This is a comprehensive set of construction plan documents and specifications for the RPS 205 Marsh Site Logistics project issued for construction on February 12, 2026, involving Rockford Public Schools as the owner, C.E.S. Inc. as the engineering firm, and Winnebago County as the governing jurisdiction. The project encompasses site improvements at 2021 Hawthorne Drive in Rockford, Illinois, including construction of a paved bus loop, additional parking lot, stormwater management infrastructure, and associated site work on approximately 4.5 acres of an 18.89-acre total site. The plan set consists of 15 sheets detailing existing conditions, demolition requirements, overall site improvements, grading plans, stormwater pollution prevention protocols, landscaping, electrical and photometric specifications, and accessibility requirements. Key infrastructure elements include 45 lineal feet of 12-inch CMP storm culvert, 91 lineal feet of 24-inch CMP storm culvert, 42 lineal feet of 15-inch RCP storm sewer, and 134 lineal feet of 12-inch RCP storm sewer. The project proposes 102 total parking spaces for school-day operations (97 standard, 5 ADA-compliant) plus 45 additional off-hour parking spaces, 2 swinging A-frame gates, concrete sidewalks totaling approximately 4,219 square yards of HMA pavement and 1,048 square yards of additional pavement, 13 light poles with LED fixtures and camera installations, and comprehensive landscaping including shade trees, deciduous shrubs, and ground cover plantings.
The contractor must comply with Illinois Department of Transportation standard specifications, Winnebago County requirements, and the Regional Office of Education standards, with all work subject to inspection and approval. The contractor is responsible for all utility coordination including verification of existing utility locations through J.U.L.I.E. (call 811), with a mandatory 48-hour advance notification requirement before construction begins. Demolition work includes removal of 973 square yards of HMA pavement, 927 square feet of concrete sidewalk, 83 lineal feet of curb and gutter, various structures and utilities, and site preparation to suitable grade. The Stormwater Pollution Prevention Plan (SWPPP) requires contractor certification and compliance with NPDES General Permit No. ILR10, with mandatory weekly inspections and post-rainfall monitoring of erosion control measures. All disturbed areas must be stabilized within 14 days of disturbance using temporary seeding and mulch, with permanent seeding and landscaping completed within 7 days of final topsoil re-spread. The contractor must furnish proof of insurance before work begins, maintain the approved SWPPP on-site throughout construction, and post required SWPPP information signage near the site entrance, with final Notice of Termination (NOT) submission required upon project completion and site stabilization.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 2-26-21 Part 1 Bid Specs.pdf | ||
| 1-26-21 Part 2 Specs Marsh School.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FAIRWAY PL
HA
W
TH
O
RN
E
DR
CP #2
CP #3
UGF
UG
F
UGF
O
HU
OHUUGT
CP #10
E
CP #40011
CP #40014
E
E
S
S
S
S
ED
G
EB
RO
O K
DR
S
S
CP #9
CONTROL POINTS
CP #
40011
40014
NORTHING
2050219.1920
2050174.5732
2050644.8333
2050657.3669
2050445.6510
2050053.7870
EASTING
2602941.3220
2603005.7475
2603081.9111
2603203.3600
2603240.9610
2603224.8820
ELEVATION
827.30
826.76
825.76
819.85
815.87
810.91
DESCRIPTION
MAG NAIL
MAG NAIL
MAG NAIL
MAG NAIL
MAG NAIL
MAG NAIL
OWNER:
ROCKFORD PUBLIC SCHOOLS
SCOTT JENSEN - DIRECTOR OF DESIGN & CONST.
201 S MADISON STREET
ROCKFORD, IL 61108
(815)-966-3000 KEVIN C. BUNGE, PE DATE
EXPIRES 11/30/2027
SITE LOCATION MAP
INDEX
SHEET #1 COVER
SHEET #2 GENERAL NOTES, SPECIFICATIONS, AND TYPICAL DETAILS
SHEET #3 EXISTING CONDITIONS AND DEMOLITION PLAN
SHEET #4 OVERALL SITE IMPROVEMENT PLAN
SHEET #5 OVERALL GRADING PLAN
SHEET #6 STORMWATER POLLUTION PREVENTION PLAN
SHEET #7 STORMWATER POLLUTION PREVENTION DOCUMENT
SHEET #8 GRADING DETAIL PLANS
SHEETS #9-13 DETAILS
SHEET #14 PHOTOMETRIC PLAN
SHEET #15 LANDSCAPING PLAN
SEAL COVERS SHEETS 1 - 15
RPS 205 MARSH SITE LOGISTICS
ROCKFORD, IL
PREPARED BY: C.E.S. INC.
700 WEST LOCUST STREET, BELVIDERE, IL 61008
PHONE: 815.547.8435 | FAX: 815.544.0421
ILLINOIS DESIGN FIRM NO. 184-001260
WEBSITE: WWW.CIVILIDEAS.COM
RPS 205 MARSH SITE LOGISTICS
CITY OF ROCKFORD
WINNEBAGO COUNTY, ILLINOIS
DATE REVISION HISTORY
NKI - NO KNOWN IMPACTS
AP - APPROVAL PENDING
APP'D - APPROVED
X - CONTRACTOR COORDINATION REQUIRED
STATUS NO
TIF
IC
AT
IO
N
RE
Q
UI
RE
D
AGENCY CONTACT
N
N.T.S.
N
N.T.S.
2/12/2026
JOB #5924
EXISTING PROPOSED
RIGHT-OF-WAY
FENCE
UTILITY POLE
UTILITY POLE W/ STREET LIGHT
GUY ANCHOR
STREET LIGHT
GAS MAIN
OVERHEAD ELECTRIC LINE
UNDERGROUND ELECTRIC LINE
ELECTRIC PEDESTAL
ELECTRIC TRANSFORMER
OVERHEAD TELEPHONE LINE
UNDERGROUND TELEPHONE LINE
UNDERGROUND FIBER OPTIC LINE
CABLE PEDESTAL
FIBER OPTIC POST/PEDESTAL
TELECOMMUNICATIONS PEDESTAL
VALVE BOX & VALVE
VALVE VAULT & VALVE
FIRE HYDRANT W/ VALVE BOX
FIRE HYDRANT
WATERMAIN
WATER SERVICE W/ CURB STOP BOX
STORM MANHOLE
STORM CATCH BASIN
FLARED END SECTION
CURB INLET TYPE 700
INLET SPECIAL
STORM SEWER
SUMP STUB
SANITARY MANHOLE
SANITARY DROP MANHOLE
SANITARY CLEANOUT
SANITARY SEWER
SANITARY SERVICE @ 1% MIN
SIGN
PROPERTY LINE
BUILDING SETBACK LINE
SECTION LINE
ROAD CENTERLINE
UTILITY EASEMENT
DRAINAGE EASEMENT
SANITARY EASEMENT
STORM EASEMENT
WATERMAIN EASEMENT
OTHER EASEMENT
O-RING JOINTS
CLAY DAM
TRENCH BACKFILL
EX ROW ROW
x x
G G
OHE OHE
UGE UGE
E E
E E
OHT OHT
UGT UGT
FO FO
C C
F F
T T
W W W
S S S S
BSL
PDF CREATED ON: 2/12/2026 2:02:21 PM
WARNING
CALL J.U.L.I.E. TOLL FREE
OPERATES 24 HOURS A DAY
365 DAYS A YEAR
CALL 811
48 HOURS BEFORE
YOU DIG
R
SITE INFORMATION:
2021 HAWTHORNE DRIVE
ROCKFORD, IL 61107
ZONING WINNEBAGO COUNTY: R-1
PIN: 12-17-177-001
ISSUED FOR
CONSTRUCTION
GAS COMPANY - NICOR
KAREY JOHNSON - (224) 471-9356
KAREJOHN@SOUTHERNCO.COM
TELEPHONE - AT&T
KARI MARTIN - (630) 573-5789
KM2618@ATT.COM
FIBER OPTICS 1 - I3 BROADBAND
TREVOR - (309) 670-0400
ENGINEERING@I3BROADBAND.COM
FIBER OPTICS 2 - SEGRA
JESSE GRIFFIN - (980) 312-5611
JESSE.GRIFFIN@SEGRAFIBER.COM
CABLE TV
ELECTRIC - COMED
PATRICIA RODRIGUEZ - (630) 396-8225
PATRICIARODRIGUEZ@USICLLC.COM
REGIONAL PIPELINE
OTHER OVERHEADS
OTHER UNDERGROUNDS
RAILROADS
ACOE - WETLANDS
NATURAL LAND INSTITUTE
IL NATURE PRESERVE COMMISSION
IEPA SANITARY
IEPA WATER
IEPA NOI
IDNR - ENDANGERED SPECIES
IDNR - OWR
FEMA (FLOOD ZONES)
ZONE X
SHPO (HISTORIC)
LOCAL SANITARY DISTRICT
FOUR RIVERS SANITATION AUTHORITY
(815)-387-7400
MUNICIPAL WATER DEPARTMENT
WINNEBAGO COUNTY
(815)-319-4000
LOCAL DRAINAGE DISTRICT
WINNEBAGO COUNTY
(815)-319-4000
TOLLWAY
COUNTY HIGHWAY DEPARTMENT
WINNEBAGO COUNTY - CARLOS MOLINA
(815)-319-4000
COUNTY STORMWATER AGENCY
WINNEBAGO
(815)-319-4000
TOWNSHIP
MUNICIPAL - ENGINEERING
WINNEBAGO COUNTY
(815)-319-4000
MUNICIPAL - PLANNING
WINNEBAGO COUNTY - TROY KRUP
(815)-319-4000
LOCAL FIRE DEPARTMENT
ROCKFORD FIRE DEPARTMENT
(779)-348-7171
FINAL PLAT APPROVAL
PARK DISTRICT / FOREST PRESERVE
IDOT - ACCESS & TRAFFIC
IDOT - DRAINAGE
IDOT - UTILITIES
IDOT - LANDSCAPING
IDOT - LOCAL ROADS
SWCD / NRCS
NKI
NKI
NKI
NKI
NKI
NKI
NKI
NKI
NKI
NKI
NKI
NKI
NKI
NKI
NKI
NKI
NKI
XAP
NKI
NKI
AP
NKI
AP
AP
NKI
AP
AP
NKI
NKI
NKI
NKI
NKI
NKI
NKI
NKI
NKI
XAP
XAP
IFB# PROJECT #2612
G :\F
IL
ES
\W
IN
N \R
O C
K
FO
R D
\5
R
PS
M ar sh
S ite
L og is tic s\ C
U R
R
EN
T
PR
O
JE
C T\
_B A
SE
.d w g, /1
2/
:0 2:
P
M , J oh nB
, 1 :1
AutoCAD SHX Text
GV
AutoCAD SHX Text
GV
AutoCAD SHX Text
GV
DATE BYREVISION
CHECKED BY: KCB
DATE: 2/10/26
DRAWN BY: LMT/RKW
DATE: 2/10/26
RPS 205 MARSH SITE LOGISTICS
GENERAL NOTES, SPECIFICATIONS, AND
TYPICAL DETAILS
700 WEST LOCUST STREET, BELVIDERE, ILLINOIS 61008
PHONE: 815.547.8435 | FAX: 815.544.0421
ILLINOIS DESIGN FIRM NO. 184-001260
WEBSITE: WWW.CIVILIDEAS.COM
GENERAL CONSTRUCTION NOTES:
1. IN THESE CONTRACT DOCUMENTS MENTION IS MADE TO THE "ENGINEER", WHICH SHALL MEAN C.E.S. INC., OR THEIR
AUTHORIZED AGENT.
