better than existed prior to approval of the work described on this Permit.
6.1 Any sod, shrubs or trees destroyed by this work shall be replaced as directed by the District Engineer (and City).
6.2 The right-of-way shall be kept free from parking, advertising signs or any other commercial activity.
7.0 OBSTRUCTION OF TRAFFIC: Petitioner shall ensure highway (and connecting link) traffic will be free of interference unless specifically provided for as a part of this Permit. All temporary traffic control devices and their installation and maintenance shall comply with the latest edition of the Manual on UniformTraffic Control Devices (MUTCD for streets and highways which has been adopted by the Secretary). Whenever the temporary Traffic Control Standards conflict with the MUTCD, the Standards shall govern. Workers shall wear approved safety vests according to 23 CFR Part 634, Worker Visibility.
8.0 MAINTENANCE: All utility installations shall be maintained or caused to be maintained by Petitioner.
9.0 PERMIT REVOCATION: In lieu of bond, Secretary may revoke the permit and remove any work performed. The Petitioner shall reimburse the Secretary for any cost incurred by Secretary to restore the right-of-way. The Secretary will not authorize any other highway permits until Petitioner has either reimbursed Secretary or restored the right-of-way.
10.1 LIABILITY: Petitioner shall indemnify and hold harmless Secretary from personal injury and property damage claims arising out of any act or omission of Petitioner. If Secretary defends a third party’s claim, the Petitioner shall indemnify Secretary for personal injury damages, property damages and related expenses Secretary incurs arising out of Petitioner’s act or omission. For purposes of this provision, the term Petitioner includes Petitioner’s employees, agents, subcontractors (at any tier), suppliers (at any tier), successors, and assigns.
10.2 INSURANCE: Liability Insurance. Petitioner shall carry “General Liability” insurance under an occurrence policy that has a minimum combined single limit of $2,000,000 for personal injury and property damage and that contains the following coverage: Comprehensive Form, Premises-Operation, Underground Hazard, Products/Completed Operations Hazard, Contractual Insurance, Broad form Property Damage, Independent Contractors, and Personal Injury. Worker’s Compensation: Petitioner shall carry “Worker’s Compensation and Employer’s Liability” insurance that complies with Kansas Statute. Automobile Liability:
Petitioner shall carry “Automobile Liability” insurance under an occurrence policy that has a minimum combined single limit of $1,000,000.00 for personal injury and property damage and that contains the following coverage: Comprehensive Form, Owned, Hired, and Non-Owned.
10.3 “Certificate of Insurance”. This permit shall not take effect unless Petitioner provides Secretary a "Certificates of Insurance" confirming Petitioner carries insurance in the amounts and type this section requires. Petitioner shall obtain insurance only from insurers on the approved Federal Treasury List and authorized by the Kansas Commissioner of Insurance. The “Certificates of Insurance” shall include a clause requiring the insurer to notify Secretary thirty (30) calendar days in advance of cancellation of the insurance contracts.
10.4 Petitioner shall maintain the insurance required in Section 10.1 until the District Engineer releases the Petitioner from any Permit obligation.
11.0 DAMAGE TO UTILITIES: KDOT shall not be liable for damage to any utility not installed in the location authorized by any permit or agreement issued pursuant to the Utility Accommodation Policy.
County,JOHNSON Miles (direction) from (Jct. or county line) and
FO
1 38.88943 -94.78912 0461000350000000 218.32 92.94
2 38.89048 -94.78890 0461000350000000 218.4 61.74
3 38.89257 -94.78828 0461000350000000 218.54 52.42
4 38.89462 -94.78746 0461000350000000 218.69 35.33
5 38.89559 -94.78676 0461000350000000 218.72 73.24
Details: aerial = "Underground", crossing = "Encroachment", relocate = "N", temporary = "N", numberOfConduits = "1", conduitDiameter = "2", conduitMaterial = "HDPE", fibersPerCable = "288", installationMethod = "Bore", depth = "72", lengthOfInstallation = "2350", Tracer = "Y", roadSide = "West of Rogers Road", ROWMarker = "N", cellAntenna = "N", attachedToBridge = "N
12.1 PIPELINE LIABILITY: For attachments to bridges or other structures and for roadway crossings of PIPELINES CARRYING PETROLEUM, HAZARDOUS AND/OR CORROSIVE PRODUCTS, Petitioner shall solely assume all risk and liability for accidents and damages that may occur to persons, property or natural resources by reason of the operation of the pipeline attached to said bridge, structure or crossing of roadway.
12.2 Petitioner shall maintain the insurance required in Section 9.0 for as long as the pipeline remains attached to the bridge or other structure or for as long as the pipeline crosses the roadway. The insurance contract shall cover claims for such length of time as the law permits such claims.
13.0 ENVIRONMENTAL LIABILITY AND INDEMNIFICATION: Petitioner shall comply with all applicable federal, state, and local statutes, regulations and ordinances relating to environmental protection, and health and safety in Petitioner's acts on, or occupation of, the Highway right-of-way(s). Petitioner assumes all risk and liability for, or resulting from, any environmental condition on, at, or leaving the Highway(s) caused by or arising out of Petitioner's, or its agents' or contractors' acts, omissions, or occupation, in whole or in part, of the Highway right-of-way(s). Petitioner shall hold harmless and indemnify the Secretary against all liability, cost, expense, and fines incurred by or levied against the Secretary under any federal, state or local environmental law, regulation, or ordinance resulting from Petitioner's breach of this paragraph or as a result of Petitioner's acts or occupation of the Highway right-of-way(s) pursuant to this Permit. For purpose of this provision, the term Petitioner includes Petitioner's employees, agents, subcontractors (at any tier), suppliers (at any tier), successors and assigns.
14.0 HIGHWAY IMPROVEMENTS AND/OR MAINTENANCE: If Secretary makes any alteration or improvement along or upon the highway right-of-way which is the subject of this Permit, Petitioner shall hold Secretary harmless for any and all damage or injury to Petitioner’s Facilities, whether finished or unfinished, as well as damage or injury to Petitioner’s equipment, materials, employees, agents or contractees. Petitioner shall conduct all work approved on this permit in such a manner as not to interfere with construction or other work being performed by the KDOT (or City) or its contractors in the vicinity of Petitioner’s work or project.
14.1 Within a reasonable time after receiving written notice from Secretary that Petitioner's Facilities are in conflict with KDOT's new construction or major maintenance operations, Petitioner shall alter, change location or move their construction work or Facilities without cost or expense to the Secretary. If Petitioner fails to relocate their Facilities within a reasonable time, KDOT may move the Facilities. Except for Rural Water Districts meeting the requirements of K.S. A. 68-415(c), Petitioner shall reimburse KDOT for the costs of relocating the Facilities upon receipt of an itemized statement. (See, K.S.A. 68- 415). Petitioner shall reimburse KDOT for any construction costs, claims or expenses KDOT incurs as a result of Petitioners failure to timely relocate the Facilities.
14.2 Written notice will not be required for KDOT's normal maintenance.
15.0 ABANDONED OR RETIRED IN PLACE: Petitioner shall notify Secretary when the Facilities will be abandoned or retired in place and shall submit a plan for abandonment or retirement in place to the District Engineer or designee for review and approval. Petitioner shall remove or abandon the Facilities in place in accordance with the approve plan. Petitioner shall pay all costs associated with removal of abandoned or retired in place upon highway right-of-way Facilities.
