3-104324 Bid Proposal Workbook.xlsx
XLSX spreadsheet 112 KB Posted
- Solicitation number
- 26-0321
- Issued by
- Tarrant County, Texas
About this file
This is a Bid Proposal Workbook for the City of Fort Worth, Texas, for 2022 Bond Year 3 Contract 18 (City Project No. 104324), a public works infrastructure project consisting of three units: Water Improvements, Sewer Improvements, and Paving Improvements. The project encompasses approximately 6,500 linear feet of 8-inch water pipe installation via open cut, 2,000 linear feet of 8-inch sewer pipe via open cut, 400 linear feet of 8-inch sewer pipe via other means, 6,500 square yards of pulverization and asphalt overlay, 7,000 square yards of concrete pavement, 20,000 square feet of concrete sidewalk, and 21,500 square feet of concrete driveway. The work includes associated site improvements such as tree removal, utility adjustments, trench safety, topsoil placement, sod installation, and traffic control. The contract requires completion within 400 calendar days after the contract time commences. Bidders must acknowledge receipt of all addenda and certify compliance with the Invitation to Bidders and Instructions to Bidders, including provisions regarding bid bonds, insurance requirements, and anti-collusion certifications.
Specific pricing for Unit 1 (Water Improvements) totals $130,000.00, Unit 2 (Sanitary Sewer Improvements) totals $60,000.00, with additional line items provided for detailed unit price bidding across all work categories. Bidders are required to provide a Conflict of Interest Questionnaire or certify one on file with the City Secretary's Office, comply with prequalification requirements for specified work types including water distribution, sewer collection systems, CCTV inspection, asphalt paving, concrete paving, and manhole lining, and provide required documentation including a bid bond, proposal form, vendor compliance certification, small business forms, and prequalification statements. The workbook includes detailed bid line items for materials, labor, and equipment across water, sewer, and paving categories, with construction allowances of $30,000 for miscellaneous utility adjustment (irrigation), $100,000 for water improvements, and $60,000 for sewer improvements built into the proposal structure.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
00 35 13
| SECTION 00 35 13 |
| CONFLICT OF INTEREST STATEMENT |
| Each bidder, offeror or respondent to a City of Fort Worth procurement is required to complete a |
| Conflict of Interest Questionnaire or certify that one is current and on file with the City Secretary's |
| Office pursuant to state law. Each bidder, offeror or respondent has a duty to review the requirements |
| set forth in the forms and may certify, if appropriate, that the respective form does not apply. |
| If a member of the Fort Worth City Council, any one or more of the City Manager or Assistant |
| City Managers, or an agent of the City who exercise discretion in the planning, recommending, |
| selecting or contracting with a bidder, offeror or respondent is affiliated with your company, then |
| a Local Government Officer Conflicts Disclosure Statement (CIS) may be required. |
| You are urged to consult with counsel regarding the applicability of these forms and Local |
| Government Code Chapter 176 to your company. |
The referenced forms may be downloaded from the links provided below.
| Form CIQ (Conflict of Interest Questionnaire) |
| Form CIS (Local Government Officer Conflicts Disclosure Statement) |
CIQ Form does not apply
CIQ Form is on file with City Secretary
CIQ Form is being provided to the City Secretary
CIS Form does not apply
CIS Form is on File with City Secretary
CIS Form is being provided to the City Secretary
BIDDER:
By: ___________________________________
Signature: ______________________________
Title: __________________________________
END OF SECTION
&"Arial,Regular"&8&A
CONFLICT OF INTEREST STATEMENT
Page &P of &N
&"Arial,Regular"&8CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Revised June 5, 2026 &"Arial,Regular"&8 2022 Bond Year 3 Contract 18 City Project No. &F https://www.ethics.state.tx.us/data/forms/conflict/CIQ.pdfhttps://www.ethics.state.tx.us/data/forms/conflict/CIS.pdf 00 41 00
| SECTION 00 41 00 | ||
| BID FORM | ||
| TO: | The Purchasing Manager | |
| c/o: The Purchasing Division | ||
| 100 Fort Worth Trail | ||
| City of Fort Worth, Texas 76102 |
FOR: 2022 Bond Year 3 Contract 18
City Project No.: 104324
| Units/Sections: | Unit 1 - Water Improvements |
| Unit 2 - Sewer Improvements | |
| Unit 3 - Paving Improvements |
1. Enter Into Agreement
The undersigned Bidder proposes and agrees, if this Bid is accepted, to enter into an Agreement with City in the form included in the Bidding Documents to perform and furnish all Work as specified or indicated in the Contract Documents for the Bid Price and within the Contract Time indicated in this Bid and in accordance with the other terms and conditions of the Contract Documents.
2. BIDDER Acknowledgements and Certification
2.1. In submitting this Bid, Bidder accepts all of the terms and conditions of the INVITATION TO BIDDERS and INSTRUCTIONS TO BIDDERS, including without limitation those dealing with the disposition of Bid Bond.
2.2. Bidder is aware of all costs to provide the required insurance, will do so pending contract award, and will provide a valid insurance certificate meeting all requirements within 14 days of notification of award.
2.3. Bidder certifies that this Bid is genuine and not made in the interest of or on behalf of any undisclosed individual or entity and is not submitted in conformity with any collusive agreement or rules of any group, association, organization, or corporation.
