1-26-21 Part 2 Specs Marsh School.pdf
PDF 1 MB Posted
- Attached to
- Marsh Montessori Site Logistics
- Solicitation number
- IFB No. 26-21
- Issued by
- Rock Island County, Illinois
About this file
This document comprises technical specifications for the Marsh Montessori Site Logistics project under Rockford Public Schools District 205 (RPS 205, Project #2612) in Illinois. The specifications cover multiple construction disciplines including exterior lighting, video surveillance systems, site clearing, earth moving, asphalt paving, concrete paving, soil preparation, turf grasses, landscape planting, chain link fencing, and storm drainage. The project requires furnishing and installing conduit, light posts, concrete foundations, lighting fixtures, fiber optic cable systems with security cameras, temporary erosion control measures, soil materials and amendments, topsoil, seed and sod for lawn installation, trees and shrubs, mulch, edging, PVC-coated steel chain link fencing, and storm sewer infrastructure including culverts and drainage structures. The specifications reference industry standards including ASTM standards, IDOT Standard Specifications for Road and Bridge Construction, ANSI Z60.1 for nursery stock, ACI standards for concrete, and AOSA rules for seed testing. Installation must comply with local codes and environmental regulations including NPDES requirements for dewatering operations and Illinois Environmental Protection Agency standards for soil materials.
The specifications establish comprehensive quality assurance and testing requirements, including geotechnical testing agencies, concrete field-testing technicians, and soil-testing laboratories. All contractors must provide submittals including product data, certifications, material test reports, and quality control documentation prior to work commencement. Warranty periods vary by component: landscape plantings carry one-year warranties from substantial completion, with extended periods for fall installations; turf areas require warranty maintenance through one growing season plus one year from substantial completion; fencing carries a 15-year warranty against rust and corrosion. The contractor bears responsibility for protecting completed work from damage, maintaining proper moisture conditions during installation, and conducting all repairs and replacements at no additional cost to the owner during warranty periods. Planting season restrictions apply between April 15 and October 31, with optimal seeding periods from August 15 through September 15 or April 15 through May 30, and prairie perennial plug installation limited to June 1 through August 15.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 2-26-21 Part 1 Bid Specs.pdf | ||
| 3-26-21 Part 3 5905 PLAN SET ISSUED FOR CONSTRUCTION 2-12-26.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MARSH MONTESSORI SITE LOGISTICS
ROCKFORD PUBLIC SCHOOLS - DISTRICT 205
RPS 205 Project #2612
265600 - 1 EXTERIOR LIGHTING
fence
TECHNICAL SPECIFICATIONS
SECTION 26-56-00 – EXTERIOR LIGHTING
PART 1 – GENERAL
1.1 SUMMARY
The Contractor shall furnish and install conduit with wire, handholes, light posts, concrete foundation, and lighting fixture at the locations shown on the construction drawings. All materials and installation procedures shall conform to the applicable requirements of Sections 801, 804, 814, 816, 821, 830, and 844 of the Standard Specifications for Road and Bridge Construction, including foundations, poles, luminaires, wiring, grounding, and hardware.
1.2 WORK INCLUDED
A. Excavation and construction of the concrete foundation, including reinforcement, anchor bolts, templates, and formwork as required.
B. Furnishing and installing the light post, luminaire fixture, any required quazite boxes, pole hardware, wiring, connectors, grounding components, and all associated accessories.
C. Setting the pole plumb and securing it to the foundation using approved anchor bolt assemblies.
D. Mounting and orienting the fixture as shown on the plans or directed by the Engineer.
D. Making all electrical connections in accordance with local codes and the Standard Specifications to properly power and control the light posts.
E. The Contractor shall verify field conditions prior to installation, and protect the completed assembly until final acceptance. Any damaged materials or improper installation shall be corrected at no additional cost to the Owner.
F. Removing & reinstalling an existing light pole.
END OF SECTION 265600
282300 - 1 VIDEO SURVEILLANCE
fence
SECTION 28-23-00 – VIDEO SURVEILLANCE
PART 1 – GENERAL
1.1 SUMMARY
The Contractor shall furnish and install fiber optic cable and all associated components at the locations shown on the construction drawings for the installation of security cameras. All work shall conform to the applicable requirements of Section 801 and Section 871 of the IDOT Standard Specifications for Road and Bridge Construction, including installation, protection, testing, and documentation of fiber optic systems.
1.2 WORK INCLUDED
A. Fiber Cable: Provide and install armored, exterior-rated, single-mode, 12-pair/24-strand fiber optic cable.
B. Rack and Enclosures: Provide and install splice tray at rack, LC duplex connection(s) (Panduit FAP12WBUDLCZ or approved equal), and fiber enclosures (Panduit FCE2U or approved equal).
C. Labeling: All cameras and license connections shall be labeled at both the rack and the device to ensure proper identification and traceability.
D. Turnkey Installation: Provide a complete turnkey system, including all fiber placement, routing, protection, splicing, termination, connection hardware, and related accessories.
E. Fiber Splicing and Termination: All splicing and termination shall be performed by qualified technicians using industry-standard splicing methods.
F. Certification Testing: The Contractor shall perform a comprehensive certification test on all installed fiber to verify compliance with the manufacturer’s performance specifications. Certification reports shall be submitted to the Engineer for review and acceptance.
G. The extra slack for the fiber lines within each light pole shall be incidental to the pole.
H. The Contractor shall protect all installed fiber components during construction and shall replace any damaged materials or improperly completed work at no additional cost to the Owner.
I. Included in this line item shall be any additional length of wiring necessary for the wiring of the lights and connections into the RPS monitoring system. No additional compensation shall be allowed for extra length as required for the light poles, receptacles, or interior connections.
J. The Contractor shall furnish and install cameras as specified on the proposed light poles with fixtures at the locations specified and in accordance with the details as provided in the construction drawings.
Contractor shall coordinate with RPS 205 to ensure the cameras are correctly connected to the proper power supply and can properly communicate with existing RPS 205 camera monitoring systems for display and recording as required by RPS 205.