This Permit is hereby accepted and its provisions agreed to by the Parties.
Linked Permits
Record No Status Created Date 1-2026-1168 Approved 9/23/2026
Petitioner
Date
9/9/2026 8:59 AM
Printed Name and Title
Leslie Donnelly
Signature
Email ledonnelly@olatheks.org
Cell/Mobile NumberPhone Number
9139719245
City
Date
9/9/2026 9:04 AM
Printed Name and Title
Brent Berry
Signature
Email bberry@olatheks.org
Cell/Mobile NumberPhone Number
913-971-8532
Area Engineer
Date
10/2/2026 11:18 AM
Printed Name and Title
Kort StClair
Signature
SECRETARY OF TRANSPORTATION OF THE STATE OF
KANSAS
Date
10/7/2026 4:07 PM
Printed Name and Title
Angel Fitzgerald (District Coordinator) sign for District Engineer
Signature
INTERSTATE
P l o t t e d o n x
.p e n j p a p e r i
S
E P
:5
A
M
R E
F E
R E
N C
E S
N O
T E
D
R E
F E
R E
N C
E S
C H
E C
K E
D
D A
T E
B Y
P l o t S c a l e
:1 s f e F i b e r T i t l e S h e e t .d g n
F i b e r C o v e r S h e e t
STATE
KANSAS 35-46 KA-6364-02
PROJECT NO.
YEAR SHEET NO.
SHEETS
TOTAL
DEPARTMENT OF TRANSPORTATION
PLAN AND PROFILE OF PROPOSED
STATE HIGHWAY
STATE OF KANSAS
JOHNSON COUNTY
INDEX OF SHEETS
FEDERAL AID PROJECT
SCALE
PLAN: Lat. & Long.
600' 1200'600' 0
CITY OF OLATHE PROJECT NO. 3-C-025-18
KDOT PROJECT NO. 35-46 KA-6364-02
FEDERAL AID NO. STP-A636(402)
I-35 AND SANTA FE STREET
STANDARD LEGEND
DND
12" W
AtmosÜ
8" SAN
"COMPANY"
L.P.
F.H.
DATEJACOB PAPERI, P.E.
1-800-DIG-SAFE
FIBER OPTIC INTERCONNECT
APPROVED BY:
CITY OF OLATHE, KANSAS
CITY ENGINEER
NATE BALDWIN, P.E.
OVERLAND PARK, KANSAS
PREPARED & SUBMITTED BY:
SANTA FE ST.
M U
R -L
E N R
D
K A
N S
A S C
IT
Y R
D
R O
G E R S R
D
C L
A I R
B O
R N
E R
D
L I N
D E
N W
O O
D D
R
129th ST.
9-12
2-7
TRAFFIC CONTROL DETAILS
FIBER OPTIC DETAIL
FIBER OPTIC PLANS
TITLE SHEET
SANTA FE ST.
127th ST.
S H
E E T
S H
E E T
S H
E E T
SHEET 4
SHEET 4
SHEET 5
SHEET 6
ð
XXXX TO BE REMOVED / ABANDONED
UNDERGROUND TELECOM
EXISTING SANITARY LINE
EXISTING GAS LINE
EXISTING WATER LINE
STREAM OR FLOWLINE
EDGE OF WOODS
EXISTING TREES
WATER HYDRANT
LIGHT POLE
EXISTING STORM SEWER
POWER POLE
EXISTING SIGN
APPROXIMATE CONSTRUCTION LIMITS
EXISTING FENCE
CITY LIMIT
EXISTING RIGHT-OF-WAY
ACCESS CONTROL
PROPERTY LINE
DO NOT DISTURB
DRAWINGS AND ANY ACCOMPANYING SPECIFICATIONS.]
USE IN ANY OTHER MANNER EXCEEDS THE INTENDED PURPOSE OF THESE
[THIS DESIGN SPECIFICALLY PREPARED FOR USE AT THE LOCATION SHOWN.
damage thereto.
of underground utilities as may be necessary to avoid making their own verification as to the type and location underground utility lines prior to any excavation and for for contacting all utility companies for field location of all accurate or all inclusive. The Contractor is responsible location of underground utilities is not guaranteed to be
The information shown on this drawing concerning type and
NOTE:
SHEET 7 SHEET 7
SHEET 5
S O
M E
R S
E T T
E R
R A
C E
M O
O R E A
V E
RECAPITULATION OF QUANTITIES
ITEM NO. ITEM UNIT TOTAL
1 Mobilization LS 1
2 Contractor Construction Staking LS 1
3 Traffic Control LS 1
4 Fiber Optic Interconnect Installation LS 1
9-3-2026
KANSAS DEPARTMENT OF TRANSPORTATION
P l o t t j p a p e r i
S
E P
:4
P
M
P l o t T a b l e
35-46 KA-6364-02
F ib e r P la n S h e e t x
.p e n s f e p r e p r o j e c t f i b e r p l a n .d g n
F i l e
M o d e l:
STATE
KANSAS
PROJECT NO. YEAR SHEET NO.
SHEETS
TOTAL
D .M
D .M
D .M
D .M
D .M
D .M
D .M
D .M
D .M
D .M
D .M
D .M
L .P
L .P
L .P
L .P
UU
M .H
C C
IÛ
U T
IL
IT
Y
V A
U L T
U T
IL
U L T
O W
N E
R
U N
A V
A
IL
A B
L E
Û
U T
IL
U L T
Ü
C O
M C
A S
T
U T
IL
U L T
Ü
O W
N
A V
A
IL
A B
L E
U T
IL
U L T
Ù C
O M
C A
S T
T V
T V
U T
IL
U L T
Ü
C
O F
L
A T
H E
U T
IL
U L T
Ü
C
A T
H E
C
A T
H E
Û
F .H
F .H
W .M
W .M
W .M
W .M
W .M
W .M
W .V
W .V
W .V
W .V
W .V
W .V
W .V
W .V
W .V
IS
IB
L E
Ü
IB
L E
Ü
IB
L E
Ü
IB
L E
Ü
Ú U n k n o w n e r
(F
O
Ù U n k n o n e r
(F
O
CCIÛ
C C
IÜ
UU
D .M
G .T .S
C .O
E .B .X
G .R
A .C .A .C . G .R
E .M
E .B .X
E .B .X
G .T .S
U T
IL
U L T
O W
N
A V
A
IL
A B
L E
U T
IL
U L T
C O
M C
A S
T
A T
T
Ü
A T
T
Ü
A T
T
Ü
U T
IL
U L T
C O
M C
A S
T
IB
E R
A .C
IT
S Ü
W .V
F .H
W .M
G .V
G .M
G .M
OLATHE WATERÛ
OLATHE WATERÛ
OLATHE WATERÛ
Ù A
T M
O S
ÙATMOS ÙATMOS
ÙATMOS ÙATMOS ÙATMOS
ÙATMOS
OLATHE SEWERÛ
AT&TÜ
AT&TÜ
AT&TÜ
AT&TÜ
AT&TÜ
AT&TÜ
AT&TÜ
AT&TÜ
AT&TÜ AT&TÜ
AT&TÜ
AT&TÜ
D .M
D .M
D .M
C A
M E
R A
W A
M
U N
T E
D L
IG
H T
W A
U N
T E
D
C A
M E
R A
W A
U N
T E
D L
IG
H T
W A
U N
T E
D M .H
M .H
M .H
6" V C P
" V
C P
" V
C P
UU
E L E
C T
R
IC
G A
S
A T
M O S
UU
A T
T
Ü
Ù A
T
T
AT&TÜ
W .V
D .M
T V
S T
E E
L
P
O L E
W
D
O P
S
C C
IÜ
ÙATMOS
ÙATMOS
O L
A T
H
W
T E
R Û
V E
R
IZ
O N
Ü
C C
IÜ
C C
IÜ
CCIÛ CCIÛ
AT&TÜ
A T
T
Ü
O L
A T
H E
S
E W
E R
Û
Ú
E S
P A
S S
IN
G
12" DIP
F .P
15" RCP
C A
N O P
Y
C A
N O P
Y
C A
N O P
Y
F .P
60 65
1 2 3 4 6
J J
ROGERS ROAD
SANTA FE FIBER OPTIC
INTERCONNECT PLANS
SCALE
40' 80'40' 0
(By Others)
Fiber Optic Junction Box
Future City of Olathe Type 3
Coil 10' of 1c#10 Tracer in box
Coil 50' of 288ct Fiber Optic Cable in box to be used in place.
