This is a Lead-Based Paint Inspection and Risk Assessment Report prepared by LEW Environmental Services, LLC for the Redevelopment Authority of Easton, Pennsylvania for the property located at 21 N 7th Street, Easton, PA. The inspection was conducted on August 22, 2022, and evaluated the presence of lead-based paint, dust-lead hazards, and soil-lead hazards throughout the residential property. The assessment employed X-Ray Fluorescence (XRF) testing methodology, collecting 204 XRF readings across the property, of which 83 were determined to contain lead-based paint hazards. Additionally, eight dust wipe samples were collected, with two locations identified as exceeding dust-lead hazard levels. The report identified 83 components with lead-based paint concentrations ranging from 1.0 mg/cm² to 30.0 mg/cm², located in multiple rooms including bedrooms, bathrooms, kitchen, hallways, foyer, basement, and stairwells. Lead-based paint was found on various substrates including wood (window casings, door jambs, baseboards, door frames, and stairs), drywall, plaster, and concrete. No bare soil hazards were identified during the evaluation.
The report recommends paint stabilization as the treatment for all identified lead-based paint hazards, consistent with United States Environmental Protection Agency (USEPA) guidelines and state regulations. Two dust wipe samples exceeded action levels: a kitchen window sill reading of 106 µg/ft² and a Bedroom 1 window sill reading of 152 µg/ft², both exceeding the 100 µg/ft² threshold for window sills. The assessment was conducted in accordance with 24 CFR Part 35 and 40 CFR Part 745 federal disclosure requirements, and the report notes that results must be provided to property owners and occupants within 15 calendar days if the property receives federal financial assistance. The report was signed by Risk Assessor Krishi Tanna (Certification #006679) on September 13, 2022, with laboratory analysis performed by EHS Labs (AIHA Certification #050118). The findings establish the baseline environmental conditions for the subject property in preparation for exterior and related rehabilitation work.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 3-21 N 7th St-Engineer report Memo.pdf | ||
| 4-21 N 7th St-Spec Drawings.pdf | ||
| 1-21 N 7th St-Request for Proposal Packet.pdf | ||
| 5-21 N 7th Work Scope.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LEAD-BASED PAINT
INSPECTION AND RISK ASSESSMENT
Performed At:
21 N 7th Street, Easton PA
Performed For:
Redevelopment Authority of Easton PA Lisa Borick 123 South 3rd Street 3rd Floor Easton, PA 18043
USA
Prepared By:
LEW Environmental Services, LLC.
181 US Hwy 46 Mine Hill, NJ 07803
Phone (908) 654-8068 Fax (908) 654-8069
Inspection Date: 8/22/2022 Project Number: 220826
181 US Hwy 46
Mine Hill, NJ 07803
(908) 654-8068
(800) 783-0567
Fax 908-654-8069
TABLE OF CONTENTS
CONTACT INFORMATION
FEDERAL DISCLOSURE REQUIREMENTS
SALES & LEASES
FEDERALLY ASSISTED PROGRAMS
SUMMARY OF LEAD INSPECTION AND RISK ASSESSMENT RESULTS
LEAD-BASED PAINT RISK ASSESSMENT
PAINT-LEAD HAZARDS
DUST-LEAD HAZARDS
SOIL-LEAD HAZARDS
LEAD-BASED PAINT INSPECTION
TESTING COMBINATIONS DETERMINED TO CONTAIN LEAD-BASED PAINT
COMPONENTS WITH LEAD-BASED PAINT
RESULTS OF CHIP SAMPLING AND SUBSTRATE CORRECTION
PAINT CHIPS
SUBSTRATE CORRECTION VALUES
APPENDICES
APPENDIX A LEAD TESTING PROCEDURES & METHODS
APPENDIX B SITE FLOOR PLAN(S)
APPENDIX C LEAD INSPECTION XRF DATA
APPENDIX D LABORATORY RESULTS
APPENDIX E RISK ASSESSMENT FORMS
APPENDIX F INSPECTOR AND COMPANY LICENSES
APPENDIX G INTERIM CONTROLS AND ABATEMENT OPTIONS
APPENDIX H PICTURES (IF APPLICABLE)
THANK YOU
Redevelopment Authority of Easton PA - 21 N 7th Street, Easton PA G:\Jobs 2022\220826\Lead SF Insp RA - 21 N 7th Street-Easton PA - KT.doc Prepared by: LEW Environmental Services, LLC. Project Number: 220826
CONTACT INFORMATION
Site Street Address: 21 N 7th Street, Easton PA
Year Of Construction: ________
Client Client Contact: Lisa Borick
Client: Redevelopment Authority of Easton PA
Street Address: 123 South 3rd Street 3rd Floor Easton, PA 18043
USA
Phone Number: (610) 250-6718
Date of Initial Inspection: 8/22/2022
Risk Assessor Site Assessor: Krishi Tanna, 006679
Instrumentation: Heuresis LPA-1 Serial #2130
Signature:
Date: September 13th, 2022
Firm Organization: LEW Environmental Services, LLC.
Certification #: NJDCA 00015
Street: 181 US Hwy 46
City, State & Zip: Mine Hill, NJ 07803
Phone Number: 908-654-8068
Web Address: www.LEWEnvironmental .com
Laboratory Organization: EHS Labs
Street: 7469 Whitepine Rd.
City, State & Zip: Richmond, VA 23237
Phone Number: (800) 347-4010
Certification number: AIHA #050118 http://www.lewcorp.com/
Prepared by: LEW Environmental Services, LLC. Project Number: 220826
FEDERAL DISCLOSURE REQUIREMENTS
Sales & Leases
A copy of this summary must be provided to new lessees (tenants) and purchasers of this property under Federal law (24 CFR PART 35 AND 40 CFR PART 745) before they become obligated under a lease or sales contract. The complete report must also be provided to new purchasers and a summary must be made available to new tenants. Landlords (lessors) and sellers are also required to distribute an educational pamphlet approved by the U.S.
Environmental Protection Agency and include standard warning language in their leases or sales contracts to ensure that parents have the information they need to protect their children from lead-based paint hazards.
Federally Assisted Programs
If this property, program or any of its tenants receives financial Federal assistance, the results of this evaluation must be provided by the designated party (client) to the owner of the referenced property and the occupants within 15 calendar days of the date when the designated party receives this report, or makes the presumption that lead-based paint hazards do or do not exist, per the Department of Housing and Urban Development 24 CFR Part 35 .125 Requirements for the Notification, Evaluation and Reduction of Lead-Based Paint Hazards in Federally Owned Residential Property and Housing Receiving Federal Assistance;
Final Rule.
Prepared by: LEW Environmental Services, LLC. Project Number: 220826
SUMMARY OF LEAD INSPECTION AND RISK ASSESSMENT
RESULTS
LEW Environmental Services, LLC. performed a lead-based paint inspection and risk assessment at the property located at 21 N 7th Street, Easton PA on 8/22/2022. The table below summarizes the testing results for the property.
Test Method Performed Total
Readings Collected Lead-Based Paint
Hazards
Determined to be Lead-Based Paint & Non-Hazardous
Determined Not to be Lead-Based
Paint, dust or soil-lead hazard
X-Ray Fluorescence Readings 204 83 7 114
Dust Wipes Samples 8 2
Soil Samples 0 0 0
The weighted arithmetic mean of dust wipes collected on window sills is less than 100 µg/ft2. Only the failed areas are considered to be lead-dust hazards.
The weighted arithmetic mean dust wipes collected on floors is less than 10 µg/ft2. Only the failed areas are considered to be lead-dust hazards.
No bare soil was present at the time of the evaluation.
Prepared by: LEW Environmental Services, LLC. Project Number: 220826
LEAD-BASED PAINT RISK ASSESSMENT
A lead-based paint hazard is defined under 24 CFR 35 as any condition that causes exposure to lead from lead-contaminated dust or soil or lead-contaminated paint that is deteriorated or present in surfaces, that would result in adverse human health effects.