2. ALL EARTHWORK, ROADWAY WORK, DRAINAGE WORK AND STORM SEWER WORK SHALL BE PERFORMED UTILIZING MATERIALS AND METHODS IN STRICT ACCORDANCE WITH THE ILLINOIS DEPARTMENT OF TRANSPORTATION'S "STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION", LATEST EDITION AND THE STANDARD DETAIL SHEETS ATTACHED.
WHERE THERE IS A CONFLICT BETWEEN THE TWO, THE STANDARD DETAIL SHEETS SHALL GOVERN. ALL REGIONAL OFFICE OF
EDUCATION (ROW) REQUIREMENTS AND STANDARDS SHALL ALSO BE STRICTLY ADHERED TO.
3. ALL EXISTING UTILITIES SHOWN HEREON ARE APPROXIMATE AND SHALL BE VERIFIED BY THE CONTRACTOR WITH ALL AFFECTED UTILITY COMPANIES PRIOR TO INITIATING CONSTRUCTION OPERATIONS. THE OWNER AND ENGINEER ASSUME NO RESPONSIBILITY FOR THE ACCURACY, SUFFICIENCY OR EXACTNESS OF THESE UTILITY REPRESENTATIONS. PRIOR TO STARTING CONSTRUCTION THE CONTRACTOR SHALL CONTACT THE OFFICE OF J.U.L.I.E. AT 811 FOR EXACT FIELD LOCATIONS OF ALL UTILITIES IN THE PROXIMITY OF THE PROJECT SITE. IF THERE ARE ANY UTILITIES WHICH ARE NOT MEMBERS OF THE J.U.L.I.E. SYSTEM, THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR DETERMINING THIS AND REQUESTING SAID UTILITIES TO FIELD VERIFY AND MARK PERTINENT UTILITY LOCATIONS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE COORDINATION OF UTILITIES TO ELIMINATE CONFLICTS BETWEEN MUNICIPAL UTILITIES AND GAS MAINS, GAS SERVICES, ELECTRIC SERVICE, POWER POLE PLACEMENT, TELEPHONE SERVICE, AND CABLE TV SERVICE.
4. THE RESPONSIBILITY FOR THE REPAIR OR REPLACEMENT OF ANY UTILITY, STRUCTURE, PERMANENT SURFACE, LANDSCAPING, ETC. DAMAGED DURING CONSTRUCTION SHALL BE BORNE BY THE CONTRACTOR, WITH NO EXPENSE BEING CHARGED TO THE OWNER. PRIOR TO ACCEPTANCE OF THIS REPAIR OR REPLACEMENT, THE CONTRACTOR SHALL PRESENT THE OWNER WITH A SIGNOFF LETTER, SIGNED BY A RESPONSIBLE OFFICIAL OF THE OWNER OF THE DAMAGED PROPERTY STATING THAT THE REPAIR IS ACCEPTABLE. ANY DAMAGE OUTSIDE THE SCOPE OF THIS PROJECT TO EXISTING PROPERTY, RIGHTS-OF-WAY, VALVES, MANHOLES, UTILITIES, SIDEWALK, PAVEMENT, CONCRETE CURB AND GUTTER, OR OTHER STRUCTURES SHALL BE
REPAIRED OR REPLACED WITH EQUALS WITHOUT COST TO THE OWNER.
5. FINAL INSPECTION OF THE WORK PERFORMED HEREIN WILL BE DONE BY ROE. ALL DEFICIENCIES NOTED AT THAT TIME SHALL BE CORRECTED BY THE CONTRACTOR WITHOUT COST TO THE OWNER PRIOR TO FINAL PAYMENT. ROE OR THEIR AGENT SHALL HAVE THE AUTHORITY TO INSPECT, APPROVE OR REJECT THE CONSTRUCTION OR IMPROVEMENTS DETAILED BY THESE PLANS AND SPECIFICATIONS. ALL WORK SHALL BE GUARANTEED WITH REGARD TO WORKMANSHIP AND MATERIALS FOR A PERIOD OF ONE YEAR FROM THE DATE OF FINAL APPROVAL. DEFECTS SHALL BE REPAIRED OR REPLACED BY THE
CONTRACTOR WITHIN 30 DAYS OF REQUEST FOR REPAIR.
6. THE CONTRACTOR SHALL NOTIFY THE ENGINEER, ROE, WINNEBAGO COUNTY AND THE OWNER AT LEAST 48 HOURS PRIOR TO START OF CONSTRUCTION IN ORDER TO ARRANGE FOR APPROPRIATE CONSTRUCTION INSPECTION. WORK PERFORMED OR MATERIALS AND EQUIPMENT INSTALLED WITHOUT INSPECTION WILL BE CONSIDERED UNACCEPTABLE, AND MAY HAVE
TO BE REPLACED AT NO COST TO THE OWNER.
7. THE CONTRACTOR SHALL INDEMNIFY THE OWNER AND HIS AGENTS, THE ENGINEER AND HIS AGENTS, ROE, WINNEBAGO COUNTY AND THEIR AGENTS, ETC. FROM ALL LIABILITY WITH THE CONSTRUCTION, INSTALLATION AND TESTING OF THE WORK ON THIS PROJECT. NO WORK SHALL BEGIN UNTIL THE CERTIFICATE OF INSURANCE IS FILED WITH THE OWNER. ALL
COSTS OF INSURANCE SHALL BE CONSIDERED INCIDENTAL TO THE CONTRACT.
8. THE CONTRACTOR SHALL ASCERTAIN THE EXISTENCE OF ANY CONDITIONS AFFECTING THE COST OF WORK THROUGH A
REASONABLE EXAMINATION OF THE WORK SITE PRIOR TO SUBMITTING THE BID.
9. RESTORATION OF EXISTING ROADWAYS AND RIGHTS-OF-WAY ARE CONSIDERED INCIDENTAL TO THIS CONTRACT WHERE NOT SPECIFICALLY CALLED OUT ON THE PLANS, AND SHOULD BE INCLUDED IN THE COST OF THE IMPROVEMENTS.
10. THE PROPOSED IMPROVEMENTS MUST BE CONSTRUCTED IN ACCORDANCE WITH THE ENGINEERING PLANS AS APPROVED BY ROE & WINNEBAGO COUNTY. THE CONSTRUCTION DETAILS AS PRESENTED ON THE PLANS MUST BE FOLLOWED BY THE CONTRACTOR. PROPER CONSTRUCTION TECHNIQUES MUST BE FOLLOWED IN CONSTRUCTING IMPROVEMENTS INDICATED ON THE ENGINEERING PLAN; CONTRACTORS ARE ADVISED THAT ALL MUD AND DEBRIS MUST BE CLEANED FROM
ROADWAYS DAILY AS PER THE REQUIREMENTS OF ROE & WINNEBAGO COUNTY.
11. THE CONTRACTOR SHALL PERFORM ALL WORK IN STRICT ACCORDANCE WITH ALL STATE, FEDERAL AND LOCAL CODES (TO INCLUDE SAFETY CODES). THE ENGINEER, ROE, WINNEBAGO COUNTY, AND THE OWNER ARE NOT RESPONSIBLE FOR ENSURING COMPLIANCE BY THE CONTRACTOR WITH SAID CODES, AND ASSUMES NO LIABILITY FOR ACCIDENTS, INJURIES, DEATHS, ETC. OR CLAIMS RELATING THERETO WHICH MAY RESULT FROM LACK OF ADHERENCE TO SAID CODES.
12. IMPROVEMENT REPRESENTATIONS SHOWN IN THESE PLANS ARE AS ACCURATE AS POSSIBLE FROM INFORMATION AVAILABLE; SOME SLIGHT REVISIONS MAY BE REQUIRED TO ACCOMMODATE UNFORESEEN CIRCUMSTANCES. THE ENGINEER SHALL BE APPRISED OF ANY NECESSARY REVISIONS WITH SUFFICIENT LEAD TIME TO PROPERLY CONSIDER AND
ACT UPON SAID REQUEST.
13. APPROVED TRENCH BACKFILL MATERIAL SHALL BE PLACED AND COMPACTED AS SPECIFIED IN THE CONTRACT DOCUMENTS IN ALL UTILITY TRENCHES WITHIN 2 FEET BEYOND PERMANENT SURFACES. ALL OTHER UTILITY TRENCHES SHALL BE BACKFILLED WITH EXISTING MATERIALS AS APPROVED BY THE ENGINEER. COMPACTION BY WATER-JETTING SHALL NOT
BE ALLOWED.
14. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL CONSTRUCTION LAYOUT, INCLUDING LINES, GRADES, AND ELEVATIONS.
LAYOUT SHALL BE BASED ON THE SURVEY CONTROL AND BENCHMARKS SHOWN ON THE PLANS AND ELECTRONIC CAD FILES PROVIDED BY THE ENGINEER. CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND EXISTING CONDITIONS IN THE FIELD PRIOR TO CONSTRUCTION. DO NOT SCALE PRINTED DRAWINGS. ANY DISCREPANCIES OR CONFLICTS SHALL BE REPORTED TO THE ENGINEER BEFORE PROCEEDING WITH THE WORK. CONTRACTOR MAY CONTACT ENGINEER FOR A LAYOUT QUOTE, IF SO DESIRED.