2.4. Bidder has not directly or indirectly induced or solicited any other Bidder to submit a false or sham Bid.
2.5. Bidder has not solicited or induced any individual or entity to refrain from bidding.
2.6. Bidder has not engaged in corrupt, fraudulent, collusive, or coercive practices in competing for the Contract. For the purposes of this Paragraph:
a. "corrupt practice" means the offering, giving, receiving, or soliciting of any thing of value likely to influence the action of a public official in the bidding process.
b. "fraudulent practice" means an intentional misrepresentation of facts made (a) to influence the bidding process to the detriment of City (b) to establish Bid prices at artificial non-competitive levels, or (c) to deprive City of the benefits of free and open competition.
c. "collusive practice" means a scheme or arrangement between two or more Bidders, with or without the knowledge of City, a purpose of which is to establish Bid prices at artificial, non-competitive levels.
d. "coercive practice" means harming or threatening to harm, directly or indirectly, persons or their property to influence their participation in the bidding process or affect the execution of the Contract.
3. Prequalification
The Bidder acknowledges that the following work types must be performed only by prequalified contractors and subcontractors:
a. Water Distribution, Urban and Renewal, 12-inch diameter and smaller
b. Sewer Collection Systems, Urban/Renewal, 12inches and smaller
c. CCTV, 18-inches and smaller
d. Asphalt Paving Construction/Reconstruction (Greater than 15,000 SY)
e. Concrete Paving Construction/Reconstruction (Greater than 15,000 SY)
f. Sanitary Sewer Manhole/Structure Interior Lining - Warren Coating
g. Sanitary Sewer Manhole/Structure Interior Lining - Chesterton Coating
h. Bypass pumping
4. Time of Completion
| 4.1. | The Work will be complete for Final Acceptance within | 400 CD | days after the date when the |
| the Contract Time commences to run as provided in Paragraph 2.03 of the General Conditions. |
4.2. Bidder accepts the provisions of the Agreement as to liquidated damages in the event of failure to complete the Work {and/or achievement of Milestones} within the times specified in the Agreement.
5. Attached to this Bid
The following documents are attached to and made a part of this Bid:
a. This Bid Form, Section 00 41 00
b. Required Bid Bond, Section 00 43 13 issued by a surety meeting the requirements of Paragraph 5.01 of the General Conditions.
c. Proposal Form, Section 00 42 43
d. Vendor Compliance to State Law Non Resident Bidder, Section 00 43 37
e. Small Business Forms (required at time of bid)
f. Prequalification Statement, Section 00 45 12
| g. | Conflict of Interest Affidavit, Section 00 35 13 |
| *If necessary, CIQ or CIS forms are to be provided directly to City Secretary |
h. Any additional documents that may be required by Section 12 of the Instructions to Bidders
6. Total Bid Amount
6.1. Bidder will complete the Work in accordance with the Contract Documents for the following bid amount. In the space provided below, please enter the total bid amount for this project. Only this figure will be read publicly by the City at the bid opening.
6.2. It is understood and agreed by the Bidder in signing this proposal that the total bid amount entered below is subject to verification and/or modification by multiplying the unit bid prices for each pay item by the respective estimated quantities shown in this proposal and then totaling all of the extended amounts.
6.3. Evaluation of Alternate Bid Items
Total Base Bid $320,000.00
Total Alternate Bid $320,000.00
Total Bid ERROR:#REF!
7. Bid Submittal
This Bid is submitted on by the entity named below.
Respectfully submitted, Receipt is acknowledged of the following Addenda: Initial
| By:____________________________________________ | Addendum No. 1: | |
| (Signature) | Addendum No. 2: | |
| Addendum No. 3: | ||
| Addendum No. 4: | ||
| (Printed Name) |
Title:
Company: Corporate Seal:
Address:
State of Incorporation:
Email:
Phone:
END OF SECTION
BID FORM
Page &P of &N
&"Arial,Regular"&8CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Revised 9/19/2025 &"Arial,Regular"&8 2022 Bond Year 3 Contract 18 City Project No. &F
00 42 43
| SECTION 00 42 43 |
| PROPOSAL FORM |
UNIT PRICE BID Bidder's Application UNIT PRICE BID Owner's Application
Project Item Information Bidder's Proposal Project Item Information Bid Item Funding and Percentage Breakdown
Bidlist Item No. Description Specification Section No. Unit of Measure Bid Quantity Unit Price Bid Value Bid Item No. Description % This Item Portion of Bid Value Amount % This Item Portion of Bid Value Amount % This Item Portion of Bid Value Amount % This Item Portion of Bid Value Amount % This Item Portion of Bid Value Amount % This Item Portion of Bid Value Amount
