This is a Highway Permit document issued by the Kansas Department of Transportation (KDOT) District 1 for the City of Olathe, Kansas, authorizing the relocation and rerouting of fiber optic communications infrastructure in advance of the planned I-35/Santa Fe Street interchange reconstruction project. The City of Olathe proposes to install new underground fiber optic conduit, 288-count fiber optic cable, junction boxes, splice enclosures, tracer wire, and related facilities to establish a new communications route outside the future interchange construction limits. Work within KDOT right-of-way includes installation of new fiber optic conduit and cable along the west side of Rogers Road adjacent to I-35 and installation of new fiber optic cable within existing conduit crossing I-35 on the 127th Street bridge. Construction will consist primarily of directional boring, with existing conduit utilized where available. The permit (1-2026-1168) was approved on October 7, 2026, and expires on January 5, 2027. The project adds approximately 520 feet of 288-count fiber optic cable totaling an estimated 90 pounds of additional weight to the bridge attachment. The comprehensive project plans include fiber optic junction boxes, splice enclosures, traffic control details, and construction staking requirements across multiple sheets detailing work along Rogers Road, 127th Street, and Santa Fe Street corridors.
The permit requires the City of Olathe to furnish two sets of comprehensive plans or detailed drawings and comply with the "Utility Accommodation Policy for KDOT" and Standard Specifications for State Road and Bridge Construction. General liability insurance with a minimum combined single limit of $2,000,000 is required, along with worker's compensation and automobile liability insurance of $1,000,000, with certificates of insurance provided by approved insurers prior to permit effectiveness. The petitioner must notify KDOT utilities coordinator Kort StClair at least one working day prior to starting any work on the highway right-of-way to arrange necessary inspections. All work must be completed within the calendar period specified by the District Engineer, with the right-of-way to be restored to its condition prior to work approval. The City of Olathe is responsible for all material, labor, and costs associated with the work, and must indemnify the Secretary of Transportation from personal injury and property damage claims arising from any act or omission. Should KDOT make alterations or improvements along the highway right-of-way conflicting with the City's facilities, the City must relocate its infrastructure without cost to KDOT or reimburse KDOT for relocation costs upon receipt of an itemized statement. The permit may be revoked and the City held liable for restoration costs if work deviates from approved specifications without prior KDOT authorization.
View the file
Other files
Show 40 more
Latest 50 of 54 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
121 S.W. 21st Street Topeka, KS 66612
Phone: 785-296-3881 Fax: 785-296-1162 kdot#publicinfo@ks.gov http://www.ksdot.org
Laura Kelly, Governor
October 7, 2026
Attached is your approved copy of the above referenced Highway Permit granting permission to The City of Olathe proposes to relocate and reroute portions of its fiber optic communications network in advance of the planned I-35/Santa Fe Street interchange reconstruction project. The project includes installation of new underground fiber optic conduit, 288-count fiber optic cable, junction boxes, splice enclosures, tracer wire, and related facilities to establish a new communications route outside the future interchange construction limits. The improvements will maintain continuous operation of the City's traffic signal and communications network during interchange construction while providing a permanent fiber optic alignment for the corridor.
Work within KDOT right-of-way includes installation of new fiber optic conduit and cable along the west side of Rogers Road adjacent to I-35 and installation of new fiber optic cable within existing conduit crossing I-35 on the 127th Street bridge. Construction will consist primarily of directional boring, with existing conduit utilized where available.
KSC 10/5/26: Statement below is pulled from geometry questions for weight of attachment.
No change to existing bridge attachment. Adding approximately 520' of 288ct fiber optic cable totaling an estimated 90lb additional weight. This permit expires 1/5/2027.
City of Olathe 1385 S Robinson Drive, Olathe, KS 66061
Dear Sir/Madam:
Date: 10/7/2026 9:01 AM Angel Fitzgerald District Coordinator
Highway Permit 1-2026-1168 Route I-35 JOHNSON County
Once you have downloaded your permit, please notify our Utilities Coordinator, "Kort StClair" using our Kansas Utilities Permit System at least one working day prior to starting any work on the highway so that arrangements can be made for the necessary inspection.
When you commence the work authorized by this permit, it will signify that you agree to any and all changes, additions and/or stipulations made to the original request and attachments. Contractors performing the work will be advised of the requirement to ensure work conforms to this permit. The work performed on the KDOT right of way will be strictly in accordance with this approved permit. Deviation from this permit with attachments (unless approved by KDOT prior to construction) will be cause for non-acceptance of the work and remedial action.
When you have completed all work connected with this permit, please let them know so that the permit can be released.
Yours Truly, Michael E. Rinehart, P.E., District Engineer
District 1
Calvin E. Reed, P.E., Secretary
Michael E. Rinehart, P.E., District Engineer
Attachment c: File Dale Kirmer – via email Kort StClair – via email Angel Fitzgerald – via email
KANSAS DEPARTMENT OF TRANSPORTATION
Bureau of Maintenance
HIGHWAY PERMIT
ATTACHMENTS TO BRIDGES
AND OTHER STRUCTURES OR INSTALLATIONS
NEAR RETAINING WALL SYSTEM
Route I-35
Co. JOHNSON
Br.Ser.No0046- B0366
0046-B0366
Secretary has jurisdiction over and control of all bridges and other stuctures on the State Highway System of Kansas, and
Secretary believes that it is in the interest of the Citizens of the State of Kansas to allow public or private utlities to utilitize bridges or other structures on the State Highway System under certain circumstances, and
Petitioner requests permission and authority from Secretary to construct and maintain a
The City of Olathe proposes to relocate and reroute portions of its fiber optic communications network in advance of the planned I-35/Santa Fe Street interchange reconstruction project. The project includes installation of new underground fiber optic conduit, 288-count fiber optic cable, junction boxes, splice enclosures, tracer wire, and related facilities to establish a new communications route outside the future interchange construction limits. The improvements will maintain continuous operation of the City's traffic signal and communications network during interchange construction while providing a permanent fiber optic alignment for the corridor.
Work within KDOT right-of-way includes installation of new fiber optic conduit and cable along the west side of Rogers Road adjacent to I-35 and installation of new fiber optic cable within existing conduit crossing I-35 on the 127th Street bridge. Construction will consist primarily of directional boring, with existing conduit utilized where available.
KSC 10/5/26: Statement below is pulled from geometry questions for weight of attachment.
No change to existing bridge attachment. Adding approximately 520' of 288ct fiber optic cable totaling an estimated 90lb additional weight
Kansas at Reference Point 218.96 , a part of tha State Highway system, and
Secretary has delegated full and complete authority to the District Engineers of the Kansas Department of Transportation (KDOT) to execute Highway Permit
County,JOHNSON
Point # Label Latitude Longitude Main Line Mile Point Offset
FO
1 38.89829 -94.78595 0461000350100000 218.96 132.55
2 38.89829 -94.78459 0461000350000000 218.99 149.71
Details: relocate = "Y", projectNumber = "35-46 KA-6364-02", purpose_of_attachment = "Relocation of City fiber optic facilities in advance of the Santa Fe/I-35 interchange reconstruction project. Utilize existing bridge-mounted conduit.", utility_type = "Fiber Optic Communications (288ct fiber)", weight_of_attachment = "No change to existing bridge attachment. Adding approximately 520' of 288ct fiber optic cable totaling an estimated 90lb additional weight.", attachment_location = "Existing PVC conduit attached to the south side of the WB 127th Street bridge below the bridge deck.", pipe_conduit_diameter_inches = "Existing 4\" PVC", pipe_conduit_material = "Existing 4\" PVC", type_of_bracket = "Existing", type_on_anchor = "Existing
Each crew or subcontractor working off of this permit must have a copy of the permit in their vehicle with them at any time they are working, and proof that proper notification was given to the appropriate KDOT representative. Proper notification must be given to the appropriate KDOT representative shown on the attached list at least 1 working day prior to starting each work instance on the highway right-of- way. Any work encountered without proof of prior notification or an approved permit will be shut down.
Traffic Control Devices and Safety Vests will be Utilized on KDOT Right-of-Way.— All “New Installations” are Required to have a Permit issued.— Petitioner will use recognized best practices for soil erosion control.—
Conditions:
Notifying the appropriate KDOT representative at least 1 day prior to starting work on the highway right of way is MANDATORY. Work encountered without prior notification will be shut down and right of way vacated.
*** Permit may be REVOKED. *** inattached to (Bridge, Structure) Serial No. 0046-B0366 on Highway Route I-35
City Olathe
THIS AGREEMENT, made and entered into, between the Secretary of Transportation of the State of Kansas, referred to as
“Secretary” and City of Olathe
Name of Firm or Individual)
9139719245
(Tel. No.)
Olathe
1385 S Robinson Drive , Olathe KS 66061
Address referred to as “Petitioner” and the City of, City Name or N/A
, referred to as “City”.
Permit 1-2026-1168
Agreements, referred to as “Permits,” for and on Secretary’s behalf.
In consideration of the permission granted by Secretary to utilize a bridge or structure or installation near a retaining wall system in the manner described above, Petitioner agrees to the following terms and conditions:
1.0 PLANS: Petitioner shall furnish two (2) sets of comprehensive plans or detailed drawings 8 1/2"x 11"or "11" x 17", or electronic pdf copy of the proposed work. Plans or detailed drawings must indicate the size, type, and nominal weight of the proposed installation, and include details of the location, method of attachment and type of attaching hardware or method of installation as applicable.