Paint-Lead Hazards The table below lists those components found during the evaluation to have lead-based paint and be in deteriorated condition causing a paint-lead hazard.
Room Name Wall Structure Member Substrate Lead mg/cm2 Treatment
Kitchen A Window Casing Wood 23.8 Paint Stabilization
Kitchen B Closet Door Wood 11.7 Paint Stabilization
Kitchen B Closet Baseboard Wood 2.1 Paint Stabilization
Kitchen D Room Wall Plaster 28.5 Paint Stabilization
Hall D Room Baseboard Wood 21.2 Paint Stabilization
Hall A Room Wall Drywall 1.5 Paint Stabilization
Hall B Room Wall Drywall 1.8 Paint Stabilization
Hall C Room Wall Drywall 1 Paint Stabilization
Hall B Door Jamb Wood 1.9 Paint Stabilization
Hall B Door Casing Wood 17.4 Paint Stabilization
Hall A Door --- Wood 15.7 Paint Stabilization
Hall C Window Jamb Wood 17.5 Paint Stabilization
Hall C Window Casing Wood 20 Paint Stabilization
Hall C Window Sill Wood 2.9 Paint Stabilization
Hall C Window Apron Wood 7.6 Paint Stabilization
Living Room A Room Wall Drywall 2.9 Paint Stabilization
Living Room B Room Wall Drywall 2.6 Paint Stabilization
Living Room C Room Wall Drywall 3.4 Paint Stabilization
Living Room D Room Wall Drywall 10.1 Paint Stabilization
Living Room A Room Baseboard Wood 3.2 Paint Stabilization
Living Room B Door Casing Wood 10.1 Paint Stabilization
Living Room D Closet Jamb Wood 21 Paint Stabilization
Living Room D Closet Casing Wood 24.7 Paint Stabilization
Living Room D Closet Baseboard Wood 16.4 Paint Stabilization
Living Room A Door --- Wood 29.2 Paint Stabilization
Foyer D Door --- Wood 9.4 Paint Stabilization
Foyer D Door Jamb Wood 14 Paint Stabilization
Foyer D Door Casing Wood 19.2 Paint Stabilization
Foyer A Apartment Door Jamb Wood 6.4
Paint Stabilization
Foyer A Apartment Door Casing Wood 8.9
Paint Stabilization
Foyer A Apartment Door Frame Wood 16.7
Paint Stabilization
Foyer D Room Wall Drywall 27.9 Paint Stabilization
Foyer A Room Baseboard Wood 9.3 Paint Stabilization
Foyer C Stairs Stringer Wood 28.1 Paint Stabilization
Bedroom 1 A Room Baseboard Wood 1.9 Paint Stabilization
Prepared by: LEW Environmental Services, LLC. Project Number: 220826
Bedroom 1 B Door Jamb Wood 16.5 Paint Stabilization
Bedroom 1 B Door Casing Wood 5.1 Paint Stabilization
1/2 Bathroom C Door Jamb Wood 7.6
Paint Stabilization
1/2 Bathroom C Door Casing Wood 25.8
Paint Stabilization
Hallway 1 A Room Baseboard Wood 8.1 Paint Stabilization
Hallway 1 B Door Jamb Wood 10.5 Paint Stabilization
Hallway 1 B Door Casing Wood 7.6 Paint Stabilization
Hallway 1 C Window Jamb Wood 14.2 Paint Stabilization
Hallway 1 C Window Casing Wood 9.4 Paint Stabilization
Hallway 1 C Window Apron Wood 13.1 Paint Stabilization
Hallway 1 C Stairs Stringer Wood 19.7 Paint Stabilization
Bedroom 2 C Door Jamb Wood 8.4 Paint Stabilization
Bedroom 2 C Door Casing Wood 11.2 Paint Stabilization
Bedroom 2 C Window Jamb Wood 13.4 Paint Stabilization
Bedroom 2 C Window Casing Wood 7.2 Paint Stabilization
Bedroom 2 C Window Apron Wood 4.8 Paint Stabilization
Bedroom 3 C Door Jamb Wood 9.1 Paint Stabilization
Bedroom 3 C Door Casing Wood 7.8 Paint Stabilization
Bedroom 3 C Window Jamb Wood 13.8 Paint Stabilization
Bedroom 3 C Window Casing Wood 16.8 Paint Stabilization
Bedroom 3 C Window Apron Wood 10.6 Paint Stabilization
Bedroom 3 A Room Baseboard Wood 17.2 Paint Stabilization
Bedroom 3 B Closet Jamb Wood 3.8 Paint Stabilization
Bedroom 3 B Closet Baseboard Wood 8.4 Paint Stabilization
Bedroom 4 A Room Baseboard Wood 10.6 Paint Stabilization
Bedroom 4 B Door Jamb Wood 6.7 Paint Stabilization
Bedroom 4 D Window Jamb Wood 15.4 Paint Stabilization
Bedroom 4 D Window Casing Wood 8.1 Paint Stabilization
Bedroom 4 D Window Apron Wood 7.8 Paint Stabilization
Bathroom 1 A Room Baseboard Wood 15.4 Paint Stabilization
Bathroom 1 C Door Jamb Wood 11.5 Paint Stabilization
Bathroom 1 C Door Casing Wood 5.7 Paint Stabilization
Bathroom 1 D Window Jamb Wood 13.4 Paint Stabilization
Bathroom 1 D Window Casing Wood 7.8 Paint Stabilization
Bathroom 1 D Window Apron Wood 11.9 Paint Stabilization
Stairwell D Door Jamb Wood 10.5 Paint Stabilization
Stairwell D Door Casing Wood 13.1 Paint Stabilization
Side Stairwell A Window Jamb Wood 13.5
Paint Stabilization
Side Stairwell A Window Casing Wood 7.8
Paint Stabilization
Side Stairwell A Window Apron Wood 10.1
Paint Stabilization
Side Stairwell D Stairs Stringer Wood 11.6
Paint Stabilization
Basement C Stairs Treads Wood 5.4 Paint Stabilization
Basement B Room Wall Concrete 3.4 Paint Stabilization
Prepared by: LEW Environmental Services, LLC. Project Number: 220826
Basement D Room Wall Concrete 2.7 Paint Stabilization
Basement D Room Ceiling Wood 1.9 Paint Stabilization
Basement A Door --- Wood 6.7 Paint Stabilization
Basement A Door Jamb Wood 4.1 Paint Stabilization
Basement A Door Casing Wood 2.7 Paint Stabilization
Note: The definition of a lead-based paint is any paint or other surface coating material that contains 1.0 mg/cm2 of lead or greater or 0.5% lead by weight (5000 ppm) or greater.
Dust-Lead Hazards The table below lists results of dust samples collected during the evaluation that were found to be above the action level.
Sample Room Component Location Dust Lead Level µg/ft2
21-05 Kitchen Sill A 106
21-07 Bedroom 1 Sill A 152
United States Environmental Protection Agency (USEPA) and the State of New Jersey considers lead in dust levels greater than or equal to: 10 µg/ft2 on carpeted and uncarpeted floors, and 100 µg/ft2 on window sills to be dust-lead hazards.
If all rooms are not sampled, all sample results per component are averaged together. If the average of the samples collected per component is greater than or equal to the hazard level for that component, then all untested rooms are also considered hazards for that component. If the average of the samples collected per component is less than the hazard level, than all untested rooms are not considered hazards for that component.
Soil-Lead Hazards The table below lists the results for soil samples collected during the evaluation that were found to be above the action level.
Sample Description Play Area
Location Measurement
(ppm)
None
EPA recommends that lead in bare soil level at or above: 400 ppm (parts per million) in children’s play areas and the average of non-children play area bare soil at or above 1200 ppm are considered lead-soil hazards.