STORM SEWER CONSTRUCTION:
1. PRECAST REINFORCED STORM SEWER PIPE SHALL CONFORM TO A.S.T.M. C-76 (CLASS IV) WITH JOINTS CONFORMING TO
A.S.T.M. C-443. WHERE NOTED ON THE PLANS, STORM SEWER SHALL BE CONSTRUCTED WITH WATERMAIN EQUIVALENT PIPE
AWWA C909, AWWA C900, OR AWWA C905.
2. STORM SEWER PIPE SHALL BE BEDDED IN ACCORDANCE WITH THE IDOT STANDARD SPECIFICATIONS; COST OF BEDDING IS
INCIDENTAL.
3. STORM SEWER MANHOLE AND INLET CASTINGS SHALL CONFORM TO ROE STANDARDS.
4. TRENCH BACKFILL FOR STORM SEWER SHALL BE CONSIDERED INCIDENTAL TO THE STORM SEWER PIPE/STRUCTURE.
EXCAVATION AND ROADWAY CONSTRUCTION:
1. AREAS WHERE EXCAVATION HAS BEEN PERFORMED SHALL RECEIVE 6" (MINIMUM) OF APPROVED COMPACTED TOPSOIL
ALONG WITH (AS NOTED IN THE SPECIFICATIONS). TOPSOIL AND SEEDING MATERIALS AND METHODS SHALL BE SUBJECT TO
THE APPROVAL OF THE ENGINEER.
2. ALL SURPLUS EXCAVATED MATERIAL FROM THE UTILITY TRENCHES OR EARTHWORK IS TO BE DISPOSED OF ON-SITE AT A LOCATION TO BE DETERMINED BY THE OWNER. COST FOR OPERATION IS CONSIDERED INCIDENTAL AND SHALL BE INCLUDED IN THE COST OF EARTHWORK. SAND, GRAVEL OR CLAY MATERIAL SHALL NOT BE LEFT ON THE SURFACE; THIS MATERIAL SHALL BE REPLACED WITH A MINIMUM OF 4" OF COMPACTED TOPSOIL (COST TO BE INCIDENTAL).
3. THE CONTRACTOR SHALL ENSURE POSITIVE SITE DRAINAGE AT THE CONCLUSION OF EACH CONSTRUCTION DAY. SITE DRAINAGE SHALL BE ACHIEVED BY DITCHING, PUMPING, OR ANY OTHER METHOD ACCEPTABLE TO THE ENGINEER.
4. THE CONTRACTOR SHALL MAINTAIN THE SEEDING FOR A MINIMUM OF 30 DAYS AFTER INSTALLATION. MAINTENANCE SHALL INCLUDE WATERING. ALL SEEDED AREAS SHALL BE MAINTAINED AS SPECIFIED INCLUDING WATERING FOR 30 DAYS AFTER INSTALLATION. SCATTERED BARE SPOTS NO LARGER THAN TWO SQUARE FEET WILL BE ALLOWED UP TO A MAXIMUM OF 5% OF ANY RESTORED AREA, LARGER AREAS SHALL BE REMOVED AND REPLACED AT THE CONTRACTORS EXPENSE.
5. SIDEWALK IS TO BE REMOVED TO THE NEAREST JOINT.
6. ALL SAWCUTS AND DISPOSAL OF MATERIALS REMOVED SHALL BE CONSIDERED INCIDENTAL TO THE REMOVAL LINE ITEMS.
EROSION AND SEDIMENT CONTROL NOTES:
1. UNLESS OTHERWISE INDICATED, ALL VEGETATIVE AND STRUCTURAL EROSION AND SEDIMENT CONTROL PRACTICES WILL BE
CONSTRUCTED ACCORDING TO MINIMUM STANDARDS AND SPECIFICATIONS IN THE ILLINOIS URBAN MANUAL, LATEST
REVISION.
2. A COPY OF THE APPROVED EROSION AND SEDIMENT CONTROL PLAN SHALL BE MAINTAINED ON THE SITE AT ALL TIMES.
3. THE CONTRACTOR IS RESPONSIBLE FOR INSTALLATION OF ANY ADDITIONAL EROSION CONTROL MEASURES NECESSARY TO
PREVENT EROSION AND SEDIMENTATION AS DETERMINED BY ROE OR WINNEBAGO COUNTY.
4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR SWEEPING PUBLIC & DEVELOPMENT STREETS WHEN DEBRIS HAS BEEN TRACKED AND OR WASHED ON THEM. THE CONTRACTOR SHALL BE RESPONSIBLE TO SWEEP THE STREETS IF DIRECTED TO DO SO BY ROE OR WINNEBAGO COUNTY. THE CONTRACTOR IS ALSO RESPONSIBLE TO CONTROL DUST ON THE SITE IN
ACCORDANCE WITH PRACTICES IN THE ILLINOIS URBAN MANUAL.
5. ALL EROSION AND SEDIMENT CONTROL DEVICES SHALL BE INSTALLED AND STABILIZED PRIOR TO SITE CLEARING AND GRADING. ALL EROSION AND SEDIMENT CONTROL PRACTICES WILL BE MAINTAINED THROUGH THE DURATION OF THE PROJECT. ALL EROSION AND SEDIMENT CONTROL STRUCTURES SHALL BE INSPECTED WEEKLY AND AFTER EACH 1/2" RAINFALL EVENT AND 6" SNOWFALL EVENT AND AN INSPECTION RECORD SHALL BE MAINTAINED BY THE CONTRACTOR AT THE JOB SITE FOR THE DURATION OF THE PROJECT. THE CONTRACTOR SHALL BE RESPONSIBLE TO PERFORM THESE INSPECTIONS AND TO MAINTAIN ALL EROSION AND SEDIMENT CONTROL DEVICES IN SUCH A MANNER THAT THEY CONTINUE TO FUNCTION FOR THE DURATION OF THEIR INTENDED USE. THE CONTRACTOR SHALL BE RESPONSIBLE TO
PERFORM ALL TEMPORARY SEEDING.
6. ALL DISTURBED AREAS SHALL BE STABILIZED WITH TEMPORARY SEEDING WITHIN 14 DAYS FOLLOWING THE END OF ACTIVE
DISTURBANCE.
7. EROSION CONTROL BLANKETS ARE TO BE INSTALLED ON ALL SLOPES STEEPER THAN 10% IMMEDIATELY AFTER TOPSOILING, FERTILIZING, AND SEEDING ARE COMPLETE. EROSION CONTROL BLANKETS WILL NOT BE REQUIRED IF SOD IS USED.
INSTALLATION OF EROSION CONTROL BLANKETS SHALL BE ACCORDING TO THE RECOMMENDATIONS OF THE MANUFACTURER. EROSION CONTROL BLANKETS SHALL BE INSPECTED PERIODICALLY AND AFTER EACH RAINFALL FOR DAMAGE OR DISPLACEMENT. DAMAGED OR DISPLACED EROSION CONTROL BLANKETS SHALL BE REPAIRED OR RESTAPLED AS SOON AS POSSIBLE. TEMPORARY EROSION AND SEDIMENT CONTROL DEVICES SHALL BE REMOVED WITHIN 30 DAYS AFTER FINAL SITE STABILIZATION HAS BEEN ACHIEVED VIA PERMANENT MEASURES. PERMANENT VEGETATION AND STRUCTURES SHALL BE INSTALLED AND FUNCTIONAL AS SOON AS PRACTICAL DURING DEVELOPMENT. PERMANENT SEEDING, SODDING, OR LANDSCAPING SHALL BE COMPLETED WITHIN 7 DAYS OF FINAL TOPSOIL RE-SPREAD.
8. ALL STOCKPILES ARE TO BE PLACED AT A LOCATION SPECIFIED BY THE OWNER. ALL STOCKPILES ARE TO BE PROTECTED BY SILT FENCE ALONG THE DOWN SLOPE SIDES OF THE STOCKPILE OR AROUND THE ENTIRE PERIMETER IF DIRECTED TO DO SO BY THE OWNER, ROE, WINNEBAGO COUNTY, OR THEIR REPRESENTATIVES. ANY STOCKPILES THAT WILL REMAIN UNDISTURBED FOR LONGER THAN THREE WEEKS SHALL BE PROTECTED BY TEMPORARY SEEDING. SOIL STORAGE PILES CONTAINING MORE THAN 10 CUBIC YARDS OF MATERIAL SHALL NOT BE LOCATED WITH A DOWN SLOPE DRAINAGE LENGTH OF LESS THAN 25
FEET TO A ROADWAY OR DRAINAGE CHANNEL.
9. ALL STORMWATER INLETS SHALL BE PROTECTED IN ACCORDANCE WITH THE DETAILS ON THE PLANS OR BY METHODS APPROVED BY ROE & WINNEBAGO COUNTY. AFTER EACH RAINFALL EACH INLET SHALL BE INSPECTED. ANY INLET PROTECTION THAT HAS FAILED OR IS DAMAGED SHALL BE REPAIRED AS SOON AS POSSIBLE. SEDIMENT SHALL BE REMOVED AS NECESSARY TO PROVIDE FOR THE CONTINUED EFFECTIVENESS OF THE INLET PROTECTION TECHNIQUE IN USE.
SOILS AND DEWATERING:
1. THE BUILDING AND PAVEMENT AREAS SHALL BE CLEARED OF VEGETATION PRIOR TO GRADING, AND THE EXISTING
TOPSOIL SHALL BE STRIPPED AND STOCKPILED FOR RE-USE.
2. THE SUBGRADE FOR THE BUILDING PAD AREA AND THE PAVEMENT AREA SHALL BE PROOF-ROLLED USING A LOADED TANDEM DUMP TRUNK PRIOR TO THE INSTALLATION OF AGGREGATE. ALL SOFT OR UNSTABLE AREAS SHOULD BE REWORKED AND RECOMPACTED OR IF NECESSARY REPLACED. REPLACEMENT WILL BE PAID AT THE CONTRACT PRICE PER CUBIC YARD FOR SUBGRADE UNDERCUT AND AT THE CONTRACT PRICE PER SQUARE YARD FOR GEOTEXTILE FABRIC FOR
GROUND STABILIZATION IN CONFORMANCE WITH THE TYPICAL SECTION ON THE PLANS.
3. FILL MATERIALS SHALL CONSIST OF INORGANIC SILTY CLAYS OF LOW TO MEDIUM PLASTICITY OR APPROVED GRANULAR MATERIALS. COMPACTION FOR THE BUILDING PAD AND PAVEMENT SHALL BE TO 90 PERCENT MODIFIED PROCTOR MAXIMUM DENSITY FOR ALL BUT THE TOP TWO FEET OF FILL. THE TOP TWO FEET OF FILL SHALL BE COMPACTED TO 95
PERCENT MODIFIED PROCTOR MAXIMUM DENSITY.