| Unit 1 - Water Improvements | |||||||||||||||
| 1 | 3311.0261 8" PVC Water Pipe | 33 11 12 | LF | 6,255 | $0.00 | 1 | 3311.0261 8" PVC Water Pipe | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 2 | 3311.0161 6" PVC Water Pipe | 33 11 12 | LF | 108 | $0.00 | 2 | 3311.0161 6" PVC Water Pipe | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 3 | 3311.0061 4" PVC Water Pipe | 33 11 12 | LF | 28 | 3 | 3311.0061 4" PVC Water Pipe | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| 4 | 3305.0116 Concrete Encasement for Utility Pipes | 33 05 22 | LF | 60 | $0.00 | 4 | 3305.0116 Concrete Encasement for Utility Pipes | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 5 | 3312.0117 Connection to Existing 4"-12" Water Main | 33 12 25 | EA | 9 | $0.00 | 5 | 3312.0117 Connection to Existing 4"-12" Water Main | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 6 | 3312.0106 Connection to Existing 16" Water Main | 33 12 25 | EA | 1 | $0.00 | 6 | 3312.0106 Connection to Existing 16" Water Main | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 7 | 3312.2003 1" Water Service | 33 12 10 | EA | 78 | $0.00 | 7 | 3312.2003 1" Water Service | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 8 | 3312.2001 1" Water Service, Meter Reconnection | 33 12 10 | EA | 67 | $0.00 | 8 | 3312.2001 1" Water Service, Meter Reconnection | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 9 | 3312.2103 1 1/2" Water Service | 33 12 10 | EA | 1 | $0.00 | 9 | 3312.2103 1 1/2" Water Service | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 10 | 3312.2101 1 1/2" Water Service, Meter Reconnection | 33 12 10 | EA | 1 | $0.00 | 10 | 3312.2101 1 1/2" Water Service, Meter Reconnection | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 11 | 3312.2203 2" Water Service | 33 12 10 | EA | 3 | $0.00 | 11 | 3312.2203 2" Water Service | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 12 | 3312.2201 2" Water Service, Meter Reconnection | 33 12 10 | EA | 3 | $0.00 | 12 | 3312.2201 2" Water Service, Meter Reconnection | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 13 | 3312.2802 4" Water Meter and Vault | 33 12 11 | EA | 1 | $0.00 | 13 | 3312.2802 4" Water Meter and Vault | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 14 | 3312.3002 6" Gate Valve | 33 12 20 | EA | 10 | $0.00 | 14 | 3312.3002 6" Gate Valve | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 15 | 3312.3003 8" Gate Valve | 33 12 20 | EA | 29 | $0.00 | 15 | 3312.3003 8" Gate Valve | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 16 | 3305.0111 Valve Box Adjustment | 33 05 14 | EA | 8 | $0.00 | 16 | 3305.0111 Valve Box Adjustment | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 17 | 3312.0001 Fire Hydrant | 33 12 40 | EA | 10 | $0.00 | 17 | 3312.0001 Fire Hydrant | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 18 | 3311.0001 Ductile Iron Water Fittings w/ Restraint | 33 11 11 | TON | 6 | $0.00 | 18 | 3311.0001 Ductile Iron Water Fittings w/ Restraint | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 19 | 0241.1510 Salvage Fire Hydrant | 02 41 14 | EA | 8 | $0.00 | 19 | 0241.1510 Salvage Fire Hydrant | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 20 | 0241.1302 Remove 6" Water Valve | 02 41 14 | EA | 12 | $0.00 | 20 | 0241.1302 Remove 6" Water Valve | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 21 | 0241.1303 Remove 8" Water Valve | 02 41 14 | EA | 5 | $0.00 | 21 | 0241.1303 Remove 8" Water Valve | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 22 | 0241.1001 Water Line Grouting | 02 41 14 | CY | 27 | $0.00 | 22 | 0241.1001 Water Line Grouting | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 23 | 0241.1118 4"-12" Pressure Plug | 02 41 14 | EA | 2 | $0.00 | 23 | 0241.1118 4"-12" Pressure Plug | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 24 | 0241.1218 4"-12" Water Abandonment Plug | 02 41 14 | EA | 4 | $0.00 | 24 | 0241.1218 4"-12" Water Abandonment Plug | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 25 | 3201.0111 4' Wide Asphalt Pvmt Repair, Residential | 32 01 17 | LF | 330 | $0.00 | 25 | 3201.0111 4' Wide Asphalt Pvmt Repair, Residential | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 26 | 3201.0201 Asphalt Pvmt Repair Beyond Defined Width, Residential | 32 01 17 | SY | 500 | $0.00 | 26 | 3201.0201 Asphalt Pvmt Repair Beyond Defined Width, Residential | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 27 | 3201.0400 Temporary Asphalt Paving Repair | 32 01 18 | LF | 11,439 | $0.00 | 27 | 3201.0400 Temporary Asphalt Paving Repair | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 28 | 3201.0614 Conc Pvmt Repair, Residential | 32 01 29 | SY | 300 | $0.00 | 28 | 3201.0614 Conc Pvmt Repair, Residential | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 29 | 3201.0616 Conc Pvmt Repair, Arterial/Industrial | 32 01 29 | SY | 2,443 | $0.00 | 29 | 3201.0616 Conc Pvmt