2.0 DESIGN FOR ATTACHMENTS: A check in the amount of $ dollars, made payable to the Kansas Department of Transporation is required from Petitioner for payment of addtional structure cost to support the Utility Installation.
3.0 MATERIAL AND METHODS: Petitioner shall furnish all material, do all work, and pay all costs for the work described on this Permit.
3.1 All proposals for Utility Installations and other attachments to bridges or structures or installation near a retaining wall system must be pre-approved in writing by the Bureau of Design, Bridge Section and the District Engineer.
3.2 All attachments to bridges or other structures or installation near retaining wall systems shall comply with the conditions and requirements of the “Utility Accommodation Policy for KDOT”, current edition which is herein incorporated by reference in its entirety.
3.3 All materials and construction methods used on work within the limits of the right-of-way shall be equal to or better than that required by the Standard Specifications for State Road and Bridge Construction, current edition.
4.0 OBSTRUCTION OF TRAFFIC: Petitioner shall ensure highway (and connecting link) traffic will be free of interference unless specifically provided for as a part of this Permit. All temporary traffic control devices and their installation and maintenance shall comply with the latest edition of the Manual on Uniform Traffic Control Devices (MUTCD) for streets and highways which has been adopted by the Secretary. Whenever the Temporary Traffic Control Standards conflict with the MUTCD, the Standards shall govern. Workers shall wear approved safety vests according to 23 CFR Part 634, Worker Visibility.
5.0 Right-of-Way. Petitioner shall restore the right-of-way to the condition existing prior to approval of the work described on this Permit.
5.1 Any sod, shrubs or trees destroyed by this work shall be replaced as directed by the District Engineer.
5.2 The right-of-way shall be kept free from parking, advertising signs or any other commercial activity.
6.0 MAINTENANCE: All Utility Installations shall be maintained or caused to be maintained by Petitioner.
7.0 PERMIT REVOCATION: In lieu of bond, Secretary may revoke the Permit and remove any work-performed. Petitioner shall reimburse Secretary for any cost incurred by Secretary to restore the right-of-way. Secretary will not authorize any other highway permits until the Petitioner has either reimbursed the Secretary or restored the right-of-way.
8.0 INTIATION AND COMPLETION OF WORK: Petitioner agrees to notify the District Engineer (and City) or their duly authorized KDOT representative Kansas Dept. of Transportation, Kort.StClair@ks.gov9139423135 before work is initiated and again when the work is completed.
8.1 An approved signed copy of this Permit shall be on the premises at the start and during the period any work is performed.
8.2 All work, including right-of-way restoration, shall be completed within calendar days of APPROVAL DATE, otherwise this Permit is null and void. The District Engineer or his duly authorized representative may grant an extension of time upon request of Petitioner. Any such request must be submitted in writing and state the reasons for delay in completing the work.
9.0 LIABILITY: Petitioner shall indemnify and hold harmless Secretary from personal injury and property damage claims arising out of any act or omission of Petitioner. If Secretary defends a third party’s claim, Petitioner shall indemnify Secretary for personal injury damages, property damages, and related expenses Secretary incurs arising out of Petitioner’s act or omission. For purposes of this provision, the term Petitioner includes Petitioner’s employees, agents, subcontractors (at any tier), suppliers (at any tier), successors, and assigns.
9.1 INSURANCE: Liability Insurance. Petitioner shall carry “General Liability” insurance under an occurence policy that has a minimum combined single limit of $2,000,000 for personal injury and property damage and that contains the following coverage: Comprehensive Form, Premises-Operation, Underground Hazard, Products/Completed Operations Hazard, Contractual Insurance, Broad form Property Damage, Independent Contractors, and Personal Injury. Worker’s Compensation. Petitioner shall carry “Worker’s Compensation and Employer’s Liability” insurance that complies with Kansas state law. Automobile Liability.
Petitioner shall carry “Automobile Liability” insurance under an occurence policy that has a minimum combined single limit of $1,000,000.00 for personal injury and property damage and that contains the following coverage: Comprehensive Form, Owned, Hired, and Non-Owned.
9.2 “Certificate of Insurance”. This Permit shall not take effect unless Petitioner provides Secretary a “Certificates of Insurance” confirming Petitioner carries insurance in the amounts and type this section requires. Petitioner shall obtain insurance only from insurers on the approved Federal Treasury List and authorized by the Kansas Commissioner of Insurance. The “Certificates of Insurance” shall include a clause requiring the insurer to notify the Secretary thirty (30) days in advance of cancellation of the insurance contracts.
9.3 Petitioner shall maintain this insurance until the District Engineer releases Petitioner from any Permit obligation.
10.0 DAMAGE TO UTILITIES: KDOT shall not be liable for damage to any utility not installed in the location authorized by any permit or agreement issued pursuant to the Utility Accommodation Policy.
11.0 PIPELINE LIABILITY: For attachments to bridges or other structures and for roadway crossings of PIPELINES CARRYING PETROLEUM, HAZARDOUS AND/OR CORROSIVE PRODUCTS, Petitioner shall solely assume all risk and liability for accidents and damages that may occur to persons, property or natural resources by reason of the operation of the pipeline attached to the bridge or structure or crossing the roadway.
11.1 Petitioner shall maintain the insurance required in Section 9.0 for as long as the pipeline remains attached to the bridge or other structure or for as long as the pipeline crosses the roadway. The insurance contract shall cover claims for such length of time as the law permits such claims.
12.0 ENVIRONMENTAL LIABILITY AND INDEMNIFICATION: Petitioner shall comply with all applicable federal, state, and local statutes, regulations and ordinances relating to environmental protection, and health and safety in Petitioner's acts on, or occupation of, the Highway right-of-way(s). Petitioner assumes all risk and liability for, or resulting from, any environmental condition on, at, or leaving the Highway(s) caused by or arising out of Petitioner's, or its agents' or contractors' acts, omissions, or occupation, in whole or in part of the Highway right-of-way(s). Petitioner shall hold harmless and indemnify the Secretary against all liability, cost, expense, and fines incurred by or levied against the Secretary under any federal, state or local environmental law, regulation, or ordinance resulting from Petitioner's breach of this paragraph or as a result of Petitioner's acts or occupation of the Highway right-of-way(s) pursuant to this Permit. For pupose of this provision, the term Petitioner includes Petitioner's employees, agents, subcontractors (at any tier), suppliers (at any tier), successors and assigns.
13.0 HIGHWAY IMPROVEMENTS: If Secretary makes any alteration or improvement along or upon the highway right-of-way which is the subject of this Permit, Petitioner agrees to hold Secretary harmless for any and all damages or injury to said Petitioner’s construction, whether finished or unfinished, as well as damage or injury to Petitioner’s equipment, materials, employees, agents or contractees. Within a reasonable time after receiving written notice from Secretary that Petitioner's facilities are in conflict with KDOT's new construction or major maintenance operations, Petitioner shall alter, change location or move their construction work or facilities without cost or expense to the Secretary. If Petitioner fails to relocate their Facilities within a reasonable time, KDOT may designate a time which is not arbitrary or capricious for moving the Facilities. Petitioner shall reimburse KDOT for the costs of relocating the Facilities upon receipt of an itemized statement.
(K.S.A. 68-415). In the alternative, Petitioner shall reimburse KDOT for any damages or liabilities or costs to accelerate it may incur as a result of Petitioner's failure to timely relocate the Facility.
13.1 Work approved on this Permit will be conducted in a manner as not to interfere with construction work being performed by KDOT or it’s contractors in the vicinity of Petitioner’s work or project.
14.0 CANCELLATION: This Permit may be terminated or cancelled by either party upon thirty (30) days written notice to the other party and all rights and privileges accrued to Petitioner under the terms of this Permit shall cease forever, and upon termination or cancellation of this Permit Petitioner shall remove the attachments to the bridge or structure without damage or injury to the bridge or structure. Petitioner shall reimburse the Secretary for any and all damages or injury which results from the removal of attachments to the bridge or structure within thirty (30) days of receipt of an itemized statement of damages.
15.0 ABANDONED OR RETIRED IN PLACE: Petitioner shall notify Secretary when the Facilities will be abandoned or retired in place and shall submit a plan for abandonment or retirement in place to the District Engineer or designee for review and approval. Petitioner shall remove or abandon the Facilities in place in accordance with the approve plan. Petitioner shall pay all costs associated with removal of abandoned or retired in place upon highway right-of-way Facilities.
Petitioner
Date
9/23/2026 12:59 PM
Printed Name and Title
Leslie Donnelly
Signature
Email ledonnelly@olatheks.org
Cell/Mobile NumberPhone Number
9139719245
City
Date
9/24/2026 10:51 AM
Printed Name and Title
Brent Berry
Signature
Email bberry@olatheks.org
Cell/Mobile NumberPhone Number
913-971-8532
Area Engineer
Date
10/6/2026 3:00 PM
Printed Name and Title
Kort StClair
Signature
This Permit is hereby accepted and its provisions agreed to by the parties.