4. THE CONTRACTOR SHALL BE PREPARED TO IMPLEMENT DEWATERING PROCEDURES ON AN AS NEEDED BASIS. AT A MINIMUM THE CONTRACTOR SHALL PROVIDE PUMPING FROM STRATEGICALLY PLACED SUMPS. DEWATERING DISCHARGE
PIPES SHALL INCLUDE PROTECTION FROM SEDIMENT DISCHARGE AND EROSION CONTROL.
A-FRAME GATE AND POST SPECIFICATION:
THE CONTRACTOR SHALL FURNISH AND INSTALL THE A-FRAME GATE WITH POSTS. ALL MATERIALS, HARDWARE, AND INSTALLATION PROCEDURES SHALL CONFORM TO THE APPLICABLE REQUIREMENTS OF SECTION 508 OF THE STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION, INCLUDING METALWORK, ANCHORAGE, AND FINISHING REQUIREMENTS.
WORK UNDER THIS ITEM SHALL INCLUDE, BUT IS NOT LIMITED TO: FURNISHING THE GATE FRAME, POSTS, HINGES, LATCHING MECHANISMS, CONCRETE FOOTINGS (IF REQUIRED), AND ALL ASSOCIATED HARDWARE NECESSARY FOR A COMPLETE AND OPERABLE GATE INSTALLATION. THE CONTRACTOR SHALL SET POSTS PLUMB AND TO THE MANUFACTURERS SPECIFIED EMBEDMENT DEPTH, VERIFY FIELD DIMENSIONS PRIOR TO INSTALLATION, ENSURE SMOOTH GATE OPERATION, AND PROVIDE PROPER
ALIGNMENT AND CLEARANCE.
ALL COMPONENTS SHALL BE INSTALLED IN A WORKMANLIKE MANNER AND PROTECTED FROM DAMAGE UNTIL FINAL ACCEPTANCE. THE CONTRACTOR SHALL REPLACE ANY DAMAGED MATERIALS OR IMPROPERLY INSTALLED COMPONENTS AT NO
ADDITIONAL COST TO THE OWNER.
TYPICAL SECTION
CONCRETE SIDEWALK
N.T.S.
TYPICAL SECTION
HMA PAVEMENT
N.T.S.
COMPACTED AGGREGATE
BASE COURSE, TYPE B, 10"
HMA SURFACE COURSE, MIX D, N50, 1.5"
HMA BINDER COURSE, N50, 1.5"
BITUMINOUS MATERIALS (PRIME COAT)
0.40 GAL/S.Y.
COMPACTED AGGREGATE
BASE COURSE, TYPE B, 4"
PC CONCRETE (CLASS SI) 4" THICK
(6" ADJACENT TO DRIVEWAYS)
TYPICAL SECTION
SUBGRADE UNDERCUT
N.T.S.
CA-6 COMPACTED
6" M
IN
G:\FILES\WINN\ROCKFORD\5905 RPS205 Marsh Site Logistics\CURRENT PROJECT\5905_BASE.dwg
PDF CREATED ON: 2/12/2026 2:02:22 PM
SHEET
of152
TYPICAL SECTION
HEAVY DUTY HMA PAVEMENT
N.T.S.
COMPACTED AGGREGATE
BASE COURSE, TYPE B, 12"
HMA SURFACE COURSE, MIX D, N50, 2"
HMA BINDER COURSE, N50, 2"
BITUMINOUS MATERIALS (PRIME COAT)
0.40 GAL/S.Y.
CA-2 CRUSHED LIMESTONE
12" MIN. (DEPTH TO BE
DETERMINED BY THE ENGINEER)
GEOTEXTILE FABRIC
(USE TO BE DETERMINED
BY THE ENGINEER)
G :\F
IL
ES
\W
IN
N \R
O C
K
FO
R D
\5
R
PS
M ar sh
S ite
L og is tic s\ C
U R
R
EN
T
PR
O
JE
C T\
_B A
SE
.d w g, /1
2/
:0 2:
P
M , J oh nB
, 1 :1
EX CATCH BASIN
RIM = 815.85
W INV = 812.85 (8" H.D.P.)
E INV = 810.96 (12" PVC)
N INV = 810.85 (15" H.D.P.)
S INV = 810.80 (18" H.D.P.)
FA
IRW
AY
PL
HAWTHORNE DR
CP #2
CP #3
821822
UG
F
UG
F
UGF
UGF
UGF
UGF
UGF
UGF
UGF
UGF
UGF
UGF
UGF
UG
F
UG
F
UG
F
OHU
OHU
O
HU
O
HU
O
HU
O
HU
O
HU
O
HU
O
HU
UG
T
UG
T
UG
T
UG
T
UGT
UGT
OHU
14"
14"
CP #10
24"
24" 24"
38"
26"
24"
24"
8"
30"
14" 14'
18"
24" 24"
6' DECIDUOUS SHRUB
36"
6' DECIDUOUS SHRUB
E
W
W
CP #40011
CP #40014
24"
24'
24'
816 809
EX STORM MANHOLE
RIM = 815.73
W INV = 811.77 (8" PVC)
N INV = 810.30 (8" H.D.P.)
S INV = 809.98 (12" RCP)
E INV = 809.94 (12" RCP)
EX SANITARY CLEANOUT
RIM = 815.90
EX SANITARY CLEANOUT
RIM = 815.84
EX STORM MANHOLE
RIM = 816.38
UNABLE TO OPEN
EX STORM MANHOLE
RIM = 815.51
N INV = 809.26 (12" RCP)
W INV = 809.26 (12" RCP)
S INV = 809.26 (12" RCP)
E INV = 809.11 (15" RCP)
EX SANITARY CLEANOUT
RIM = 815.41
E
EX SANITARY CLEANOUT
RIM = 815.38
E
EX CATCH BASIN
RIM = 800.37
N INV = 796.22 (36" RCP)
S INV = 796.22 (36" RCP)
EX CATCH BASIN
RIM = 813.43
S INV = 810.14 (12" RCP)
EX SANITARY MANHOLE 075-067
RIM = 810.70
S INV = 803.05 (12" CLAY)
N INV = 803.03 (12" CLAY)
EX STORM MANHOLE
RIM = 816.47
SE INV = 813.38 (6" PVC)
NW INV = 811.39 (8" PVC)
S INV = 810.72 (8" PVC)
N INV = 810.58 (12" RCP)
EX SANITARY MANHOLE 075-049
RIM = 801.96
NW INV = 795.01 (8" PVC)
S INV = 794.41 (12" CLAY)
N INV = 794.38 (12" CLAY)
x x x
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
EX SANITARY CLEANOUT
RIM = 816.57
EX 36" RCP
N INV = 811.87
EX 12" CMP
N INV = 812.417
EX 8" STORM PIPE
INV = 816.54
EX 8" STORM PIPE
INV = 814.18
EX 12" F.E.S.
INV = 804.65
W W
W
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
EX 12" F.E.S.
INV = 808.75
EX WOOD BEAMS (TYP)
2-EX 36" PIPES
INV = 797.02
N
L
M
K
J I
H G F
E
D
C
B
A
O
34" 34"
42"
12" 36"
14"
12"
12"
EX SANITARY MANHOLE
RIM = 827.13
NW INV = 818.73 (10" CLAY)
W INV = 817.23 (10" CLAY)
S INV = 817.18 (10" CLAY)
EX SHEDS
EX FIRE HYDRANT (TYP)
APPROX PROPERTY LINE (TYP)
APPROX ROW (TYP)
EX TRASH ENCLOSURE
APPROX ROW (TYP)
CP #9
810 812
EX SANITARY MANHOLE
TO BE RECONSTRUCTED
EX. RIM = 811.31
PROP. RIM = 809.70
NW INV = 802.13 (8" PVC)
SE INV 802.01 (8" PVC)
EXISTING BUILDING
EX TREE STUMP (TYP)
EX HANDHOLE (TYP)
EX UNKNOWN MANHOLE
RIM = 822.53
EX STREET SIGN (TYP)
EX SIGN (TYP)
EX BOLLARD (TYP)
EX VALVE BOX (TYP)
EX FIRE HYDRANT (TYP)
EX STREET LIGHT (TYP)
EX VALVE VAULT (TYP)
EX INLET DRAIN (TYP)
EX DECIDUOUS TREE (TYP)
EX DOWNSPOUT (TYP)
EX DOOR(TYP)
F/F = 817.09
EX ELECTRIC OUTLET (TYP)
F/F = 828.06
F/F = 814.23
F/F = 816.66
F/F = 816.58
F/F = 824.58
F/F = 828.12
F/F = 818.93
EX WING WALL
EX EVERGREEN TREES
EX. LIGHT POLE TO BE
REMOVED & REINSTALLED
CONFIRM UNDERGROUND CABLE LOCATION & DEPTH
TO BE LOWERED/RELOCATED AS NECESSARY
EX 21" 14 LF HDPE STORM PIPE
TO BE REMOVED
E INV = 808.76
W INV = 808.85
EX RIPRAP
TO BE REMOVED
EX STREET SIGN
TO BE RELOCATED
EX SIGNS
TO BE REMOVED
EX SIGNS
TO BE RELOCATED
46 SY AGGREGATE SHOULDER
TO BE REMOVED
34 SY AGGREGATE SHOULDER
TO BE REMOVED
927 SF CONCRETE SIDEWALK
TO BE REMOVED
973 SY HMA PAVEMENT
TO BE REMOVED
EX 34" DECIDUOUS TREE
TO BE REMOVED
EX 4" DECIDUOUS TREE
TO BE RELOCATED
127 LF SAWCUT &
20 SY HMA PAVEMENT
TO BE REMOVED
86 LF SAWCUT &
425 SY HMA PAVEMENT
TO BE REMOVED
83 LF B6-18 CURB & GUTTER
TO BE REMOVED
13 LF SAWCUT PAVEMENT
6 LF SAWCUT PAVEMENT &
197 SF SIDEWALK
TO BE REMOVED
5 LF SAWCUT PAVEMENT
5 LF SAWCUT PAVEMENT
6" CONCRETE F.E.S.
INV = 811.31
TO BE REMOVED
18" CONCRETE F.E.S.