Prepared by: LEW Environmental Services, LLC. Project Number: 220826
LEAD-BASED PAINT INSPECTION
Testing Combinations determined to contain Lead-Based Paint The testing combinations listed in this table have not statistically been determined to be Lead Based paint free. All requirements of 40 CFR 745 "Lead; Requirements for Hazard Education Before Renovation of Target Housing Final Rule” must be followed.
The following table presents testing combinations/building components, which were determined to be actionable for Lead-based paint (See table above). Some of the Testing Combinations/building components were determined to be actionable for lead based paint at a statistically significant percentage (Greater than 15%); while other Testing Combinations/building components were determined to be actionable on a non-statistical significant occurrence and further Inspection/testing might be appropriate (See options in table below). The table contains the information available for the testing combinations/building components and highlights which option LEW Environmental Services, LLC. , believes to be the most appropriate and economical based on the lead concentration value, the substrate, the location, quantity, percentage, etc.
Lead-based paint is defined as any paint or other surface coating material found to contain 1.0 mg/cm2 of lead or greater or 0.5% (5000 ppm) lead by weight or greater.
Components with Lead-Based Paint
Room Name Wall Structure Member Substrate Lead mg/cm2
Kitchen A Window Casing Wood 23.8
Kitchen B Closet Door Wood 11.7
Kitchen B Closet Baseboard Wood 2.1
Kitchen D Room Wall Plaster 28.5
Hall D Room Baseboard Wood 21.2
Hall A Room Wall Drywall 1.5
Hall B Room Wall Drywall 1.8
Hall C Room Wall Drywall 1
Hall B Door Jamb Wood 1.9
Hall B Door Casing Wood 17.4
Hall A Door --- Wood 15.7
Hall C Window Jamb Wood 17.5
Hall C Window Casing Wood 20
Hall C Window Sill Wood 2.9
Hall C Window Apron Wood 7.6
Living Room A Room Wall Drywall 2.9
Living Room B Room Wall Drywall 2.6
Living Room C Room Wall Drywall 3.4
Living Room D Room Wall Drywall 10.1
Living Room A Room Baseboard Wood 3.2
Living Room B Door Casing Wood 10.1
Living Room D Closet Jamb Wood 21
Living Room D Closet Casing Wood 24.7
Living Room D Closet Baseboard Wood 16.4
Living Room A Door --- Wood 29.2
Foyer D Door --- Wood 9.4
Foyer D Door Jamb Wood 14
Foyer D Door Casing Wood 19.2
Foyer A Apartment Door Jamb Wood 6.4
Prepared by: LEW Environmental Services, LLC. Project Number: 220826
Foyer A Apartment Door Casing Wood 8.9
Foyer A Apartment Door Frame Wood 16.7
Foyer D Room Wall Drywall 27.9
Foyer A Room Baseboard Wood 9.3
Foyer C Stairs Stringer Wood 28.1
Bedroom 1 A Room Baseboard Wood 1.9
Bedroom 1 B Door Jamb Wood 16.5
Bedroom 1 B Door Casing Wood 5.1
1/2 Bathroom C Door Jamb Wood 7.6
1/2 Bathroom C Door Casing Wood 25.8
Hallway 1 A Room Baseboard Wood 8.1
Hallway 1 B Door Jamb Wood 10.5
Hallway 1 B Door Casing Wood 7.6
Hallway 1 C Window Jamb Wood 14.2
Hallway 1 C Window Casing Wood 9.4
Hallway 1 C Window Apron Wood 13.1
Hallway 1 C Stairs Stringer Wood 19.7
Bedroom 2 C Door Jamb Wood 8.4
Bedroom 2 C Door Casing Wood 11.2
Bedroom 2 C Window Jamb Wood 13.4
Bedroom 2 C Window Casing Wood 7.2
Bedroom 2 C Window Apron Wood 4.8
Bedroom 3 C Door Jamb Wood 9.1
Bedroom 3 C Door Casing Wood 7.8
Bedroom 3 C Window Jamb Wood 13.8
Bedroom 3 C Window Casing Wood 16.8
Bedroom 3 C Window Apron Wood 10.6
Bedroom 3 A Room Baseboard Wood 17.2
Bedroom 3 B Closet Jamb Wood 3.8
Bedroom 3 B Closet Baseboard Wood 8.4
Bedroom 4 A Room Baseboard Wood 10.6
Bedroom 4 B Door Jamb Wood 6.7
Bedroom 4 D Window Jamb Wood 15.4
Bedroom 4 D Window Casing Wood 8.1
Bedroom 4 D Window Apron Wood 7.8
Bathroom 1 A Room Baseboard Wood 15.4
Bathroom 1 C Door Jamb Wood 11.5
Bathroom 1 C Door Casing Wood 5.7
Bathroom 1 D Window Jamb Wood 13.4
Bathroom 1 D Window Casing Wood 7.8
Bathroom 1 D Window Apron Wood 11.9
Stairwell D Door Jamb Wood 10.5
Stairwell D Door Casing Wood 13.1
Side Stairwell A Window Jamb Wood 13.5
Side Stairwell A Window Casing Wood 7.8
Side Stairwell A Window Apron Wood 10.1
Side Stairwell D Stairs Stringer Wood 11.6
Basement C Stairs Treads Wood 5.4
Basement B Room Wall Concrete 3.4
Prepared by: LEW Environmental Services, LLC. Project Number: 220826
Basement D Room Wall Concrete 2.7
Basement D Room Ceiling Wood 1.9
Basement A Door --- Wood 6.7
Basement A Door Jamb Wood 4.1
Basement A Door Casing Wood 2.7
Living Room D Window Jamb Wood 3.2
Living Room D Window Casing Wood 1.3
Living Room D Window Apron Wood 5.3
Bedroom 1 C Window Jamb Wood 30
Bedroom 1 C Window Casing Wood 17.3
Bedroom 1 C Window Apron Wood 10.8
½ Bathroom A Room Baseboard Wood 9.7
For a complete listing of all XRF results please refer to Appendix C - Lead Based Paint XRF results
Prepared by: LEW Environmental Services, LLC. Project Number: 220826
Location of Testing Combinations/Building Components reference descriptive:
The apartment unit A-Wall pertains to the wall that is in the same plane or closest to the street address of the property. Laundry room A-Wall pertains to the wall that holds the entrance door. The apartment building exterior A-Wall pertains to the side of the building that faces the street address. The pool house A-Wall pertains to the side of the building that faces the street address.
LEW Environmental Services, LLC. recommends all abatement/hazard controls by United States Environmental Protection Agency (USEPA) (See 40 CFR 745) and/or all appropriate State (see N.J.A.C. 5:48 and 5:17) and local required or approved methods only.
It should be understood that an anomaly or lead painted component could exist in areas not inspected; however, the probability of such an occurrence is low.
RESULTS OF CHIP SAMPLING AND SUBSTRATE
CORRECTION
See Appendix C for LEAD PAINT INSPECTION REPORT DATA SHEETS for measurement, location, substrate, and condition of surfaces tested.
Paint Chips Sample number Location Measurement Actionable
HUD guidelines state lead in paint equal to or greater than 0.5% lead by weight or 5000 ppm (parts per million) or 1.0 mg/cm2 are considered actionable items.
Substrate Correction Values
Job Number Readings Component Result (mg/cm2) Substrate
Prepared by: LEW Environmental Services, LLC. Project Number: 220826
APPENDIX A: LEAD TESTING PROCEDURES & METHODS
Visual Inspection
Lead-Based Inspection:
A visual inspection is performed to assist the environmental inspector in obtaining a feeling of the condition of the property to be inspected. With this in mind, the inspector is better able to assess the situation; and, in turn, can offer more valuable suggestions.
Upon beginning the inspection each LEW Environmental Services, LLC. inspector is required to perform a visual inspection.