913-971-9245Emergency Contact Leslie Donnelly Emergency Phone
SECRETARY OF TRANSPORTATION OF THE STATE OF
KANSAS
Date
10/7/2026 9:00 AM
Printed Name and Title
Angel Fitzgerald (District Coordinator) sign for District Engineer
Signature
INTERSTATE
P l o t t e d o n x
.p e n j p a p e r i
S
E P
:5
A
M
R E
F E
R E
N C
E S
N O
T E
D
R E
F E
R E
N C
E S
C H
E C
K E
D
D A
T E
B Y
P l o t S c a l e
:1 s f e F i b e r T i t l e S h e e t .d g n
F i b e r C o v e r S h e e t
STATE
KANSAS 35-46 KA-6364-02
PROJECT NO.
YEAR SHEET NO.
SHEETS
TOTAL
DEPARTMENT OF TRANSPORTATION
PLAN AND PROFILE OF PROPOSED
STATE HIGHWAY
STATE OF KANSAS
JOHNSON COUNTY
INDEX OF SHEETS
FEDERAL AID PROJECT
SCALE
PLAN: Lat. & Long.
600' 1200'600' 0
CITY OF OLATHE PROJECT NO. 3-C-025-18
KDOT PROJECT NO. 35-46 KA-6364-02
FEDERAL AID NO. STP-A636(402)
I-35 AND SANTA FE STREET
STANDARD LEGEND
DND
12" W
AtmosÜ
8" SAN
"COMPANY"
L.P.
F.H.
DATEJACOB PAPERI, P.E.
1-800-DIG-SAFE
FIBER OPTIC INTERCONNECT
APPROVED BY:
CITY OF OLATHE, KANSAS
CITY ENGINEER
NATE BALDWIN, P.E.
OVERLAND PARK, KANSAS
PREPARED & SUBMITTED BY:
SANTA FE ST.
M U
R -L
E N R
D
K A
N S
A S C
IT
Y R
D
R O
G E R S R
D
C L
A I R
B O
R N
E R
D
L I N
D E
N W
O O
D D
R
129th ST.
9-12
2-7
TRAFFIC CONTROL DETAILS
FIBER OPTIC DETAIL
FIBER OPTIC PLANS
TITLE SHEET
SANTA FE ST.
127th ST.
S H
E E T
S H
E E T
S H
E E T
SHEET 4
SHEET 4
SHEET 5
SHEET 6
ð
XXXX TO BE REMOVED / ABANDONED
UNDERGROUND TELECOM
EXISTING SANITARY LINE
EXISTING GAS LINE
EXISTING WATER LINE
STREAM OR FLOWLINE
EDGE OF WOODS
EXISTING TREES
WATER HYDRANT
LIGHT POLE
EXISTING STORM SEWER
POWER POLE
EXISTING SIGN
APPROXIMATE CONSTRUCTION LIMITS
EXISTING FENCE
CITY LIMIT
EXISTING RIGHT-OF-WAY
ACCESS CONTROL
PROPERTY LINE
DO NOT DISTURB
DRAWINGS AND ANY ACCOMPANYING SPECIFICATIONS.]
USE IN ANY OTHER MANNER EXCEEDS THE INTENDED PURPOSE OF THESE
[THIS DESIGN SPECIFICALLY PREPARED FOR USE AT THE LOCATION SHOWN.
damage thereto.
of underground utilities as may be necessary to avoid making their own verification as to the type and location underground utility lines prior to any excavation and for for contacting all utility companies for field location of all accurate or all inclusive. The Contractor is responsible location of underground utilities is not guaranteed to be
The information shown on this drawing concerning type and
NOTE:
SHEET 7 SHEET 7
SHEET 5
S O
M E
R S
E T T
E R
R A
C E
M O
O R E A
V E
RECAPITULATION OF QUANTITIES
ITEM NO. ITEM UNIT TOTAL
1 Mobilization LS 1
2 Contractor Construction Staking LS 1
3 Traffic Control LS 1
4 Fiber Optic Interconnect Installation LS 1
9-3-2026
P l o t t j p a p e r i
S
E P
:4
P
M
P l o t T a b l e
35-46 KA-6364-02
F ib e r P la n S h e e t x
.p e n s f e p r e p r o j e c t f i b e r p l a n .d g n
F i l e
M o d e l:
STATE
KANSAS
PROJECT NO. YEAR SHEET NO.
SHEETS
TOTAL
D .M
D .M
D .M
D .M
D .M
D .M
D .M
D .M
D .M
D .M
D .M
D .M
L .P
L .P
L .P
L .P
UU
M .H
C C
IÛ
U T
IL
IT
Y
V A
U L T
U T
IL
U L T
O W
N E
R
U N
A V
A
IL
A B
L E
Û
U T
IL
U L T
Ü
C O
M C
A S
T
U T
IL
U L T
Ü
O W
N
A V
A
IL
A B
L E
U T
IL
U L T
Ù C
O M
C A
S T
T V
T V
U T
IL
U L T
Ü
C
O F
L
A T
H E
U T
IL
U L T
Ü
C
A T
H E
C
A T
H E
Û
F .H
F .H
W .M
W .M
W .M
W .M
W .M
W .M
W .V
W .V
W .V
W .V
W .V
W .V
W .V
W .V
W .V
IS
IB
L E
Ü
IB
L E
Ü
IB
L E
Ü
IB
L E
Ü
Ú U n k n o w n e r
(F
O
Ù U n k n o n e r
(F
O
CCIÛ
C C
IÜ
UU
D .M
G .T .S
C .O
E .B .X
G .R
A .C .A .C . G .R
E .M
E .B .X
E .B .X
G .T .S
U T
IL
U L T
O W
N
A V
A
IL
A B
L E
U T
IL
U L T
C O
M C
A S
T
A T
T
Ü
A T
T
Ü
A T
T
Ü
U T
IL
U L T
C O
M C
A S
T
IB
E R
A .C
IT
S Ü
W .V
F .H
W .M
G .V
G .M
G .M
OLATHE WATERÛ
OLATHE WATERÛ
OLATHE WATERÛ
Ù A
T M
O S
ÙATMOS ÙATMOS
ÙATMOS ÙATMOS ÙATMOS
ÙATMOS
OLATHE SEWERÛ
AT&TÜ
AT&TÜ
AT&TÜ
AT&TÜ
AT&TÜ
AT&TÜ
AT&TÜ
AT&TÜ
AT&TÜ AT&TÜ
AT&TÜ
AT&TÜ
D .M
D .M
D .M
C A
M E
R A
W A
M
U N
T E
D L
IG
H T
W A
U N
T E
D
C A
M E
R A
W A
U N
T E
D L
IG
H T
W A
U N
T E
D M .H
M .H
M .H
6" V C P
" V
C P
" V
C P
UU
E L E
C T
R
IC
G A
S
A T
M O S
UU
A T
T
Ü
Ù A
T
T
AT&TÜ
W .V
D .M
T V
S T
E E
L
P
O L E
W
D
O P
S
C C
IÜ
ÙATMOS
ÙATMOS
O L
A T
H
W
T E
R Û
V E
R
IZ
O N
Ü
C C
IÜ
C C
IÜ
CCIÛ CCIÛ
AT&TÜ
A T
T
Ü
O L
A T
H E
S
E W
E R
Û
Ú
E S
P A
S S
IN
G
12" DIP
F .P
15" RCP
C A
N O P
Y
C A
N O P
Y
C A
N O P
Y
F .P
60 65
1 2 3 4 6
J J
ROGERS ROAD
SANTA FE FIBER OPTIC
INTERCONNECT PLANS
SCALE
40' 80'40' 0
(By Others)
Fiber Optic Junction Box
Future City of Olathe Type 3
Coil 10' of 1c#10 Tracer in box
Coil 50' of 288ct Fiber Optic Cable in box to be used in place.
Existing Fiber Optic Junction Box
Future 1-288ct Fiber Optic Cable with Project. (By Others)
Install 1-288ct Fiber Optic Cable (See Plan Note 1)
Operation Center to be used in place.
Existing Fiber Optic Conduit to City Traffic
(Typical)
Install 1-1c#10 Tracer
Install 1-288ct Fiber Optic Cable
Proposed 7-Way Conduit
(By Others)
1-1c#10 Tracer
1-288ct Fiber Optic Cable
Future - 7-Way Conduit
Contractor shall install conduit markers as directed by City Fiber staff.7.
the fiber equipment is installed within the R/W or U/E.
Right-of-Way is shown for reference only. The Contractor shall field verify and stake R/W and U/E to ensure that 6.
the junction boxes and/or other fiber equipment.
Conduit entering service boxes, junction boxes and/or other fiber equipment shall be continuous between 5.
This work will be considered SUBSIDIARY to the "Fiber Optic Interconnect Installation" bid item.
of green space. All repair work shall be approved by the City Engineer and work to be completed per City Standards.
conditions. This may include, (but not limited to), the repair to sidewalk, roadway sections, irrigation, or re-sodding
All areas disturbed by conduit installation, (either by trenching or boring), shall be replaced to match existing4.
construction. Minor relocation of equipment to avoid conflicts may be allowed with the approval of the City's Staff.