Existing Fiber Optic Junction Box
Future 1-288ct Fiber Optic Cable with Project. (By Others)
Install 1-288ct Fiber Optic Cable (See Plan Note 1)
Operation Center to be used in place.
Existing Fiber Optic Conduit to City Traffic
(Typical)
Install 1-1c#10 Tracer
Install 1-288ct Fiber Optic Cable
Proposed 7-Way Conduit
(By Others)
1-1c#10 Tracer
1-288ct Fiber Optic Cable
Future - 7-Way Conduit
Contractor shall install conduit markers as directed by City Fiber staff.7.
the fiber equipment is installed within the R/W or U/E.
Right-of-Way is shown for reference only. The Contractor shall field verify and stake R/W and U/E to ensure that 6.
the junction boxes and/or other fiber equipment.
Conduit entering service boxes, junction boxes and/or other fiber equipment shall be continuous between 5.
This work will be considered SUBSIDIARY to the "Fiber Optic Interconnect Installation" bid item.
of green space. All repair work shall be approved by the City Engineer and work to be completed per City Standards.
conditions. This may include, (but not limited to), the repair to sidewalk, roadway sections, irrigation, or re-sodding
All areas disturbed by conduit installation, (either by trenching or boring), shall be replaced to match existing4.
construction. Minor relocation of equipment to avoid conflicts may be allowed with the approval of the City's Staff.
City Fiber staff shall inspect the staking prior to any excavation and/or System, North Zone (NAD 83/HARN).
locations shown with Northing and Easting coordinates are referenced to the Kansas State Plane Coordinate
Fiber optic equipmentContractor shall stake the location of all conduit and junction boxes to be installed. 3.
Standard Specifications and shall be approved by the City Engineer.
All construction methods and fiber optic equipment shall conform to the latest edition of the City of Olathe 2.
responsibility of the individual contractors to exactly locate each utility before actual construction.
available information and therefore, their locations must be considered approximate only. It is the
Existing underground (U/G), overhead (OH) utilities and drainage structures have been plotted from 1.
GENERAL NOTES
(By Others)
Future Roadway
Pole Relocation (By Others)
Proposed Evergy Power
Pole Relocation (By Others)
Proposed Evergy Power
City Operation Center with the City's Fiber Optic Staff. Contact Matt Mossman at (913) 971-5166.
Contractor shall coordinate installation and termination of the new 288ct Fiber Optic cable in the 1.
PLAN NOTES
FO
FO
} Rogers Rd.
S p ru c e S t.
R o g e rs
R d S ta
M a tc h li n e
FIBER OPTIC INTERCONNECT LEGEND
Unless Otherwise Noted.
288ct Fiber Optic Cable and 1c#10 Tracer Wire, Duraline FuturePath 7-Way Fiber Optic Conduit, With
Proposed Fiber Optic Junction Box, Type as Noted.
Exist. R/W
15" R
CP
" R
C P
D.M.D.M.
D.M.
D.M.
D.M.D.M.
F.H.
U.J.B.
H.H.
GRASS
GRASS
GRASS
GRASS
GRASS GRASS
UNK. PED.
H.H.
U.J.B.
GRASS
GRASS
GRASS
GRASS
O.H.E.
O.H.E.
KANSAS DEPARTMENT OF TRANSPORTATION
P l o t t j p a p e r i
S
E P
:4
P
M
P l o t T a b l e
35-46 KA-6364-02
F ib e r P la n S h e e t x
.p e n s f e p r e p r o j e c t f i b e r p l a n .d g n
F i l e
M o d e l:
STATE
KANSAS
PROJECT NO. YEAR SHEET NO.
SHEETS
TOTAL
UU
A
T
IL
U L T
S
Ù U
T
IL
U
C C
Ú A
T
IL
U L T
Ú A
T
IL
U L T
Ú C
O M
C A
IL
U L T
T V
D .M
Ú K
C P
L
L
A
Ú K
C P
L
L
A
Ú O
H P
Ú O
H P
ÙATMOS
AT&TÜ
AT&TÜ
LumenÜ
CCIÛ
LumenÜ
LumenÜ
15" R
CP
" R
C P
D.M.D.M.
D.M.
D.M.
D.M.D.M.
F.H.
U.J.B.
H.H.
GRASS
GRASS
GRASS
GRASS
GRASS GRASS
UNK. PED.
295 300 305 6 7 8 9 1 2 3 4 6 7
LumenÜ
LumenÜ
LumenÜ
H.H.
U.J.B.
GRASS
GRASS
GRASS
GRASS
O.H.E.
O.H.E.
8 9 1 2
ROGERS ROAD
INTERCONNECT PLANS
Coil 10' of 1c#10 Tracer in box
Coil 50' of 288ct Fiber Optic Cable in box
N: 218334.972, E: 2226127.294
Fiber Optic Junction Box
Proposed City of Olathe Type 3
Coil 10' of 1c#10 Tracer in box
Coil 50' of 288ct Fiber Optic Cable in box
2226110.352N: 218814.182, E:
Fiber Optic Junction Box
Proposed City of Olathe Type 3
Coil 10' of 1c#10 Tracer in box
Coil 50' of 288ct Fiber Optic Cable in box
Fiber Optic Junction Box
Proposed City of Olathe Type 3
Coil 10' of 1c#10 Tracer in box
Coil 50' of 288ct Fiber Optic Cable in box
Fiber Optic Junction Box
Proposed City of Olathe Type 3
Coil 10' of 1c#10 Tracer in box
Coil 50' of 288ct Fiber Optic Cable in box
Fiber Optic Junction Box
Proposed City of Olathe Type 3
Coil 10' of 1c#10 Tracer in box
Coil 50' of 288ct Fiber Optic Cable in box
Fiber Optic Junction Box
Proposed City of Olathe Type 3
Coil 10' of 1c#10 Tracer in box
Coil 50' of 288ct Fiber Optic Cable in box
Fiber Optic Junction Box
Proposed City of Olathe Type 3
(Typical)
Install 1-1c#10 Tracer
Install 1-288ct Fiber Optic Cable
Proposed 7-Way Conduit
10' from the Edge of Pavement and 6' below ground.
