3-26-098-B Bid Pricing Form 2026-02-11.xlsx
XLSX spreadsheet 12 KB Posted
- Solicitation number
- 26-098-B
- Issued by
- Texas
About this file
This is a Bid Pricing Form for RFB No. 26-098-B issued by the North Texas Municipal Water District (NTMWD) in Texas for lifting equipment inspections, maintenance, and repairs. The NTMWD intends to issue multiple contract awards and request quotes for individual jobs on an annual contract basis. The bid pricing form establishes labor rate categories for the services required under the contract, including equipment inspection, preventative maintenance, corrective maintenance at regular time, overtime, emergency, and holiday rates, all measured in hourly units.
The pricing form requests bidders to submit hourly rates for six labor categories, with estimated quantities of zero hours for all line items, resulting in zero extended prices on the form itself. Additional pricing elements include a per-mile travel rate on a portal-to-portal basis, a parts discount percentage from manufacturer's suggested retail price (MSRP) for new and replacement parts, and a rental equipment percentage markup of rental equipment costs. The form specifies that mileage and additional pricing will not be used in determining the lowest bidder, indicating that award selection will be based primarily on the six hourly labor rates submitted.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 1-26-098-B Solicitation Packet 2026-02-11.pdf | ||
| 2-26-098-B Exhibit A 2026-02-11.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet2
| Item No. | Description | Unit of Measure | Unit Price | Estimated Quantity | Extended Price |
| LABOR RATES | |||||
| 1.1 | Equipment Inspection | HR | 200 | $ - 0 | |
| 1.2 | Preventative Maintenance Hourly Labor Rate | HR | 200 | $ - 0 | |
| 1.3 | Corrective Maintenance Hourly Labor Rate - Regular Time | HR | 200 | $ - 0 | |
| 1.4 | Corrective Maintenance Hourly Labor Rate - Overtime Rate | HR | 100 | $ - 0 | |
| 1.5 | Corrective Maintenance Hourly Labor Rate - Emergency Rate | HR | 20 | $ - 0 | |
| 1.6 | Corrective Maintenance Hourly Labor Rate - Holiday Rate | HR | 20 | $ - 0 | |
| TOTAL | $ - 0 |
| ADDITIONAL PRICING | |||
| Item No. | Description | Unit of Measure | Unit Price |
| MILEAGE | |||
| 2.1 | Per mile travel rate - portal to portal | per/mile | |
| 2.2 | Parts - Discount Percentage from MSRP for New and Replacement Parts | Percentage | |
| 2.3 | Rental Equipment - Percentage mark-up of rental equipment cost | Percentage |
*Mileage and Additional Pricing will not be used in determining lowest bidder
&"Arial,Bold"NORTH TEXAS MUNICIPAL WATER DISTRICT
BID PRICING FORM
RFB No. 26-098-B
LIFTING EQUIPMENT INSPECTIONS, MAINTENANCE AND REPAIRS
File details come from the government source that posted it. Updated .