The visual inspection includes a complete walk around of the property to be inspected and an overall evaluation of the premises.
Risk Assessment:
A visual assessment is performed as a necessary part of the Risk Assessment in order to adequately describe the current condition of the property. LEW Environmental Services, LLC. has conducted a complete walk-around of the property for an overall evaluation of the premises.
While performing the XRF testing or paint sampling, the risk assessor, in his or her professional judgment, will visually assess the condition of the painted building material or the painted area being tested in accordance with the Federal government’s documented methodologies. In accordance with 40 CFR 745 a paint lead hazard is: Any lead-based paint on a friction surface that is subject to abrasion and where the lead dust levels on the nearest horizontal surface underneath the friction surface (e.g., the window sill, or floor) are equal to or greater than the dust-lead hazard levels (2) Any damaged or otherwise deteriorated lead-based paint on an impact surface that is caused by impact from a related building component (such as a door knob that knocks into a wall or a door that knocks against its door frame. (3) Any chewable lead-based painted surface on which there is evidence of teeth marks. (4) Any other deteriorated lead-based paint (Deteriorated paint means any interior or exterior paint or other coating that is peeling, chipping, chalking or cracking, or any paint or coating located on an interior or exterior surface or fixture that is otherwise damaged or separated from the substrate.) in any residential building or child-occupied facility or on the exterior of any residential building or child-occupied facility.
In accordance with the Federal government’s documented methodologies. The risk assessors’ findings are then recorded as Intact or Deteriorated and entered into the data collection software as “I” for Intact condition, “F” or “P” for Deteriorated condition.
LEW Environmental Services, LLC. classifies the condition of the painted component that is being tested based on the condition classifications found in the 1995 HUD guidelines (inclusive of 2012 revision).
Lead-Based Paint Inspection, X-Ray Fluorescence (XRF) XRF testing is performed to detect the presence of lead throughout the property on painted surfaces. XRF testing is usually the preferred method of testing because it is non-destructive, quantitative and can be performed on the spot with acceptable accuracy. The results of the XRF testing are the basis and one of the major sources of gathering evidence for drawing conclusions and making recommendations in the report.
LEW Environmental Services, LLC. inspectors follow the manufacturers’ suggested use and the Performance Characteristic Sheet of the XRF instrument being used. If you have specific questions about the instrument please call the LEW Environmental Services, LLC. . The LEW Environmental Services, LLC. currently uses the LPA-1 “INSPECTOR” by RMD. The XRF is State- Of-The Art equipment. The LPA-1 has automatic substrate correction, software downloading capabilities, 3/8 inch penetration capabilities, and many more sophisticated advantages.
In performing XRF testing, all LEW Environmental Services, LLC. inspectors follow the New Jersey Department of Community Affairs regulations for inspections and/or the Department of Housing and Urban Developments federal guidelines for testing lead by using an XRF instrument. All state and city regulations are followed when applicable and in all cases the most stringent regulation is followed. LEW Environmental Services, LLC. inspectors test one of each and every different type of testing combination (component) in each room being inspected or as described in our client services agreement. Testing procedures for XRF testing are usually performed from left to right by room and within each room left to right by component. All testing is performed top to bottom. The above described testing format is followed unless otherwise not practical or if the inspector’s judgment decides to test in a different systematic approach. Each XRF reading is assigned an exclusive sample reference number and a measurement that is stored in the instrument. Each sample reference number location is logged on the data sheets for future reference, testing location, and report generation.
Prepared by: LEW Environmental Services, LLC. Project Number: 220826
Current action levels for lead based paint testing using XRF vary from state to state. The federal level is currently 1.0 mg/cm2.
See the LEAD PAINT INSPECTION REPORT DATA SHEETS COVER PAGE FOR THE ACTION LEVEL USED ON YOUR
PROPERTY.
See Appendix C for LEAD PAINT INSPECTION REPORT DATA SHEETS for measurement, location, substrate, color and condition of surfaces tested.
It should be noted that detected lead levels below current action levels still could cause elevated blood lead levels. Lead poisoning is a cumulative affect. Should a child or an adult inhale or ingest sufficient quantities of low concentrations of leaded paint, dust, soil, or water, it will accumulate in the bodies systems and could eventually cumulate to an elevated blood level of concern. With good nutrition and a clean living environment, lead poisoning is preventable.
Any untested building components should be considered lead-based paint until tested.
XRF - Substrate Correction
XRF readings are sometimes subject to systematic biases as a result of interference from substrate material beneath the paint.
The magnitude and direction of bias depends on the substrate, the specific XRF instrument being used, and other factors such as temperature and humidity. Results can be biased in either the positive or negative direction and may be quite high.
Consequently, the XRF Performance Characteristic Sheet is consulted to determine the requirements for LPA-1 XRF substrate correction conditions.
XRF results are corrected for substrate bias by subtracting a correction value determined by randomly selecting two housing units to be used to collect substrate measurements for all substrates within the development that need corrections and use the results from those two units to perform substrate correction calculations in all tested units within the development or building.
The substrate correction value is obtained by using the specific XRF instrument(s) that is/are being used at the site. The correction value is an average of six XRF readings taken over red NIST SRM (1.02mg/cm2) paint film, with three readings taken from two test locations that have been scraped visually clean of their paint coating. The red NIST SRM 1.02mg/cm2 is then subtracted from the average of the six readings; the result is the Substrate Correction value. The substrate correction value is then subtracted from the XRF measurement on the specific testing combinations that falls within the substrate correction range according to the Performance Characteristic Sheets requirements. According to the Performance Characteristic Sheet for the LPA-1 XRF instrument once a substrate correction value is applied should it be needed the final Lead-Based Paint measurement should be either Positive or Negative.
XRF Calibration Check Readings
In addition to the manufacturer’s recommended warm up and quality control procedures, LEW Environmental Services, LLC.
collects quality control readings as recommended in the HUD Guidelines. Quality control for XRF instrumentation instruments involves readings to check calibration.
For each XRF instrument, a set of XRF calibration check readings is recommended at least every four hours. The first is a set of three nominal-time or source decay corrected time XRF calibration check readings to be taken before the inspection begins for the day. The second occurs either after the day’s inspection work has been completed, or at least every four hours, whichever occurs first. LEW Environmental Services, LLC. ’s XRF calibration check readings are taken on the Standard Reference Material (SRM) paint film nearest to 1.0 mg/cm2 within the National Institute of Standards and Technology (NIST) SRM Used or the XRF manufacturer’s factory supplied SRM film. The average of the three readings on the SRM must be within the acceptable plus and minus tolerances for proper calibration as detailed in the Performance Characteristic Sheet (PCS). All calibration checks are taken with the SRM film positioned at least several inches away from any potential source of lead (LPA-1 XRF only reads 3/8” deep lead).
Three readings are taken each time calibration check readings are made, The readings are taken using the nominal time that is specified in the LPA-1’s Performance Characteristic Sheet. The average of the readings are compared to the known value and if the average value is within the acceptable calibration check tolerance specified in the LPA-1’s XRF Performance Characteristic Sheet the instrument is considered in control. If the average readings are not within the calibration check tolerance the instrument is not used until the instrument is brought back into control.
Paint Chips Paint chips are taken for confirmation of lead based paint, or as a solution to inconclusive measurement recorded by the use of XRF testing. Paint chips are typically not taken unless absolutely necessary. On components that are right on the XRF action level, a paint chip is the only other way to get a conclusive determination as to the level of lead in the paint and if the component
Prepared by: LEW Environmental Services, LLC. Project Number: 220826 should be considered an actionable or not. Paint chips, when taken, are usually taken from an inconspicuous areas and tape and/or paint is placed over the removed paint location. The paint chips are then sent to an accredited laboratory for analysis.