END OF SECTION 282300
SITE CLEARING 311000 - 1
SECTION 311000 - SITE CLEARING
PART 1 - GENERAL
1.1 SUMMARY
A. This Section includes the following:
1. Protecting existing trees shrubs plants and grass to remain.
2. Removing existing trees shrubs plants and grass.
3. Clearing and grubbing.
4. Stripping and stockpiling topsoil.
5. Removing above- and below-grade site improvements.
6. Temporary erosion and sedimentation control measures.
1.2 MATERIAL OWNERSHIP
A. Except for stripped topsoil or other materials indicated to remain Owner's property, cleared materials shall become Contractor's property and shall be removed from Project site.
1.3 PROJECT CONDITIONS
A. Traffic: Minimize interference with adjoining roads, streets, walks, and other adjacent occupied or used facilities during site-clearing operations.
1. Do not close or obstruct streets, walks, or other adjacent occupied or used facilities without permission from Owner and authorities having jurisdiction.
2. Provide alternate routes around closed or obstructed traffic ways if required by authorities having jurisdiction.
B. Salvable Improvements: Carefully remove items indicated to be salvaged and store on Owner's premises where indicated.
C. Utility Locator Service: Notify utility locator service for area where Project is located before site clearing.
D. Do not commence site clearing operations until temporary erosion and sedimentation control measures are in place.
PART 2 - PRODUCTS
2.1 SOIL MATERIALS
A. Satisfactory Soil Materials: Requirements for satisfactory soil materials are specified in Division 31 Section "Earth Moving".
1. Obtain approved borrow soil materials off-site when satisfactory soil materials are not available on-site.
SITE CLEARING 311000 - 2
PART 3 - EXECUTION
3.1 PREPARATION
A. Protect and maintain benchmarks and survey control points from disturbance during construction.
B. Locate and clearly flag trees and vegetation to remain or to be relocated.
C. Protect existing site improvements to remain from damage during construction.
1. Restore damaged improvements to their original condition, as acceptable to Owner.
3.2 TEMPORARY EROSION AND SEDIMENTATION CONTROL
A. Provide temporary erosion and sedimentation control measures to prevent soil erosion and discharge of soil-bearing water runoff or airborne dust to adjacent properties and walkways, according to sediment and erosion control Drawings.
B. Inspect, repair, and maintain erosion and sedimentation control measures during construction until permanent vegetation has been established.
C. Remove erosion and sedimentation controls and restore and stabilize areas disturbed during removal.
3.3 TREE PROTECTION
A. Erect and maintain temporary fencing around tree protection zones before starting site clearing.
Remove fence when construction is complete.
B. Do not excavate within tree protection zones, unless otherwise indicated.
C. Repair or replace trees and vegetation indicated to remain that are damaged by construction operations, in a manner approved by Engineer.
D. Existing Utilities: Do not interrupt utilities serving facilities occupied by Owner or others unless permitted under the following conditions and then only after arranging to provide temporary utility services according to requirements indicated:
1. Notify Engineer not less than two days in advance of proposed utility interruptions.
2. Do not proceed with utility interruptions without Engineer's written permission.
3.4 CLEARING AND GRUBBING
A. Fill depressions caused by clearing and grubbing operations with satisfactory soil material unless further excavation or earthwork is indicated.
1. Place fill material in horizontal layers not exceeding a loose depth of 8 inches, and compact each layer to a density required for the proposed condition and as specified in Division 31 Section "Earth Moving”.
SITE CLEARING 311000 - 3
3.5 TOPSOIL STRIPPING
A. Remove sod and grass before stripping topsoil.
B. Strip topsoil to whatever depths are encountered in a manner to prevent intermingling with underlying subsoil or other waste materials.
C. Stockpile topsoil materials away from edge of excavations without intermixing with subsoil.
Grade and shape stockpiles to drain surface water. Cover to prevent windblown dust.
1. Limit height of topsoil stockpiles to 72 inches
2. Dispose of excess topsoil as specified on the plans.
3. Do not stockpile topsoil within drip line of trees to remain.
3.6 SITE IMPROVEMENTS
A. Remove existing above- and below-grade improvements as indicated and as necessary to facilitate new construction.
3.7 DISPOSAL
A. Disposal: Remove surplus soil material, unsuitable topsoil, obstructions, demolished materials, and waste materials including trash and debris, and legally dispose of them off Owner's property.
1. Separate recyclable materials produced during site clearing from other nonrecyclable materials. Store or stockpile without intermixing with other materials and transport them to recycling facilities.
END OF SECTION 311000
EARTH MOVING 312000 - 1
SECTION 312000 - EARTH MOVING
1.1 SUMMARY
A. This Section includes the following:
1. Preparing subgrades for walks, pavements, lawns and grasses and exterior plants.
2. Base course for concrete walks and pavements.
3. Base course for asphalt paving.
B. Related Sections include the following:
1. Division 31 Section "Site Clearing" for temporary erosion and sedimentation control measures, site stripping, grubbing, stripping and stockpiling topsoil, and removal of above- and below-grade improvements and utilities.
2. Division 32 Section "Turf and Grasses" for finish grading, including preparing and placing topsoil and planting soil for lawns.
1.2 DEFINITIONS
A. Backfill: Soil material used to fill an excavation.
1. Initial Backfill: Backfill placed beside and over pipe in a trench, including haunches to support sides of pipe.
2. Final Backfill: Backfill placed over initial backfill to fill a trench.
B. Base Course: Course placed between the subbase course and paving.
C. Borrow Soil: Satisfactory soil imported from off-site for use as fill or backfill.
D. Excavation: Removal of material encountered above subgrade elevations and to lines and dimensions indicated.
1. Authorized Additional Excavation: Excavation below subgrade elevations or beyond indicated lines and dimensions as directed by Engineer. Authorized additional excavation and replacement material will be paid for according to Contract provisions for changes in the Work.
2. Unauthorized Excavation: Excavation below subgrade elevations or beyond indicated lines and dimensions without direction by Engineer. Unauthorized excavation, as well as remedial work directed by Engineer, shall be without additional compensation.
E. Fill: Soil materials used to raise existing grades.
EARTH MOVING 312000 - 2
F. Structures: Modular Block Retaining walls, slabs on-grade (excluding building), tanks, curbs, sewerage, mechanical and electrical appurtenances, or other man-made stationary features constructed above or below the ground surface excluding building.
