This is an Approved Plans document prepared by the Division of Facilities Construction and Management (DFCM) for the State of Utah, detailing the scope of work for Project #27075550, a ductless split and water heater replacement project for Ogden Public Safety. The project encompasses replacement of an existing mini split system in the IT Room with a new 2-ton ductless split system, including installation of a roof stand meeting DFCM standards, indoor and outdoor units, power connections, thermostat, line set, and condensate tie-in, followed by system startup and commissioning. Additionally, the project requires removal and replacement of the existing water heater, relocation of the pump to an accessible location, and rebuilding of the Pressure Reducing Valve (PRV) station. General plumbing work will be completed during regular hours, with the exception of the PRV station rebuild, which will be performed after hours. The plans document was reviewed for code compliance by Thomas Peterson on May 28, 2026.
The document includes comprehensive technical specifications and detailed construction drawings for rooftop equipment platform installation, including an elevated equipment platform design, drain sump detail, gooseneck pipe specifications, line set enclosure requirements, pipe and conduit flashing options, equipment curb detail, guardrail specifications, and satellite/antenna post details. The construction cost estimate for this invitational project is $20,000.00. Only three contractors were invited to bid: Grimes Mechanical (contact: Kade Brown), Ralph Tye and Sons (contact: Brian Tye), and Salmon Mechanical (contact: Zac Schwitzer). All electrical work must comply with NEC standards, and specific restrictions include prohibiting welding on the roof, with all welding to be performed in the parking lot or shop, and requiring replacement of all existing line sets and electrical lines with new installations, except at equipment location connections.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 1-3-CS27022-27075550-Hazmat Survey.pdf | ||
| 2-1-CS27022-27075550-Solicitation.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
27075550 - Ogden public safety mini split and water heater replacement
Project Scope of Work:
Mini Split System Replacement (IT Room)
• Demolition and replacement of the existing mini split system in the IT Room.
• Upgrading the roof stand to meet DFCM roof standards.
• Installation 2 Ton Split system, which includes the new stand, indoor unit, and outdoor unit.
• Installation of all necessary system components, including the power connections, thermostat, line set, and condensate tie-in.
• Startup and commissioning of the new ductless split system once installed.
Water Heater and Plumbing Services
• Removal and replacement of the existing water heater.
• Relocation of the pump to a more accessible location.
• Rebuilding the PRV (Pressure Reducing Valve) station.
• Note on schedule: General plumbing work will be completed during regular hours, with the exception of the PRV station rebuild, which will be performed after hours.
DIVISION OF FACILITIES
CONSTRUCTION AND
MANAGEMENT
REVIEWED FOR
CODE COMPLIANCE
THOMAS PETERSON
05/28/2026
ROOFING MEMBRANE - VARIES
BY PROJECT
RIGID INSULATION -
VARIES BY PROJECT
STAINLESS STEEL
CLAMPING RING
CONT. BEAD OF
APPROVED SEALANT
FIELD FABRICATED
METAL HOOD
PRE-MOLDED PVC
PIPE FLASHING
2" MIN. WELDED
SPLICE
GALVANIZED C4x5.4
CHANNEL
24" TALL GALVANIZED HSS 3x.203 -
MEASURE AND FIELD CUT BOTTOM OF
POSTS AS REQ'D. TO ACHIEVE LEVEL
TOP OF PLATFORM
M
IN
ADJUSTABLE BASE / SUPPORT
NOTE:
4 SUCH SUPPORT LEGS ARE TO BE
PROVIDED FOR EACH PIECE OF
EQUIPMENT - INSTALL IN A 24" x 48"
RECTANGULAR CONFIGURATION - MITER
CHANNEL CORNERS AND WELD (TYP.)
12x12x1/2" GALVANIZED STEEL
PLATE - FASTEN INTO DECK
PER STRUCTURAL ENGINEERS
RECOMMENDATIONS
NOTE:
NO WELDING WILL BE ALLOWED ON
THE ROOF - WELDING SHALL BE DONE
IN THE PARKING LOT OR IN A SHOP
1/2" ⌀ THROUGH BOLT WITH LOCK
WASHER - DRILL THROUGH ANGLES
AND HSS POST AS REQ'D.