Current action levels for lead in paint:
PAINT CHIP ACTION LEVELS BY PERCENT WEIGHT 0.5% by weight OR 5000 parts per million
PAINT CHIP ACTION LEVELS BY WEIGHT PER AREA Same as XRF action levels, may be state dependent
Dust Wipes There may be one or multiple sources of lead dust on a given property or area. It is important to know that lead, like iron, oxidizes. When iron oxidizes it forms rust, and when lead oxidizes it forms lead carbonate. Some people call the lead carbonate “chalking” of the lead. Inhaling or ingesting lead carbonate can be as dangerous as eating a lead paint chip. Many people are unaware that a small child who does a lot of crawling around does not have to eat paint chips to acquire an elevated blood lead level (EBL). All they have to do is hand-to-mouth activity in a piece of property that has a high lead dust problem. Lead dust problems can also become elevated by not performing a proper lead cleanup after renovation, painting, or reconstruction activities.
Dust wipes are taken during the initial assessment to determine if a dust lead hazard exists. If interim controls are employed, wipes are taken on a regular scheduled basis to determine the effectiveness of the interim controls. Dust wipes are taken from floors and window sills during risk assessments. Window wells (also called troughs) are also sampled but only during clearance activities or after post-renovation, maintenance work. Depending on the lead dust level found, cleaning by wet washing ( using a lead specific cleaner such as LEDIZOLV) and HEPA (High Efficiency Particulate Air) vacuuming or other forms of interim controls are needed. For clearance sampling, dust wipes are used on three different places: floors, window sills, and window wells.
LEW Environmental Services, LLC. strongly believes that a high lead dust level in a piece of property is a greater environmental threat than intact or sound lead paint on a wall. LEW Environmental Services, LLC. strongly suggests taking lead dust wipes on a regularly scheduled timetable if full abatement has not taken place.
Current hazard levels for lead in dust:
FLOORS: 10 µg/ft2 (Micrograms per square foot)
WINDOW SILLS (STOOL): 100 µg/ft2 (Micrograms per square foot)
For properties built post 1960 a lead hazard screen inspection/assessment can be performed with composite dust wipe sampling. Although fewer samples are collected for a screen, the action levels are more stringent.
Soil Soil samples are usually taken at the initial assessment to determine if a soil lead hazard exists or to determine the current level of lead in the soil (base line). Soil samples may also be collected after abatement or renovation to determine if the clearance levels have been met. LEW Environmental Services, LLC. risk assessors take the soil samples around the building drip line or other areas of concern on the property that may contribute to possible elevated blood lead levels in children and cause poisoning problems for pets. Sampling locations may include areas where pets or children play, the sunny side of a piece of property or a side that is adjacent to a highly traveled road, sandboxes, gardens etc. By conducting soil sampling, we are increasing our probability of finding an elevated soil lead problem if one exists; and, therefore, are best able to make recommendations to remedy or reduce the potential associated exposure risks. A typical composite soil sample is collected by taking multiple scoops of soil from a specific area of property, typically along a straight line. Soil is taken from the top half-inch only, as this is the soil that people would typically encounter. By performing our sampling in this fashion we are acquiring a composite sample that is representative of that area of the property.
EPA’s 40 CFR 745.65 defines a soil-lead hazard as bare soil on residential real property or on the property of a child-occupied facility that contains total lead equal to or exceeding 400 parts per million (ppm or µg/g) in a play area or average 1,200 parts per million of bare soil in the rest of the yard based on soil samples. Interim control measures such as laying sod or permanent abatement such as soil removal or paving may require consideration.
Current action levels for lead in bare soil:
TYPE of SAMPLE AREA AREA PASSES INTERIM CONTROLS SOIL ABATEMENT
Child Play Area <400 ppm 400 – <5000 ppm >=5000 ppm
Remainder of Yard <1200 ppm 1200 – <5000 ppm >=5000 ppm
APPENDIX B: SITE FLOOR PLAN(S)
CamScanner https://digital-camscanner.onelink.me/P3GL/g26ffx3k
CamScanner https://digital-camscanner.onelink.me/P3GL/g26ffx3k
APPENDIX C: LEAD INSPECTION XRF DATA
Company LEW Corporation
XRF Make Heuresis
Model Pb200i
Serial Num. 2130
Total Readings: 204
Action Level 0.8
Mode Action Level
Analytic Mode Paint
Job Id Reading # Concentration Result Calibration RTA Present Date Time Analytic Mode Site Address Area Unit # Room Structure Member Substrate Wall Location Condition Cause
8221011 12456 1.1 TRUE FALSE 8/22/2022 10:11 AM Paint 21 N 7th
8221011 12457 1 TRUE FALSE 8/22/2022 10:11 AM Paint 21 N 7th
8221011 12458 1 TRUE FALSE 8/22/2022 10:12 AM Paint 21 N 7th
8221011 12459 -0.1 TRUE FALSE 8/22/2022 10:12 AM Paint 21 N 7th
8221011 12460 0 TRUE FALSE 8/22/2022 10:13 AM Paint 21 N 7th
8221011 12461 0 TRUE FALSE 8/22/2022 10:13 AM Paint 21 N 7th
8221011 12462 -0.2 NEG FALSE FALSE 8/22/2022 10:13 AM Paint 21 N 7th Unit Kitchen Apartment Door Wood A 1 Deteriorated Impact
8221011 12463 0.3 NEG FALSE FALSE 8/22/2022 10:14 AM Paint 21 N 7th Unit Kitchen Door Jamb Wood A 1 Deteriorated Impact