G. Subgrade: Surface or elevation remaining after completing excavation, or top surface of a fill or backfill immediately below base, subbase, drainage fill, or topsoil materials.
H. Utilities: On-site underground pipes, conduits, ducts, and cables.
1.3 SUBMITTALS
A. Product Data: For the following:
1. Geotextiles.
1.4 QUALITY ASSURANCE
A. Geotechnical Testing Agency Qualifications: An independent testing agency qualified according to ASTM E 329 to conduct soil materials and rock-definition testing, as documented according to ASTM D 3740 and ASTM E 548.
1. Contractor shall be responsible for contacting the Owner’s Geotechnical Testing Agency at those times required by the specifications for the appropriate materials and soils testing.
2. Contractor shall coordinate with the Owner’s Geotechnical Testing Agency as to the Testing Agency’s requirements for advance notification, but allow for a minimum 24-hr notification.
1.5 PROJECT CONDITIONS
A. Existing Utilities: Do not interrupt utilities serving facilities occupied by Owner or others unless permitted in writing by Engineer and then only after arranging to provide temporary utility services according to requirements indicated.
1. Notify Engineer not less than two days in advance of proposed utility interruptions.
2. Do not proceed with utility interruptions without Engineer's written permission.
3. Contact utility-locator service for area where Project is located before excavating.
2.1 SOIL MATERIALS
A. General: Provide borrow soil materials when sufficient satisfactory soil materials are not available from excavations.
B. Satisfactory Soils: ASTM D 2487 Soil Classification Groups GW, GP, GM, GC, SC, SW, SP, ML, CL and SM, or a combination of these groups; free of rock or gravel larger than 3 inches in any dimension, debris, waste, frozen materials, vegetation, and other deleterious matter.
EARTH MOVING 312000 - 3
C. Unsatisfactory Soils: Soil Classification Groups MH, CH, OL, OH, and PT according to ASTM D 2487, or a combination of these groups.
1. Unsatisfactory soils also include satisfactory soils not maintained within 2 percent of optimum moisture content at time of compaction.
2. Unsatisfactory soils hereunder are Clean Construction or Demolition Debris (CCDD) as defined by the State of Illinois Environmental Protection Agency and is acceptable as fill material at CCDD facilities.
D. Non-special Waste Containing Soils: Either satisfactory or unsatisfactory soils that contain non-special waste that are non-liquid non-hazardous industrial process and pollution control waste and are excluded from special waste meeting all the requirements of Section 3.475 of the Illinois Environmental Protection Act.
1. Are not CCDD
2. Are not hazardous
3. Are not a liquid (as determined by paint-filter test SW-846 Method 9095)
4. Are not regulated asbestos-containing material as defined in 40 Code of Federal
Regulations, Section 61.141
5. Do not contain polychlorinated biphenyls (PCBs) regulated in accordance with 40 Code of Federal Regulations, Part 761
6. Are not formerly hazardous waste rendered non-hazardous
7. Do not result from shredding recyclable metals
E. Non-Hazardous Special Waste Containing Soils: Either satisfactory or unsatisfactory soils that contain special waste as defined by Illinois Environmental Protection Act (Act) Section 809.103 and that has not been determined as hazardous in that Section of the Act.
F. Hazardous Waste Containing Soils: Either satisfactory or unsatisfactory soils that contain hazardous special waste as defined by Section 3.220 of the Illinois Environmental Protection Act and as determined by Section 722.111 of Title 35 of Illinois Administrative Code.
G. Topsoil: ASTM D 5268, pH range of 5.5 to 7, a minimum of 4 percent organic material content; less than 3 percent stones ¾-inch or larger in any dimension and roots, plants, sod, clay lumps, and other extraneous materials harmful to plant growth.
1. Topsoil shall be free of all deleterious material that may adversely affect the use of the planted surface including any metal, wood, plastic, glass or other manmade materials not intended specifically as a soil supplement.
2. Topsoil shall be free of obnoxious weeds and invasive plants or other undesirable organisms and disease-causing plant pathogens.
3. Topsoil particle sizes shall fall in the following ranges as percentages by mass both separately and in combination:
a. Clay: 35 percent to 60 percent
b. Silt: 35 percent to 60 percent
c. Sand: less than 60 percent
d. Silt and Clay in combination: less than 65 percent
EARTH MOVING 312000 - 4
4. Topsoil Source: Reuse surface soil stockpiled on-site. Verify suitability of stockpiled surface soil to produce topsoil. Clean surface soil of roots, plants, sod, stones, clay lumps, and other extraneous materials harmful to plant growth.
a. Supplement with imported topsoil from off-site sources when quantities are insufficient. Obtain topsoil displaced from naturally well-drained construction or mining sites where topsoil occurs at least 6 inches deep; do not obtain from bogs or marshes.
H. Base Course: Graded mixture of crushed gravel or crushed stone ASTM D 2940; conforming to State of Illinois, Dept of Transportation Gradation CA-6.
I. Engineered Fill: Graded mixture of crushed gravel or crushed stone; ASTM D 2940;
conforming to State of Illinois, Dept of Transportation Gradation CA-6 or CA-7.
J. Unsuitable Soil Undercut Area Fill: Per Geotechnical Engineer’s Recommendations.
2.2 GEOTEXTILES AND GEOGRIDS
A. Separation Geotextile: Nonwoven needle punched geotextile fabric, manufactured for separation applications, made from polyolefins or polyesters; with elongation less than 50 percent; complying with AASHTO M 288 and the following, measured per test methods referenced:
1. Survivability: Class 1; AASHTO M 288.
2. Grab Tensile Strength: 315 lbf; ASTM D 4632.
3. Sewn Seam Strength: 284 lbf ; ASTM D 4632.
4. Tear Strength: 113 lbf; ASTM D 4533.
5. Puncture Strength: 113 lbf ;ASTM D 4833.
6. Apparent Opening Size: No. 70 sieve, maximum; ASTM D 4751.
7. Water Flow Rate: 110 gpm minimum; ASTM D 4491
8. Permittivity: 0.02 per second, minimum; ASTM D 4491.
9. UV Stability: 50 percent after 500 hours' exposure; ASTM D 4355.
3.1 PREPARATION
A. Protect structures, utilities, sidewalks, pavements, and other facilities from damage caused by settlement, lateral movement, undermining, washout, and other hazards created by earthwork operations.
B. Preparation of subgrade for earthwork operations including removal of vegetation, topsoil, debris, obstructions, and deleterious materials from ground surface is specified in Division 31 Section "Site Clearing."
C. Protect and maintain erosion and sedimentation controls during earthwork operations.
EARTH MOVING 312000 - 5
D. Provide protective insulating materials to protect subgrades and foundation soils against freezing temperatures or frost.
3.2 DEWATERING
A. Prevent surface water and ground water from entering excavations, from ponding on prepared subgrades, and from flooding Project site and surrounding area.
B. Discharge from dewatering operations must meet with local and State National Pollutant Discharge Elimination System (NPDES) requirements.
1. Incorporate structural and non-structural Best Management Practices (BMP’s) as necessary to meet NPDES and local requirements.
2. Waste material shall be legally disposed of where mechanical means are used to separate sediments and other pollutants from dewatering discharge water
C. Protect subgrades from softening, undermining, washout, and damage by rain or water accumulation.
1. Reroute surface water runoff away from excavated areas. Do not allow water to accumulate in excavations. Do not use excavated trenches as temporary drainage ditches.
2. Install a dewatering system to keep subgrades dry and convey ground water away from excavations. Maintain until dewatering is no longer required.
3.3 EXPLOSIVES
A. Explosives: Do not use explosives.
3.4 EXCAVATION, GENERAL
A. Unclassified Excavation: Excavate to as a minimum to subgrade elevations regardless of the character of surface and subsurface conditions encountered. Where topsoil depth exceeds the proposed subgrade elevation and where within pavement or synthetic turf areas, remove all topsoil encountered. Unclassified excavated materials may include rock, soil materials, and obstructions. No changes in the Contract Sum or the Contract Time will be authorized for rock excavation or removal of obstructions.
1. If excavated materials intended for fill and backfill include unsatisfactory soil materials and rock, replace with satisfactory soil materials.
3.5 EXCAVATION FOR WALKS AND PAVEMENTS
A. Excavate surfaces under walks and pavements to indicated lines, cross sections, elevations, and subgrades.
3.6 SUBGRADE INSPECTION
A. Notify Owner’s Geotechnical Testing Agency when excavations have reached required subgrade.
EARTH MOVING 312000 - 6
B. If Owner’s Geotechnical Testing Agency determines that unsatisfactory soil is present, continue excavation and replace with compacted backfill or fill material as directed.
C. Proof-roll subgrade below pavements with heavy pneumatic-tired equipment to identify soft pockets and areas of excess yielding. Do not proof-roll wet or saturated subgrades.
1. Completely proof-roll subgrade in one direction, repeating proof-rolling in direction perpendicular to first direction. Limit vehicle speed to 3 mph.
2. Proof-roll with a loaded 10-wheel, tandem-axle dump truck weighing not less than 15 tons.
3. Excavate soft spots, unsatisfactory soils, and areas of excessive pumping or rutting, as determined by Engineer, and replace with compacted backfill or fill as directed.
D. Authorized additional excavation and replacement material will be paid for according to Contract provisions for changes in the Work.
E. Reconstruct subgrades damaged by freezing temperatures, frost, rain, accumulated water, or construction activities, as directed by Engineer, without additional compensation.
3.7 UNAUTHORIZED EXCAVATION
1. Fill unauthorized excavations under other construction or utility pipe as directed by Owner’s Geotechnical Testing Agency.
3.8 STORAGE OF SOIL MATERIALS
A. Stockpile borrow soil materials and excavated satisfactory soil materials without intermixing.
Place, grade, and shape stockpiles to drain surface water. Cover to prevent windblown dust.
1. Stockpile soil materials away from edge of excavations. Do not store within drip line of remaining trees.
3.9 SOIL FILL
A. Plow, scarify, bench, or break up sloped surfaces steeper than 1 vertical to 4 horizontal so fill material will bond with existing material.
B. Place and compact fill material in layers to required elevations as follows:
1. Under grass and planted areas, use satisfactory soil material.
2. Under walks and pavements, use satisfactory soil material.
3. Under steps and ramps, use engineered fill.
4. Under other slabs on grade excluding buildings, use engineered fill.
C. Place soil fill on subgrades free of mud, frost, snow, or ice.
3.10 SOIL MOISTURE CONTROL
A. Uniformly moisten or aerate subgrade and each subsequent fill or backfill soil layer before compaction to within 2 percent of optimum moisture content.
EARTH MOVING 312000 - 7
1. Do not place backfill or fill material on surfaces that are muddy, frozen, or contain frost or ice.
2. Remove and replace, or scarify and air dry otherwise satisfactory material that exceeds optimum moisture content by 2 percent and is too wet to compact to specified dry unit weight.
3.11 COMPACTION OF BACKFILLS AND FILLS
A. Place backfill and fill materials in layers not more than 8 inches in loose depth for material compacted by heavy compaction equipment, and not more than 4 inches in loose depth for material compacted by hand-operated tampers.
1. Place backfill for self-compacting CA-7 in layers of 12” maximum for material compacted by heavy compaction equipment or by hand operated tampers.
B. Place backfill and fill materials evenly on all sides of structures excluding buildings to required elevations, and uniformly along the full length of each structure.
C. Compact materials to not less than the following percentages of maximum dry density according to ASTM D 1557
1. Under pavements, curbs and walks, scarify and recompact top 4 inches of existing subgrade and each layer of backfill or fill soil material at 95 percent Modified Proctor.
2. Under lawn or unpaved areas compact each layer of backfill or fill soil material at 85 percent Modified Proctor.
3.12 GRADING
A. General: Uniformly grade areas to a smooth surface, free of irregular surface changes. Comply with compaction requirements and grade to cross sections, lines, and elevations indicated.
1. Provide a smooth transition between adjacent existing grades and new grades.
2. Cut out soft spots, fill low spots, and trim high spots to comply with required surface tolerances.
B. Site Grading: Slope grades to direct water away from buildings and to prevent ponding. Finish subgrades to required elevations within the following tolerances:
1. Lawn or Unpaved Areas: Plus or minus 1 inch.
2. Walks: Plus or minus 1/2 inch.
3. Pavements: Plus or minus 1/2 inch.
3.13 BASE COURSE
A. Place base course on subgrades free of mud, frost, snow, or ice.
B. On prepared subgrade, place base course under pavements and walks as follows:
1. Install separation geotextile on prepared subgrade according to manufacturer's written instructions, overlapping sides and ends.