TO BE RELOCATED
47 LF SAWCUT &
7 SY HMA PAVEMENT
TO BE REMOVED
EX. 6" HDPE PIPE
TO BE DAYLIGHTED
TO NEW SWALE
16 LF SAWCUT PAVEMENT
312 SF CONCRETE SIDEWALK
TO BE REMOVED
EX. BASKETBALL HOOPS
TO BE RELOCATED
EX. 3 TRUNK 18" TREES
TO BE REMOVED
EX. 14" EVERGREEN TREE
TO BE REMOVED
40 L.F. EX 12" CMP CULVERT
N INV - 825.73
S INV = 825.17
EX TREE LIMBS
TO BE TRIMMED AS NECESSARY
EX VALVE BOX TO BE ADJUSTED
EX. RIM = 801.77
PROP. RIM = 804.00
136 S.Y. RIP RAP TO BE
REMOVED AS NECESSARY
CONTROL POINTS
CP #
40011
40014
NORTHING
2050219.1920
2050174.5732
2050644.8333
2050657.3669
2050445.6510
2050053.7870
EASTING
2602941.3220
2603005.7475
2603081.9111
2603203.3600
2603240.9610
2603224.8820
ELEVATION
827.30
826.76
825.76
819.85
815.87
810.91
DESCRIPTION
MAG NAIL
MAG NAIL
MAG NAIL
MAG NAIL
MAG NAIL
MAG NAIL
NOTES:
1. EXISTING TOPOGRAPHY SHOWN REPRESENTS SITE CONDITIONS AS PREPARED BY C.E.S. INC.
ON OCTOBER 27, 2025. CONTRACTOR SHALL FIELD CHECK EXISTING ELEVATIONS AND
CONDITIONS PRIOR TO CONSTRUCTION AND NOTIFY ARCHITECT AND ENGINEER OF ANY
DISCREPANCIES PRIOR TO STARTING CONSTRUCTION.
2. THE UNDERGROUND UTILITY INFORMATION AS SHOWN HEREON IS BASED, IN PART, UPON
INFORMATION FURNISHED BY UTILITY COMPANIES AND THE LOCAL MUNICIPALITY. WHILE
THIS INFORMATION IS PROVIDED AS THE BEST AVAILABLE INFORMATION, ITS ACCURACY
AND COMPLETENESS CANNOT BE GUARANTEED NOR CERTIFIED TO.
3. EXISTING CONDITIONS AND DEMOLITION PLAN REPRESENT SITE CONDITIONS AS OF
OCTOBER 27, 2025. CONTRACTOR SHALL INSPECT SITE PRIOR TO BIDDING WORK TO VERIFY
ACTUAL FIELD CONDITIONS AS PORTIONS OF THE DEMOLITION WORK MAY HAVE SINCE
BEEN COMPLETED. CONTRACTOR SHALL BE RESPONSIBLE TO COMPLETE ALL DEMOLITION
WORK. ALL THE DEMOLITION AS PER PLANS TO PREPARE THE SITE FOR CONSTRUCTION OF
PROPOSED IMPROVEMENTS.
4. THE CONTRACTOR IS RESPONSIBLE FOR DEMOLITION, REMOVAL, AND DISPOSAL (IN A
LOCATION APPROVED BY ALL JURISDICTIONAL GOVERNING ENTITIES) OF ALL STRUCTURES,
PADS, WALLS, FLUMES, FOUNDATIONS, ROADS, PARKING LOTS, DRIVES, DRAINAGE
STRUCTURES, UTILITIES, ETC., SUCH THAT THE IMPROVEMENTS SHOWN ON THESE PLANS CAN
BE CONSTRUCTED. ALL DEMOLITION WORK SHALL BE IN ACCORDANCE WITH ALL
APPLICABLE FEDERAL, STATE, AND LOCAL REQUIREMENTS. ALL FACILITIES TO BE REMOVED
SHALL BE UNDERCUT TO SUITABLE MATERIAL AND BROUGHT TO GRADE WITH SUITABLE
COMPACTED FILL MATERIAL PER THE SPECIFICATIONS.
5. EXISTING EASEMENTS ARE NOT SHOWN.
0 400 20 80
N
LEGEND
EXISTING HMA PAVEMENT
EXISTING GRAVEL SURFACE
EXISTING CONCRETE SURFACE
REMOVE HMA PAVEMENT
REMOVE CONCRETE
REMOVE GRAVEL
DATE BYREVISION
CHECKED BY: KCB
DATE: 2/10/26
DRAWN BY: LMT/RKW
DATE: 2/10/26
RPS 205 MARSH SITE LOGISTICS
EXISTING CONDITIONS AND DEMOLITION PLAN
700 WEST LOCUST STREET, BELVIDERE, ILLINOIS 61008
PHONE: 815.547.8435 | FAX: 815.544.0421
ILLINOIS DESIGN FIRM NO. 184-001260
WEBSITE: WWW.CIVILIDEAS.COM G:\FILES\WINN\ROCKFORD\5905 RPS205 Marsh Site Logistics\CURRENT
PROJECT\5905_BASE.dwg
PDF CREATED ON: 2/12/2026 2:02:26 PM
SHEET
of153
CONTOURS
EXISTING MINOR
MAJOR
G :\F
IL
ES
\W
IN
N \R
O C
K
FO
R D
\5
R
PS
M ar sh
S ite
L og is tic s\ C
U R
R
EN
T
PR
O
JE
C T\
_B A
SE
.d w g, /1
2/
:0 2:
P
M , J oh nB
, 1 :1
AutoCAD SHX Text
GV
AutoCAD SHX Text
GV
FA
IRW
AY
PL
HAWTHORNE DR
UG
F
UG
F
UGF
UGF
UGF
UGF
UGF
UGF
UGF
UGF
UGF
UGF
UGF
UG
F
UG
F
UG
F
OHU
OHU
O
HU
O
HU
O
HU
O
HU
O
HU
O
HU
O
HU
UG
T
UG
T
UG
T
UG
T
UGT
UGT
OHU
E
W
W
E
E x x x
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
W W
W
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
EX WOOD BEAMS (TYP)
13 PASSENGER VEHICLE PARALLEL
PARKING SPACES
SUNRISE BUS
DROPOFF
SUNRISE BUS
PICKUP
13 PROPOSED 6.6" CONCRETE STEPS
(INCLUDING SAFETY TREADS)
W/ HANDRAILS
N
L
M
K
J I
H G F
E
D
C
B
A
O
263'
64'
24'
2 - 12' PROPOSED
SWINGING "A"
FRAME GATES
26.65'
30 L.F. PROPOSED 24" WHITE PAINT STOP
BAR FOR AFTERNOON BUS QUEUING
5'
EX SHEDS
EX FIRE HYDRANT (TYP)
APPROX PROPERTY LINE (TYP)
APPROX ROW (TYP)
24'
EX TRASH ENCLOSURE
STORAGE FOR 20 BUSES
4 WIDE
9' (TYP)
23'
TY
P)
PROPOSED 701 LF 4'
TALL METAL FENCE
30'
10'10
22 FUTURE PARKING STALLS
.8 8'
.2
3'
.2
7'
9' (TYP)
22' (TYP)
2 - CURB SPILLOUTS
RELOCATED BASKETBALL HOOPS
PROPOSED
STOP SIGN
APPROX ROW (TYP)
R45'
R4 5'
R8 .5
467 SF CONCRETE SIDEWALK
2,351 SF CONCRETE SIDEWALK
197 SF CONCRETE SIDEWALK
4,219 SY HMA PAVEMENT
1,048 SY HMA PAVEMENT
PROPOSED LIGHT POST (TYP)
2 - 21' PROPOSED
SWINGING "A"
FRAME GATES
PROPOSED LIGHT
POST WITH
CAMERA (TYP)
RELOCATED STREET SIGN
STOP SIGN POINTING
AWAY FROM STREET
88 LF B6.12 "TIP-OUT" CURB & GUTTER
94 LF B6.12 CURB & GUTTER
313 LF B6.12 CURB & GUTTER
5'
32'
9 PROPOSED 6" CONCRETE STEPS (INCLUDING
SAFETY TREADS) W/ HANDRAILS
PROPOSED RAMP W/ HANDRAILS
253 L.F. B6.12 "TIP-OUT" CURB & GUTTER
EXISTING BUILDING
EX TREE STUMP (TYP)
EX HANDHOLE (TYP)
EX UNKNOWN MANHOLE
RIM = 822.53
EX STREET SIGN (TYP)
EX SIGN (TYP)
EX BOLLARD (TYP)
EX VALVE BOX (TYP)
EX FIRE HYDRANT (TYP)
EX STREET LIGHT (TYP)
EX VALVE VAULT (TYP)
EX INLET DRAIN (TYP)
EX DECIDUOUS TREE (TYP)
EX DOWNSPOUT (TYP)
EX DOOR(TYP)
F/F = 817.09
EX ELECTRIC OUTLET (TYP)
F/F = 828.06
F/F = 814.23
F/F = 816.66
F/F = 816.58
F/F = 824.58
F/F = 828.12
F/F = 818.93
EX WING WALL
EX EVERGREEN TREES
EX. LIGHT POLE TO BE
REMOVED & REINSTALLED
CONFIRM UNDERGROUND CABLE LOCATION & DEPTH
TO BE LOWERED/RELOCATED AS NECESSARY
R8.5'
45 LF 12" CMP STORM CULVERT @ 2.00%
CONNECTED TO EX. 12" CMP UNDER HAWTHORNE DR.
91 LF 24" CMP STORM CULVERT @ 1.63%
42 LF 15" RCP STORM SEWER @ 0.52%
34 LF 18" HDPE
STORM PIPE
134 LF 12" RCP STORM
SEWER @ 2.0%
PROPOSED 2' DIA. STORM INLET
TYPE A W/ TYPE 8 GRATE
RIM = 813.00
EX NW INV= 811.35 (6" PVC)
PROP. SE INV= 810.28 (12" RCP)
PROPOSED 12" RCP FES
LENGTH = 6 L.F.
INV = 807.48
24" CMP F.E.S.
LENGTH = 3.5'
INV= 809.60
24" CMP F.E.S.
LENGTH = 3.5'
INV= 808.00
12" CMP F.E.S.
INV = 824.27
PROPOSED 15" RCP F.E.S.
LENGTH = 6 L.F.
INV= 804.00
2' DIA. STORM INLET TYPE A
W/ TYPE 8 GRATE
RIM = 806.25
INV= 804.25 (15" RCP)
RELOCATED 18"
CONCRETE F.E.S.
INV = 810.00
R60'
R3'
R3'
R3'
R10'
R3'
R3'
YELLOW PAINT ARROW
SYMBOL (TYP)
2 - SWINGING GATE POSTS
R23.42' R23.42'
R23.42' R23.42'
YELLOW PAINT PAVEMENT
MARKING, 4" (TYP)
YELLOW PAINT PAVEMENT
MARKING, 6" (TYP)
YELLOW PAINT PAVEMENT
MARKING, 12" (TYP)
DETECTABLE
WARNING (TYP.)
PROPOSED WHITE PAINT PAVEMENT MARKINGS,
4" FOR BASKETBALL & FOUR SQUARE COURTS
PROPOSED BLUE DASHED PAINT PAVEMENT
MARKINGS, 4" FOR BUS PARKING (TYP)
YELLOW PAINT PAVEMENT
MARKING, 6" (TYP)
YELLOW PAINT PAVEMENT
MARKING, 12" (TYP)
2 - SWINGING GATE POSTS
PROPOSED SOLID BLUE PAINT PAVEMENT
MARKINGS, 4" FOR BUS PARKING (TYP)
2 - PROPOSED TWO POST SIGN RPS TYPE A:
"BUSES ONLY DO NOT ENTER"
2 - PROPOSED TWO POST SIGN
RPS TYPE A: "BUSES ONLY"
PROPOSED TWO POST SIGN RPS TYPE A:
"STAFF PARKING" -WITH STRAIGHT ARROW
"DROP-OFF/PICK-UP AT DOOR DOOR J"
-WITH STRAIGHT ARROW
"VISITOR PARKING" -WITH RIGHT ARROW
PROPOSED
FENCE GATE
PROPOSED
FENCE GATE
16 LF 12" CMP STORM
CULVERT @ 1.40%
12" CMP F.E.S.
LENGTH = 1.75'
INV= 818.22
12" CMP F.E.S.
LENGTH = 1.75'
INV= 817.94
35 LF 24" RCP STORM SEWER @ 2.68%
PROPOSED 24" RCP F.E.S.
LENGTH = 6 L.F.
INV= 799.88
PROPOSED 24" RCP F.E.S.
LENGTH = 6 L.F.
INV= 798.62
EX VALVE BOX TO BE ADJUSTED
EX. RIM = 801.77
PROP. RIM = 804.00
NOTES:
1. CONTRACTOR TO VERIFY EXACT LOCATION AND ELEVATION OF EXISTING UTILITIES AT
LOCATIONS OF CONFLICT. CONTRACTOR TO NOTIFY ENGINEER WITH ANY DISCREPANCIES.
2. ALL SIDEWALK RAMPS TO BE IN ACCORDANCE WITH ADA REQUIREMENTS.
3. SEE PHOTOMETRIC PLAN FOR ELECTRICAL AND FIBER SERVICE TO LIGHT POLES & CAMERAS.
4. CONTRACTOR SHALL COORDINATE DESIGN AND VERBIAGE OF DIRECTIONAL SIGNS WITH
RPS PRIOR TO DIRECTIONAL SIGN PROCUREMENT.
5. SAFETY TREADS SHALL BE SUPERGRIT OR APPROVED EQUAL.
LEGEND
EXISTING HMA PAVEMENT
EXISTING GRAVEL/SHOULDER
EXISTING CONCRETE SURFACE
PROPOSED HMA PAVEMENT
PROPOSED HEAVY DUTY HMA
PAVEMENT
PROPOSED P.C.C. SIDEWALK
NUMBER OF PARKING STALLSXX
0 400 20 80
N
DATE BYREVISION
CHECKED BY: KCB
DATE: 2/10/26
DRAWN BY: LMT/RKW
DATE: 2/10/26
RPS 205 MARSH SITE LOGISTICS
OVERALL SITE IMPROVEMENT PLAN
700 WEST LOCUST STREET, BELVIDERE, ILLINOIS 61008
PHONE: 815.547.8435 | FAX: 815.544.0421
ILLINOIS DESIGN FIRM NO. 184-001260
WEBSITE: WWW.CIVILIDEAS.COM G:\FILES\WINN\ROCKFORD\5905 RPS205 Marsh Site Logistics\CURRENT
PROJECT\5905_BASE.dwg
PDF CREATED ON: 2/12/2026 2:02:29 PM
SHEET
of154
SCHOOL DAY PARKING DATA
97 STANDARD PARKING SPACES
5 ADA PARKING SPACES
102 TOTAL PARKING SPACES
ADDITIONAL OFF-HOUR
PARKING DATA
30 STANDARD PARKING SPACES
15 PARKING ON PLAYGROUND
45 TOTAL PARKING SPACES
G :\F
IL
ES
\W
IN
N \R
O C
K
FO
R D
\5
R
PS
M ar sh
S ite
L og is tic s\ C
U R
R
EN
T
PR
O
JE
C T\
_B A
SE
.d w g, /1
2/
:0 2:
P
M , J oh nB
, 1 :1
AutoCAD SHX Text
GV
AutoCAD SHX Text
GV
AY
PL
HAWTHORNE DR
821822
UG
F
UG
F
UGF
UGF
UGF
UGF
UGF
UGF
UGF
UGF
UGF
UGF
UGF
UG
F
UG
F
UG
F
O
HU
O
HU
O
HU
O
HU
O
HU
O
HU
O
HU
UG
T
UG
T
UG
T
UG
T
UGT
UGT
E
W
W
E
E x x x
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
W W
W
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
N
L
M
K
J I
H G F
E
D
C
B
A
O
810 812
(826.42)(825.78)
(825.34)
(825.10)
(824.79)
(824.74)
(826.33)
(8
.46
(806.52)
(805.76)(804.39)
(80 3.8
6)
(803.79)
(824.86)(824.77)
(825.41)
(825.64)
(826.05)
(826.50)
(826.78)
(827.16)
(827.28)(827.22)
(815.85) (813.53)
(813.48)
(812.23)
(811.52)
(806.00)
(808.70)
(809.16)
(810.60)
(812.00)
(814.00)
(816.00)
(818.70) (819.00)
(821.70)
(823.00)
(8
.0 0)
823.56
(825.52)
(826.53)
(823.31)
(823.77)
(824.53)(824.60)
(824.00) (823.00)
(822.84) (818.00)
(8
.00
(813.00)
(811.00)
(810.00)
(812.20)
(822.00) (823.87)
(802.60)
(803.60)
(804.00)
(803.00)
(80 2.5
1)(802.74)
(802.50)
(802.71)
(803.00)
(804.00)
(805.00)
(813.00)
(811.41)(811.16)
(810.54)
(810.00)
EXISTING BUILDING
811 812
811 812
810811812
808809
825 82
823822 821 820 819 818
813 81
818 819
824.94
824.55
824.75
825.15
824.50
6.0
825.29
826.88
824.26
3.
823.50
3.
823.00
0.
818.74 818.50
817.92
817.96
5.9
5.5
813.87
3.2
814.89
816.81
816.76
4.4
812.43
1.8
813.43
812.83
813.71
813.72
813.64
3.
3.
813.04
3.
814.33814.05
814.82
815.26
813.59
814.23
4.
4.
816.22 816.15
817.51
818.47 818.40
825.55
818.23
815.98 814.74
814.92
4.
816.00
5.
813.70 813.00
809.60
824.24
6.
6.
806.79 806.4880
6.5
806.59
6.
805.54
805.56
805.83
805.31
5.
804.44
804.1780 3.
805.27
805.54
805.12
4.
805.69 805.88
6.9
807.25
806.35
805.39
805.12
5.
6.
806.33
806.07804.87
804.68804.00
803.73
803.46
804.49
805.44
806.73
806.46
6.
805.10
805.10
804.83 806.25
826.07
826.85
824.75825.19
824.68
803.91
803.37
824.27
8.0
810.00
814812.78
813.04
813.38
(806.00)
(806.57)
(807.38)
(808.45)
810809 807 808
(81 8.2
2)
(817.94)
(81 9.1
8)
(819.19)
819.75
9.8
819.95 820.00820.50
820.28 820.40 820.35
799.88 800
8.6
100' WIDE SPILLWAY @ 803.00
0 400 20 80
N
NOTES:
1. CONTRACTOR TO VERIFY EXACT LOCATION AND ELEVATION OF EXISTING UTILITIES AT
LOCATIONS OF CONFLICT. CONTRACTOR TO NOTIFY ENGINEER WITH ANY DISCREPANCIES.
2. ALL SIDEWALK RAMPS TO BE IN ACCORDANCE WITH ADA REQUIREMENTS.
LEGEND
EXISTING SPOT ELEVATION
PROPOSED SPOT ELEVATION
X.X% DESIGN SLOPE
DRAINAGE FLOW DIRECTION
(XXX.XX)
XXX.XX
DATE BYREVISION
CHECKED BY: KCB
DATE: 2/10/26
DRAWN BY: LMT/RKW
DATE: 2/10/26
RPS 205 MARSH SITE LOGISTICS
OVERALL GRADING PLAN
700 WEST LOCUST STREET, BELVIDERE, ILLINOIS 61008
PHONE: 815.547.8435 | FAX: 815.544.0421
ILLINOIS DESIGN FIRM NO. 184-001260
WEBSITE: WWW.CIVILIDEAS.COM G:\FILES\WINN\ROCKFORD\5905 RPS205 Marsh Site Logistics\CURRENT
PROJECT\5905_BASE.dwg
PDF CREATED ON: 2/12/2026 2:02:31 PM
SHEET
of155
CONTOURS
EXISTING MINOR
MAJOR
FINAL GRADINGMINOR
MAJOR
SEE GRADING DETAIL A
SHEET 8
SEE GRADING DETAIL B
ON SHEET 8
G :\F
IL
ES
\W
IN
N \R
O C
K
FO
R D
\5
R
PS
M ar sh
S ite
L og is tic s\ C
U R
R
EN
T
PR
O
JE
C T\
_B A
SE
.d w g, /1
2/
:0 2:
P
M , J oh nB
, 1 :1
AutoCAD SHX Text
GV
AutoCAD SHX Text
GV
AY
PL
HAWTHORNE DR
821822
UG
F
UG
F
UGF
UGF
UGF
UGF
UGF
UGF
UGF
UGF
UGF
UGF
UGF
UG
F
UG
F
UG
F
O
HU
O
HU
O
HU
O
HU
O
HU
O
HU
O
HU
UG
T
UG
T
UG
T
UG
T
UGT
UGT
E
W
W
E
E x x x
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
W W
W
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
N
L
M
K
J I
H G F
E
D
C
B
A
O
810 812
SF
SF
SF
SF
SF
SF
SF
SF
SF
SFSFSFSFSF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF SF SF SF SF SF SF SF SF SF SF SF
SF
SF
SF
EXISTING BUILDING
UG
E
UG
E
UG
E
UGE UGE UGE
UG
E
UG
E
UG
E
UG
E
UGE UGE UGE UGE
UGE
UG
E
UG
E
UG
E
UG
E
UG
E
UG
E
UGE UGE
UG
E
UG
E
UG
E
UGE UGE UGE
UGE
UGE
FO FO FO
FO FO
FO
FO
FO
FO
FO
FO FO FO
FO
FO
FO FO FO FO
811 812
811 812
810811812
808809
825 82
823822 821 820 819 818
813 81
818 819
TEMPORARY
CONCRETE
WASHOUT
TEMPORARY
CONCRETE
WASHOUT
± 580 C.Y. OF TOPSOIL TO BE PLACED EAST OF PLAYGROUND AREA.
IF MORE TOPSOIL IS FOUND ONSITE EXPAND PLATEAU AREA NORTH
& SOUTH KEEPING POSITIVE DRAINAGE THRU THE SITE.
810809 807 808
9.
803.00 SPILLWAY
804.00 TOP OF BERMPROPOSED BERM W/
1' THICK CLAY LAYER
(UPSTREAM SIDE)
UNDER 6" TOPSOIL
EXISTING GROUND
EXISTING ROADWAY
0 400 20 80
N
EROSION AND SEDIMENT CONTROL NOTES:
1. UNLESS OTHERWISE INDICATED, ALL VEGETATIVE AND STRUCTURAL EROSION AND SEDIMENT CONTROL PRACTICES WILL BE CONSTRUCTED ACCORDING TO MINIMUM STANDARDS AND
SPECIFICATIONS IN THE "ILLINOIS URBAN MANUAL", LATEST REVISION.
2. A COPY OF THE APPROVED EROSION AND SEDIMENT CONTROL PLAN SHALL BE MAINTAINED ON THE SITE AT ALL TIMES.
3. THE CONTRACTOR IS RESPONSIBLE FOR INSTALLATION OF ANY ADDITIONAL EROSION CONTROL MEASURES NECESSARY TO PREVENT EROSION AND SEDIMENTATION AS DETERMINED BY
ROE & THE COUNTY OF WINNEBAGO.
4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR SWEEPING PUBLIC & DEVELOPMENT STREETS WHEN DEBRIS HAS BEEN TRACKED AND OR WASHED ON THEM. THE CONTRACTOR SHALL BE RESPONSIBLE TO SWEEP THE STREETS IF DIRECTED TO DO SO BY THE ROE & COUNTY OF WINNEBAGO. THE CONTRACTOR IS ALSO RESPONSIBLE TO CONTROL DUST ON THE SITE IN
ACCORDANCE WITH PRACTICES IN THE "ILLINOIS URBAN MANUAL", LATEST REVISION.
5. ALL EROSION AND SEDIMENT CONTROL DEVICES SHALL BE INSTALLED AND STABILIZED PRIOR TO SITE CLEARING AND GRADING. ALL EROSION AND SEDIMENT CONTROL PRACTICES WILL BE MAINTAINED THROUGH THE DURATION OF THE PROJECT. ALL EROSION AND SEDIMENT CONTROL STRUCTURES SHALL BE INSPECTED WEEKLY AND AFTER EACH 1/2" RAINFALL EVENT AND 6" SNOWFALL EVENT AND AN INSPECTION RECORD SHALL BE MAINTAINED BY THE CONTRACTOR AT THE JOB SITE FOR THE DURATION OF THE PROJECT. THE CONTRACTOR SHALL BE RESPONSIBLE TO PERFORM THESE INSPECTIONS AND TO MAINTAIN ALL EROSION AND SEDIMENT CONTROL DEVICES IN SUCH A MANNER THAT THEY CONTINUE TO FUNCTION FOR THE DURATION OF THEIR INTENDED USE. THE CONTRACTOR SHALL BE RESPONSIBLE TO PERFORM ALL TEMPORARY SEEDING.
6. ALL DISTURBED AREAS SHALL BE STABILIZED WITH TEMPORARY SEEDING WITHIN 14 DAYS FOLLOWING THE END OF ACTIVE DISTURBANCE.
7. EROSION BLANKETS ARE TO BE INSTALLED ON ALL SLOPES STEEPER THAN 10 % IMMEDIATELY AFTER TOPSOILING, FERTILIZING, AND SEEDING ARE COMPLETE. EROSION BLANKETS WILL NOT BE REQUIRED IF SOD IS USED. INSTALLATION OF EROSION BLANKETS SHALL BE ACCORDING TO THE RECOMMENDATIONS OF THE MANUFACTURER. EROSION BLANKETS SHALL BE INSPECTED
LEGEND
SILT FENCE
6" TOPSOIL, LAWN SEEDING (AS
SHOWN IN THE SPECIFICATIONS) &
NORTH AMERICAN GREEN ERONET
S75 (OR APPROVED EQUAL)
6" TOPSOIL, LAWN SEEDING (AS
SHOWN IN THE SPECIFICATIONS) &
MULCH METHOD 2
6" TOPSOIL, LAWN SEEDING (AS
SHOWN IN THE SPECIFICATIONS) &
VMAX S200 (TURF REINFORCEMENT
MAT) OR APPROVED EQUAL
STABILIZED CONSTRUCTION
ENTRANCE
TEMPORARY DITCH CHECK
SF SF
T
DATE BYREVISION
CHECKED BY: KCB
DATE: 2/10/26
DRAWN BY: LMT/RKW
DATE: 2/10/26
RPS 205 MARSH SITE LOGISTICS
STORMWATER POLLUTION PREVENTION PLAN
700 WEST LOCUST STREET, BELVIDERE, ILLINOIS 61008
PHONE: 815.547.8435 | FAX: 815.544.0421
ILLINOIS DESIGN FIRM NO. 184-001260
WEBSITE: WWW.CIVILIDEAS.COM G:\FILES\WINN\ROCKFORD\5905 RPS205 Marsh Site Logistics\CURRENT
PROJECT\5905_BASE.dwg
PDF CREATED ON: 2/12/2026 2:02:34 PM
SHEET
of156
CONTOURS
EXISTING MINOR
MAJOR
FINAL GRADINGMINOR
MAJOR
PERIODICALLY AND AFTER EACH RAINFALL FOR DAMAGE OR DISPLACEMENT. DAMAGED OR DISPLACED EROSION BLANKETS SHALL BE REPAIRED OR RESTAPLED AS SOON AS POSSIBLE.
TEMPORARY EROSION AND SEDIMENT CONTROL DEVICES SHALL BE REMOVED WITHIN 30 DAYS AFTER FINAL SITE STABILIZATION HAS BEEN ACHIEVED VIA PERMANENT MEASURES.
PERMANENT VEGETATION AND STRUCTURES SHALL BE INSTALLED AND FUNCTIONAL AS SOON AS PRACTICAL DURING DEVELOPMENT. PERMANENT SEEDING, SODDING, OR LANDSCAPING
SHALL BE COMPLETED WITHIN 7 DAYS OF FINAL TOPSOIL RE-SPREAD.
8. ALL STOCKPILES ARE TO BE PLACED AT A LOCATION SPECIFIED BY THE OWNER. ALL STOCKPILES ARE TO BE PROTECTED BY SILT FENCE ALONG THE DOWN SLOPE SIDES OF THE STOCKPILE OR AROUND THE ENTIRE PERIMETER IF DIRECTED TO DO SO BY THE ENGINEER, ROE, THE COUNTY OF WINNEBAGO, OR THEIR REPRESENTATIVES. ANY STOCKPILES THAT WILL REMAIN UNDISTURBED FOR LONGER THAN THREE WEEKS SHALL BE PROTECTED BY TEMPORARY SEEDING. SOIL STORAGE PILES CONTAINING MORE THAN 10 CUBIC YARDS OF MATERIAL SHALL NOT BE LOCATED WITH A DOWN SLOPE DRAINAGE LENGTH OF LESS THAN 25 FEET TO A ROAD WAY OR DRAINAGE CHANNEL. COST OF TEMPORARY SEEDING SHALL BE INCLUDED PRICE BID
PER EROSION CONTROL LUMP SUM.
9. EROSION FABRIC IS NECESSARY FOR SILT TRAPS INSTALLED AT ALL STORM STRUCTURES WITH OPEN LIDS. ALL STORMWATER INLETS SHALL BE PROTECTED BY SILT TRAPS, STRAW BALE DIKES, EXCELSIOR LOGS, EROSION FABRIC, OR OTHER METHODS APPROVED BY THE ROE OR COUNTY OF WINNEBAGO. AFTER EACH RAINFALL EACH INLET SHALL BE INSPECTED. ANY INLET PROTECTION THAT HAS FAILED OR IS DAMAGED SHALL BE REPAIRED AS SOON AS POSSIBLE. SEDIMENT SHALL BE REMOVED AS NECESSARY TO PROVIDE FOR THE CONTINUED
EFFECTIVENESS OF THE INLET PROTECTION TECHNIQUE IN USE.
POND SECTION
POND SECTION
G :\F
IL
ES
\W
IN
N \R
O C
K
FO
R D
\5
R
PS
M ar sh
S ite
L og is tic s\ C
U R
R
EN
T
PR
O
JE
C T\
_B A
SE
.d w g, /1
2/
:0 2:
P
M , J oh nB
, 1 :1
AutoCAD SHX Text
GV
AutoCAD SHX Text
GV
EXECUTIVE SUMMARY
The general contractor, and all subcontractors involved with a construction activity that disturbs site soil or who implement a pollutant control measure identified in the Storm Water Pollution Prevention Plan (SWPPP) must comply with the following requirements of the National Pollutant Discharge Elimination System (NPDES) General Permit as well as any requirements of local governing agencies having jurisdiction concerning erosion and sedimentation control.
A. List the notification requirements of the permit. List names and addresses of the governing agencies requiring notification before earthwork can begin and what the minimum notification time is. (* Indicated any requirements for a pre-construction meeting).
*Rockford Public Schools ATTN: Scott Jensen - Director of Design & Construction 201 S Madison Street Rockford, IL 601108
*C.E.S. Inc.
ATTN: Kevin Bunge 700 W. Locust St.
Belvidere, IL 61008
Min. Notification Time: 48 Hours
A copy of the Notice of Intent (NOI) and a description of the project must be posted in a prominent place for public viewing at the construction site.
B. Complete copy of the SWPPP, including copies of all inspection reports, plan revisions, etc., must be retained at the project site at all times during working hours and kept in the permanent project records for at least three years following submission of the Notice of Termination (NOT).
C. The general contractor must provide names and address of all subcontractors working on this project who will be involved with the major construction activities that disturb site soil. That information must be kept with the SWPPP.
D. The general contractor and all subcontractors involved with the major construction activities that disturb site soils must sign a copy of the appropriate certification statement included in this document.
E. As described previously, regular inspections must be made to determine effectiveness of the SWPPP. The SWPPP must be modified as needed to prevent pollutants from discharging from the site. The inspector must be a person familiar with the site, the nature of the major construction activities, and qualified to evaluate both overall system performance and individual component performance. Additionally, the inspector must either be someone empowered to implement modifications to this SWPPP and the pollutant control devices, if needed, in order to increase effectiveness to an acceptable level, or someone with the authority to cause such things to happen.
F. This SWPPP must be updated each time there are significant modifications to the pollutant prevention system or a change of contractors working on the project who disturbs site soil. The general contractor must notify the governing review agency as soon as these modifications are implemented.
G. Discharge of oil or other hazardous substances into the storm water is subject to reporting and cleanup requirements. Refer to Part III, B of the NPDES General Permit for additional information. Copies of the NPDES General Permit and the Notice of Intent forms are available by calling 815-547-8435 or online at "http://www.epa.state.il.us/water/permits/storm-water/general-construction-permit.pdf." and "http://www.epa.state.il.us/water/permits/storm-water/forms/notice-intent-construction.pdf."
H. Once the site reaches final stabilization, the general contractor must complete and submit a Notice of Termination (NOT). A blank form can be found at "http://www.epa.state.il.us/water/permits/storm-water/forms/notice-termination-construction.pdf"
I. This SWPPP intends to control water-borne and liquid pollutant discharges by some continuation of interception, filtration, and containment. The general contractor and subcontractors implementing this SWPPP must remain alert to the need to periodically refine and update the SWPPP in order to accomplish the intended goals.
J. This SWPPP must be amended as necessary during the course of construction in order to keep it current with the pollutant control measures utilized at the site. Amending the SWPPP does not mean that it has to be reprinted. It is acceptable to add addenda, sketches, new sections, and/or drawings.
K. A record of the dates when major grading activities occur, when construction activities temporarily or permanently cease on a portion of the site, and when stabilization measures are initiated must be maintained until the NOT is filed. A log for keeping such records can be found online at "http://www.epa.gov/npdes/pubs/sw_swppp_inspection_form.doc". A different form for the log may be substituted if it is found to be more useful.
INTRODUCTION
This SWPPP has been prepared for major activities associated with the construction of a bus parking loop and an additional parking lot on a 4.5 acre site (part of a 11.50 total acre site). This SWPPP includes the elements necessary to comply with the national baseline general permit for construction activities administered by the U.S. Environmental Protection Agency (USEPA) under the National Pollutant Discharge Elimination System (NPDES) program and all local governing agency requirements. This SWPPP must be actuated and on-site before construction begins.
Construction phase pollutant sources anticipated at the site are disturbed (bare) soil, vehicle fuels and lubricants, chemicals associated with building construction, and building materials. Without adequate control there is the potential for each type of pollutant to be transported by storm water.
Project construction will consist of site grading, paving & seeding to facilitate the construction of a paved bus loop & an additional on-site parking lot.
A. Purpose A major goal of pollution prevention efforts during project construction is to control soil and pollutants that originate on the site and prevent them from flowing to surface waters. The purpose of this SWPPP is to provide guidelines for achieving that goal. A successful pollution prevention program also relies upon careful inspection and adjustments during the construction process in order to enhance its effectiveness.
B. Scope This SWPPP must be actuated and on-site when construction begins. It primarily addresses the impact of storm rainfall and runoff areas of the ground surface disturbed during the construction process. In addition, there are recommendations to controlling other sources of pollution that could accompany the major construction activities. This SWPPP will terminate when disturbed areas are stabilized, construction activities covered herein have ceased, and a completed Notice of Termination (NOT) is mailed to the governing agency requiring the NOT. Particular forms can be found at the following web addresses:
"https://epa.illinois.gov/content/dam/soi/en/web/epa/topics/forms/water-permits/storm-water/documents/general-npdes-permit-ilr10-construction.pdf", "https://www3.epa.gov/npdes/pubs/sw_swppp_inspection_form.doc", and "https://epa.illinois.gov/content/dam/soi/en/web/epa/topics/forms/water-permits/storm-water/documents/notice-of-termination-construction.pdf" for implementing this SWPPP.
The National Baseline General Permit for Storm Water Discharges From Construction Activities prohibits most non-storm water discharges during the construction phase. Allowable non-storm water discharges that could occur during construction on this project, which would therefore be covered by the General Permit, include:
1. Discharges from the fire fighting activities.
2. Fire hydrant flushing
3. Water used to wash vehicles or control dust.
4. Water flowing from potable sources and water line flushing.
5. Irrigation drainage.
6. External building wash down which does not use detergents.
7. Runoff from pavement wash down where spills or leaks of toxic or hazardous materials have not occurred (unless all spilled material has been removed) and where detergents have not be used.
8. Air conditioning condensate.
9. Springs and uncontaminated groundwater.
10. Foundation or footing drains where flows are not contaminated with process materials such as solvents.
The techniques described in this SWPPP focus on providing control of pollutant discharges with practical approaches that utilize readily available expertise, materials, and equipment.
The owner referred to in this SWPPP is the Rockford Public School System. The general contractor will construct the site development improvements while working under contract with the owner.
CONTROL
MEASURE
GROUP
CONTROL MEASURE
URBAN
MANUAL
CODE
APPLIED CONTROL MEASURE DESCRIPTION TE
M
P.
PE
RM
SO
IL
ST
AB
ILI
ZA
TIO
N
RU
NO
FF
C
O
NT
RO
L
SE
DI
M
EN
T C O
NT
RO
L M
ISC
ST
O
RM
W
AT
ER
M
AN
AG
EM
EN
T
SP
EC
IA
L A
RE
A
PR
O
TE
C
TIO
N
DIVERSION
DIVERSION DIKE
RIGHT-OF-WAY DIVERSION
ROCK CHECK DAM - COARSE AGGREGATE
TEMPORARY DIVERSION
TEMPORARY SLOPE DRAIN
CULVERT INLET PROTECTION - SILT FENCE
INLET PROTECTION - BLOCK & GRAVEL
PORTABLE SEDIMENT TANK
SILT FENCE
STABILIZED CONSTRUCTION ENTRANCE
SUMP PIT PLAN
TEMPORARY SEDIMENT TRAP
DUST CONTROL
TEMPORARY STREAM CROSSING
(WETLAND CONSULTANT TO PROVIDE DETAIL)
FILTER STRIP - GRASSED
GRASSED-LINED CHANNEL
INFILTRATION TRENCH
LEVEL SPREADER
PERMEABLE PAVEMENT
SUBSURFACE DRAIN
URBAN STORMWATER
WETLAND
IMPOUNDMENT STRUCTURE - FULL FLOW
IMPOUNDMENT STRUCTURE - ROUTED
VEGETATIVE STREAMBANK STABILIZATION
WELL DECOMMISSIONING
TREE & FOREST ECOSYSTEM PRESERVATION
TREE & SHRUB PLANTING
TREE PROTECTION - FENCING
TREE PROTECTION - AUGURING
TOPSOILING
TEMPORARY SEEDING
SURFACE ROUGHENING
SODDING
ROCK OUTLET PROTECTION
PERMANENT VEGETATION
MULCHING
LAND GRADING
EROSION BLANKET
CONSTRUCTION ROAD STABILIZATION
INLET PROTECTION - EXCAVATED DRAIN
INLET PROTECTION - FABRIC DROP
INLET PROTECTION - GRAVEL & WIRE MESH
INLET PROTECTION - SOD FILTER
THE STABILIZATION OF TEMPORARY CONSTRUCTION ACCESS ROUTES, SUBDIVISION ROADS, ON-SITE
VEHICLE TRANSPORTATION ROUTES, AND CONSTRUCTION PARKING AREAS WITH STONE
IMMEDIATELY AFTER GRADING
A PREFORMED PROTECTIVE BLANKET OF STRAW OR OTHER PLANT RESIDUE, OR PLASTIC FIBERS
FORMED INTO A MAT, USUALLY WITH A PLASTIC MESH ON ONE OR BOTH SIDES.
A TEMPORARY BARRIER OF ENTRENCHED GEOTEXTILE FABRIC (FILTER FABRIC) STRETCHED ACROSS
AND ATTACHED TO SUPPORTING POSTS USED TO INTERCEPT SEDIMENT LADEN RUNOFF FROM
SMALL DRAINAGE AREAS OF DISTURBED SOIL.
A STABILIZED PAD OF AGGREGATE UNDERLAIN WITH FILTER FABRIC LOCATED AT ANY POINT
WHERE TRAFFIC WILL BE ENTERING OR LEAVING A CONSTRUCTION SITE TO OR FROM A PUBLIC
RIGHT-OF-WAY, STREET, ALLEY, SIDEWALK, OR PARKING AREA.
A CONSTRUCTED SYSTEM OF SHALLOW POOLS THAT CREATE GROWING CONDITIONS SUITABLE FOR EMERGENT AND RIPARIAN WETLAND PLANTS EXPLICITLY DESIGNED TO LESSEN THE IMPACTS OF
STORMWATER QUALITY IN URBAN AREAS.
RESHAPING THE GROUND SURFACE TO PLANNED GRADES AS DETERMINED BY THE
ENGINEERING PLANS.
A RIDGE OR RIDGE AND CHANNEL CONSTRUCTED DIAGONALLY ACROSS A SLOPING
ROAD OR UTILITY RIGHT-OF-WAY THAT IS SUBJECT TO EROSION.
A DIKE OR DIKE & CHANNEL CONSTRUCTED ALONG THE PERIMETER OF A DISTURBED
CONSTRUCTION AREA.
A CHANNEL AND SUPPORTING RIDGE CONSTRUCTED ACROSS THE SLOPE TO COLLECT AND
DIVERT RUNOFF.
METHODS OF PRESERVING AND USING TOPSOIL TO ENHANCE FINAL SITE STABILIZATION WITH
VEGETATION.
PLANTING RAPID-GROWING ANNUAL GRASSES OR SMALL GRAINS, TO PROVIDE INITIAL,
TEMPORARY…