City Fiber staff shall inspect the staking prior to any excavation and/or System, North Zone (NAD 83/HARN).
locations shown with Northing and Easting coordinates are referenced to the Kansas State Plane Coordinate
Fiber optic equipmentContractor shall stake the location of all conduit and junction boxes to be installed. 3.
Standard Specifications and shall be approved by the City Engineer.
All construction methods and fiber optic equipment shall conform to the latest edition of the City of Olathe 2.
responsibility of the individual contractors to exactly locate each utility before actual construction.
available information and therefore, their locations must be considered approximate only. It is the
Existing underground (U/G), overhead (OH) utilities and drainage structures have been plotted from 1.
GENERAL NOTES
(By Others)
Future Roadway
Pole Relocation (By Others)
Proposed Evergy Power
Pole Relocation (By Others)
Proposed Evergy Power
City Operation Center with the City's Fiber Optic Staff. Contact Matt Mossman at (913) 971-5166.
Contractor shall coordinate installation and termination of the new 288ct Fiber Optic cable in the 1.
PLAN NOTES
FO
FO
} Rogers Rd.
S p ru c e S t.
R o g e rs
R d S ta
M a tc h li n e
FIBER OPTIC INTERCONNECT LEGEND
Unless Otherwise Noted.
288ct Fiber Optic Cable and 1c#10 Tracer Wire, Duraline FuturePath 7-Way Fiber Optic Conduit, With
Proposed Fiber Optic Junction Box, Type as Noted.
Exist. R/W
15" R
CP
" R
C P
D.M.D.M.
D.M.
D.M.
D.M.D.M.
F.H.
U.J.B.
H.H.
GRASS
GRASS
GRASS
GRASS
GRASS GRASS
UNK. PED.
H.H.
U.J.B.
GRASS
GRASS
GRASS
GRASS
O.H.E.
O.H.E.
KANSAS DEPARTMENT OF TRANSPORTATION
P l o t t j p a p e r i
S
E P
:4
P
M
P l o t T a b l e
35-46 KA-6364-02
F ib e r P la n S h e e t x
.p e n s f e p r e p r o j e c t f i b e r p l a n .d g n
F i l e
M o d e l:
STATE
KANSAS
PROJECT NO. YEAR SHEET NO.
SHEETS
TOTAL
UU
A
T
IL
U L T
S
Ù U
T
IL
U
C C
Ú A
T
IL
U L T
Ú A
T
IL
U L T
Ú C
O M
C A
IL
U L T
T V
D .M
Ú K
C P
L
L
A
Ú K
C P
L
L
A
Ú O
H P
Ú O
H P
ÙATMOS
AT&TÜ
AT&TÜ
LumenÜ
CCIÛ
LumenÜ
LumenÜ
15" R
CP
" R
C P
D.M.D.M.
D.M.
D.M.
D.M.D.M.
F.H.
U.J.B.
H.H.
GRASS
GRASS
GRASS
GRASS
GRASS GRASS
UNK. PED.
295 300 305 6 7 8 9 1 2 3 4 6 7
LumenÜ
LumenÜ
LumenÜ
H.H.
U.J.B.
GRASS
GRASS
GRASS
GRASS
O.H.E.
O.H.E.
8 9 1 2
ROGERS ROAD
INTERCONNECT PLANS
Coil 10' of 1c#10 Tracer in box
Coil 50' of 288ct Fiber Optic Cable in box
N: 218334.972, E: 2226127.294
Fiber Optic Junction Box
Proposed City of Olathe Type 3
Coil 10' of 1c#10 Tracer in box
Coil 50' of 288ct Fiber Optic Cable in box
2226110.352N: 218814.182, E:
Fiber Optic Junction Box
Proposed City of Olathe Type 3
Coil 10' of 1c#10 Tracer in box
Coil 50' of 288ct Fiber Optic Cable in box
Fiber Optic Junction Box
Proposed City of Olathe Type 3
Coil 10' of 1c#10 Tracer in box
Coil 50' of 288ct Fiber Optic Cable in box
Fiber Optic Junction Box
Proposed City of Olathe Type 3
Coil 10' of 1c#10 Tracer in box
Coil 50' of 288ct Fiber Optic Cable in box
Fiber Optic Junction Box
Proposed City of Olathe Type 3
Coil 10' of 1c#10 Tracer in box
Coil 50' of 288ct Fiber Optic Cable in box
Fiber Optic Junction Box
Proposed City of Olathe Type 3
Coil 10' of 1c#10 Tracer in box
Coil 50' of 288ct Fiber Optic Cable in box
Fiber Optic Junction Box
Proposed City of Olathe Type 3
(Typical)
Install 1-1c#10 Tracer
Install 1-288ct Fiber Optic Cable
Proposed 7-Way Conduit
10' from the Edge of Pavement and 6' below ground.
Install Proposed 7-Way Conduit in this area
10' from the Edge of Pavement and 6' below ground.
Install Proposed 7-Way Conduit in this area
Rogers Rd.
L in d e n w o o d D r.
Rogers Rd.
{ I-35
{ I-35
R o g e rs R d . S ta
M a tc h lin e
M a tc h li n e T h is
S h e e t
M a tc h li n e T h is
S h e e t
M a tc h li n e A
R o g e rs
R d
Exist. R/W
Exist. R/W
Exist. R/W
Exis
t. R/
W
Exis
t. R/
W
Exist. R/W Exist. R/W
Exis
t. R/
W
} Ro gers Rd.
Exis
t. R/
W
Exis
t. R/
.P
KANSAS DEPARTMENT OF TRANSPORTATION
P l o t t j p a p e r i
S
E P
:4
P
M
P l o t T a b l e
35-46 KA-6364-02
F ib e r P la n S h e e t x
.p e n s f e p r e p r o j e c t f i b e r p l a n .d g n
F i l e
M o d e l:
STATE
KANSAS
PROJECT NO. YEAR SHEET NO.
SHEETS
TOTAL
L u m e n Ü
L .P
U
CONCRETE WALK
ADA
G R
A
ROGERS ROAD/129TH STREET
INTERCONNECT PLANS
Coil 10' of 1c#10 Tracer in box
Coil 50' of 288ct Fiber Optic Cable in box
Fiber Optic Junction Box
Proposed City of Olathe Type 3
Coil 10' of 1c#10 Tracer in box
Coil 50' of 288ct Fiber Optic Cable in box
Fiber Optic Junction Box
Proposed City of Olathe Type 3
Fiber Optic Junction Box
Proposed City of Olathe Type 3
Coil 10' of 1c#10 Tracer in box
Coil 50' of 288ct Fiber Optic Cable in box
Fiber Optic Junction Box
Proposed City of Olathe Type 3 cables to be used in place.
Existing Fiber Optic Conduit and
Coil 10' of 1c#10 Tracer in box
Coil 100' of 288ct Fiber Optic Cable in box to Existing at this location.
Splice new 288ct Fiber Optic Cable to be used in place.
Existing Fiber Optic Junction Box cables to be used in place.
Existing Fiber Optic Conduit and
Coil 10' of 1c#10 Tracer in box
Coil 50' of 288ct Fiber Optic Cable in box
Fiber Optic Junction Box
Proposed City of Olathe Type 3
Coil 10' of 1c#10 Tracer in box
Coil 50' of 288ct Fiber Optic Cable in box
Fiber Optic Junction Box
Proposed City of Olathe Type 3
' f ro m t h e E d g e o f P a v e m e n t a n d ' b e lo w g ro u n d
I n s ta ll P ro p o s e d -W a y C o n d u it i n t h is a re a
10'
F O
R o g e rs R d
R o g e rs R d
129th St.
M u r- L e n
R d
.129th St.
S o m e rs e t
T e r.
M o o re A v e
M a tc h li n e T h is
S h e e t
M a tc h lin e T h is S h e e t
Matchline A (Rogers Rd.)
I -3
Exist. R/W
Exist. R/W
Exist. R/W
Exist. R/W
Exist. R/W
Exist. R/W
Exist. R/W
E x is t.
/W
.P
Bit.
Bit.
KANSAS DEPARTMENT OF TRANSPORTATION
P l o t t j p a p e r i
S
E P
:4
P
M
P l o t T a b l e
35-46 KA-6364-02
F ib e r
P la n
S h e e t x
.p e n s f e p r e p r o j e c t f i b e r p l a n .d g n
F i l e
M o d e l:
STATE
KANSAS
PROJECT NO. YEAR SHEET NO.
SHEETS
TOTAL
127TH STREET
INTERCONNECT PLANS
Coil 10' of 1c#10 Tracer in box
Coil 50' of 288ct cable in box
Install new 288ct Fiber Optic Cable
Existing Fiber Optic Junction Box
Coil 10' of 1c#10 Tracer in box
Coil 50' of 288ct cable in box in Empty Existing Conduit.
Install new 288ct Fiber Optic Cable
Existing Fiber Optic Junction Box
Coil 10' of 1c#10 Tracer in box
Coil 100' of 288ct cable in box to Existing at this location.
Splice new 288ct Fiber Optic Cable to be used in place.
Existing Fiber Optic Junction Box
Coil 10' of 1c#10 Tracer in box
Coil 50' of 288ct cable in box in Empty Existing Conduit.
Install new 288ct Fiber Optic Cable
Existing Fiber Optic Junction Box
Coil 10' of 1c#10 Tracer in box
Coil 50' of 288ct cable in box
Install new 288ct Fiber Optic Cable
Existing Fiber Optic Junction Box
& 1c#10 Tracer in Existing Conduit.
Install new 288ct Fiber Optic Cable
Existing Fiber Optic Conduit on Structure
& 1c#10 Tracer in Existing Conduit.
Install new 288ct Fiber Optic Cable
Existing Fiber Optic Conduit on Structure
Cable after the new 288ct fiber is active.
Remove Existing 48ct Fiber Optic
Existing Fiber Optic Conduit (Abandon)
Cable after the new 288ct fiber is active.
Remove Existing 48ct Fiber Optic
Existing Fiber Optic Conduit (Abandon)
Interconnect bid item.
to the Fiber Opticsubsidiarybe construction operations and shall system damage resulting from
Contractor shall repair irrigation
Existing irrigation. CAUTION:
Interconnect bid item.
to the Fiber Opticsubsidiarybe construction operations and shall system damage resulting from
Contractor shall repair irrigation
Existing irrigation. CAUTION:
Interconnect bid item.
to the Fiber Opticsubsidiarybe construction operations and shall system damage resulting from
Contractor shall repair irrigation
Existing irrigation. CAUTION:
& 1c#10 Tracer in Existing Conduit.
Install new 288ct Fiber Optic Cable
Existing Fiber Optic Conduit
& 1c#10 Tracer in Existing Conduit.
Install new 288ct Fiber Optic Cable
Existing Fiber Optic Conduit
Coil 10' of 1c#10 Tracer in box
Coil 50' of 288ct cable in box in Empty Existing Conduit.
Install new 288ct Fiber Optic Cable
Existing Fiber Optic Junction Box
F O
FO
F O
FO
FO
FO
FO
FO FO
FO
FO
FO
FO FO
FO
FOFO
M a tc h li n e T h is S h e e t
127th St.
K a n s a s C it y
R d
Harold St.
127th St.
M o o re A v e
M a tc h li n e B th S t.
M a tc h li n e T h is S h e e t
R o g e rs R d
I-
P l o t t j p a p e r i
S
E P
:4
P
M
P l o t T a b l e
35-46 KA-6364-02
F ib e r P la n S h e e t x
.p e n s f e p r e p r o j e c t f i b e r p l a n .d g n
F i l e
M o d e l:
STATE
KANSAS
PROJECT NO. YEAR SHEET NO.
SHEETS
127TH STREET
INTERCONNECT PLANS
Coil 10' of 1c#10 Tracer in box
Coil 100' of 288ct cable in box
288ct fiber is active.
Cable running west after the new
Remove Existing 48ct Fiber Optic to Existing at this location.
Splice new 288ct Fiber Optic Cable and 288ct Fiber Optic Cable to be used in place. Install New 7-way
Existing Fiber Optic Junction Box
Cable after the new 288ct fiber is active.
Remove Box and Existing 48ct Fiber Optic
Existing Fiber Optic Junction Box
Cable after the new 288ct fiber is active.
Remove Existing 48ct Fiber Optic
Existing Fiber Optic Conduit (Abandon)
Coil 10' of 1c#10 Tracer in box
Coil 50' of 288ct cable in box
Fiber Optic Junction Box
Proposed City of Olathe Type 3
Cable after the new 288ct fiber is active.
Remove Existing 48ct Fiber Optic
Existing Fiber Optic Conduit (Abandon)
Coil 10' of 1c#10 Tracer in box
Coil 50' of 288ct cable in box
Fiber Optic Junction Box
Proposed City of Olathe Type 3
Interconnect bid item.
to the Fiber Opticsubsidiarybe construction operations and shall system damage resulting from
Contractor shall repair irrigation
Existing irrigation. CAUTION:
F O
FO
FO
127th St.
M u r-
L e n R o a d
M a tc h li n e B th S t.
36" CMP
24" CMP
C M
P
C M
P
M.H.
FO
FO
FO FOFO
F O
FO
FO
FO
FO FOFO
F O
FO
P
V C
M.H.
M.H.
M.H.
D.M.
D.M.
D.M. D.M.
D.M.
D.M.
D.M.
L.P.
L.P.
L.P. L.P.
L.P.
L.P.
L.P. L.P.
L.P.
L.P.
L.P.
L.P.
L.P.
L.P.
L.P.
L.P.
L.P.
UU
UU
UU
UU UU
UU
M.H.
M.H.
M.H.
M.H.
M.H.
W.H.
L.P.
L.P.
M.H.
M.H.
-SUREWEST UTILITY VAULT
-MCI UTILITY VAULT2" & 6" PVC DROPS-
KCPL #105070 W/
UTILITY VAULT
ÙCITY OF OLATHE
KCPL #105343Ü
ÚCITY OF OLATHE
KCPL #105345Û
UTILITY VAULT
ÙAT&T
END OF MARKSÜ
OWNER UNAVAILABLE
KCPL #104050Ü
-KCPL #103959
UTILITY VAULT
CITY OF OLATHE-
KCPL #103960Ü
NO VISIBLE #Ü
Ú#OLA 1939
UTILITY VAULT
OWNER UNAVAILABLE-
Ú#OLA 1641
NO VISIBLE #Ü
#OLA 1944-
NO VISIBLE #Ü
UTILITY VAULTÜ
AT&T
ÚKCPL #LA1945
UTILITY VAULTÜ
CITY OF OLATHE
NO VISIBLE #Ü
" V
C P
4" PVC 8" VCP
V
C P
UTILITY VAULTS
CITY OF OLATHE-
MCI UTILITY VAULT-
CITY OF OLATHEÜ
F.H.
W.M.
W.M.
W.M.
W.V.
W.V.
W.V.
W.V. W.V.
W.V.
W.V.
ÚNO VISIBLE #
-KCPL #LA1947
ÚNO VISIBLE #
DOUBLE LIGHTS
NO VISIBLE #Ü
ÚDATED: 06/21/2021
LWE=19.0'
8-OHP
ÚNO VISIBLE #
NO VISIBLE #Ü
ÚNO VISIBLE #
ÚKCPL #104111 ÚKCPL #564394 KCPL #104119Ü KCPL #564393Ü
-END OF MARKS
OWNER UNAVAILABLE
11-OHPÜ 11-OHPÜ 10-OHPÜ
#OLA 1942-
Ù2-OHP
ÚKCPL #104055
NO VISIBLE #Ü
7-OHPÛ
DATED: 06/21/2021
LWE=15.6'
Ù3-OHP
DATED: 06/21/2021Ü
LWE=20.4'
11-OHP
DATED: 06/21/2021Ü
LWE=17.9'
10-OHP
DATED: 06/21/2021Ü
LWE=18.3'
11-OHP
ÚNO VISIBLE #
ÚNO VISIBLE #UTILITY VAULT-
CITY OF OLATHE
UTILITY VAULT
-SBC
UTILITY VAULT-
CENTURY LINK
M.H.
M.H.
LUMENÜ
LUMENÜ
S P
E C
T R
U M
Ü
S P
E C
T R
U M
Ü VerizonÜ
VerizonÜ
VerizonÜ
OLATHE WATERÛ
OLATHE WATERÛ
OLATHE WATERÛ
O L
A T
T E
R Û
OLATHE WATERÛ
O L
A T
T E
R
ÛMCI UTILITY VAULT-
UTILITY VAULT
OWNER UNAVAILABLE
L.P.
ÚNO VISIBLE #
G.M.
M.H.
ÙATMOSG.M.
G.M.
O L
A T
T E
R Û
ÙATMOS
ÙATMOS
ÙATMOS ÙATMOS ÙATMOS
ÙATMOSÙATMOS
ÙATMOS
ÙATMOS
ÙATMOS
Ù A
T M
O S
Ù
ATM
OS
Ù A
T M
O S
Ù A
T M
O S
VerizonÜVerizonÜ
S P E
C T
R U
M Ü
SPECTRUMÜ
S P
E C
T R
U M
Ü
O L
A T
W E
R Û
OLATHE SEWERÛ
OLATHE SEWERÛ
AT&TÜ
AT&TÜ
AT&TÜ
AT&TÜ
AT&TÜ
AT&TÜ
AT&TÜ
AT&TÜ
AT&TÜ
AT&TÜAT&TÜ
AT&TÜ
AT&TÜ
A T
T
Ü
A T
T
Ü A
T
T Ü
A T
T
Ü C
C
IÜ
C C
IÜ
C C
IÜ
U G
E Ü
U G
E Ü U G
E Ü
U G
E Ü
U G
E Ü
U G
E Ü
U G
E Ü
U G
E Ü
U G
E Ü
U G
E Ü
UGEÜ
UGEÜ
UGE
Ü
UGEÜ
UGE
Ü
UGE
Ü
UGEÜ
UGEÜ
UGEÜ
UGEÜ
UGEÜ
UGEÜ
UGEÜ
UGEÜ
UGEÜ
UGEÜ
UGEÜ
UGEÜ
UGEÜ
UGEÜ
UGEÜ
ÚCOMCAST
L.P.
#LA1944
ELECTRIC OUTLET
WALL MOUNTED
W.V.
L.P.
LumenÜ
L u m e n
Ü
W/ 4 DROPS W/ 1 DROP W/ 1 DROP W/ 1 DROP
DROPS
& 4 ADDITIONAL
W/ 1-ATT DROP
W/ 1-2" DROPE.C.V.
CONTROL CABINETÜ
TRAFFIC SIGNAL
ÚATT
M.H.
W/ 3 DROPS
VERIZONÜ
V E
R
IZ
O N
Ü
V E
R
IZ
O N
Ü
ÙGOOGLE FIBER
S.C.B.
S.C.B.
S.C.B.
S.C.B.
S.C.B.
S.C.B.S.C.B.
DIVIDED ROAD
S.C.B.S.C.B.BORE HOLEÜ
DIAMOND REFLECTOR
TOWING ENFORCEDÜ
ÚMISSING SIGN
SIGN POST, TURN RIGHTÜ
RIGHT LANE MUST
24" HDPE
24" HDPE
M.H.
D I P
24" CMP
24" CMP
" P
VC
18" CMP
36" CMP36" RCP
36" RCP
C
M P
36" RCP
C M
P
36" RCP
12"
CMP
" R
C P
36" RCP
15" CMP 15" CMP
18" CMP
F.P.
M.H.
M.H.
M.H.M.H.
M.H.
M.H.
M.H.M.H.
M.H.
M.H.
M.H.
M.H.M.H.
M.H.
M.H.
M.H.
M.H.
M.H.
M.H.
M.H.
M.H.
M.H.
15" CMP(PREVIOUS 18" CMP)
J
J
150 155 9 1 2 3 4 6 7 8
150 155 1 2 3 4 6 7 8
MP
MP
KANSAS DEPARTMENT OF TRANSPORTATION
P l o t t j p a p e r i
S
E P
:4
P
M
P l o t T a b l e
35-46 KA-6364-02
F i b e r P l a n S h e e t x
.p e n s f e p r e p r o j e c t f i b e r p l a n .d g n
F i l e
M o d e l:
STATE
KANSAS
PROJECT NO. YEAR SHEET NO.
SHEETS
TOTAL
FOFO
D.M.
L.P.L.P.
L.P.
L.P.
UU
UU
M.H.
UTILITY VAULTÜ
CITY OF OLATHE
NO VISIBLE #Ü
ÙMCI UTILITY VAULT
NO VISIBLE #Ü
8" VCP
8" VCP
F.H.
F.H.
W.M.
W.V.
W.V.
W.V.
W.V.
UTILITY VAULT
AT&T-
UTILITY VAULT-
CENTURY LINK
VerizonÜ
O L
A T
T E
R Û
OLATHE WATERÛ
ÙGOOGLE FIBER
-BGL
66540
1005.92
SNG
66546
1004.85
O L
A T
T E
R Û
ÙATMOS
ÙATMOSÙATMOS
Ù A
T M
O S
Ù A
T M
O S
OLATHE SEWERÛ
OLATHE SEWERÛ
AT&TÜ
AT&TÜ
AT&TÜ
UGEÜ
UGEÜUGEÜ
Ú S p e c tr u m
ÙDITCH
ÚTREE MOUND
M.H.
L.P.L.P. L.P. L.P.
L.P.
UU
UU
M.H.
M.H. M.H.
KCPL #104087Û
ÚUTILITY VAULT
OWNER UNAVAILABLE
R C P
8" PVC 8" PVC
W.V.
W.V.
ÚKCPL #LA1949
KCPL #LA1950Ü
KCPL #LA1957- KCPL #LA1956-
ÚKCPL #LA1955
9-OHPÜ
Ú2" PVC DROP
KCPL #104088 W/
4" PVC DROP
-KCPL #584248 W/
ÙKCPL #104090Ù10-OHP Ù10-OHP
DATED: 06/21/2021Ü
LWE=14.4
10-OHP
M.H.
LUMENÜ
LUMENÜ
OLATHE WATERÛ OLATHE WATERÛ
O L
A T
T E
R Û
UTILITY VAULT
ÙOWNER UNAVAILABLE
66367
END MARKS*
1001.53
ÙATMOS
SPECTRUMÜ
SPECTRUMÜ
SPECTRUMÜ
SPECTRUMÜ
SPECTRUMÜ
SPECTRUMÜ
SPECTRUMÜ
O L
A T
H E
S E
W E
R Û
O L
A T
W E
R Û
O L
A T
W E
R Û
O L
A T
W E
R Û
OLATHE SEWERÛ
OLATHE SEWERÛOLATHE SEWERÛ
AT&TÜ
AT&TÜ
AT&TÜ
AT&TÜ
AT&TÜAT&TÜ
AT&TÜ
UGEÜ
UGEÜ
U G E
Ü
UGEÜ
W/ 1 DROPS
VERIZONÜVERIZONÜVERIZONÜ
ÙDITCH
INDIAN CREEKÛ
45 MPH
12" DIP
C M
P
15" RCP
18" RCP
C M
P
" C
MP
42" CMP 36" CMP
24" CMP
C M
P
C M
P
42" CMP
42" CMP M.H.
M.H.
M.H.
M.H.
M.H.
M.H.
M.H.M.H.
M.H.
M.H.
M.H.
M.H.
160 165 1 2 3 4 6 7 8 9 160 165 1 2 3 4 6 7 8 9
SANTA FE STREET
INTERCONNECT PLANS
Coil 10' of 1c#10 Tracer in box
Coil 50' of 288ct Existing Fiber Optic Cable in box
N: 216847.754 E: 2229776.071
Fiber Optic Junction Box
Proposed City of Olathe Type 3 cables to be used in place.
Existing Fiber Optic Conduit and
Coil 10' of 1c#10 Tracer in box
Coil 50' of 288ct Existing Fiber Optic Cable in box junction box at the northeast corner of Mur-Len.
to the new splice enclosure in the new type 4 fiber optic back to this box and reroute through the new conduit
Remove existing fiber optic cable from the west to be used in place.
Existing Fiber Optic Junction Box
Coil 10' of 1c#10 Tracer in box
Coil 50' of 288ct Existing Fiber Optic Cable in box
N: 216852.563 E: 2230277.809
Fiber Optic Junction Box
Proposed City of Olathe Type 3
Coil 10' of each 1c#10 Tracer in box
Coil 50' of each Fiber Optic Cable in box and East at this location.
Install Fiber Optic Cables from the South
N: 216827.205, E: 2228972.255
Proposed Type 3 Fiber Optic Junction Box
Coil 10' of each 1c#10 Tracer in box
Coil 100' of each Fiber Optic Cable in box
Furnish and Install Splice Enclosure & Splice Fiber Optic Cables from the North, South and East at this location.
Proposed City of Olathe Type 4 Fiber Optic Junction Box the northwest corner of the intersection.
conduit back to the new junction box in to the south and re-install in the modified back to the next existing fiber junction box northwest corner of Santa Fe & Mur-Len
Remove existing fiber optic cables from the
Existing Fiber Optic Conduit to be used in place.
N: 216651.551 E: 2228964.521
Fiber Optic Junction Box
Proposed City of Olathe Type 3 corner of the intersection.
conduit to the new junction box in the northeast to the north and re-install in the modified back to the next existing fiber junction box northwest corner of Santa Fe & Mur-Len
Remove existing fiber optic cables from the
Existing Fiber Optic Conduit to be used in place.
Coil 10' of 1c#10 Tracer in box
Coil 50' of 288ct Existing Fiber Optic Cable in box
N: 216839.423 E: 2229474.961
Fiber Optic Junction Box
Proposed City of Olathe Type 3
Existing Fiber Optic Cable (Remove & Reroute)
Existing Fiber Optic Conduit (Abandon)
Existing Fiber Optic Cable (Remove & Reroute)
Existing Fiber Optic Conduit (Abandon)
(By Others)
1-1c#10 Tracer
1-288ct Fiber Optic Cable
Future - 7-Way Conduit
(By Others)
Future Roadway
(By Others)
Future Roadway
(By Others)
Future Roadway
(By Others)
Future Roadway
(By Others)
Future Traffic Signal Installation
(By Others)
Future Traffic Signal Installation
Util. Esmt.
R/W
Util. Esmt.
R/W
1-1c#10 Tracer
Install Existing Fiber Optic Cables from the South and East at this location.
New 7-Way Conduit
N: 216854.415 E: 2229760.008
Future Evergy Equipment
Conduit Deflection Point to avoid
N: 216847.327 E: 2229548.256
Future Evergy Equipment
Conduit Deflection Point to avoid
FO
FO
FO
F O
FO FOFO
FO
FO
FO
FO
FO
FO
FO
.0
M a tc h li n e S ta
} Santa Fe St.
} Santa Fe St.
M u r-
L e n
R d
B ro u g h a m
D r.
.0
M a tc h li n e S ta
FIBER SPLICE
FIBER SPLICE OF EACH FIBER IN BUFFER TUBE
UNTERMINATED FIBER
TRANSMIT
RECEIVE
FIBER DEVICE IN LOCAL CABINET
FIBER DEVICE IN DESTINATION CABINET
FIBER SPLICE LOCATION AT CONTROLLER
ASSEMBLY / BUILDING
FIBER SPLICE LOCATION AT HANDHOLE /
SPLICE VAULT
T
R
XYZ
XYZ
LEGEND
1. UNUSED BUFFER TUBES SHALL PASS THROUGH SPLICE ENCLOSURE WITHOUT SPLICING, DO NOT BREAK OUT
INDIVIDUAL FIBERS.
2. UNTERMINATED FIBERS/BUFFER TUBES SHALL BE STORED IN SPLICE TRAYS.
3. ALL PIGTAILS AND JUMPERS SHALL BE TERMINATED WITH ST STYLE CONNECTORS. PATCH PANELS (FIBER
DISTRIBUTION UNITS) ARE TO BE CONFIGURED WITH ST STYLE CONNECTORS.
4. FOR LOCATIONS WITH MULTIPLE SPLICE TRAYS, CONTRACTOR SHALL DENOTE ON DRAWINGS WHICH SPLICE TRAY
EACH SPLICE IS STORED IN.
5. NO-FIBER CONNECTIONS BETWEEN EQUIPMENT LOCATED WITHIN HANDHOLES/SPLICE VAULTS, WITHIN THE
REGENERATION BUILDING, AND WITH CONTROLLER ASSEMBLES ARE NOT SHOWN.
6. ALL FIBERS IN THE BUFFER TUBE(S) SHALL BE SPLICED IN THIS ENCLOSURE.
NOTES
T
R
T
R
FIBER SPLICE LOCATION AT CONTROLLER ASSEMBLY/BUILDING
FIBER DEVICE IN
FIBER DEVICE IN
FIBER PIGTAILS FIBER JUMPERS
BUFFER TUBE
BLUE
ORANGE
GREEN
BROWN
SLATE
WHITE
BLUE
ORANGE
GREEN
BROWN
SLATE
WHITE
BUFFER TUBE
(TYP) (TYP)
BLUE
BLUE
P A
T C
H P
A N
E L
P A
T C
H P
A N
E L
DESTINATION CABINET
LOCAL CABINET
FIBER DEVICE IN
FIBER DEVICE IN
DESTINATION CABINET
LOCAL CABINET
T
R
FIBER SPLICE LOCATION AT CONTROLLER ASSEMBLY/BUILDING
FIBER DEVICE IN
FIBER PIGTAILS FIBER JUMPERS
BUFFER TUBE
BLUE
ORANGE
GREEN
BROWN
SLATE
WHITE
(TYP) (TYP)
BLUE
P A
T C
H P
A N
E L
LOCAL CABINET
FIBER DEVICE IN
DESTINATION CABINET
T
R
FIBER DEVICE IN
LOCAL CABINET
FIBER DEVICE IN
DESTINATION CABINET
## COUNT FIBER CABLE
T
R
FIBER SPLICE LOCATION AT CONTROLLER ASSEMBLY/BUILDING
FIBER DEVICE IN
FIBER PIGTAILS FIBER JUMPERS
BUFFER TUBE
BLUE
ORANGE
GREEN
BROWN
SLATE
WHITE
(TYP) (TYP)
BLUE
P A
T C
H P
A N
E L
LOCAL CABINET
FIBER DEVICE IN
DESTINATION CABINET
## COUNT FIBER CABLE
T
R
FIBER SPLICE LOCATION AT CONTROLLER ASSEMBLY/BUILDING
FIBER DEVICE IN
FIBER PIGTAILS FIBER JUMPERS
BUFFER TUBE
BLUE
ORANGE
GREEN
BROWN
SLATE
WHITE
(TYP) (TYP)
BLUE
P A
T C
H P
A N
E L
LOCAL CABINET
FIBER DEVICE IN
DESTINATION CABINET
## COUNT FIBER CABLE
BLUE
ORANGE
GREEN
BROWN
SLATE
WHITE
RED
BLACK
YELLOW
VIOLET
BLUE
BUFFER TUBE
BLUE
ORANGE
GREEN
BROWN
SLATE
WHITE
BLUE
ORANGE
GREEN
BROWN
SLATE
WHITE
RED
BLACK
YELLOW
VIOLET
ROSE
AQUA
ROSE
AQUA
BLUE
ORANGE
GREEN
BROWN
BLUE
ORANGE
GREEN
BROWN
BLUE
GREEN
BROWN
BUFFER TUBE
SEE NOTE 1
FIBER SPLICE LOCATION AT HANDHOLE/SPLICE VAULT
BLUE
ORANGE
GREEN
BROWN
SLATE
WHITE
BLUE
BUFFER TUBE
BLUE
ORANGE
BLUE
ORANGE
GREEN
BROWN
SLATE
WHITE
RED
BLACK
YELLOW
VIOLET
ROSE
AQUA
BLUE
ORANGE
GREEN
BROWN
BLUE
ORANGE
GREEN
BROWN
GREEN
BROWN
BUFFER TUBE
SEE NOTE 1
FIBER SPLICE LOCATION AT HANDHOLE/SPLICE VAULT
GREEN
BROWN
SLATE
WHITE
RED
BLACK
YELLOW
VIOLET
ROSE
AQUA
ORANGE
GREEN
BROWN
SLATE
WHITE
BLUE
BUFFER TUBE
BLUE
ORANGE
GREEN
BROWN
SLATE
WHITE
RED
BLACK
YELLOW
VIOLET
ROSE
AQUA
BLUE
ORANGE
GREEN
BROWN
BLUE
ORANGE
GREEN
BROWN
GREEN
BROWN
BUFFER TUBE
SEE NOTE 1
FIBER SPLICE LOCATION AT HANDHOLE/SPLICE VAULT
GREEN
BROWN
SLATE
WHITE
RED
BLACK
YELLOW
VIOLET
ROSE
AQUA
ORANGE
BLUE
ORANGE
BLUE
ORANGE
## COUNT FIBER CABLE ## COUNT FIBER CABLE TO *LOCATION*
SEE FIBER SPLICE SHEET ##
## COUNT FIBER CABLE## COUNT FIBER CABLE FROM *LOCATION*
SEE FIBER SPLICE SHEET ##
## COUNT FIBER CABLE
CHOOSES TO BORE INSTEAD OF TRENCH, THERE WILL BE NO CHANGE IN PRICING.
OR DRIVEWAYS SHALL BE INSTALLED USING AN APPROVED JACKING OR BORING METHOD. IF THE CONTRACTOR
PER CITY OF OLATHE TECHNICAL SPECIFICATIONS (TS-9212), CONDUIT UNDER EXISTING PAVEMENT, SIDEWALK, 7.
KANSAS DEPARTMENT OF TRANSPORTATION
P l o t t j p a p e r i
S
E P
:5
A
M
P l o t T a b l e
35-46 KA-6364-02
R E
F E
R E
N C
E S
N O
T E
D
R E
F E
R E
N C
E S
C H
E C
K E
D
D A
T E
B Y
S h e e t x
.p e n
P r e p r o j e c t F i b e r O p D e t a i l
.d g n
F i l e
M o d e l:
STATE
KANSAS
PROJECT NO. YEAR SHEET NO.
SHEETS
FIBER OPTIC DETAIL
DIAGRAM FROM CITY TRAFFIC PERSONNEL.
CONTRACTOR SHALL OBTAIN SPLICING
* To include all jumpers & equipment for full operation.* *
Factory Pigtail with connector (including splices)
Fiber Distribution Unit (Complete) - See Olathe specifications
Patch cable SM duplex SC/LC
Splice enclosure - complete
ITEM (***)
Each
UNIT
FIBER OPTIC EQUIPMENT
MODELSIZE
ADC FDU 1U RMG1U
From Factory-
Tyco FOSC 45024
-1 meter
-1 meter
See Olathe Spec.-
-24 x 36
Each
Patch cable MM duplex ST/ST
Fiber optic cable SM/MM 12/12
Splice enclosure - complete
Splice enclosure - complete
Fiber optic cable SM 6
Fiber optic cable SM 24
Fiber optic cable SM 48
MicroFiber 288 Count
Tyco FOSC 450
Tyco FOSC 450
See Olathe Spec.
See Olathe Spec.
See Olathe Spec.
288ZH4-Y4F40A20
Fiber optic junction box - Type III
1c#10 Tracer wire
Dura-Line FuturePath Multi-duct Conduit
Splices (FDU)
Splices (Enclosure)
30 x 48
7-Way
Each
Lin Ft
Lin Ft
See Olathe Spec.
See Olathe Spec.
Lump
Fiber optic junction box - Type IV
QUANTITY
10550
10740
Lin Ft
HDPE/7-Way Conduit (Bored) (See Note 7) 7-Way See Olathe Spec. Lin Ft
-QUANTITIES FOR INFORMATION ONLY-
AND ARE NOT GUARANTEED TO BE A COMPLETE LIST OF MATERIALS FOR THIS PROJECT.
CONVENIENCE THESE APPROXIMATE QUANTITIES WERE PREPARED FOR THE CONTRACTOR'S
I
A
N D
S A
N T
A F
E S
T R
E E
T
P .N
K
A
W20-3
M4-8A
W20-2
M4-9
ON BARRICADE
R11-2 WITH M4-10
ROAD CLOSED
TO
THRU TRAFFIC
ROAD
CLOSED
AHEAD
DETOUR
AHEAD
END
DETOUR
ON BARRICADE
R11-2 WITH M4-10
ROAD
CLOSED
ROAD
CLOSED
DETOUR
M4-8A
M
ROAD
CLOSED
AHEAD
W20-3
M4-
W20-2
M
D E
T O
U R
DETOUR
AHEAD
DETOUR
DETOUR SIGNING-STREET
CONSTRUCTION IN A STREET GRID
ROADWAY FOR WHICH THE DETOUR WAS ESTABLISHED.
DETOUR SIGN (M4-9) TO INDICATE THE NAME OF THE
STREET NAME SIGN (D-3) TO BE PLACED ABOVE THE
CHANNELIZERS
CONES OR SLIMLINE
OR FLUORESCENT ORANGE
= REFLECTORIZED DRUMS
= TYPE III BARRICADE
BOARD
= ARROW PANEL
= SIGN
LEGEND
= WORK SPACE
= FLAGGER
SIDEWALK
CLOSED
SIDEWALK
CLOSED
SIDEWALK
CLOSED
SIDEWALK CLOSED
CROSS HERE
CORNER SIDEWALK CLOSURE
WITH PEDESTRIAN DETOUR
MID-BLOCK SIDEWALK CLOSURE
WITH PEDESTRIAN DETOUR
GENERAL NOTES:
ALL DEVICES, THEIR INSTALLATION, AND MAINTENENCE SHALL COMPLY WITH THE 2009 EDITION OF
THE MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (MUTCD).
UNLESS OTHERWISE NOTED, ALL TRAFFIC CONTROL DEVICES SHALL BE PROVIDED AND MAINTAINED
BY THE CONTRACTOR.
SIGNS AND TRAFFIC CONTROL DEVICES NEED TO BE PROPERLY MAINTAINED FOR CLEANLINESS, VISIBILITY, AND CORRECT POSITIONING.
CONTRACTOR SHALL OBTAIN UTILITY LOCATES PRIOR TO INSTALLING SIGNPOSTS.
SIGNS LEFT IN PLACE THREE OR FEWER DAYS CAN BE MOUNTED AT ONE FOOT ABOVE THE ROAD-
WAY. SIGNS LEFT IN PLACE GREATER THAN THREE DAYS NEED TO BE MOUNTED AT SEVEN (7)
TRAFFIC CONTROL DEVICES SHALL MEET MASH 2009.
ALL SIGNS SHALL TO BE REMOVED, COVERED, OR TURNED AWAY FROM TRAFFIC WHEN NOT IN USE.
CONTRACTOR MAY BE REQUIRED TO ADD CONSTRUCTION FENCE TO PROHIBIT PEDESTRIANS FROM
ENTERING THE WORK AREA. FENCING SHOULD NOT CREATE A SIGHT DISTANCE RESTRICTION FOR
ALL WORKERS SHALL WEAR HIGH VISIBILITY APPAREL MEETING ANSI 107-2010 CLASS 2 FOR DAY-
NOTIFY TRAFFIC OPERATIONS OF ANY WORK WITHIN THE RIGHT-OF-WAY AT 913-971-5180. 72 HOUR
NOTICE IS REQUIRED IF TRAFFIC SIGNALS ARE TO BE MODIFIED AS PART OF TRAFFIC CONTROL.
FEET. IF THERE ARE NO SIDEWALKS, NO PEDESTRIANS, AND NO PARKING, MOUNTING HEIGHT CAN
BE REDUCED TO FIVE FEET. IF SECONDARY SIGN IS NEEDED MINIMUM MOUNTING HEIGHT MAY BE
EXCEPT AS NOTED (DOWNSTREAM TAPER, FLAGGER OPERATIONS,
YIELD OPERATION), SPACE CHANNELIZER @ SPEED LIMIT. IF
SPEED LIMIT IS 40mph SET DEVICES AT 40'.
TAPER LENGTH (L) IN FEET
SPEED LIMIT
SPEED (S)
40 MPH OR LESS
L = WS45 MPH OR MORE
L =
WS²
TAPER (L) SIGN SPACING (X)
80' 100'
125' 100'
180' 100'
245' 100'
320' 100'
540' 350'
BASED ON W=12'
L = TAPER LENGTH IN FEET
W = WIDTH OF OFFSET IN FEET
S = POSTED SPEED LIMIT PRIOR TO WORK STARTING
TAPER LENGTH
SIDEWALK CLOSED
CROSS HERE
SIDEWALK CLOSED
CROSS HERE
S
ID
E W
A L
K C
L O
S E
D
C R
O S
S H
E R
E
SIDEWALK CLOSED
USE OTHER SIDE
S
ID
E W
A L
K C
L O
S E
D
U S
E O
T H
E R
S
ID
E
-9
M4
DETOUR
M
D E
T O
U R
-9
M4
DETOUR
D E
T O
U R
DETOUR
M
D E
T O
U R
END
DETOUR
DETOUR
WHEN ROAD WORK CREATES A DIFFERENCE IN ELEVATION BETWEEN ADJACENT LANES THAT ARE
OPEN TO TRAVEL, UNEVEN LANE SIGNS (W8-11) 36"x36" SHALL BE ADDED. THEY SHALL BE
PLACED AT BEGINNING AND AT INTERVALS EQUAL TO APPROXIMATELY 1000', BOTH DIRECTIONS IF
A BUMP SIGN (W8-1) 36'X36" SHALL BE INSTALLED TO GIVE WARNING OF A 2" OR MORE RISE
OR DEPRESSION IN THE PROFILE OF THE ROADWAY. USE AT BEGINNING AND END OF MILLING
ADVANCE SIGNS TO BE PLACED ON TYPE I OR TYPE II BARRICADES. PLACE
SO THAT AT LEAST 48" OF SIDEWALK IS AVAILABLE FOR PEDESTRIAN USE.
SIGNS TO BE PLACED ON CONTINUOUS DETECTABLE DEVICES. DEVICE CAN BE
TYPE I, TYPE II, TYPE III OR OTHER TYPE WALLS OR RAILS AS PER MUTCD. THEY
WILL HAVE ORANGE AND WHITE STRIPES. THE BOTTOM EDGING WILL BE AT LEAST
6 INCHES IN WIDTH AND PLACED A MAXIMUM OF 2 1/2 INCHES ABOVE THE
SIDEWALK, SO AS TO BE DETECTABLE BY PEDESTRIANS WITH LONG CANE.
A P
P R
O V
E D
S C
A L
E
D A
T E
C H
E C
K E
D
D E
T A
IL
E
D
D E
S
IG
N E
D
O F
S H
E E
T B
Y D
E S
C R
IP
T
IO
N
D A
T E
N O
R E
V
IS
IO
N
S
C
IT
Y O
F O
L A
T H
E P
U B
L I C
W O
R K
S
T R
A F
F I C
D I V
I S
I O
N
P .O
B
O X
O
L A
T H
E K
A N
S A
S
X X
N O
N E
X X
/X X
/X X
G e n e r a l N o t e s a n d
P e d e s t r i a n s
X X
X X
X X
O
F
WHERE:
FORMULAS FOR DETERMINING
TIME AND CLASS 3 FOR NIGHTTIME.
ALL EXISTING PERMANENT SPEED LIMIT SIGNS AND OTHER CONFLICTING SIGNS SHALL BE COVERED
WITH AN OPAQUE WEATHERPROOF MATERIAL OR REMOVED.
ARROW PANEL BOARD IS NOT REQUIRED IF LANE CLOSURE IS TWO (2) HOURS OR LESS IN
UNLESS OTHERWISE APPROVED, ON AN ARTERIAL ROADWAY THERE WILL BE NO LANE CLOSURES
FROM 6:30 TO 8:30 AM AND FROM 4:00 TO 6:00PM.
AN APPROVED RIGHT-OF-WAY PERMIT IS REQUIRED FOR ALL WORK PERFORMED WITHIN THE CITY
OF OLATHE RIGHT OF WAY.
THE TRAFFIC CONTROL REQUIREMENTS SHOWN ON THESE PLANS ARE MINIMUM REQUIREMENTS
ONLY AND DO NOT ATTEMPT TO ADDRESS IN DEPTH THE VARIETY OF SITUATIONS THAT MAY OCCUR
ONCE CONSTRUCTION HAS STARTED. IN NO WAY DO THE REQUIREMENTS SHOWN ON THE PLANS
RELIEVE THE CONTRACTORS OF THEIR RESPONSIBILITY FOR SELECTING THE PROPER TRAFFIC
IF THE PLANS DO NOT INCLUDE A TRAFFIC CONTROL PLAN, OR SHOULD THE CONTRACTOR DESIRE
TO CHANGE THE PLAN, A SPECIFIC TRAFFIC HANDLING PLAN THROUGH THE CONSTRUCTION AREA
CONTROL DEVICES. ANY ADDITIONAL QUANTITIES OF TRAFFIC CONTROL DEVICES NECESSARY TO
COMPLETE THE CONTRACT OR AS ORDERED INSTALLED BY THE ENGINEER SHALL BE CONSIDERED
SHALL BE SUBMITTED BY THE CONTRACTOR AND APPROVED BY…