EARTH MOVING 312000 - 8
2. Shape base course to required crown elevations and cross-slope grades.
3. Place base course 4 inches or less in compacted thickness in a single layer.
4. Compact base course at optimum moisture content to required grades, lines, cross sections, and thickness to not less than 95 percent of maximum dry unit weight according to ASTM D 1557.
3.14 FIELD QUALITY CONTROL
A. Geotechnical Testing Agency: Owner will engage a qualified independent geotechnical engineering testing agency to perform field quality-control testing.
B. Allow testing agency to inspect and test subgrades and each fill or backfill layer. Proceed with subsequent earthwork only after test results for previously completed work comply with requirements.
C. Testing agency will test compaction of soils in place according to ASTM D 1557and ASTM D6938, as applicable. Tests will be performed at the following locations and frequencies:
1. Paved Areas: At subgrade and at each compacted fill and backfill layer, at least 1 test for every 3500 sq. ft. or less of paved area, but in no case fewer than 2 tests.
D. When testing agency reports that subgrades, fills, or backfills have not achieved degree of compaction specified, scarify and moisten or aerate, or remove and replace soil to depth required; recompact and retest until specified compaction is obtained.
3.15 PROTECTION
A. Protecting Graded Areas: Protect newly graded areas from traffic, freezing, and erosion. Keep free of trash and debris.
B. Repair and reestablish grades to specified tolerances where completed or partially completed surfaces become eroded, rutted, settled, or where they lose compaction due to subsequent construction operations or weather conditions.
1. Scarify or remove and replace soil material to depth as directed by Engineer; reshape and recompact.
C. Where settling occurs before Project correction period elapses, remove finished surfacing, backfill with additional soil material, compact, and reconstruct surfacing.
1. Restore appearance, quality, and condition of finished surfacing to match adjacent work, and eliminate evidence of restoration to greatest extent possible.
3.16 DISPOSAL OF WASTE MATERIALS
A. Disposal: Remove waste material, including trash, and debris, and legally dispose of off Owner's property.
END OF SECTION 312000
ASPHALT PAVING 321216 - 1
SECTION 321216 - ASPHALT PAVING
1.1 SUMMARY
A. Section Includes:
1. Hot-mix asphalt paving.
2. Pavement-marking paint.
B. Related Sections:
1. Division 31 Section "Earth Moving" for aggregate subbase and base courses and for aggregate pavement shoulders.
1.2 DEFINITION
A. Hot-Mix Asphalt Paving Terminology: Refer to ASTM D 8 for definitions of terms.
1.3 SUBMITTALS
A. Product Data: For each type of product indicated. Include technical data and tested physical and performance properties.
1. Job-Mix Designs: Certification, by authorities having jurisdiction, of approval of each job mix proposed for the Work.
B. Material Certificates: For each paving material, from manufacturer.
C. Material Test Reports: For each paving material.
1.4 QUALITY ASSURANCE
A. Regulatory Requirements: Comply with materials, workmanship, and other applicable requirements of IDOT for asphalt paving work.
1.5 DELIVERY, STORAGE, AND HANDLING
A. Deliver pavement-marking materials to Project site in original packages with seals unbroken and bearing manufacturer's labels containing brand name and type of material, date of manufacture, and directions for storage.
1. Store pavement-marking materials in a clean, dry, protected location within temperature range required by manufacturer. Protect stored materials from direct sunlight.
ASPHALT PAVING 321216 - 2
1.6 PROJECT CONDITIONS
A. Environmental Limitations: Do not apply asphalt materials if subgrade is wet or excessively damp, if rain is imminent or expected before time required for adequate cure, or if the following conditions are not met:
1. HMA Temperature: Delivered between 250 deg F and 350 deg F
2. Tack Coat: Minimum surface temperature of 60 deg F.
3. Asphalt Binder Course: Minimum surface temperature of 40 deg F in the shade and rising at time of placement.
4. Asphalt Surface Course: Minimum surface temperature of 45 deg F in the shade at time of placement and rising at time of placement.
B. Pavement-Marking Paint: Proceed with pavement marking only on clean, dry surfaces and at a minimum ambient or surface temperature of 55 deg F for water-based materials, and not exceeding 95 deg F. When more restrictive, manufacturer limits shall be adhered to.
2.1 AGGREGATES
A. General: Use materials and gradations that have performed satisfactorily in previous installations.
B. Coarse Aggregate: ASTM D 692, sound; angular crushed stone, crushed gravel.
1. Used in Surface Course: IDOT B Quality or better
2. Used in Binder Course: IDOT C Quality or better
C. Fine Aggregate: ASTM D 1073, sharp-edged natural sand or sand prepared from stone, gravel, or combinations thereof.
1. For hot-mix asphalt, limit natural sand to a maximum of 20 percent by weight of the total aggregate mass.
2. Quality: IDOT B Quality or better.
D. Mineral Filler: ASTM D 242, rock or slag dust, hydraulic cement, or other inert material.
2.2 ASPHALT MATERIALS
A. Asphalt Binder: AASHTO M 320 and AASHTO MP 1a, PG58-28, PG64-22, PG64-28
B. Prime Coat: ASTM D 2027, medium-curing cutback asphalt matching IDOT MC-30 per Section 1032 of the Standard Specifications for Road and Bridge construction.
C. Tack Coat: IDOT SS-1, SS-1hP, CSS-1, CSS-1hP, emulsified asphalt or cationic emulsified asphalt, slow curing, diluted in water, per Section 1032 of the Standard Specifications for Road and Bridge Construction and of suitable grade and consistency for application.
ASPHALT PAVING 321216 - 3
D. Water: Potable.
2.3 AUXILIARY MATERIALS
A. Joint Sealant: ASTM D 6690 or AASHTO M 324 Type II or III Type II Type IV, hot-applied, single-component, polymer-modified bituminous sealant.
B. Pavement-Marking Paint: Alkyd-resin type, lead and chromate free, ready mixed, complying with AASHTO M 248, Type N Type F Type S; colors complying with FS TT-P-1952.
1. Color: Yellow
2. Color: Accessible Spaces Yellow
2.4 MIXES
A. Hot-Mix Asphalt: Dense, hot-laid, hot-mix asphalt plant mixes designed according to the Illinois Modified Strategic Highway Research Program criteria and the IDOT Special Provision “Superpave Bituminous Concrete Mixtures”.
1. Binder Course Mixture N50, IL-9.5, Surface Course Mixture N50, IL-12.5,Mix “D” designed in accordance with Sections 1030 and Sections 406 and 407 of the Standard Specifications for Road and Bridge Construction and the special provision, “Quality Control/Quality Assurance of Bituminous Concrete Mixtures.”
2. Provide mixes with a history of satisfactory performance in geographical area where Project is located.
3. All mixes shall be approved by IDOT for use for the current constructions season.
Provide verification and approval letter from IDOT for the mixes proposed.
B. Emulsified-Asphalt Slurry: ASTM D 3910, Type 1, consisting of emulsified asphalt, fine aggregate, and mineral fillers.
3.1 EXAMINATION
A. Verify that subgrade is dry and in suitable condition to begin paving.
B. Proof-roll subgrade below pavements with heavy pneumatic-tired equipment to identify soft pockets and areas of excess yielding. Do not proof-roll wet or saturated subgrades.
1. Completely proof-roll subgrade in one direction, repeating proof-rolling in direction perpendicular to first direction. Limit vehicle speed to 3 mph.
2. Proof roll with a loaded 10-wheel, tandem-axle dump truck weighing not less than 15 tons.
3. Excavate soft spots, unsatisfactory soils, and areas of excessive pumping or rutting, as determined by the Engineer, and replace with compacted backfill or fill as directed.
C. Proceed with paving only after unsatisfactory conditions have been corrected.
ASPHALT PAVING 321216 - 4
D. Verify that utilities, traffic loop detectors, and other items requiring a cut and installation beneath the asphalt surface have been completed and that asphalt surface has been repaired flush with adjacent asphalt prior to beginning installation of imprinted asphalt.
3.2 SURFACE PREPARATION
A. General: Immediately before placing asphalt materials, remove loose and deleterious material from substrate surfaces. Ensure that prepared subgrade is ready to receive paving.
B. Prime Coat: Apply uniformly over surface of compacted unbound-aggregate base course at a rate of 0.15 to 0.50 gal./sq. yd and per Drawings. Apply enough material to penetrate and seal but not flood surface. Allow prime coat to cure.
1. If prime coat is not entirely absorbed within 24 hours after application, spread sand over surface to blot excess asphalt. Use enough sand to prevent pickup under traffic. Remove loose sand by sweeping before pavement is placed and after volatiles have evaporated.
2. Protect primed substrate from damage until ready to receive paving.
C. Tack Coat: Apply uniformly to surfaces of existing pavement at a rate of 0.05 to 0.15 gal./sq.
yd.
1. Allow tack coat to cure undisturbed before applying hot-mix asphalt paving.
2. Avoid smearing or staining adjoining surfaces, appurtenances, and surroundings.
Remove spillages and clean affected surfaces.
3.3 HOT-MIX ASPHALT PLACING
A. Machine place hot-mix asphalt on prepared surface, spread uniformly, and strike off. Place asphalt mix by hand to areas inaccessible to equipment in a manner that prevents segregation of mix. Place each course to required grade, cross section, and thickness when compacted.
1. Place hot-mix asphalt base course in number of lifts and thicknesses indicated.
2. Spread mix at minimum temperature of 250 deg F.
3. Begin applying mix along centerline of crown for crowned sections and on high side of one-way slopes unless otherwise indicated.
4. Regulate paver machine speed to obtain smooth, continuous surface free of pulls and tears in asphalt-paving mat.
B. Place paving in consecutive strips not less than 10 feet wide unless infill edge strips of a lesser width are required.
1. After first strip has been placed and rolled, place succeeding strips and extend rolling to overlap previous strips. Complete a section of asphalt base course before placing asphalt surface course.
C. Promptly correct surface irregularities in paving course behind paver. Use suitable hand tools to remove excess material forming high spots. Fill depressions with hot-mix asphalt to prevent segregation of mix; use suitable hand tools to smooth surface.
ASPHALT PAVING 321216 - 5
3.4 JOINTS
A. Construct joints to ensure a continuous bond between adjoining paving sections. Construct joints free of depressions, with same texture and smoothness as other sections of hot-mix asphalt course. Contractor shall use Longitudinal Joint Sealant (LJS) per sections 406 and
1032.12 of the IDOT Standards.
1. Clean contact surfaces and apply tack coat to joints.
2. Offset longitudinal joints, in successive courses, a minimum of 6 inches and not more than 12 inches.
3. Offset transverse joints, in successive courses, a minimum of 24 inches.
4. Construct transverse joints at each point where paver ends a day's work and resumes work at a subsequent time. Construct these joints according to AI MS22, for both "Ending a Lane" and "Resumption of Paving Operations."
5. Compact joints as soon as hot-mix asphalt will bear roller weight without excessive displacement.
6. Compact asphalt at joints to a density within 2 percent of specified course density.
3.5 COMPACTION
A. General: Begin compaction as soon as placed hot-mix paving will bear roller weight without excessive displacement. Compact hot-mix paving with hot, hand tampers or with vibratory-plate compactors in areas inaccessible to rollers.
1. Complete compaction before mix temperature cools to 195 deg F.
B. Breakdown Rolling: Complete breakdown or initial rolling immediately after rolling joints and outside edge. Examine surface immediately after breakdown rolling for indicated crown, grade, and smoothness. Correct laydown and rolling operations to comply with requirements.
C. Intermediate Rolling: Begin intermediate rolling immediately after breakdown rolling while hot-mix asphalt is still hot enough to achieve specified density. Continue rolling until hot-mix asphalt course has been uniformly compacted to the following density:
1. Average Density: 94 percent of reference laboratory density based on AASHTO T 209 and Illinois Modified AASHTO T 166 or “In Place Nuclear Method” according to Illinois Modified ASTM D 2950 but not less than 92 percent nor greater than 96 percent.
D. Finish Rolling: Finish roll paved surfaces to remove roller marks while hot-mix asphalt is still warm.
E. Edge Shaping: While surface is being compacted and finished, trim edges of pavement to proper alignment. Bevel edges while asphalt is still hot; compact thoroughly.
F. Repairs: Remove paved areas that are defective or contaminated with foreign materials and replace with fresh, hot-mix asphalt. Compact by rolling to specified density and surface smoothness.
G. Protection: After final rolling, do not permit vehicular traffic on pavement until it has cooled and hardened.
ASPHALT PAVING 321216 - 6
H. Erect barricades to protect paving from traffic until mixture has cooled enough not to become marked.
3.6 INSTALLATION TOLERANCES
A. Pavement Thickness: Compact each course to produce the thickness indicated within the following tolerances:
1. Base Course: Plus 1/2 inch, Minus 1/4 inch
2. Surface Course: Plus 1/4 inch, no minus.
B. Pavement Surface Smoothness: Compact each course to produce a surface smoothness within the following tolerances as determined by using a 10-foot straightedge applied transversely or longitudinally to paved areas:
1. Base Course: 1/4 inch.
2. Surface Course: 1/8 inch.
3. Crowned Surfaces: Test with crowned template centered and at right angle to crown.
Maximum allowable variance from template is 1/4 inch.
3.7 PAVEMENT MARKING
A. Do not apply pavement-marking paint until layout, colors, and placement have been verified with Engineer.
B. Sweep and clean surface to eliminate loose material and dust.
C. Apply paint with mechanical equipment to produce pavement markings, of dimensions indicated, with uniform, straight edges. Apply at manufacturer's recommended rates to provide a minimum wet film thickness of 15 mils.
3.8 FIELD QUALITY CONTROL
A. Thickness: In-place compacted thickness of hot-mix asphalt courses will be determined according to ASTM D 3549.
B. Surface Smoothness: Finished surface of each hot-mix asphalt course will be tested for compliance with smoothness tolerances.
C. Remove and replace or install additional hot-mix asphalt where test results or measurements indicate that it does not comply with specified requirements.
3.9 DISPOSAL
A. Except for material indicated to be recycled, remove excavated materials from Project site and legally dispose of in an EPA-approved landfill.
1. Do not allow milled materials to accumulate on-site.
END OF SECTION 321216
CONCRETE PAVING 321313 - 1
SECTION 321313 - CONCRETE PAVING
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, apply to this Section.
1.2 SUMMARY
A. This Section includes exterior cement concrete pavement for the following:
1. Curbs and gutters.
2. Walkways w/ detectable warnings.
3. Stairs
4. Ramps
B. Related Sections include the following:
1. Division 31 Section "Earth Moving" for subgrade preparation, grading, and subbase course.
1.3 DEFINITIONS
A. Cementitious Materials: Portland cement alone or in combination with one or more of blended hydraulic cement, fly ash and other pozzolans, and ground granulated blast-furnace slag.
1.4 SUBMITTALS
A. Product Data: For each type of manufactured material and product indicated.
B. Design Mixtures: For each concrete pavement mixture. Include alternate mixture designs when characteristics of materials, Project conditions, weather, test results, or other circumstances warrant adjustments.
C. Curing and Sealing Compound
D. Qualification Data: For testing agency.
E. Field quality-control test reports.
F. Testing Agency Qualifications: An independent agency qualified according to ASTM C 1077 and ASTM E 329 for testing indicated, as documented according to ASTM E 548.
1. Personnel conducting field tests shall be qualified as ACI Concrete Field-Testing Technician, Grade 1, according to ACI CP-01 or an equivalent certification program.
G. ACI Publications: Comply with ACI 301, "Specification for Structural Concrete," unless modified by requirements in the Contract Documents.
CONCRETE PAVING 321313 - 2
H. Concrete Testing Service: Engage a qualified independent testing agency to perform material evaluation tests and to design concrete mixtures.
1.5 PROJECT CONDITIONS
A. Traffic Control: Maintain access for vehicular and pedestrian traffic as required for other construction activities.
2.1 FORMS
A. Form Materials: Plywood, metal, metal-framed plywood, or other approved panel-type materials to provide full-depth, continuous, straight, smooth exposed surfaces.
1. Use flexible or curved forms for curves with a radius 100 feet or less.
B. Form-Release Agent: Commercially formulated form-release agent that will not bond with, stain, or adversely affect concrete surfaces and will not impair subsequent treatments of concrete surfaces.
2.2 STEEL REINFORCEMENT
A. Epoxy-Coated Welded Wire Fabric: ASTM A 884, Class A, steel.
B. Epoxy-Coated Reinforcing Bars: ASTM A 775 or ASTM A 934; with ASTM A 615, Grade 60 deformed bars.
2.3 CONCRETE MATERIALS
A. Cementitious Material: Use the following cementitious materials, of the same type, brand, and source throughout the Project:
1. Portland Cement: Shall be per IDOT Standard Specifications for Road and Bridge Construction sections 424, 587, 606, 1020, 1021, 1022, 102. Concrete shall be IDOT Class SI Concrete Mix.
2.4 CONCRETE MIXTURES
A. Prepare design mixtures, proportioned according to ACI 301, for each type and strength of normal-weight concrete determined by either laboratory trial mixes or field experience.
1. Use a qualified independent testing agency for preparing and reporting proposed concrete mixture designs for the trial batch method.
B. Proportion mixtures to provide normal-weight concrete with the following properties:
1. Minimum Compressive Strength (14 Days): 3500 psi.
2. Water-Cementitious Materials Ratio at Point of Placement: 0.32-0.44.
3. Slump Limit: 3 inches, plus or minus 1 inch.
CONCRETE PAVING 321313 - 3
C. Add air-entraining admixture at manufacturer's prescribed rate to result in normal-weight concrete at point of placement having an air content as follows:
1. Air Content: 5 to 8 percent for 1-inch to 1-1/2-inch nominal maximum aggregate size.
D. Limit water-soluble, chloride-ion content in hardened concrete to 0.15 percent by weight of cement.
E. Chemical Admixtures: Use admixtures according to manufacturer's written instructions.
1. Use water-reducing and retarding admixture when required by high temperatures, low humidity, or other adverse placement conditions.