Repair, Arterial/Industrial | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 30 | 3305.0109 Trench Safety | 33 05 10 | LF | 2,500 | $0.00 | 30 | 3305.0109 Trench Safety | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 31 | 3110.0102 6"-12" Tree Removal | 31 10 00 | EA | 17 | $0.00 | 31 | 3110.0102 6"-12" Tree Removal | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 32 | 3110.0103 12"-18" Tree Removal | 31 10 00 | EA | 5 | $0.00 | 32 | 3110.0103 12"-18" Tree Removal | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 33 | 3110.0104 18"-24" Tree Removal | 31 10 00 | EA | 3 | $0.00 | 33 | 3110.0104 18"-24" Tree Removal | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 34 | 3110.0105 24" and Larger Tree Removal | 31 10 00 | EA | 3 | $0.00 | 34 | 3110.0105 24" and Larger Tree Removal | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 35 | 3305.0202 Imported Embedment/Backfill, CSS | 33 05 10 | CY | 500 | $0.00 | 35 | 3305.0202 Imported Embedment/Backfill, CSS | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 36 | 3305.0203 Imported Embedment/Backfill, CLSM | 33 05 10 | CY | 500 | $0.00 | 36 | 3305.0203 Imported Embedment/Backfill, CLSM | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 37 | 3305.0204 Imported Embedment/Backfill, Crushed Rock | 33 05 10 | CY | 500 | $0.00 | 37 | 3305.0204 Imported Embedment/Backfill, Crushed Rock | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 38 | 3305.0207 Imported Embedment/Backfill, Select Fill | 33 05 10 | CY | 2,000 | $0.00 | 38 | 3305.0207 Imported Embedment/Backfill, Select Fill | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 39 | 3304.0101 Temporary Water Services | 33 04 30 | LS | 1 | $0.00 | 39 | 3304.0101 Temporary Water Services | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 40 | 3305.0103 Exploratory Excavation of Existing Utilities | 33 05 30 | EA | 8 | $0.00 | 40 | 3305.0103 Exploratory Excavation of Existing Utilities | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 41 | 3305.0003 8" Waterline Lowering | 33 05 12 | EA | 3 | $0.00 | 41 | 3305.0003 8" Waterline Lowering | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 42 | 0241.0100 Remove Sidewalk | 02 41 13 | SF | 1,000 | $0.00 | 42 | 0241.0100 Remove Sidewalk | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 43 | 0241.0401 Remove Concrete Drive | 02 41 13 | SF | 1,000 | $0.00 | 43 | 0241.0401 Remove Concrete Drive | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 44 | 0241.0402 Remove Asphalt Drive | 02 41 13 | SF | 300 | $0.00 | 44 | 0241.0402 Remove Asphalt Drive | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 45 | 0241.0500 Remove Fence | 02 41 13 | LF | 200 | $0.00 | 45 | 0241.0500 Remove Fence | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 46 | 0241.0550 Remove Guardrail | 02 41 13 | LF | 30 | $0.00 | 46 | 0241.0550 Remove Guardrail | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 47 | 0241.1300 Remove Concrete Curb & Gutter | 02 41 13 | LF | 500 | $0.00 | 47 | 0241.1300 Remove Concrete Curb & Gutter | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 48 | 3123.0101 Unclassified Excavation by Plan | 31 23 16 | CY | 200 | $0.00 | 48 | 3123.0101 Unclassified Excavation by Plan | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 49 | 3291.0100 Topsoil | 32 91 19 | CY | 28 | $0.00 | 49 | 3291.0100 Topsoil | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 50 | 3292.0100 Block Sod Placement | 32 92 13 | SY | 250 | $0.00 | 50 | 3292.0100 Block Sod Placement | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 51 | 0241.1700 Pavement Pulverization (11") | 02 41 15 | SY | 1,080 | $0.00 | 51 | 0241.1700 Pavement Pulverization (11") | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 52 | 3212.0305 3" Asphalt Pvmt Superpave SP-D | 32 12 16 | SY | 1,080 | $0.00 | 52 | 3212.0305 3" Asphalt Pvmt Superpave SP-D | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 53 | 3213.0401 6" Concrete Driveway | 32 13 20 | SF | 1,000 | $0.00 | 53 | 3213.0401 6" Concrete Driveway | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 54 | 3216.0101 6" Conc Curb and Gutter | 32 16 13 | LF | 500 | $0.00 | 54 | 3216.0101 6" Conc Curb and Gutter | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 55 | 3216.0301 7" Conc Valley Gutter, Residential | 32 16 13 | SY | 500 | $0.00 | 55 | 3216.0301 7" Conc Valley Gutter, Residential | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 56 | 3213.0301 4" Conc Sidewalk | 32 13 20 | SF | 1,000 | $0.00 | 56 | 3213.0301 4" Conc Sidewalk | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 57 | 3212.0401 HMAC Transition | 32 12 16 | TN | 5 | $0.00 | 57 | 3212.0401 HMAC Transition | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 58 | 3211.0601 CEMLIME™ (8" at 32lb/SY) | 32 11 33 | TN | 20 | $0.00 | 58 | 3211.0601 CEMLIME™ (8" at 32lb/SY) | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 59 | 3217.5001 Curb Address Painting | 32 17 25 | EA | 15 | $0.00 | 59 | 3217.5001 Curb Address Painting | $0.00 | $0.00 | $0.00 | 0.00% | $0.00 | $0.00 | $0.00 | |
| 60 | 3231.0131 4' Wrought Iron Fence | 32 31 13 | LF | 100 | $0.00 | 60 | 3231.0131 4' Wrought Iron Fence | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 61 | 3231.0123 6' Chain Link, Aluminum | 32 31 13 | LF | 50 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 62 | 0171.0101 Construction Staking | 01 71 23 | LS | 1 | $0.00 | 62 | 0171.0101 Construction Staking | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 63 | 3125.0101 SWPPP ≥ 1 acre | 31 25 00 | LS | 1 | $0.00 | 63 | 3125.0101 SWPPP ≥ 1 acre | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 64 | 3471.0001 Traffic Control | 34 71 13 | MO | 5 | $0.00 | 64 | 3471.0001 Traffic Control | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 65 | 0171.0102 As-Built Survey (Redline Survey) | 01 71 23 | LS | 1 | $0.00 | 65 | 0171.0102 As-Built Survey (Redline Survey) | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 66 | 3305.011 Utility Markers | 33 05 26 | LS | 1 | $0.00 | 66 | 3305.011 Utility Markers | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 67 | 3346.0008 4" Pipe Underdrain, Type 8 | 33 46 00 | LF | 50 | $0.00 | 67 | 3346.0008 4" Pipe Underdrain, Type 8 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 68 | 9999.0004 Install Guardrail | 00 00 00 | LF | 30 | $0.00 | 68 | 9999.0004 Install Guardrail | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 69 | 9999.0001 Miscellaneous Utility Adjustment (Irrigation) | 00 00 00 | LS | 1 | $30,000.00 | $30,000.00 | 69 | 9999.0001 Miscellaneous Utility Adjustment (Irrigation) | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 70 | 9999.0002 Construction Allowance (Water) | 00 00 00 | LS | 1 | $100,000.00 | $100,000.00 | 70 | 9999.0002 Construction Allowance (Water) | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||||
| Sub-Total Unit 1 - Water Improvements | $130,000.00 | Sub-Total Unit 1 - Water Improvements | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||||
| Unit 2 - Sanitary Sewer Improvements | Unit 2 - Sanitary Sewer Improvements | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 1 | 3331.4115 8" Sewer Pipe | 33 11 10, 33 31 12, 33 31 20 | LF | 1,620 | $0.00 | 1 | 3331.4115 8" Sewer Pipe | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 2 | 3331.4119 8" DIP Sewer Pipe | 33 11 10 | LF | 200 | |||||||||||
| 3 | 3331.3101 4" Sewer Service | 33 31 50 | EA | 18 | $0.00 | 3 | 3331.3101 4" Sewer Service | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 4 | 3339.1001 4' Manhole | 33 39 10, 33 39 20 | EA | 8 | $0.00 | 4 | 3339.1001 4' Manhole | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 5 | 3331.0103 8" Sewer Pipe, Point Repair | 33 31 22, 33 31 23 | LF | 100 | $0.00 | 5 | 3331.0103 8" Sewer Pipe, Point Repair | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 6 | 3331.1102 8" Pipe Enlargement | 33 31 23 | LF | 669 | $0.00 | 6 | 3331.1102 8" Pipe Enlargement | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 7 | 3331.1201 Service Reinstatement, Pipe Enlargement with 4" 2-way Cleanout | 33 31 23 | EA | 12 | $0.00 | 7 | 3331.1201 Service Reinstatement, Pipe Enlargement with 4" 2-way Cleanout | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 8 | 3201.0111 4' Wide Asphalt Pvmt Repair, Residential | 32 01 17 | LF | 889 | $0.00 | 8 | 3201.0111 4' Wide Asphalt Pvmt Repair, Residential | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 9 | 3201.0201 Asphalt Pvmt Repair Beyond Defined Width, Residential | 32 01 17 | SY | 200 | $0.00 | 9 | 3201.0201 Asphalt Pvmt Repair Beyond Defined Width, Residential | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 10 | 3201.0400 Temporary Asphalt Paving Repair | 32 01 18 | LF | 137 | $0.00 | 10 | 3201.0400 Temporary Asphalt Paving Repair | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 11 | 3201.0616 Conc Pvmt Repair, Arterial/Industrial | 32 01 29 | SY | 186 | $0.00 | 11 | 3201.0616 Conc Pvmt Repair, Arterial/Industrial | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 12 | 3201.0614 Conc Pvmt Repair, Residential | 32 01 29 | SY | 200 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 13 | 3291.0100 Topsoil | 32 91 19 | CY | 111 | $0.00 | 13 | 3291.0100 Topsoil | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 14 | 3292.0100 Block Sod Placement | 32 92 13 | SY | 140 | $0.00 | 14 | 3292.0100 Block Sod Placement | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 15 | 3301.0001 Pre-CCTV Inspection | 33 01 31 | LF | 346 | $0.00 | 15 | 3301.0001 Pre-CCTV Inspection | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 16 | 3301.0002 Post-CCTV Inspection | 33 01 31 | LF | 2,130 | $0.00 | 16 | 3301.0002 Post-CCTV Inspection | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 