ROOF DECK - VARIES
BY PROJECT
1/4
1/4
1/8
CJP (TYP @ MITERED CHANNEL
JOINTS TOP & SIDES)
3x3x1/4x 4" LONG GALVANIZED STEEL
ANGLE WELDED TO BASE PLATE -
EACH SIDE OF HSS POST
BOTH ENDS
1/4
ROOFTOP EQUIPMENT VARIES - IF
EQUIPMENT MOUNTING POINTS ALIGN WITH
THE CHANNEL FRAME, ATTACHMENT OF
EQUIPMENT CAN BE MADE DIRECTLY TO
THE FRAME - IF EQUIPMENT MOUNTING
POINTS DO NOT ALIGN WITH THE CHANNEL
FRAME, MOUNT TO A UNI-STRUT SYSTEM
THAT WOULD SPAN BETWEEN AND ATTACH
TO BOTH THE CHANNEL FRAME AS WELL AS
THE EQUIPMENT MOUNTS
FIELD CUT BOTTOM OF SUPPORT POSTS
AS REQ'D. TO ACHIEVE A LEVEL PLATFORM
NOTE THAT THIS DETAIL IS TO BE
USED WHEREVER ROOFTOP
EQUIPMENT WOULD TYPICALLY BE
INSTALLED ON WOOD, BOXED, CURB -
WOOD CURBS SHOULD NOT BE USED
COORDINATE WITH DETAIL #03 AND
DETAIL #04 FOR ELECTRICAL AND
OR LINE SET (AS OCCURS)
PENETRATION DETAILS
TYPICAL NOTE: ALL EXISTING LINE SETS AND
ELECTRICAL LINES / CONNECTIONS (AS OCCUR)
ARE TO BE REPLACED WITH NEW - WITH THE
EXCEPTION OF RIGHT AT THE EQUIPMENT
LOCATION, ELECTRICAL LINES AND JUNCTION
BOX'S THAT ARE RUN ABOVE THE ROOF, AND OR
DECK, ARE TO BE REPLACED AND RE-RUN
BENEATH THE DECK BACK TO THE NEAREST
JUNCTION OR ELECTRICAL BOX - NO FLEXIBLE
ELECTRICAL CONDUIT WILL BE ALLOWED LOWER
THAN 12" ABOVE THE FINISHED ROOF SURFACE -
ALL ELECTRICAL WORK MUST BE DONE TO NEC
STANDARDS
NOTE THAT WALK PADS ARE TO BE
PROVIDED AT ALL 4 SIDES OF
THESE ELEVATED PLATFORMS
EQUIPMENT PLATFORM 3D
ROTATE DIRECTION OF BASE
PLATES AS REQ'D TO ALIGN WITH
SLOPE OF DECK (TYP.)
NO SCALE
GENERAL DFCM ROOFING DETAILS ELEVATED EQUIPMENT PLATFORM
| Condenser-Equipment-Stand.pdf |
| Sheets |
| #01 - DRAIN SUMP DETAIL |
| #02 - ELEVATED EQUIPMENT PLATFORM |
| #03 - GOOSENECK PIPE |
| #04 - LINE SET ENCLOSURE |
| #05 - PIPE / CONDIUT FLASHING OPTIONS |
| #06 - EQUIPMENT CURB DETAIL |
| #07 - PARAPET EDGE METAL |
| #08 - GUARDRAIL |
| #09 - DFCM ROOF WARRANTY SIGN |
| #10 - SATELLITE / ANTENNA POST DETAIL |
| #11 - DRAINAGE TROUGH |
| #12 - WATER HYDRANT |
| #13 - CANTILEVERED MAU / RTU / AHU SUPPORT |
| #14 - REMOVABLE FLASHING AT WALL BASE |