Install Proposed 7-Way Conduit in this area
10' from the Edge of Pavement and 6' below ground.
Install Proposed 7-Way Conduit in this area
Rogers Rd.
L in d e n w o o d D r.
Rogers Rd.
{ I-35
{ I-35
R o g e rs R d . S ta
M a tc h lin e
M a tc h li n e T h is
S h e e t
M a tc h li n e T h is
S h e e t
M a tc h li n e A
R o g e rs
R d
Exist. R/W
Exist. R/W
Exist. R/W
Exis
t. R/
W
Exis
t. R/
W
Exist. R/W Exist. R/W
Exis
t. R/
W
} Ro gers Rd.
Exis
t. R/
W
Exis
t. R/
.P
KANSAS DEPARTMENT OF TRANSPORTATION
P l o t t j p a p e r i
S
E P
:4
P
M
P l o t T a b l e
35-46 KA-6364-02
F ib e r P la n S h e e t x
.p e n s f e p r e p r o j e c t f i b e r p l a n .d g n
F i l e
M o d e l:
STATE
KANSAS
PROJECT NO. YEAR SHEET NO.
SHEETS
TOTAL
L u m e n Ü
L .P
U
CONCRETE WALK
ADA
G R
A
ROGERS ROAD/129TH STREET
INTERCONNECT PLANS
Coil 10' of 1c#10 Tracer in box
Coil 50' of 288ct Fiber Optic Cable in box
Fiber Optic Junction Box
Proposed City of Olathe Type 3
Coil 10' of 1c#10 Tracer in box
Coil 50' of 288ct Fiber Optic Cable in box
Fiber Optic Junction Box
Proposed City of Olathe Type 3
Fiber Optic Junction Box
Proposed City of Olathe Type 3
Coil 10' of 1c#10 Tracer in box
Coil 50' of 288ct Fiber Optic Cable in box
Fiber Optic Junction Box
Proposed City of Olathe Type 3 cables to be used in place.
Existing Fiber Optic Conduit and
Coil 10' of 1c#10 Tracer in box
Coil 100' of 288ct Fiber Optic Cable in box to Existing at this location.
Splice new 288ct Fiber Optic Cable to be used in place.
Existing Fiber Optic Junction Box cables to be used in place.
Existing Fiber Optic Conduit and
Coil 10' of 1c#10 Tracer in box
Coil 50' of 288ct Fiber Optic Cable in box
Fiber Optic Junction Box
Proposed City of Olathe Type 3
Coil 10' of 1c#10 Tracer in box
Coil 50' of 288ct Fiber Optic Cable in box
Fiber Optic Junction Box
Proposed City of Olathe Type 3
' f ro m t h e E d g e o f P a v e m e n t a n d ' b e lo w g ro u n d
I n s ta ll P ro p o s e d -W a y C o n d u it i n t h is a re a
10'
F O
R o g e rs R d
R o g e rs R d
129th St.
M u r- L e n
R d
.129th St.
S o m e rs e t
T e r.
M o o re A v e
M a tc h li n e T h is
S h e e t
M a tc h lin e T h is S h e e t
Matchline A (Rogers Rd.)
I -3
Exist. R/W
Exist. R/W
Exist. R/W
Exist. R/W
Exist. R/W
Exist. R/W
Exist. R/W
E x is t.
/W
.P
Bit.
Bit.
KANSAS DEPARTMENT OF TRANSPORTATION
P l o t t j p a p e r i
S
E P
:4
P
M
P l o t T a b l e
35-46 KA-6364-02
F ib e r
P la n
S h e e t x
.p e n s f e p r e p r o j e c t f i b e r p l a n .d g n
F i l e
M o d e l:
STATE
KANSAS
PROJECT NO. YEAR SHEET NO.
SHEETS
TOTAL
127TH STREET
INTERCONNECT PLANS
Coil 10' of 1c#10 Tracer in box
Coil 50' of 288ct cable in box
Install new 288ct Fiber Optic Cable
Existing Fiber Optic Junction Box
Coil 10' of 1c#10 Tracer in box
Coil 50' of 288ct cable in box in Empty Existing Conduit.
Install new 288ct Fiber Optic Cable
Existing Fiber Optic Junction Box
Coil 10' of 1c#10 Tracer in box
Coil 100' of 288ct cable in box to Existing at this location.
Splice new 288ct Fiber Optic Cable to be used in place.
Existing Fiber Optic Junction Box
Coil 10' of 1c#10 Tracer in box
Coil 50' of 288ct cable in box in Empty Existing Conduit.
Install new 288ct Fiber Optic Cable
Existing Fiber Optic Junction Box
Coil 10' of 1c#10 Tracer in box
Coil 50' of 288ct cable in box
Install new 288ct Fiber Optic Cable
Existing Fiber Optic Junction Box
& 1c#10 Tracer in Existing Conduit.
Install new 288ct Fiber Optic Cable
Existing Fiber Optic Conduit on Structure
& 1c#10 Tracer in Existing Conduit.
Install new 288ct Fiber Optic Cable
Existing Fiber Optic Conduit on Structure
Cable after the new 288ct fiber is active.
Remove Existing 48ct Fiber Optic
Existing Fiber Optic Conduit (Abandon)
Cable after the new 288ct fiber is active.
Remove Existing 48ct Fiber Optic
Existing Fiber Optic Conduit (Abandon)
Interconnect bid item.
to the Fiber Opticsubsidiarybe construction operations and shall system damage resulting from
Contractor shall repair irrigation
Existing irrigation. CAUTION:
Interconnect bid item.
to the Fiber Opticsubsidiarybe construction operations and shall system damage resulting from
Contractor shall repair irrigation
Existing irrigation. CAUTION:
Interconnect bid item.
to the Fiber Opticsubsidiarybe construction operations and shall system damage resulting from
Contractor shall repair irrigation
Existing irrigation. CAUTION:
& 1c#10 Tracer in Existing Conduit.
Install new 288ct Fiber Optic Cable
Existing Fiber Optic Conduit
& 1c#10 Tracer in Existing Conduit.
Install new 288ct Fiber Optic Cable
Existing Fiber Optic Conduit
Coil 10' of 1c#10 Tracer in box
Coil 50' of 288ct cable in box in Empty Existing Conduit.
Install new 288ct Fiber Optic Cable
Existing Fiber Optic Junction Box
F O
FO
F O
FO
FO
FO
FO
FO FO
FO
FO
FO
FO FO
FO
FOFO
M a tc h li n e T h is S h e e t
127th St.
K a n s a s C it y
R d
Harold St.
127th St.
M o o re A v e
M a tc h li n e B th S t.