17 | 3301.0003 Final CCTV Inspection | 33 01 31 | LF | 2,130 | $0.00 | 17 | 3301.0003 Final CCTV Inspection | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 18 | 3301.0004 Final MH CCTV Inspection | 33 01 31 | EA | 8 | $0.00 | 18 | 3301.0004 Final MH CCTV Inspection | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 19 | 3301.0101 Manhole Vacuum Testing | 33 01 30 | EA | 8 | $0.00 | 19 | 3301.0101 Manhole Vacuum Testing | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 20 | 3305.0109 Trench Safety | 33 05 10 | LF | 1,620 | $0.00 | 20 | 3305.0109 Trench Safety | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 21 | 3305.0112 Concrete Collar for Manhole | 33 05 17 | EA | 15 | $0.00 | 21 | 3305.0112 Concrete Collar for Manhole | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 22 | 3305.0114 Manhole Adjustment, Major w/ Cover | 33 05 14 | EA | 7 | $0.00 | 22 | 3305.0114 Manhole Adjustment, Major w/ Cover | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 23 | 3339.0003 Liner - 4' Sewer MH (Chesterton or Warren Coating) | 33 39 60 | VF | 65 | $0.00 | 23 | 3339.0003 Liner - 4' Sewer MH (Chesterton or Warren Coating) | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 24 | 3305.0202 Imported Embedment/Backfill, CSS | 33 05 10 | CY | 500 | $0.00 | 24 | 3305.0202 Imported Embedment/Backfill, CSS | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 25 | 3305.0203 Imported Embedment/Backfill, CLSM | 33 05 10 | CY | 500 | $0.00 | 25 | 3305.0203 Imported Embedment/Backfill, CLSM | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 26 | 3305.0204 Imported Embedment/Backfill, Crushed Rock | 33 05 10 | CY | 500 | $0.00 | 26 | 3305.0204 Imported Embedment/Backfill, Crushed Rock | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 27 | 3305.0207 Imported Embedment/Backfill, Select Fill | 33 05 10 | CY | 1,000 | $0.00 | 27 | 3305.0207 Imported Embedment/Backfill, Select Fill | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 28 | 0241.2201 Remove 4' Sewer Manhole | 02 41 14 | EA | 2 | $0.00 | 28 | 0241.2201 Remove 4' Sewer Manhole | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 29 | 0241.2102 6" Sewer Abandonment Plug | 02 41 14 | EA | 2 | $0.00 | 29 | 0241.2102 6" Sewer Abandonment Plug | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 30 | 0241.2001 Sanitary Line Grouting | 02 41 14 | CY | 3 | $0.00 | 30 | 0241.2001 Sanitary Line Grouting | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 31 | 3110.0102 6"-12" Tree Removal | 31 10 00 | EA | 20 | $0.00 | 31 | 3110.0102 6"-12" Tree Removal | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 32 | 3110.0103 12"-18" Tree Removal | 31 10 00 | EA | 4 | $0.00 | 32 | 3110.0103 12"-18" Tree Removal | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 33 | 3110.0104 18"-24" Tree Removal | 31 10 00 | EA | 5 | $0.00 | 33 | 3110.0104 18"-24" Tree Removal | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 34 | 0241.0401 Remove Concrete Drive | 02 41 13 | SF | 1,055 | $0.00 | 34 | 0241.0401 Remove Concrete Drive | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 35 | 0241.0500 Remove Fence | 02 41 13 | LF | 700 | $0.00 | 35 | 0241.0500 Remove Fence | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 36 | 0241.1100 Remove Asphalt Pvmt | 02 41 15 | SY | 187 | $0.00 | 36 | 0241.1100 Remove Asphalt Pvmt | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 37 | 0241.1300 Remove Conc Curb&Gutter | 02 41 15 | LF | 500 | $0.00 | 37 | 0241.1300 Remove Conc Curb&Gutter | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 38 | 0241.1700 Pavement Pulverization (11") | 02 41 15 | SY | 500 | $0.00 | 38 | 0241.1700 Pavement Pulverization (11") | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 39 | 3212.0305 3" Asphalt Pvmt Superpave SP-D | 32 12 16 | SY | 500 | $0.00 | 39 | 3212.0305 3" Asphalt Pvmt Superpave SP-D | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 40 | 3211.0601 CEMLIME™ (8" at 32lb/SY) | 32 11 33 | TN | 8 | $0.00 | 40 | 3211.0601 CEMLIME™ (8" at 32lb/SY) | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 41 | 3213.0401 6" Concrete Driveway | 32 13 20 | SF | 1,055 | $0.00 | 41 | 3213.0401 6" Concrete Driveway | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 42 | 3216.0101 6" Conc Curb and Gutter | 32 16 13 | LF | 500 | $0.00 | 42 | 3216.0101 6" Conc Curb and Gutter | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 43 | 3231.0113 6' Chain Link, Steel | 32 31 13 | LF | 200 | $0.00 | 43 | 3231.0113 6' Chain Link, Steel | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 44 | 3231.0412 6' Fences, Wood | 32 31 29 | LF | 500 | $0.00 | 44 | 3231.0412 6' Fences, Wood | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 45 | 3231.0302 6' Gate, Steel | 32 31 26 | EA | 1 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 46 | 3471.0001 Traffic Control | 34 71 13 | MO | 2 | $0.00 | 46 | 3471.0001 Traffic Control | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 47 | 3125.0101 SWPPP ≥ 1 acre | 31 25 00 | LS | 1 | $0.00 | 47 | 3125.0101 SWPPP ≥ 1 acre | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 48 | 3305.0110 Utility Markers | 33 05 26 | LS | 1 | $0.00 | 48 | 3305.0110 Utility Markers | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 49 | 0171.0101 Construction Staking | 01 71 23 | LS | 1 | $0.00 | 49 | 0171.0101 Construction Staking | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 50 | 0171.0102 As-Built Survey (Redline Survey) | 01 71 23 | LS | 1 | $0.00 | 50 | 0171.0102 As-Built Survey (Redline Survey) | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 51 | 3305.0103 Exploratory Excavation of Existing Utilities | 33 05 30 | EA | 11 | $0.00 | 51 | 3305.0103 Exploratory Excavation of Existing Utilities | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 52 | 9999.0002 Construction Allowance (Sewer) | 00 00 00 | LS | 1 | $60,000.00 | $60,000.00 | 52 | 9999.0002 Construction Allowance (Sewer) | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| $0.00 | 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| Sub-Total Unit 2 - Sanitary Sewer Improvements | $60,000.00 | Sub-Total Unit 2 - Sanitary Sewer Improvements | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||||
| Unit 3 - Paving Improvements | Unit 3 - Paving Improvements | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 1B | 0241.1100 Remove Asphalt Pvmt | 02 41 15 | SY | 6,618 | $0.00 | 1B | 0241.1100 Remove Asphalt Pvmt | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 2B | 3123.0101 Unclassified Excavation by Plan | 31 23 16 | CY | 550 | $0.00 | 2B | 3123.0101 Unclassified Excavation by Plan | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 3B | 3211.0400 Hydrated Lime | 32 11 29 | TN | 144 | $0.00 | 3B | 3211.0400 Hydrated Lime | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 4B | 3211.0502 8" Lime Treatment | 32 11 29 | SY | 7,669 | $0.00 | 4B | 3211.0502 8" Lime Treatment | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 5B | 3213.0101 6" Conc Pvmt | 32 13 13 | SY | 7,235 | $0.00 | 5B | 3213.0101 6" Conc Pvmt | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 6B | 3305.0111 Valve Box Adjustment | 33 05 14 | EA | 14 | $0.00 | 6B | 3305.0111 Valve Box Adjustment | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 7 | 0241.1000 Remove Conc Pvmt (Tension Dr) | 02 41 15 | SY | 14,391 | $0.00 | 7 | 0241.1000 Remove Conc Pvmt (Tension Dr) | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 8 | 3211.0400 Hydrated Lime (Tension Dr) | 32 11 29 | TN | 378 | $0.00 | 8 | 3211.0400 Hydrated Lime (Tension Dr) | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 9 | 3211.0502 8" Lime Treatment (Tension Dr) | 32 11 29 | SY | 18,689 | $0.00 | 9 | 3211.0502 8" Lime Treatment (Tension Dr) | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 10 | 3213.0103 8" Conc Pvmt (Tension Dr) | 32 13 13 | SY | 17,370 | $0.00 | 10 | 3213.0103 8" Conc Pvmt (Tension Dr) | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 11 | 3305.0107 Manhole Adjustment, Minor (Tension Dr) | 33 05 14 | EA | 3 | $0.00 | 11 | 3305.0107 Manhole Adjustment, Minor (Tension Dr) | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 12 | 3305.0111 Valve Box Adjustment (Tension Dr) | 33 05 14 | EA | 4 | $0.00 | 12 | 3305.0111 Valve Box Adjustment (Tension Dr) | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 13 | 0135.0101 Railroad Coordination | 01 35 13 | LS | 1 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 14 | 0135.0102 Railroad Flagmen | 01 35 13 | WD | 60 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 15 | 0171.0001 Construction Staking (Paving) | 01 71 23 | LS | 1 | $0.00 | 15 | 0171.0001 Construction Staking (Paving) | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 16 | 0241.0100 Remove Sidewalk | 02 41 13 | SF | 9,797 | $0.00 | 16 | 0241.0100 Remove Sidewalk | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 17 | 0241.0300 Remove ADA Ramp | 02 41 13 | EA | 16 | $0.00 | 17 | 0241.0300 Remove ADA Ramp | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 18 | 0241.0200 Remove Step | 02 41 13 | SF | 120 | $0.00 | 18 | 0241.0200 Remove Step | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 19 | 0241.0600 Remove Wall <4' | 02 41 13 | LF | 100 | $0.00 | 19 | 0241.0600 Remove Wall <4' | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 20 | 0241.0401 Remove Concrete Drive | 02 41 13 | SF | 17,036 | $0.00 | 20 | 0241.0401 Remove Concrete Drive | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 21 | 0241.0702 Relocate Mailbox - Traditional | 02 41 13 | EA | 28 | $0.00 | 21 | 0241.0702 Relocate Mailbox - Traditional | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 22 | 0241.0705 Remove and Replace Mailbox - Brick | 02 41 13 | EA | 8 | $0.00 | 22 | 