F. Cementitious Materials: Limit percentage, by weight, of cementitious materials other than portland cement according to ACI 301 requirements for concrete exposed to deicing chemicals.
2.5 CONCRETE MIXING
A. Ready-Mixed Concrete: Measure, batch, and mix concrete materials and concrete according to ASTM C 94/C and ASTM C 1116. Furnish batch certificates for each batch discharged and used in the Work.
1. When air temperature is between 85 deg F and 90 deg F, reduce mixing and delivery time from 1-1/2 hours to 75 minutes; when air temperature is above 90 deg F, reduce mixing and delivery time to 45 minutes.
B. Project-Site Mixing: Measure, batch, and mix concrete materials and concrete according to ASTM C 94/C 94M. Mix concrete materials in appropriate drum-type batch machine mixer.
1. For concrete mixes of 1 cu. yd or smaller, continue mixing at least 1-1/2 minutes, but not more than 5 minutes after ingredients are in mixer, before any part of batch is released.
2. For concrete mixes larger than 1 cu. Yd., increase mixing time by 15 seconds for each additional 1 cu. yd.
3. Provide batch ticket for each batch discharged and used in the Work, indicating Project identification name and number, date, mixture type, mixing time, quantity, and amount of water added.
2.6 DETECTABLE WARNING
A. Detectable warnings shall meet all ADA requirements.
A. Examine exposed subgrades and subbase surfaces for compliance with requirements for dimensional, grading, and elevation tolerances.
B. Proof-roll prepared subbase surface below concrete pavements with heavy pneumatic-tired equipment to identify soft pockets and areas of excess yielding.
CONCRETE PAVING 321313 - 4
1. Completely proof-roll subbase in one direction and repeat in perpendicular direction.
Limit vehicle speed to 3 mph.
2. Proof-roll with a loaded 10-wheel tandem-axle dump truck weighing not less than 15 tons.
3. Subbase with soft spots and areas of pumping or rutting exceeding depth of 1 inch require correction according to requirements in Division 31 Section "Earth Moving."
C. Proceed with concrete pavement operations only after nonconforming conditions have been corrected and subgrade is ready to receive pavement.
3.2 PREPARATION
A. Remove loose material from compacted subbase surface immediately before placing concrete.
3.3 EDGE FORMS AND SCREED CONSTRUCTION
A. Set, brace, and secure edge forms, bulkheads, and intermediate screed guides for pavement to required lines, grades, and elevations. Install forms to allow continuous progress of work and so forms can remain in place at least 24 hours after concrete placement.
B. Clean forms after each use and coat with form-release agent to ensure separation from concrete without damage.
3.4 STEEL REINFORCEMENT
A. General: Comply with CRSI's "Manual of Standard Practice" for fabricating, placing, and supporting reinforcement.
B. Clean reinforcement of loose rust and mill scale, earth, ice, or other bond-reducing materials.
C. Arrange, space, and securely tie bars and bar supports to hold reinforcement in position during concrete placement. Maintain minimum cover to reinforcement.
D. Install welded wire reinforcement in lengths as long as practicable. Lap adjoining pieces at least one full mesh, and lace splices with wire. Offset laps of adjoining widths to prevent continuous laps in either direction.
E. Epoxy-Coated Reinforcement: Use epoxy-coated steel wire ties to fasten epoxy-coated reinforcement. Repair cut and damaged epoxy coatings with epoxy repair coating according to
ASTM D 3963/D 3963M.
3.5 JOINTS
A. General: Form construction, isolation, and contraction joints and tool edgings true to line with faces perpendicular to surface plane of concrete. Construct transverse joints at right angles to centerline, unless otherwise indicated.
1. When joining existing pavement, place transverse joints to align with previously placed joints, unless otherwise indicated.
CONCRETE PAVING 321313 - 5
B. Construction Joints: Set construction joints at side and end terminations of pavement and at locations where pavement operations are stopped for more than one-half hour unless pavement terminates at isolation joints.
1. Continue steel reinforcement across construction joints, unless otherwise indicated. Do not continue reinforcement through sides of pavement strips, unless otherwise indicated.
2. Provide tie bars at sides of pavement strips where indicated.
3. Butt Joints: Use bonding agent at joint locations where fresh concrete is placed against hardened or partially hardened concrete surfaces.
4. Keyed Joints: Provide preformed keyway-section forms or bulkhead forms with keys, unless otherwise indicated. Embed keys at least 1-1/2 inches into concrete.
C. Isolation/Expansion Joints: Form isolation joints of preformed joint-filler strips abutting concrete curbs, catch basins, manholes, inlets, structures, walks, other fixed objects, and where indicated.
1. Locate expansion joints at intervals of 50 feet, unless otherwise indicated.
2. Extend joint fillers full width and depth of joint.
3. Terminate joint filler not less than 1/2 inch or more than 3/4 inch below finished surface if joint sealant is indicated.
4. Place top of joint filler flush with finished concrete surface if joint sealant is not indicated.
5. Furnish joint fillers in one-piece lengths. Where more than one length is required, lace or clip joint-filler sections together.
6. Protect top edge of joint filler during concrete placement with metal, plastic, or other temporary preformed cap. Remove protective cap after concrete has been placed on both sides of joint.
D. Contraction Joints: Form weakened-plane contraction joints, sectioning concrete into areas as indicated. Construct contraction joints for a depth equal to at least one-fourth of the concrete thickness.
1. Grooved Joints: Form contraction joints after initial floating by grooving and finishing each edge of joint with grooving tool to a 1/4-inch radius. Repeat grooving of contraction joints after applying surface finishes. Eliminate groover marks on concrete surfaces.
E. Edging: Tool edges of pavement, gutters, curbs, and joints in concrete after initial floating with an edging tool to a 1/4-inch radius. Repeat tooling of edges after applying surface finishes.
Eliminate tool marks on concrete surfaces.
3.6 CONCRETE PLACEMENT
A. Inspection: Before placing concrete, inspect and complete formwork installation, steel reinforcement, and items to be embedded or cast in.
This is the start of the file's text. The full file is on GovTribe.