8221011 12464 0.4 NEG FALSE FALSE 8/22/2022 10:14 AM Paint 21 N 7th Unit Kitchen Door Casing Wood A 1 Deteriorated Impact
8221011 12465 0.4 NEG FALSE FALSE 8/22/2022 10:18 AM Paint 21 N 7th Unit Kitchen Window Jamb Wood A 1 Deteriorated Impact
8221011 12466 23.8 POS FALSE TRUE 8/22/2022 10:19 AM Paint 21 N 7th Unit Kitchen Window Casing Wood A 1 Deteriorated Impact
8221011 12467 0.2 NEG FALSE TRUE 8/22/2022 10:19 AM Paint 21 N 7th Unit Kitchen Window Sill Wood A 1 Deteriorated Impact
8221011 12468 11.7 POS FALSE FALSE 8/22/2022 10:22 AM Paint 21 N 7th Unit Kitchen Closet Door Wood B 1 Deteriorated Impact
8221011 12469 -0.1 NEG FALSE FALSE 8/22/2022 10:23 AM Paint 21 N 7th Unit Kitchen Closet Door Jamb Wood B 1 Deteriorated Impact
8221011 12470 0.1 NEG FALSE FALSE 8/22/2022 10:23 AM Paint 21 N 7th Unit Kitchen Closet Door Casing Wood B 1 Deteriorated Impact
8221011 12471 0.1 NEG FALSE FALSE 8/22/2022 10:24 AM Paint 21 N 7th Unit Kitchen Closet Shelf Support Wood B 1 Deteriorated Impact
8221011 12472 0 NEG FALSE FALSE 8/22/2022 10:24 AM Paint 21 N 7th Unit Kitchen Closet Shelf Wood B 1 Deteriorated Impact
8221011 12473 2.1 POS FALSE FALSE 8/22/2022 10:25 AM Paint 21 N 7th Unit Kitchen Closet Baseboard Wood B 1 Deteriorated Impact
8221011 12474 0.3 NEG FALSE FALSE 8/22/2022 10:25 AM Paint 21 N 7th Unit Kitchen Closet Wall Drywall B 1 Deteriorated Impact
8221011 12475 0.3 NEG FALSE FALSE 8/22/2022 10:28 AM Paint 21 N 7th Unit Kitchen Room Wall Drywall A 1 Deteriorated Impact
8221011 12476 0.3 NEG FALSE FALSE 8/22/2022 10:29 AM Paint 21 N 7th Unit Kitchen Room Wall Drywall B 1 Deteriorated Impact
8221011 12477 0.3 NEG FALSE FALSE 8/22/2022 10:31 AM Paint 21 N 7th Unit Kitchen Room Wall Drywall C 1 Deteriorated Impact
8221011 12478 0.4 NEG FALSE FALSE 8/22/2022 10:31 AM Paint 21 N 7th Unit Kitchen Room Wall Drywall D 1 Deteriorated Impact
8221011 12479 28.5 POS FALSE TRUE 8/22/2022 10:34 AM Paint 21 N 7th Unit Kitchen Room Wall Plaster D 1 Deteriorated Impact
8221011 12480 0.1 NEG FALSE FALSE 8/22/2022 10:34 AM Paint 21 N 7th Unit Kitchen Room Baseboard Wood D 1 Deteriorated Impact
8221011 12481 21.2 POS FALSE TRUE 8/22/2022 10:35 AM Paint 21 N 7th Unit Hall Room Baseboard Wood D 1 Deteriorated Impact
8221011 12482 1.5 POS FALSE FALSE 8/22/2022 10:36 AM Paint 21 N 7th Unit Hall Room Wall Drywall A 1 Deteriorated Impact
8221011 12483 1.8 POS FALSE FALSE 8/22/2022 10:36 AM Paint 21 N 7th Unit Hall Room Wall Drywall B 1 Deteriorated Impact
8221011 12484 1 POS FALSE FALSE 8/22/2022 10:36 AM Paint 21 N 7th Unit Hall Room Wall Drywall C 1 Deteriorated Impact
8221011 12485 -0.1 NEG FALSE FALSE 8/22/2022 10:37 AM Paint 21 N 7th Unit Hall Room Wall Drywall D 1 Deteriorated Impact
8221011 12486 0.2 NEG FALSE FALSE 8/22/2022 10:37 AM Paint 21 N 7th Unit Hall Room Ceiling Drywall D 1 Deteriorated Impact
8221011 12487 1.9 POS FALSE FALSE 8/22/2022 10:38 AM Paint 21 N 7th Unit Hall Door Jamb Wood B 1 Deteriorated Impact
8221011 12488 17.4 POS FALSE TRUE 8/22/2022 10:38 AM Paint 21 N 7th Unit Hall Door Casing Wood B 1 Deteriorated Impact
8221011 12489 15.7 POS FALSE TRUE 8/22/2022 10:38 AM Paint 21 N 7th Unit Hall Door --- Wood A 1 Deteriorated Impact
8221011 12490 17.5 POS FALSE TRUE 8/22/2022 10:39 AM Paint 21 N 7th Unit Hall Window Jamb Wood C 1 Deteriorated Impact
8221011 12491 20 POS FALSE TRUE 8/22/2022 10:40 AM Paint 21 N 7th Unit Hall Window Casing Wood C 1 Deteriorated Impact
8221011 12492 2.9 POS FALSE FALSE 8/22/2022 10:40 AM Paint 21 N 7th Unit Hall Window Sill Wood C 1 Deteriorated Impact
8221011 12493 7.6 POS FALSE FALSE 8/22/2022 10:46 AM Paint 21 N 7th Unit Hall Window Apron Wood C 1 Deteriorated Impact
8221011 12494 2.9 POS FALSE FALSE 8/22/2022 10:46 AM Paint 21 N 7th Unit Living Room Room Wall Drywall A 1 Deteriorated Impact
8221011 12495 2.6 POS FALSE FALSE 8/22/2022 10:47 AM Paint 21 N 7th Unit Living Room Room Wall Drywall B 1 Deteriorated Impact
8221011 12496 3.4 NEG FALSE FALSE 8/22/2022 10:47 AM Paint 21 N 7th Unit Living Room Room Wall Drywall C 1 Deteriorated Impact
8221011 12497 10.1 POS FALSE FALSE 8/22/2022 10:47 AM Paint 21 N 7th Unit Living Room Room Wall Drywall D 1 Deteriorated Impact
8221011 12498 3.2 POS FALSE FALSE 8/22/2022 10:48 AM Paint 21 N 7th Unit Living Room Room Baseboard Wood A 1 Deteriorated Impact
8221011 12499 0.4 NEG FALSE FALSE 8/22/2022 10:48 AM Paint 21 N 7th Unit Living Room Room Ceiling Plaster A 1 Intact
8221011 12500 -0.1 NEG FALSE FALSE 8/22/2022 10:48 AM Paint 21 N 7th Unit Living Room Door Jamb Wood B 1 Deteriorated Impact
8221011 12501 10.1 POS FALSE FALSE 8/22/2022 10:48 AM Paint 21 N 7th Unit Living Room Door Casing Wood B 1 Deteriorated Impact
8221011 12502 3.2 POS FALSE FALSE 8/22/2022 10:49 AM Paint 21 N 7th Unit Living Room Window Jamb Wood D 1 Intact
8221011 12503 1.3 POS FALSE TRUE 8/22/2022 10:49 AM Paint 21 N 7th Unit Living Room Window Casing Wood D 1 Intact
Lead concentration units: mg/cm2 All Readings
Job Id Reading # Concentration Result Calibration RTA Present Date Time Analytic Mode Site Address Area Unit # Room Structure Member Substrate Wall Location Condition Cause
8221011 12504 0.1 NEG FALSE FALSE 8/22/2022 10:49 AM Paint 21 N 7th Unit Living Room Window Sill Wood D 1 Intact
8221011 12505 5.3 POS FALSE FALSE 8/22/2022 10:50 AM Paint 21 N 7th Unit Living Room Window Apron Wood D 1 Intact
8221011 12506 21 POS FALSE TRUE 8/22/2022 10:50 AM Paint 21 N 7th Unit Living Room Closet Jamb Wood D 1 Deteriorated Impact
8221011 12507 24.7 POS FALSE TRUE 8/22/2022 10:50 AM Paint 21 N 7th Unit Living Room Closet Casing Wood D 1 Deteriorated Impact