M a tc h li n e T h is S h e e t
R o g e rs R d
I-
KANSAS DEPARTMENT OF TRANSPORTATION
P l o t t j p a p e r i
S
E P
:4
P
M
P l o t T a b l e
35-46 KA-6364-02
F ib e r P la n S h e e t x
.p e n s f e p r e p r o j e c t f i b e r p l a n .d g n
F i l e
M o d e l:
STATE
KANSAS
PROJECT NO. YEAR SHEET NO.
SHEETS
127TH STREET
INTERCONNECT PLANS
Coil 10' of 1c#10 Tracer in box
Coil 100' of 288ct cable in box
288ct fiber is active.
Cable running west after the new
Remove Existing 48ct Fiber Optic to Existing at this location.
Splice new 288ct Fiber Optic Cable and 288ct Fiber Optic Cable to be used in place. Install New 7-way
Existing Fiber Optic Junction Box
Cable after the new 288ct fiber is active.
Remove Box and Existing 48ct Fiber Optic
Existing Fiber Optic Junction Box
Cable after the new 288ct fiber is active.
Remove Existing 48ct Fiber Optic
Existing Fiber Optic Conduit (Abandon)
Coil 10' of 1c#10 Tracer in box
Coil 50' of 288ct cable in box
Fiber Optic Junction Box
Proposed City of Olathe Type 3
Cable after the new 288ct fiber is active.
Remove Existing 48ct Fiber Optic
Existing Fiber Optic Conduit (Abandon)
Coil 10' of 1c#10 Tracer in box
Coil 50' of 288ct cable in box
Fiber Optic Junction Box
Proposed City of Olathe Type 3
Interconnect bid item.
to the Fiber Opticsubsidiarybe construction operations and shall system damage resulting from
Contractor shall repair irrigation
Existing irrigation. CAUTION:
F O
FO
FO
127th St.
M u r-
L e n R o a d
M a tc h li n e B th S t.
36" CMP
24" CMP
C M
P
C M
P
M.H.
FO
FO
FO FOFO
F O
FO
FO
FO
FO FOFO
F O
FO
P
V C
M.H.
M.H.
M.H.
D.M.
D.M.
D.M. D.M.
D.M.
D.M.
D.M.
L.P.
L.P.
L.P. L.P.
L.P.
L.P.
L.P. L.P.
L.P.
L.P.
L.P.
L.P.
L.P.
L.P.
L.P.
L.P.
L.P.
UU
UU
UU
UU UU
UU
M.H.
M.H.
M.H.
M.H.
M.H.
W.H.
L.P.
L.P.
M.H.
M.H.
-SUREWEST UTILITY VAULT
-MCI UTILITY VAULT2" & 6" PVC DROPS-
KCPL #105070 W/
UTILITY VAULT
ÙCITY OF OLATHE
KCPL #105343Ü
ÚCITY OF OLATHE
KCPL #105345Û
UTILITY VAULT
ÙAT&T
END OF MARKSÜ
OWNER UNAVAILABLE
KCPL #104050Ü
-KCPL #103959
UTILITY VAULT
CITY OF OLATHE-
KCPL #103960Ü
NO VISIBLE #Ü
Ú#OLA 1939
UTILITY VAULT
OWNER UNAVAILABLE-
Ú#OLA 1641
NO VISIBLE #Ü
#OLA 1944-
NO VISIBLE #Ü
UTILITY VAULTÜ
AT&T
ÚKCPL #LA1945
UTILITY VAULTÜ
CITY OF OLATHE
NO VISIBLE #Ü
" V
C P
4" PVC 8" VCP
V
C P
UTILITY VAULTS
CITY OF OLATHE-
MCI UTILITY VAULT-
CITY OF OLATHEÜ
F.H.
W.M.
W.M.
W.M.
W.V.
W.V.
W.V.
W.V. W.V.
W.V.
W.V.
ÚNO VISIBLE #
-KCPL #LA1947
ÚNO VISIBLE #
DOUBLE LIGHTS
NO VISIBLE #Ü
ÚDATED: 06/21/2021
LWE=19.0'
8-OHP
ÚNO VISIBLE #
NO VISIBLE #Ü
ÚNO VISIBLE #
ÚKCPL #104111 ÚKCPL #564394 KCPL #104119Ü KCPL #564393Ü
-END OF MARKS
OWNER UNAVAILABLE
11-OHPÜ 11-OHPÜ 10-OHPÜ
#OLA 1942-
Ù2-OHP
ÚKCPL #104055
NO VISIBLE #Ü
7-OHPÛ
DATED: 06/21/2021
LWE=15.6'
Ù3-OHP
DATED: 06/21/2021Ü
LWE=20.4'
11-OHP
DATED: 06/21/2021Ü
LWE=17.9'
10-OHP
DATED: 06/21/2021Ü
LWE=18.3'
11-OHP
ÚNO VISIBLE #
ÚNO VISIBLE #UTILITY VAULT-
CITY OF OLATHE
UTILITY VAULT
-SBC
UTILITY VAULT-
CENTURY LINK
M.H.
M.H.
LUMENÜ
LUMENÜ
S P
E C
T R
U M
Ü
S P
E C
T R
U M
Ü VerizonÜ
VerizonÜ
VerizonÜ
OLATHE WATERÛ
OLATHE WATERÛ
OLATHE WATERÛ
O L
A T
T E
R Û
OLATHE WATERÛ
O L
A T
T E
R
ÛMCI UTILITY VAULT-
UTILITY VAULT
OWNER UNAVAILABLE
L.P.
ÚNO VISIBLE #
G.M.
M.H.
ÙATMOSG.M.
G.M.
O L
A T
T E
R Û
ÙATMOS
ÙATMOS
ÙATMOS ÙATMOS ÙATMOS
ÙATMOSÙATMOS
ÙATMOS
ÙATMOS
ÙATMOS
Ù A
T M
O S
Ù
ATM
OS
Ù A
T M
O S
Ù A
T M
O S
VerizonÜVerizonÜ
S P E
C T
R U
M Ü
SPECTRUMÜ
S P
E C
T R
U M
Ü
O L
A T
W E
R Û
OLATHE SEWERÛ
OLATHE SEWERÛ
AT&TÜ
AT&TÜ
AT&TÜ
AT&TÜ
AT&TÜ
AT&TÜ
AT&TÜ
AT&TÜ
AT&TÜ
AT&TÜAT&TÜ
AT&TÜ
AT&TÜ
A T
T
Ü
A T
T
Ü A
T
T Ü
A T
T
Ü C
C
IÜ
C C
IÜ
C C
IÜ
U G
E Ü
U G
E Ü U G
E Ü
U G
E Ü
U G
E Ü
U G
E Ü
U G
E Ü
U G
E Ü
U G
E Ü
U G
E Ü
UGEÜ
UGEÜ
UGE
Ü
UGEÜ
UGE
Ü
UGE
Ü
UGEÜ
UGEÜ
UGEÜ
UGEÜ
UGEÜ
UGEÜ
UGEÜ
UGEÜ
UGEÜ
UGEÜ
UGEÜ
UGEÜ
UGEÜ
UGEÜ
UGEÜ
ÚCOMCAST
L.P.
#LA1944
ELECTRIC OUTLET
WALL MOUNTED
W.V.
L.P.
LumenÜ
L u m e n
Ü
W/ 4 DROPS W/ 1 DROP W/ 1 DROP W/ 1 DROP
DROPS
& 4 ADDITIONAL
W/ 1-ATT DROP
W/ 1-2" DROPE.C.V.
CONTROL CABINETÜ
TRAFFIC SIGNAL
ÚATT
M.H.
W/ 3 DROPS
VERIZONÜ
V E
R
IZ
O N
Ü
V E
R
IZ
O N
Ü
ÙGOOGLE FIBER
S.C.B.
S.C.B.
S.C.B.
S.C.B.
S.C.B.
S.C.B.S.C.B.
DIVIDED ROAD
S.C.B.S.C.B.BORE HOLEÜ
DIAMOND REFLECTOR
TOWING ENFORCEDÜ
ÚMISSING SIGN
SIGN POST, TURN RIGHTÜ
RIGHT LANE MUST
24" HDPE
24" HDPE
M.H.
D I P
24" CMP
24" CMP
" P
VC
18" CMP
36" CMP36" RCP
36" RCP
C
M P
36" RCP
C M
P
36" RCP
12"
CMP
" R
C P
36" RCP
15" CMP 15" CMP
18" CMP
F.P.
M.H.
M.H.
M.H.M.H.
M.H.
M.H.
M.H.M.H.
M.H.
M.H.
M.H.
M.H.M.H.
M.H.
M.H.
M.H.
M.H.
M.H.
M.H.
M.H.
M.H.
M.H.
15" CMP(PREVIOUS 18" CMP)
J
J
150 155 9 1 2 3 4 6 7 8
150 155 1 2 3 4 6 7 8
MP
MP
KANSAS DEPARTMENT OF TRANSPORTATION
P l o t t j p a p e r i
S
E P
:4
P
M
P l o t T a b l e
35-46 KA-6364-02
F i b e r P l a n S h e e t x
.p e n s f e p r e p r o j e c t f i b e r p l a n .d g n
F i l e
M o d e l:
STATE
KANSAS
PROJECT NO. YEAR SHEET NO.
SHEETS
TOTAL
FOFO
D.M.
L.P.L.P.
L.P.
L.P.
UU
UU
M.H.
UTILITY VAULTÜ
CITY OF OLATHE
NO VISIBLE #Ü
ÙMCI UTILITY VAULT
NO VISIBLE #Ü
8" VCP
8" VCP
F.H.
F.H.
W.M.
W.V.
W.V.
W.V.
W.V.
UTILITY VAULT
AT&T-
UTILITY VAULT-
CENTURY LINK
VerizonÜ
O L
A T
T E
R Û
OLATHE WATERÛ
ÙGOOGLE FIBER
-BGL
66540
1005.92
SNG
66546
1004.85
O L
A T
T E
R Û
ÙATMOS
ÙATMOSÙATMOS
Ù A
T M
O S
Ù A
T M
O S
OLATHE SEWERÛ
OLATHE SEWERÛ
AT&TÜ
AT&TÜ
AT&TÜ
UGEÜ
UGEÜUGEÜ
Ú S p e c tr u m
ÙDITCH
ÚTREE MOUND
M.H.
L.P.L.P. L.P. L.P.
L.P.
UU
UU
M.H.
M.H. M.H.
KCPL #104087Û
ÚUTILITY VAULT
OWNER UNAVAILABLE
R C P
8" PVC 8" PVC
W.V.
W.V.
ÚKCPL #LA1949
KCPL #LA1950Ü
KCPL #LA1957- KCPL #LA1956-
ÚKCPL #LA1955
9-OHPÜ
Ú2" PVC DROP
KCPL #104088 W/
4" PVC DROP
-KCPL #584248 W/
ÙKCPL #104090Ù10-OHP Ù10-OHP
DATED: 06/21/2021Ü
LWE=14.4
10-OHP
M.H.
LUMENÜ
LUMENÜ
OLATHE WATERÛ OLATHE WATERÛ
O L
A T
T E
R Û
UTILITY VAULT
ÙOWNER UNAVAILABLE
66367
END MARKS*
1001.53
ÙATMOS
SPECTRUMÜ
SPECTRUMÜ
SPECTRUMÜ
SPECTRUMÜ
SPECTRUMÜ
SPECTRUMÜ
SPECTRUMÜ
O L
A T
H E
S E
W E
R Û
O L
A T
W E
R Û
O L
A T
W E
R Û
O L
A T
W E
R Û
OLATHE SEWERÛ
OLATHE SEWERÛOLATHE SEWERÛ
AT&TÜ
AT&TÜ
AT&TÜ
AT&TÜ
AT&TÜAT&TÜ
AT&TÜ
UGEÜ
UGEÜ
U G E
Ü
UGEÜ
W/ 1 DROPS
VERIZONÜVERIZONÜVERIZONÜ
ÙDITCH
INDIAN CREEKÛ
45 MPH
12" DIP
C M
P
15" RCP
18" RCP
C M
P
" C
MP
42" CMP 36" CMP
24" CMP
C M
P
C M
P
42" CMP
42" CMP M.H.
M.H.
M.H.
M.H.
M.H.
M.H.
M.H.M.H.
M.H.
M.H.
M.H.
M.H.
160 165 1 2 3 4 6 7 8 9 160 165 1 2 3 4 6 7 8 9
SANTA FE STREET
INTERCONNECT PLANS
Coil 10' of 1c#10 Tracer in box
Coil 50' of 288ct Existing Fiber Optic Cable in box
N: 216847.754 E: 2229776.071
Fiber Optic Junction Box
Proposed City of Olathe Type 3 cables to be used in place.
Existing Fiber Optic Conduit and
Coil 10' of 1c#10 Tracer in box
Coil 50' of 288ct Existing Fiber Optic Cable in box junction box at the northeast corner of Mur-Len.
to the new splice enclosure in the new type 4 fiber optic back to this box and reroute through the new conduit
Remove existing fiber optic cable from the west to be used in place.
Existing Fiber Optic Junction Box
Coil 10' of 1c#10 Tracer in box
Coil 50' of 288ct Existing Fiber Optic Cable in box
N: 216852.563 E: 2230277.809
Fiber Optic Junction Box
Proposed City of Olathe Type 3
Coil 10' of each 1c#10 Tracer in box
Coil 50' of each Fiber Optic Cable in box and East at this location.
Install Fiber Optic Cables from the South
N: 216827.205, E: 2228972.255
Proposed Type 3 Fiber Optic Junction Box
Coil 10' of each 1c#10 Tracer in box
Coil 100' of each Fiber Optic Cable in box
Furnish and Install Splice Enclosure & Splice Fiber Optic Cables from the North, South and East at this location.
Proposed City of Olathe Type 4 Fiber Optic Junction Box the northwest corner of the intersection.
conduit back to the new junction box in to the south and re-install in the modified back to the next existing fiber junction box northwest corner of Santa Fe & Mur-Len
Remove existing fiber optic cables from the
Existing Fiber Optic Conduit to be used in place.
N: 216651.551 E: 2228964.521
Fiber Optic Junction Box
Proposed City of Olathe Type 3 corner of the intersection.
conduit to the new junction box in the northeast to the north and re-install in the modified back to the next existing fiber junction box northwest corner of Santa Fe & Mur-Len
Remove existing fiber optic cables from the
Existing Fiber Optic Conduit to be used in place.
Coil 10' of 1c#10 Tracer in box
Coil 50' of 288ct Existing Fiber Optic Cable in box
N: 216839.423 E: 2229474.961
Fiber Optic Junction Box
Proposed City of Olathe Type 3
Existing Fiber Optic Cable (Remove & Reroute)
Existing Fiber Optic Conduit (Abandon)
Existing Fiber Optic Cable (Remove & Reroute)
Existing Fiber Optic Conduit (Abandon)
(By Others)
1-1c#10 Tracer
1-288ct Fiber Optic Cable
Future - 7-Way Conduit
(By Others)
Future Roadway
(By Others)
Future Roadway
(By Others)
Future Roadway
(By Others)
Future Roadway
(By Others)
Future Traffic Signal Installation
(By Others)
Future Traffic Signal Installation
Util. Esmt.
R/W
Util. Esmt.
R/W
1-1c#10 Tracer
Install Existing Fiber Optic Cables from the South and East at this location.
New 7-Way Conduit
N: 216854.415 E: 2229760.008
Future Evergy Equipment
Conduit Deflection Point to avoid
N: 216847.327 E: 2229548.256
Future Evergy Equipment
Conduit Deflection Point to avoid
FO
FO
FO
F O
FO FOFO
FO
FO
FO
FO
FO
FO
FO
.0
M a tc h li n e S ta
} Santa Fe St.
} Santa Fe St.
M u r-
L e n
R d
B ro u g h a m
D r.
.0
M a tc h li n e S ta
FIBER SPLICE
FIBER SPLICE OF EACH FIBER IN BUFFER TUBE
UNTERMINATED FIBER
TRANSMIT
RECEIVE
FIBER DEVICE IN LOCAL CABINET
FIBER DEVICE IN DESTINATION CABINET
FIBER SPLICE LOCATION AT CONTROLLER
ASSEMBLY / BUILDING
FIBER SPLICE LOCATION AT HANDHOLE /
SPLICE VAULT
T
R
XYZ
XYZ
LEGEND
1. UNUSED BUFFER TUBES SHALL PASS THROUGH SPLICE ENCLOSURE WITHOUT SPLICING, DO NOT BREAK OUT
INDIVIDUAL FIBERS.
2. UNTERMINATED FIBERS/BUFFER TUBES SHALL BE STORED IN SPLICE TRAYS.
3. ALL PIGTAILS AND JUMPERS SHALL BE TERMINATED WITH ST STYLE CONNECTORS. PATCH PANELS (FIBER
DISTRIBUTION UNITS) ARE TO BE CONFIGURED WITH ST STYLE CONNECTORS.
4. FOR LOCATIONS WITH MULTIPLE SPLICE TRAYS, CONTRACTOR SHALL DENOTE ON DRAWINGS WHICH SPLICE TRAY
EACH SPLICE IS STORED IN.
5. NO-FIBER CONNECTIONS BETWEEN EQUIPMENT LOCATED WITHIN HANDHOLES/SPLICE VAULTS, WITHIN THE
REGENERATION BUILDING, AND WITH CONTROLLER ASSEMBLES ARE NOT SHOWN.
6. ALL FIBERS IN THE BUFFER TUBE(S) SHALL BE SPLICED IN THIS ENCLOSURE.
NOTES
T
R
T
R
FIBER SPLICE LOCATION AT CONTROLLER ASSEMBLY/BUILDING
FIBER DEVICE IN
FIBER DEVICE IN
FIBER PIGTAILS FIBER JUMPERS
BUFFER TUBE
BLUE
ORANGE
GREEN
BROWN
SLATE
WHITE
BLUE
ORANGE
GREEN
BROWN
SLATE
WHITE
BUFFER TUBE
(TYP) (TYP)
BLUE
BLUE
P A
T C
H P
A N
E L
P A
T C
H P
A N
E L
DESTINATION CABINET
LOCAL CABINET
FIBER DEVICE IN
FIBER DEVICE IN
DESTINATION CABINET
LOCAL CABINET
T
R
FIBER SPLICE LOCATION AT CONTROLLER ASSEMBLY/BUILDING
FIBER DEVICE IN
FIBER PIGTAILS FIBER JUMPERS
BUFFER TUBE
BLUE
ORANGE
GREEN
BROWN
SLATE
WHITE
(TYP) (TYP)
BLUE
P A
T C
H P
A N
E L
LOCAL CABINET
FIBER DEVICE IN
DESTINATION CABINET
T
R
FIBER DEVICE IN
LOCAL CABINET
FIBER DEVICE IN
DESTINATION CABINET
## COUNT FIBER CABLE
T
R
FIBER SPLICE LOCATION AT CONTROLLER ASSEMBLY/BUILDING
FIBER DEVICE IN
FIBER PIGTAILS FIBER JUMPERS
BUFFER TUBE
BLUE
ORANGE
GREEN
BROWN
SLATE
WHITE
(TYP) (TYP)
BLUE
P A
T C
H P
A N
E L
LOCAL CABINET
FIBER DEVICE IN
DESTINATION CABINET
## COUNT FIBER CABLE
T
R
FIBER SPLICE LOCATION AT CONTROLLER ASSEMBLY/BUILDING
FIBER DEVICE IN
FIBER PIGTAILS FIBER JUMPERS
BUFFER TUBE
BLUE
ORANGE
GREEN
BROWN
SLATE
WHITE
(TYP) (TYP)
BLUE
P A
T C
H P
A N
E L
LOCAL CABINET
FIBER DEVICE IN
DESTINATION CABINET
## COUNT FIBER CABLE
BLUE
ORANGE
GREEN
BROWN
SLATE
WHITE
RED
BLACK
YELLOW
VIOLET
BLUE
BUFFER TUBE
BLUE
ORANGE
GREEN
BROWN
SLATE
WHITE
BLUE
ORANGE
GREEN
BROWN
SLATE
WHITE
RED
BLACK
YELLOW
VIOLET
ROSE
AQUA
ROSE
AQUA
BLUE
ORANGE
GREEN
BROWN
BLUE
ORANGE
GREEN
BROWN
BLUE
GREEN
BROWN
BUFFER TUBE
SEE NOTE 1
FIBER SPLICE LOCATION AT HANDHOLE/SPLICE VAULT
BLUE
ORANGE
GREEN
BROWN
SLATE
WHITE
BLUE
BUFFER TUBE
BLUE
ORANGE
BLUE
ORANGE
GREEN
BROWN
SLATE
WHITE
RED
BLACK
YELLOW
VIOLET
ROSE
AQUA
BLUE
ORANGE
GREEN
BROWN
BLUE
ORANGE
GREEN
BROWN
GREEN
BROWN
BUFFER TUBE
SEE NOTE 1
FIBER SPLICE LOCATION AT HANDHOLE/SPLICE VAULT
GREEN
BROWN
SLATE
WHITE
RED
BLACK
YELLOW
VIOLET
ROSE
AQUA
ORANGE
GREEN
BROWN
SLATE
WHITE
BLUE
BUFFER TUBE
BLUE
ORANGE
GREEN
BROWN
SLATE
WHITE
RED
BLACK
YELLOW
VIOLET
ROSE
AQUA
BLUE
ORANGE
GREEN
BROWN
BLUE
ORANGE
GREEN
BROWN
GREEN
BROWN
BUFFER TUBE
SEE NOTE 1
FIBER SPLICE LOCATION AT HANDHOLE/SPLICE VAULT
GREEN
BROWN
SLATE
WHITE
RED
BLACK
YELLOW
VIOLET
ROSE
AQUA
ORANGE
BLUE
ORANGE
BLUE
ORANGE
## COUNT FIBER CABLE ## COUNT FIBER CABLE TO *LOCATION*
SEE FIBER SPLICE SHEET ##
## COUNT FIBER CABLE## COUNT FIBER CABLE FROM *LOCATION*
SEE FIBER SPLICE SHEET ##
## COUNT FIBER CABLE
CHOOSES TO BORE INSTEAD OF TRENCH, THERE WILL BE NO CHANGE IN PRICING.
OR DRIVEWAYS SHALL BE INSTALLED USING AN APPROVED JACKING OR BORING METHOD. IF THE CONTRACTOR
PER CITY OF OLATHE TECHNICAL SPECIFICATIONS (TS-9212), CONDUIT UNDER EXISTING PAVEMENT, SIDEWALK, 7.
KANSAS DEPARTMENT OF TRANSPORTATION
P l o t t j p a p e r i
S
E P
:5
A
M
P l o t T a b l e
35-46 KA-6364-02
R E
F E
R E
N C
E S
N O
T E
D
R E
F E
R E
N C
E S
C H
E C
K E
D
D A
T E
B Y
S h e e t x
.p e n
P r e p r o j e c t F i b e r O p D e t a i l
.d g n
F i l e
M o d e l:
STATE
KANSAS
PROJECT NO. YEAR SHEET NO.
SHEETS
FIBER OPTIC DETAIL
DIAGRAM FROM CITY TRAFFIC PERSONNEL.
CONTRACTOR SHALL OBTAIN SPLICING
* To include all jumpers & equipment for full operation.* *
Factory Pigtail with connector (including splices)
Fiber Distribution Unit (Complete) - See Olathe specifications
Patch cable SM duplex SC/LC
Splice enclosure - complete
ITEM (***)
Each
UNIT
FIBER OPTIC EQUIPMENT
MODELSIZE
ADC FDU 1U RMG1U
From Factory-
Tyco FOSC 45024
-1 meter
-1 meter
See Olathe Spec.-
-24 x 36
Each
Patch cable MM duplex ST/ST
Fiber optic cable SM/MM 12/12
Splice enclosure - complete
Splice enclosure - complete
Fiber optic cable SM 6
Fiber optic cable SM 24
Fiber optic cable SM 48
MicroFiber 288 Count
Tyco FOSC 450
Tyco FOSC 450
See Olathe Spec.
See Olathe Spec.
See Olathe Spec.
288ZH4-Y4F40A20
Fiber optic junction box - Type III
1c#10 Tracer wire
Dura-Line FuturePath Multi-duct Conduit
Splices (FDU)
Splices (Enclosure)
30 x 48
7-Way
Each
Lin Ft
Lin Ft
See Olathe Spec.
See Olathe Spec.
Lump
Fiber optic junction box - Type IV
QUANTITY
10550
10740
Lin Ft
HDPE/7-Way Conduit (Bored) (See Note 7) 7-Way See Olathe Spec. Lin Ft
-QUANTITIES FOR INFORMATION ONLY-
AND ARE NOT GUARANTEED TO BE A COMPLETE LIST OF MATERIALS FOR THIS PROJECT.
CONVENIENCE THESE APPROXIMATE QUANTITIES WERE PREPARED FOR THE CONTRACTOR'S
I
A
N D
S A
N T
A F
E S
T R
E E
T
P .N
K
A
W20-3
M4-8A
W20-2
M4-9
ON BARRICADE
R11-2 WITH M4-10
ROAD CLOSED
TO
THRU TRAFFIC
ROAD
CLOSED
AHEAD
DETOUR
AHEAD
END
DETOUR
ON BARRICADE
R11-2 WITH M4-10
ROAD
CLOSED
ROAD
CLOSED
DETOUR
M4-8A
M
ROAD
CLOSED
AHEAD
W20-3
M4-
W20-2
M
D E
T O
U R
DETOUR
AHEAD
DETOUR
DETOUR SIGNING-STREET
CONSTRUCTION IN A STREET GRID
ROADWAY FOR WHICH THE DETOUR WAS ESTABLISHED.
DETOUR SIGN (M4-9) TO INDICATE THE NAME OF THE
STREET NAME SIGN (D-3) TO BE PLACED ABOVE THE
CHANNELIZERS
CONES OR SLIMLINE
OR FLUORESCENT ORANGE
= REFLECTORIZED DRUMS
= TYPE III BARRICADE
BOARD
= ARROW PANEL
= SIGN
LEGEND
= WORK SPACE
= FLAGGER
SIDEWALK
CLOSED
SIDEWALK
CLOSED
SIDEWALK
CLOSED
SIDEWALK CLOSED
CROSS HERE
CORNER SIDEWALK CLOSURE
WITH PEDESTRIAN DETOUR
MID-BLOCK SIDEWALK CLOSURE
WITH PEDESTRIAN DETOUR
GENERAL NOTES:
ALL DEVICES, THEIR INSTALLATION, AND MAINTENENCE SHALL COMPLY WITH THE 2009 EDITION OF
THE MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (MUTCD).
UNLESS OTHERWISE NOTED, ALL TRAFFIC CONTROL DEVICES SHALL BE PROVIDED AND MAINTAINED
BY THE CONTRACTOR.
SIGNS AND TRAFFIC CONTROL DEVICES NEED TO BE PROPERLY MAINTAINED FOR CLEANLINESS, VISIBILITY, AND CORRECT POSITIONING.
CONTRACTOR SHALL OBTAIN UTILITY LOCATES PRIOR TO INSTALLING SIGNPOSTS.
SIGNS LEFT IN PLACE THREE OR FEWER DAYS CAN BE MOUNTED AT ONE FOOT ABOVE THE ROAD-
WAY. SIGNS LEFT IN PLACE GREATER THAN THREE DAYS NEED TO BE MOUNTED AT SEVEN (7)
TRAFFIC CONTROL DEVICES SHALL MEET MASH 2009.
ALL SIGNS SHALL TO BE REMOVED, COVERED, OR TURNED AWAY FROM TRAFFIC WHEN NOT IN USE.
CONTRACTOR MAY BE REQUIRED TO ADD CONSTRUCTION FENCE TO PROHIBIT PEDESTRIANS FROM
ENTERING THE WORK AREA. FENCING SHOULD NOT CREATE A SIGHT DISTANCE RESTRICTION FOR
ALL WORKERS SHALL WEAR HIGH VISIBILITY APPAREL MEETING ANSI 107-2010 CLASS 2 FOR DAY-
NOTIFY TRAFFIC OPERATIONS OF ANY WORK WITHIN THE RIGHT-OF-WAY AT 913-971-5180. 72 HOUR
NOTICE IS REQUIRED IF TRAFFIC SIGNALS ARE TO…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .