3-26-115 CIPP Rate Sheet-Sample Cost.xlsx
XLSX spreadsheet 38 KB Posted
- Attached to
- On-Call Pipe Lining Services
- Solicitation number
- 26-115
- Issued by
- Fulton County, Georgia
About this file
This is a CIPP Rate Sheet for RFP 26-115 submitted to the City of Alpharetta, Georgia for On-Call Pipe Lining Services. The document serves as the pricing template that bidders must complete to submit unit prices for cured-in-place pipe (CIPP) lining work. The City of Alpharetta anticipates entering into on-call contracts with up to two contractors—one for CIPP services and one for spincast services—for an initial period of one year with four optional one-year renewals. The City has identified over 500 pipes requiring repair, with additional pipes added annually based on inspection results. No minimum guarantee of work is provided under these contracts, as work prioritization depends on the City's annual capital budget allocation and citywide needs assessment.
The rate sheet requires bidders to provide unit prices for 91 line items covering inversion setup charges, CIPP pipe lining in various diameters (12" to 48") with different resin thicknesses, styrene-free CIPP alternatives, precast and cast-in-place concrete headwalls, rubble masonry headwalls, and miscellaneous materials such as stone, concrete, and flowable fill. All unit prices must be inclusive of mobilization, labor, equipment, materials, typical point repairs, pre- and post-CCTV inspections, and cleaning services. The form includes a sample project cost calculation section to evaluate bidder pricing. Lump sum items for erosion control, landscaping, traffic control, special point repairs, pumping operations, ground penetrating radar, and pressure grouting will be determined on a project-by-project basis and provided with purchase order proposals. Bidders must certify independent price determination and acknowledge understanding of the RFP documents, with proposals non-withdrawable for 120 days after the due date.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CIPP Rate Sheet
| RFP 26-115, City of Alpharetta On-Call Pipe Lining Services | |||
| CIPP PIPE LINING RATE SHEET ITEMS | |||
| Bidder Name | 0 | ||
| Instructions for CIPP Pipe Lining Rate Sheet Completion: | |||
| 1. This form MUST be used to submit CIPP Rate Sheet and Sample CIPP Project cost. | |||
| 2. Do not include a copy of this Form in your technical proposl information. | |||
| 3. Complete all the fields. See end of this page as well for authorization and contact info. | |||
| 4. Verify all amounts entered. These forms will be used Cost Scoring. | |||
| 5. Enter Unit Price. Form will calculate the Sample CIPP Cost, multiplying Sample Quantities by Unit Prices provided in this CIPP Rate sheet. | |||
| ITEM # | Description | Unit | Unit Price |
| Lining Requirements | |||
| Inversion Setup | |||
| 1 | Inversion Setup Charge 15-36" CIPP | EA | |
| 2 | Inversion Setup Charge 42-48" CIPP | EA | |
| CIPP (12' or less in depth) | |||
| Includes Pre & Post TV & typical point repairs during lining | |||
| Includes Cleaning (less than 25% full) | |||
| 3 | 12" - 7.5 mm (.2953") | LF | |
| 4 | 15" - 7.5mm (.2953") | LF | |
| 5 | 18" - 8.0mm (.315") | LF | |
| 6 | 21" - 10.0mm (.3937") | LF | |
| 7 | 24" - 10.0mm (.3937") | LF | |
| 8 | 30" - 12.5mm (.4921") | LF | |
| 9 | 36" - 16.0mm (.6299") | LF | |
| 10 | 42" - 18.0mm (.7087") | LF | |
| 11 | 48" - 21.0mm (.8268") | LF | |
| 12 | Add Thickness Per 1.5mm -12" | LF | |
| 13 | Add Thickness Per 1.5mm -15" | LF | |
| 14 | Add Thickness Per 1.5mm -18" | LF | |
| 15 | Add Thickness Per 1.5mm -21" | LF | |
| 16 | Add Thickness Per 1.5mm -24" | LF | |
| 17 | Add Thickness Per 1.5mm -30" | LF | |
| 18 | Add Thickness Per 1.5mm -36" | LF | |
| 19 | Add Thickness Per 1.5mm -42" | LF | |
| 20 | Add Thickness Per 1.5mm -48" | LF | |
| CIPP (12' or less in depth) | |||
| Includes Pre & Post TV & typical point repairs during lining | |||
| Includes Cleaning (greater than 25% full) | |||
| 21 | 12" - 7.5 mm (.2953") | LF | |
| 22 | 15" - 7.5mm (.2953") | LF | |
| 23 | 18" - 8.0mm (.315") | LF | |
| 24 | 21" - 10.0mm (.3937") | LF | |
| 25 | 24" - 10.0mm (.3937") | LF | |
| 26 | 30" - 12.5mm (.4921") | LF | |
| 27 | 36" - 16.0mm (.6299") | LF | |
| 28 | 42" - 18.0mm (.7087") | LF | |
| 29 | 48" - 21.0mm (.8268") | LF | |
| 30 | Add Thickness Per 1.5mm -12" | LF | |
| 31 | Add Thickness Per 1.5mm -15" | LF | |
| 32 | Add Thickness Per 1.5mm -18" | LF | |
| 33 | Add Thickness Per 1.5mm -21" | LF | |
| 34 | Add Thickness Per 1.5mm -24" | LF | |
| 35 | Add Thickness Per 1.5mm -30" | LF | |
| 36 | Add Thickness Per 1.5mm -36" | LF | |
| 37 | Add Thickness Per 1.5mm -42" | LF | |
| 38 | Add Thickness Per 1.5mm -48" | LF | |
| Styrene Free-CIPP (12' or less depth) | |||
| Includes Pre & Post TV & typical point repairs during lining | |||
| Includes Cleaning (less than 25% full) | |||
| 39 | 12" Pipe - 7.5mm | LF | |
| 40 | 15" Pipe - 7.5mm | LF | |
| 41 | 18" Pipe - 8.0mm | LF | |
| 42 | 21" Pipe - 10.0mm | LF | |
| 43 | 24" Pipe - 12.5mm | LF | |
| 44 | 30" Pipe - 12.5mm | LF | |
| 45 | 36" Pipe - 16.0mm | LF | |
| 46 | 42" Pipe -18.0mm | LF | |
| 47 | 48" Pipe - 21.0mm | LF | |
| 48 | Additional Cost Per 1.5mm - 12" | LF | |
| 49 | Additional Cost Per 1.5mm - 15" | LF | |
| 50 | Additional Cost Per 1.5mm - 18" | LF | |
| 51 | Additional Cost Per 1.5mm - 21" | LF | |
| 52 | Additional Cost Per 1.5mm - 24" | LF | |
| 53 | Additional Cost Per 1.5mm - 30" | LF | |
| 54 | Additional Cost Per 1.5mm - 36" | LF | |
| 55 | Additional Cost Per 1.5mm - 42" | LF | |
| 56 | Additional Cost Per 1.5mm - 48" | LF | |
| Styrene Free-CIPP (12' or less depth) | |||
| Includes Pre & Post TV & typical point repairs during lining | |||
| Includes Cleaning (greater than 25% full) | |||
| 57 | 12" Pipe - 7.5mm | LF | |
| 58 | 15" Pipe - 7.5mm | LF | |
| 59 | 18" Pipe - 8.0mm | LF | |
| 60 | 21" Pipe - 10.0mm | LF | |
| 61 | 24" Pipe - 12.5mm | LF | |
| 62 | 30" Pipe - 12.5mm | LF | |
| 63 | 36" Pipe - 16.0mm | LF | |
| 64 | 42" Pipe -18.0mm | LF | |
| 65 | 48" Pipe - 21.0mm | LF | |
| 66 | Additional Cost Per 1.5mm - 12" | LF | |
| 67 | Additional Cost Per 1.5mm - 15" | LF | |
| 68 | Additional Cost Per 1.5mm - 18" | LF | |
| 69 | Additional Cost Per 1.5mm - 21" | LF | |
| 70 | Additional Cost Per 1.5mm - 24" | LF | |
| 71 | Additional Cost Per 1.5mm - 30" | LF | |
| 72 | Additional Cost Per 1.5mm - 36" | LF | |
| 73 | Additional Cost Per 1.5mm - 42" | LF | |
| 74 | Additional Cost Per 1.5mm - 48" | LF | |
| Precast Headwalls (per Alpharetta Std 232) | |||
| 75 | Precast Headwall for 18" Pipe | EA | |
| 76 | Precast Headwall for 24" Pipe | EA | |
| 77 | Precast Headwall for 30" Pipe | EA | |
| 78 | Precast Headwall for 36" Pipe | EA | |
| 79 | Precast Headwall for 42" Pipe | EA | |
| 80 | Precast Headwall for 48" Pipe | EA | |
| Cast-In_Place Concrete Headwall | |||
| 81 | Cast-n-Place Conc HW-GDOT Det 1125 | CY | |
| Rubble Masonry HW | |||
| 82 | Rubble Headwall for 18" Pipe | EA | |
| 83 | Rubble Headwall for 24" Pipe | EA | |
| 84 | Rubble Headwall for 30" Pipe | EA | |
| 85 | Rubble Headwall for 36" Pipe | EA | |
| Miscellaneous Items | |||
| 86 | Stone #57 | Ton | |
| 87 | Surge Stone | Ton | |
| 88 | No.3's and 4's Stone | Ton | |
| 89 | Reset Existing Headwall | EA | |
| 90 | 3000psi Concrete | CY | |
| 91 | Flowable Fill | CY | |
| NOTES | |||
| All unit prices shall include but not be limited to all mobilization, labor, equipment and materials necessary to perform the work. In addition, unit prices for pipe lining shall include typical point repairs, pre and post CCTV, and cleaning (less than 25% full & greater than 25%). |
| Lump sum items will be determined on a project by project basis and include but not be limited to erosion control, landscaping, traffic control, special internal and external point repairs, pumping operations, ground penetrating radar and pressure grouting. These items will be included with proposals prior to each purchase order for lining projects. | |
| By completing and submitting this CIPP Pipe Lining rate sheet form in response to the City of Alpharetta's RFP 26-115, Contractor certifies that: | |
| A. Contractor has carefully read and understands RFP Documents and Scope of Work; | |
| B. Contractor understands that proposal may not be withdrawn within one hundred twenty (120) days after due date, and Contractor guarantees that the City has the right to waive informalities and irregularities in proposal received and to accept the proposal which, in City’s judgment, is in City’s own best interests. | |
| Certificate of Independent Price Determination: By submitting a bid in response to RFP 26-115, the authorized signer below certifies to the following: | |
| I certify that this bid is made without prior understanding, agreement, or connection with any corporation, firm, or person submitting a bid for the same materials, supplies, services, or equipment and is in all respects fair and without collusion or fraud. I understand collusive bidding is a violation of state and federal law and can result in fines, prison sentences, and civil damage awards. I agree to abide by all conditions of this bid and certify that I am authorized to sign this bid for the bidder or offeror. | |
| Bidder Name: | |
| Address: | |
| Name, Title Authorized Signer: | |
| Contact Info - Phone Number: | |
| Contact Info - Email Address: |
&P 0F &N
Sample CIPP Cost
| SAMPLE PROJECT CIPP PIPE LINING BID ITEMS | |||||
| RFP 26-115, City of Alpharetta On-Call Pipe Lining Services | |||||
| Add Bidder Name | Sample Project Total | $ - 0 | |||
| ITEM # | Description | Unit | Unit Price | Quantity | Price |
| Lining Requirements | |||||
| Inversion Setup | |||||
| 1 | Inversion Setup Charge 15-36" CIPP | EA | - 0 | 17 | $ - 0 |
| 2 | Inversion Setup Charge 42-48" CIPP | EA | - 0 | 1 | $ - 0 |
| CIPP (12' or less in depth) | |||||
| Includes Pre & Post TV & typical point repairs during lining | |||||
| Includes Cleaning (less than 25% full) | |||||
| 3 | 12" - 7.5 mm (.2953") | LF | - 0 | 0 | $ - 0 |
| 4 | 15" - 7.5mm (.2953") | LF | - 0 | 222 | $ - 0 |
| 5 | 18" - 8.0mm (.315") | LF | - 0 | 2528 | $ - 0 |
| 6 | 21" - 10.0mm (.3937") | LF | - 0 | 0 | $ - 0 |
| 7 | 24" - 10.0mm (.3937") | LF | - 0 | 1831 | $ - 0 |
| 8 | 30" - 12.5mm (.4921") | LF | - 0 | 1307 | $ - 0 |
| 9 | 36" - 16.0mm (.6299") | LF | - 0 | 1131 | $ - 0 |
| 10 | 42" - 18.0mm (.7087") | LF | - 0 | 112 | $ - 0 |
| 11 | 48" - 21.0mm (.8268") | LF | - 0 | 0 | $ - 0 |
| 12 | Add Thickness Per 1.5mm -12" | LF | - 0 | 0 | $ - 0 |
| 13 | Add Thickness Per 1.5mm -15" | LF | - 0 | 222 | $ - 0 |
| 14 | Add Thickness Per 1.5mm -18" | LF | - 0 | 2528 | $ - 0 |
| 15 | Add Thickness Per 1.5mm -21" | LF | - 0 | 0 | $ - 0 |
| 16 | Add Thickness Per 1.5mm -24" | LF | - 0 | 1831 | $ - 0 |
| 17 | Add Thickness Per 1.5mm -30" | LF | - 0 | 1307 | $ - 0 |
| 18 | Add Thickness Per 1.5mm -36" | LF | - 0 | 1131 | $ - 0 |
| 19 | Add Thickness Per 1.5mm -42" | LF | - 0 | 112 | $ - 0 |
| 20 | Add Thickness Per 1.5mm -48" | LF | - 0 | 0 | $ - 0 |
| CIPP (12' or less in depth) | |||||
| Includes Pre & Post TV & typical point repairs during lining | |||||
| Includes Cleaning (greater than 25% full) | |||||
| 21 | 12" - 7.5 mm (.2953") | LF | - 0 | 0 | $ - 0 |
| 22 | 15" - 7.5mm (.2953") | LF | - 0 | 0 | $ - 0 |
| 23 | 18" - 8.0mm (.315") | LF | - 0 | 0 | $ - 0 |
| 24 | 21" - 10.0mm (.3937") | LF | - 0 | 0 | $ - 0 |
| 25 | 24" - 10.0mm (.3937") | LF | - 0 | 0 | $ - 0 |
| 26 | 30" - 12.5mm (.4921") | LF | - 0 | 0 | $ - 0 |
| 27 | 36" - 16.0mm (.6299") | LF | - 0 | 0 | $ - 0 |
| 28 | 42" - 18.0mm (.7087") | LF | - 0 | 0 | $ - 0 |
| 29 | 48" - 21.0mm (.8268") | LF | - 0 | 0 | $ - 0 |
| 30 | Add Thickness Per 1.5mm -12" | LF | - 0 | 0 | $ - 0 |
| 31 | Add Thickness Per 1.5mm -15" | LF | - 0 | 0 | $ - 0 |
| 32 | Add Thickness Per 1.5mm -18" | LF | - 0 | 0 | $ - 0 |
| 33 | Add Thickness Per 1.5mm -21" | LF | - 0 | 0 | $ - 0 |
| 34 | Add Thickness Per 1.5mm -24" | LF | - 0 | 0 | $ - 0 |
| 35 | Add Thickness Per 1.5mm -30" | LF | - 0 | 0 | $ - 0 |
| 36 | Add Thickness Per 1.5mm -36" | LF | - 0 | 0 | $ - 0 |
| 37 | Add Thickness Per 1.5mm -42" | LF | - 0 | 0 | $ - 0 |
| 38 | Add Thickness Per 1.5mm -48" | LF | - 0 | 0 | $ - 0 |
| Styrene Free-CIPP (12' or less depth) | |||||
| Includes Pre & Post TV & typical point repairs during lining | |||||
| Includes Cleaning (less than 25% full) | |||||
| 39 | 12" Pipe - 7.5mm | LF | - 0 | 0 | $ - 0 |
| 40 | 15" Pipe - 7.5mm | LF | - 0 | 0 | $ - 0 |
| 41 | 18" Pipe - 8.0mm | LF | - 0 | 0 | $ - 0 |
| 42 | 21" Pipe - 10.0mm | LF | - 0 | 0 | $ - 0 |
| 43 | 24" Pipe - 12.5mm | LF | - 0 | 0 | $ - 0 |
| 44 | 30" Pipe - 12.5mm | LF | - 0 | 0 | $ - 0 |
| 45 | 36" Pipe - 16.0mm | LF | - 0 | 0 | $ - 0 |
| 46 | 42" Pipe -18.0mm | LF | - 0 | 0 | $ - 0 |
| 47 | 48" Pipe - 21.0mm | LF | - 0 | 0 | $ - 0 |
| 48 | Additional Cost Per 1.5mm - 12" | LF | - 0 | 0 | $ - 0 |
| 49 | Additional Cost Per 1.5mm - 15" | LF | - 0 | 0 | $ - 0 |
| 50 | Additional Cost Per 1.5mm - 18" | LF | - 0 | 0 | $ - 0 |
| 51 | Additional Cost Per 1.5mm - 21" | LF | - 0 | 0 | $ - 0 |
| 52 | Additional Cost Per 1.5mm - 24" | LF | - 0 | 0 | $ - 0 |
| 53 | Additional Cost Per 1.5mm - 30" | LF | - 0 | 0 | $ - 0 |
| 54 | Additional Cost Per 1.5mm - 36" | LF | - 0 | 0 | $ - 0 |
| 55 | Additional Cost Per 1.5mm - 42" | LF | - 0 | 0 | $ - 0 |
| 56 | Additional Cost Per 1.5mm - 48" | LF | - 0 | 0 | $ - 0 |
| Styrene Free-CIPP (12' or less depth) | |||||
| Includes Pre & Post TV & typical point repairs during lining | |||||
| Includes Cleaning (greater than 25% full) | |||||
| 57 | 12" Pipe - 7.5mm | LF | - 0 | 0 | $ - 0 |
| 58 | 15" Pipe - 7.5mm | LF | - 0 | 0 | $ - 0 |
| 59 | 18" Pipe - 8.0mm | LF | - 0 | 0 | $ - 0 |
| 60 | 21" Pipe - 10.0mm | LF | - 0 | 0 | $ - 0 |
| 61 | 24" Pipe - 12.5mm | LF | - 0 | 0 | $ - 0 |
| 62 | 30" Pipe - 12.5mm | LF | - 0 | 0 | $ - 0 |
| 63 | 36" Pipe - 16.0mm | LF | - 0 | 0 | $ - 0 |
| 64 | 42" Pipe -18.0mm | LF | - 0 | 0 | $ - 0 |
| 65 | 48" Pipe - 21.0mm | LF | - 0 | 0 | $ - 0 |
| 66 | Additional Cost Per 1.5mm - 12" | LF | - 0 | 0 | $ - 0 |
| 67 | Additional Cost Per 1.5mm - 15" | LF | - 0 | 0 | $ - 0 |
| 68 | Additional Cost Per 1.5mm - 18" | LF | - 0 | 0 | $ - 0 |
| 69 | Additional Cost Per 1.5mm - 21" | LF | - 0 | 0 | $ - 0 |
| 70 | Additional Cost Per 1.5mm - 24" | LF | - 0 | 0 | $ - 0 |
| 71 | Additional Cost Per 1.5mm - 30" | LF | - 0 | 0 | $ - 0 |
| 72 | Additional Cost Per 1.5mm - 36" | LF | - 0 | 0 | $ - 0 |
| 73 | Additional Cost Per 1.5mm - 42" | LF | - 0 | 0 | $ - 0 |
| 74 | Additional Cost Per 1.5mm - 48" | LF | - 0 | 0 | $ - 0 |
| Precast Headwalls (per Alpharetta Std 232) | |||||
| 75 | Precast Headwall for 18" Pipe | EA | - 0 | 0 | $ - 0 |
| 76 | Precast Headwall for 24" Pipe | EA | - 0 | 0 | $ - 0 |
| 77 | Precast Headwall for 30" Pipe | EA | - 0 | 0 | $ - 0 |
| 78 | Precast Headwall for 36" Pipe | EA | - 0 | 0 | $ - 0 |
| 79 | Precast Headwall for 42" Pipe | EA | - 0 | 0 | $ - 0 |
| 80 | Precast Headwall for 48" Pipe | EA | - 0 | 0 | $ - 0 |
| Cast-In_Place Concrete Headwall | |||||
| 81 | Cast-n-Place Conc HW-GDOT Det 1125 | CY | - 0 | 0 | $ - 0 |
| Rubble Masonry HW | |||||
| 82 | Rubble Headwall for 18" Pipe | EA | - 0 | 0 | $ - 0 |
| 83 | Rubble Headwall for 24" Pipe | EA | - 0 | 0 | $ - 0 |
| 84 | Rubble Headwall for 30" Pipe | EA | - 0 | 0 | $ - 0 |
| 85 | Rubble Headwall for 36" Pipe | EA | - 0 | 0 | $ - 0 |
| Miscellaneous Items | |||||
| 86 | Stone #57 | Ton | - 0 | 0 | $ - 0 |
| 87 | Surge Stone | Ton | - 0 | 0 | $ - 0 |
| 88 | No.3's and 4's Stone | Ton | - 0 | 0 | $ - 0 |
| 89 | Reset Existing Headwall | EA | - 0 | 0 | $ - 0 |
| 90 | 3000psi Concrete | CY | - 0 | 0 | $ - 0 |
| 91 | Flowable Fill | CY | - 0 | 0 | $ - 0 |
| NOTES | |||||
| All unit prices shall include but not be limited to all mobilization, labor, equipment and materials necessary to perform the work. In addition, unit prices for pipe lining shall include typical point repairs, pre and post CCTV, and cleaning (less than 25% full & greater than 25%). | |||||
| Lump sum items will be determined on a project by project basis and include but not be limited to erosion control, landscaping, traffic control, special internal and external point repairs, pumping operations, ground penetrating radar and pressure grouting. These items will be included with proposals prior to each purchase order for lining projects. |