8221011 12508 0.3 NEG FALSE FALSE 8/22/2022 10:51 AM Paint 21 N 7th Unit Living Room Closet Shelf Wood D 1 Deteriorated Impact
8221011 12509 0.4 NEG FALSE TRUE 8/22/2022 10:51 AM Paint 21 N 7th Unit Living Room Closet Shelf Support Wood D 1 Deteriorated Impact
8221011 12510 16.4 POS FALSE FALSE 8/22/2022 10:52 AM Paint 21 N 7th Unit Living Room Closet Baseboard Wood D 1 Deteriorated Impact
8221011 12511 0.4 NEG FALSE FALSE 8/22/2022 10:52 AM Paint 21 N 7th Unit Living Room Closet Wall Drywall D 1 Deteriorated Impact
8221011 12512 29.2 POS FALSE TRUE 8/22/2022 10:52 AM Paint 21 N 7th Unit Living Room Door --- Wood A 1 Deteriorated Impact
8221011 12513 9.4 POS FALSE FALSE 8/22/2022 10:53 AM Paint 21 N 7th Unit Foyer Door --- Wood D 1 Deteriorated Impact
8221011 12514 14 POS FALSE FALSE 8/22/2022 10:53 AM Paint 21 N 7th Unit Foyer Door Jamb Wood D 1 Deteriorated Impact
8221011 12515 19.2 POS FALSE TRUE 8/22/2022 10:54 AM Paint 21 N 7th Unit Foyer Door Casing Wood D 1 Deteriorated Impact
8221011 12516 0.2 NEG FALSE TRUE 8/22/2022 10:54 AM Paint 21 N 7th Unit Foyer Apartment Door --- Wood A 1 Deteriorated Impact
8221011 12517 6.4 POS FALSE FALSE 8/22/2022 10:55 AM Paint 21 N 7th Unit Foyer Apartment Door Jamb Wood A 1 Deteriorated Impact
8221011 12518 8.9 POS FALSE FALSE 8/22/2022 10:56 AM Paint 21 N 7th Unit Foyer Apartment Door Casing Wood A 1 Deteriorated Impact
8221011 12519 16.7 POS FALSE FALSE 8/22/2022 10:56 AM Paint 21 N 7th Unit Foyer Apartment Door Frame Wood A 1 Deteriorated Impact
8221011 12520 0.4 NEG FALSE FALSE 8/22/2022 10:57 AM Paint 21 N 7th Unit Foyer Room Wall Drywall A 1 Deteriorated Impact
8221011 12521 0 NEG FALSE FALSE 8/22/2022 11:02 AM Paint 21 N 7th Unit Foyer Room Wall Drywall B 1 Deteriorated Impact
8221011 12522 0.4 NEG FALSE FALSE 8/22/2022 11:04 AM Paint 21 N 7th Unit Foyer Room Wall Drywall C 1 Deteriorated Impact
8221011 12523 27.9 POS FALSE TRUE 8/22/2022 11:04 AM Paint 21 N 7th Unit Foyer Room Wall Drywall D 1 Deteriorated Impact
8221011 12524 0.4 NEG FALSE FALSE 8/22/2022 11:05 AM Paint 21 N 7th Unit Foyer Room Ceiling Plaster A 1 Deteriorated Impact
8221011 12525 9.3 POS FALSE FALSE 8/22/2022 11:05 AM Paint 21 N 7th Unit Foyer Room Baseboard Wood A 1 Deteriorated Impact
8221011 12526 0.2 NEG FALSE TRUE 8/22/2022 11:06 AM Paint 21 N 7th Unit Foyer Stairs Newel Post Wood C 1 Deteriorated Impact
8221011 12527 -0.1 NEG FALSE FALSE 8/22/2022 11:06 AM Paint 21 N 7th Unit Foyer Stairs Railing Wood C 1 Deteriorated Impact
8221011 12528 0.2 NEG FALSE FALSE 8/22/2022 11:07 AM Paint 21 N 7th Unit Foyer Stairs Balusters Wood C 1 Deteriorated Impact
8221011 12529 0.4 NEG FALSE TRUE 8/22/2022 11:07 AM Paint 21 N 7th Unit Foyer Stairs Risers Wood C 1 Deteriorated Impact
8221011 12530 28.1 POS FALSE TRUE 8/22/2022 11:08 AM Paint 21 N 7th Unit Foyer Stairs Stringer Wood C 1 Deteriorated Impact
8221011 12531 -0.1 NEG FALSE FALSE 8/22/2022 11:08 AM Paint 21 N 7th Unit Foyer Stairs Treads Wood C 1 Deteriorated Impact
8221011 12532 0 NEG FALSE FALSE 8/22/2022 11:09 AM Paint 21 N 7th Unit Bedroom 1 Room Wall Drywall A 1 Deteriorated Impact
8221011 12533 0 NEG FALSE FALSE 8/22/2022 11:09 AM Paint 21 N 7th Unit Bedroom 1 Room Wall Drywall B 1 Deteriorated Impact
8221011 12534 0.1 NEG FALSE FALSE 8/22/2022 11:10 AM Paint 21 N 7th Unit Bedroom 1 Room Wall Drywall C 1 Deteriorated Impact
8221011 12535 0.1 NEG FALSE FALSE 8/22/2022 11:11 AM Paint 21 N 7th Unit Bedroom 1 Room Wall Drywall D 1 Deteriorated Impact
8221011 12536 1.9 POS FALSE FALSE 8/22/2022 11:12 AM Paint 21 N 7th Unit Bedroom 1 Room Baseboard Wood A 1 Deteriorated Impact
8221011 12537 0 NEG FALSE FALSE 8/22/2022 11:12 AM Paint 21 N 7th Unit Bedroom 1 Room Ceiling Plaster A 1 Deteriorated Impact
8221011 12538 30 POS FALSE TRUE 8/22/2022 11:13 AM Paint 21 N 7th Unit Bedroom 1 Window Jamb Wood C 1 Intact
8221011 12539 17.3 POS FALSE FALSE 8/22/2022 11:13 AM Paint 21 N 7th Unit Bedroom 1 Window Casing Wood C 1 Intact
8221011 12540 0.1 NEG FALSE FALSE 8/22/2022 11:15 AM Paint 21 N 7th Unit Bedroom 1 Window Sill Wood C 1 Intact
8221011 12541 10.8 POS FALSE FALSE 8/22/2022 11:24 AM Paint 21 N 7th Unit Bedroom 1 Window Apron Wood C 1 Intact
8221011 12542 0.3 NEG FALSE FALSE 8/22/2022 11:25 AM Paint 21 N 7th Unit Bedroom 1 Door --- Wood B 1 Deteriorated Impact
8221011 12543 16.5 POS FALSE FALSE 8/22/2022 11:25 AM Paint 21 N 7th Unit Bedroom 1 Door Jamb Wood B 1 Deteriorated Impact
8221011 12544 5.1 POS FALSE FALSE 8/22/2022 11:25 AM Paint 21 N 7th Unit Bedroom 1 Door Casing Wood B 1 Deteriorated Impact
8221011 12545 0.4 NEG FALSE FALSE 8/22/2022 11:26 AM Paint 21 N 7th Unit 1/2 Bathroom Door --- Wood C 1 Deteriorated Impact
8221011 12546 7.6 POS FALSE FALSE 8/22/2022 11:26 AM Paint 21 N 7th Unit 1/2 Bathroom Door Jamb Wood C 1 Deteriorated Impact
8221011 12547 25.8 POS FALSE TRUE 8/22/2022 11:26 AM Paint 21 N 7th Unit 1/2 Bathroom Door Casing Wood C 1 Deteriorated Impact
8221011 12548 0.1 NEG FALSE FALSE 8/22/2022 11:27 AM Paint 21 N 7th Unit 1/2 Bathroom Room Wall Drywall A 1 Intact
8221011 12549 0 NEG FALSE FALSE 8/22/2022 11:28 AM Paint 21 N 7th Unit 1/2 Bathroom Room Wall Drywall B 1 Intact
8221011 12550 -0.2 NEG FALSE FALSE 8/22/2022 11:28 AM Paint 21 N 7th Unit 1/2 Bathroom Room Wall Drywall C 1 Intact
8221011 12551 0.4 NEG FALSE FALSE 8/22/2022 11:29 AM Paint 21 N 7th Unit 1/2 Bathroom Room Wall Drywall D 1 Intact
8221011 12552 9.7 POS FALSE FALSE 8/22/2022 11:29 AM Paint 21 N 7th Unit 1/2 Bathroom Room Baseboard Wood A 1 Intact
8221011 12553 0.1 NEG FALSE FALSE 8/22/2022 11:30 AM Paint 21 N 7th Unit 1/2 Bathroom Room Ceiling Plaster A 1 Intact
8221011 12554 0.2 NEG FALSE FALSE 8/22/2022 11:31 AM Paint 21 N 7th Unit Hallway 1 Room Wall Drywall A 1 Intact
8221011 12555 0.4 NEG FALSE FALSE 8/22/2022 11:31 AM Paint 21 N 7th Unit Hallway 1 Room Wall Drywall B 1 Intact
8221011 12556 0.1 NEG FALSE FALSE 8/22/2022 11:32 AM Paint 21 N 7th Unit Hallway 1 Room Wall Drywall C 1 Intact
8221011 12557 0.2 NEG FALSE FALSE 8/22/2022 11:32 AM Paint 21 N 7th Unit Hallway 1 Room Wall Drywall D 1 Intact
8221011 12558 8.1 POS FALSE FALSE 8/22/2022 11:33 AM Paint 21 N 7th Unit Hallway 1 Room Baseboard Wood A 1 Deteriorated Impact
8221011 12559 0.2 NEG FALSE FALSE 8/22/2022 11:33 AM Paint 21 N 7th Unit Hallway 1 Room Ceiling Plaster A 1 Intact
8221011 12560 10.5 POS FALSE FALSE 8/22/2022 11:34 AM Paint 21 N 7th Unit Hallway 1 Door Jamb Wood B 1 Deteriorated Impact
8221011 12561 7.6 POS FALSE FALSE 8/22/2022 11:35 AM Paint 21 N 7th Unit Hallway 1 Door Casing Wood B 1 Deteriorated Impact
Job Id Reading # Concentration Result Calibration RTA Present Date Time Analytic Mode Site Address Area Unit # Room Structure Member Substrate Wall Location Condition Cause
8221011 12562 0.6 NEG FALSE FALSE 8/22/2022 11:35 AM Paint 21 N 7th Unit Hallway 1 Door --- Wood B 1 Deteriorated Impact
8221011 12563 0.2 NEG FALSE FALSE 8/22/2022 11:36 AM Paint 21 N 7th Unit Hallway 1 Pipe Vertical Metal C 1 Intact
8221011 12564 14.2 POS FALSE FALSE 8/22/2022 11:36 AM Paint 21 N 7th Unit Hallway 1 Window Jamb Wood C 1 Deteriorated Impact
8221011 12565 9.4 POS FALSE FALSE 8/22/2022 11:37 AM Paint 21 N 7th Unit Hallway 1 Window Casing Wood C 1 Deteriorated Impact
8221011 12566 0.2 NEG FALSE FALSE 8/22/2022 11:37 AM Paint 21 N 7th Unit Hallway 1 Window Sill Wood C 1 Deteriorated Impact
8221011 12567 13.1 POS FALSE FALSE 8/22/2022 11:38 AM Paint 21 N 7th Unit Hallway 1 Window Apron Wood C 1 Deteriorated Impact
8221011 12568 0.2 NEG FALSE FALSE 8/22/2022 11:39 AM Paint 21 N 7th Unit Hallway 1 Stairs Newel Post Wood C 1 Deteriorated Impact
8221011 12569 0.1 NEG FALSE FALSE 8/22/2022 11:39 AM Paint 21 N 7th Unit Hallway 1 Stairs Railing Wood C 1 Deteriorated Impact
8221011 12570 0.2 NEG FALSE FALSE 8/22/2022 11:40 AM Paint 21 N 7th Unit Hallway 1 Stairs Balusters Wood C 1 Deteriorated Impact
8221011 12571 0.2 NEG FALSE FALSE 8/22/2022 11:40 AM Paint 21 N 7th Unit Hallway 1 Stairs Risers Wood C 1 Deteriorated Impact
8221011 12572 19.7 POS FALSE FALSE 8/22/2022 11:41 AM Paint 21 N 7th Unit Hallway 1 Stairs Stringer Wood C 1 Deteriorated Impact
8221011 12573 0.1 NEG FALSE FALSE 8/22/2022 11:41 AM Paint 21 N 7th Unit Hallway 1 Stairs Treads Wood C 1 Deteriorated Impact
8221011 12574 0.2 NEG FALSE FALSE 8/22/2022 11:42 AM Paint 21 N 7th Unit Bedroom 2 Door --- Wood C 1 Intact
8221011 12575 8.4 POS FALSE FALSE 8/22/2022 11:43 AM Paint 21 N 7th Unit Bedroom 2 Door Jamb Wood C 1 Deteriorated Impact
8221011 12576 11.2 POS FALSE FALSE 8/22/2022 11:43 AM Paint 21 N 7th Unit Bedroom 2 Door Casing Wood C 1 Deteriorated Impact
8221011 12577 0.2 NEG FALSE FALSE 8/22/2022 11:44 AM Paint 21 N 7th Unit Bedroom 2 Room Wall Drywall A 1 Intact
8221011 12578 0.1 NEG FALSE FALSE 8/22/2022 11:44 AM Paint 21 N 7th Unit Bedroom 2 Room Wall Drywall B 1 Intact
8221011 12579 0.3 NEG FALSE FALSE 8/22/2022 11:45 AM Paint 21 N 7th Unit Bedroom 2 Room Wall Drywall C 1 Intact
8221011 12580 0.2 NEG FALSE FALSE 8/22/2022 11:45 AM Paint 21 N 7th Unit Bedroom 2 Room Wall Drywall D 1 Intact
8221011 12581 0.4 NEG FALSE FALSE 8/22/2022 11:46 AM Paint 21 N 7th Unit Bedroom 2 Room Baseboard Wood A 1 Intact
8221011 12582 0.1 NEG FALSE FALSE 8/22/2022 11:46 AM Paint 21 N 7th Unit Bedroom 2 Room Ceiling Plaster A 1 Intact
8221011 12583 13.4 POS FALSE FALSE 8/22/2022 11:47 AM Paint 21 N 7th Unit Bedroom 2 Window Jamb Wood C 1 Deteriorated Impact
8221011 12584 7.2 POS FALSE FALSE 8/22/2022 11:48 AM Paint 21 N 7th Unit Bedroom 2 Window Casing Wood C 1 Deteriorated Impact
8221011 12585 0.1 NEG FALSE FALSE 8/22/2022 11:48 AM Paint 21 N 7th Unit Bedroom 2 Window Sill Wood C 1 Deteriorated Impact
8221011 12586 4.8 POS FALSE FALSE 8/22/2022 11:49 AM Paint 21 N 7th Unit Bedroom 2 Window Apron Wood C 1 Deteriorated Impact
8221011 12587 0.1 NEG FALSE FALSE 8/22/2022 11:49 AM Paint 21 N 7th Unit Bedroom 3 Door --- Wood C 1 Intact
8221011 12588 9.1 POS FALSE FALSE 8/22/2022 11:50 AM Paint 21 N 7th Unit Bedroom 3 Door Jamb Wood C 1 Deteriorated Impact
8221011 12589 7.8 POS FALSE FALSE 8/22/2022 11:50 AM Paint 21 N 7th Unit Bedroom 3 Door Casing Wood C 1 Deteriorated Impact
8221011 12590 13.8 POS FALSE FALSE 8/22/2022 11:51 AM Paint 21 N 7th Unit Bedroom 3 Window Jamb Wood C 1 Deteriorated Impact
8221011 12591 16.8 POS FALSE FALSE 8/22/2022 11:52 AM Paint 21 N 7th Unit Bedroom 3 Window Casing Wood C 1 Deteriorated Impact
8221011 12592 0.1 NEG FALSE FALSE 8/22/2022 11:52 AM Paint 21 N 7th Unit Bedroom 3 Window Sill Wood C 1 Deteriorated Impact
8221011 12593 10.6 POS FALSE FALSE 8/22/2022 11:53 AM Paint 21 N 7th Unit Bedroom 3 Window Apron Wood C 1 Deteriorated Impact
8221011 12594 0.1 NEG FALSE FALSE 8/22/2022 11:53 AM Paint 21 N 7th Unit Bedroom 3 Room Wall Drywall A 1 Intact
8221011 12595 0 NEG FALSE FALSE 8/22/2022 11:54 AM Paint 21 N 7th Unit Bedroom 3 Room Wall Drywall B 1 Intact
8221011 12596 -0.1 NEG FALSE FALSE 8/22/2022 11:54 AM Paint 21 N 7th Unit Bedroom 3 Room Wall Drywall C 1 Intact
8221011 12597 0.2 NEG FALSE FALSE 8/22/2022 11:55 AM Paint 21 N 7th Unit Bedroom 3 Room Wall Drywall D 1 Intact
8221011 12598 17.2 POS FALSE FALSE 8/22/2022 11:56 AM Paint 21 N 7th Unit Bedroom 3 Room Baseboard Wood A 1 Deteriorated Impact
8221011 12599 0.2 NEG FALSE FALSE 8/22/2022 11:56 AM Paint…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .