About this file

This is a structural assessment memo prepared by Base Engineering Inc. for the Redevelopment Authority of the City of Easton, Pennsylvania, regarding 21 N 7th Street in Easton, PA. The engineer conducted a site visit on December 2, 2022, to evaluate the structural integrity of the first-floor framing in this approximately 1,600-square-foot wood-framed dwelling constructed around 1900. The assessment found the structure to be sound and structurally adequate, with previously installed wooden beams supported by steel jack columns determined to be addressing normal deflection rather than indicating a structural deficiency. The engineer recommends several maintenance items to preserve the building's structural condition, including properly securing the jack posts to the beams via lag bolts, anchoring baseplate connections to the existing concrete slab with epoxy expansion anchors, and welding the jack post screws to prevent loosening. Additionally, the stone foundation wall should be cleaned and joints re-pointed as necessary.

The assessment is limited to visual observations of readily accessible elements and did not include destructive or non-destructive materials testing. Base Engineering's conclusions are contingent upon the information available as of the site visit date, with the firm noting that discovery of additional information should prompt immediate notification to determine if conclusions require revision. This memo supports the concurrent Request for Proposal issued by the Redevelopment Authority of Easton for exterior rehabilitation of the same property, with proposals due January 4, 2026, and a mandatory pre-bid meeting scheduled for December 7, 2026.

View the file

Other files

File Type Posted
4-21 N 7th St-Spec Drawings.pdf PDF
1-21 N 7th St-Request for Proposal Packet.pdf PDF
2-21 N 7th St-LBP Report.pdf PDF
5-21 N 7th Work Scope.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

٠ Build your foundation on a solid BASE ٠ 43 years of service with integrity ٠

BASE ENGINEERING INC.

(610) 437-0978

(610) 437-0979 CONSULTING ENGINEERS & SURVEYORS

1010 N. QUEBEC STREET, ALLENTOWN, PA 18109-1607

FAX (610) 432-3800 www.BaseEng.com BaseEngineering@BaseEng.com

CIVIL STRUCTURAL MUNICIPAL ELECTRICAL MATERIAL HANDLING MECHANICAL SUPERVISION

MEMO

To:

Michael Brett – Redevelopment Authority of the City of Easton

Date: 12/5/2022

From: Barry A Cohen, PE Project No. 2022-301

CC:

Re:

21 N 7th St – Easton PA

Structural Assessment

Pursuant to your request, Base Engineering Inc (Base) performed a site visit to the above referenced single family dwelling on December 2, 2022. The purpose of this site visit was to observe the condition of the existing first floor framing, and address concerns raised by the City of Easton (City) regarding the structural integrity of the floor. These concerns stem from previous strengthening of the floor.

Based upon a review of the Northampton County Tax records the wood framed, 1600 SF home was constructed CIRCA 1900. Initial observations made within the basement of the home revealed previously installed wooden beams, supported on steel jack columns which in turn sit directly on the existing concrete slab-on-grade. The joists and girders exhibited little signs of distress other than what one would expect in a building of this age and construction, and appeared sound and structurally adequate to support the code-mandated loads. Heel-drop tests revealed little movement/deflection of the floor.

Based on this initial investigation, it is our professional opinion that the added strengthening of the floor was most likely added to limit the normal deflection of the floor system, and does not represent a structural deficiency.

While it is our opinion that the building is structurally sound, there are several areas that we strongly recommend be addressed to maintain this condition:

The jack-posts installed to support the new beams should be physically attached to the beam via four (4) lag bolts thru the cap plate into the bottom of the beam. In addition, the baseplate of the same posts should be anchored to the existing slab via epoxy expansion anchors. Finally, while these jack-posts are typically not recommended for this type of permanent application, they can be used if the screw portion of the jack is welded to prevent movement of the screw, and loosening of the column.

The existing stone foundation wall should be cleaned, and the joints re-pointed where required.

٠ Build your foundation on a solid BASE ٠ 43 years of service with integrity ٠

Please note that the conclusions and recommendations noted here are based upon the visual observations made during the course of our investigation. These observations were limited to those elements readily visible at the time of our December 2, 2022 site visit. Materials testing, whether destructive or non0destructive, was outside the scope of this work, and therefore not performed. If additional information is found, base should be notified immediately to determine if this information affects our conclusions.

If you have any further questions, or wish to discuss this matter further, please do not hesitate to call this office.