0241.0705 Remove and Replace Mailbox - Brick | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 23 | 0241.1100 Remove Asphalt Pvmt | 02 41 15 | SY | 1,669 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 24 | 0241.1300 Remove Conc Curb&Gutter | 02 41 15 | LF | 11,334 | $0.00 | 24 | 0241.1300 Remove Conc Curb&Gutter | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 25 | 0241.1400 Remove Conc Valley Gutter | 02 41 15 | SY | 27 | $0.00 | 25 | 0241.1400 Remove Conc Valley Gutter | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 26 | 3110.0111 Site Clearing | 31 10 00 | SY | 500 | $0.00 | 26 | 3110.0111 Site Clearing | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 27 | 3110.0102 6"-12" Tree Removal | 31 10 00 | EA | 6 | $0.00 | 27 | 3110.0102 6"-12" Tree Removal | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 28 | 3110.0103 12"-18" Tree Removal | 31 10 00 | EA | 2 | $0.00 | 28 | 3110.0103 12"-18" Tree Removal | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 29 | 3110.0104 18"-24" Tree Removal | 31 10 00 | EA | 2 | $0.00 | 29 | 3110.0104 18"-24" Tree Removal | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 30 | 3110.0105 24" and Larger Tree Removal | 31 10 00 | EA | 2 | $0.00 | 30 | 3110.0105 24" and Larger Tree Removal | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 31 | 3124.0101 Embankment by Plan | 31 24 00 | CY | 133 | $0.00 | 31 | 3124.0101 Embankment by Plan | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 32 | 3125.0101 SWPPP ≥ 1 acre | 31 25 00 | LS | 1 | $0.00 | 32 | 3125.0101 SWPPP ≥ 1 acre | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 33 | 3137.0105 Medium Stone Riprap, grouted | 31 37 00 | SY | 20 | $0.00 | 33 | 3137.0105 Medium Stone Riprap, grouted | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 34 | 3137.0101 Concrete Riprap | 31 37 00 | SY | 130 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 35 | 3211.0112 6" Flexible Base, Type A, GR-1 | 32 11 23 | SY | 500 | $0.00 | 35 | 3211.0112 6" Flexible Base, Type A, GR-1 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 36 | 3212.0305 3" Asphalt Pvmt Superpave SP-D | 32 12 16 | SY | 1,995 | $0.00 | 36 | 3212.0305 3" Asphalt Pvmt Superpave SP-D | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 37 | 3212.0401 HMAC Transition | 32 12 16 | TN | 100 | $0.00 | 37 | 3212.0401 HMAC Transition | $0.00 | $0.00 | $0.00 | 0.00% | $0.00 | $0.00 | $0.00 | |
| 38 | 3213.0301 4" Conc Sidewalk | 32 13 20 | SF | 17,470 | $0.00 | 38 | 3213.0301 4" Conc Sidewalk | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 39 | 3213.0311 4" Conc Sidewalk, Adjacent to Curb | 32 13 20 | SF | 2,277 | $0.00 | 39 | 3213.0311 4" Conc Sidewalk, Adjacent to Curb | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 40 | 3213.0321 Conc Sidewalk, Adjacent to Ret Wall | 32 13 20 | SF | 500 | $0.00 | 40 | 3213.0321 Conc Sidewalk, Adjacent to Ret Wall | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 41 | 3213.0322 Conc Curb at Back of Sidewalk | 32 13 20 | LF | 400 | $0.00 | 41 | 3213.0322 Conc Curb at Back of Sidewalk | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 42 | 3232.0100 Conc Ret Wall Adjacent to Sidewalk | 32 32 13 | SF | 200 | $0.00 | 42 | 3232.0100 Conc Ret Wall Adjacent to Sidewalk | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 43 | 3213.0401 6" Concrete Driveway | 32 13 20 | SF | 9,366 | $0.00 | 43 | 3213.0401 6" Concrete Driveway | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 44 | 3213.0403 8" Concrete Driveway | 32 13 20 | SF | 13,202 | $0.00 | 44 | 3213.0403 8" Concrete Driveway | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 45 | 3213.0501 Barrier Free Ramp, Type R-1 | 32 13 20 | EA | 2 | $0.00 | 45 | 3213.0501 Barrier Free Ramp, Type R-1 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 46 | 3213.0506 Barrier Free Ramp, Type P-1 | 32 13 20 | EA | 4 | $0.00 | 46 | 3213.0506 Barrier Free Ramp, Type P-1 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 47 | 3213.0507 Barrier Free Ramp, Type P-2 | 32 13 20 | EA | 2 | $0.00 | 47 | 3213.0507 Barrier Free Ramp, Type P-2 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 48 | 3217.0101 6" SLD Pvmt Marking HAS (W) | 32 17 23 | LF | 150 | $0.00 | 48 | 3217.0101 6" SLD Pvmt Marking HAS (W) | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 49 | 3217.0102 6" SLD Pvmt Marking HAS (Y) | 32 17 23 | LF | 1,074 | $0.00 | 49 | 3217.0102 6" SLD Pvmt Marking HAS (Y) | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 50 | 3217.0103 6" BRK Pvmt Marking HAS (W) | 32 17 23 | LF | 1,741 | $0.00 | 50 | 3217.0103 6" BRK Pvmt Marking HAS (W) | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 51 | 3217.0201 8" SLD Pvmt Marking HAS (W) | 32 17 23 | LF | 160 | $0.00 | 51 | 3217.0201 8" SLD Pvmt Marking HAS (W) | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 52 | 3217.0202 8" SLD Pvmt Marking HAS (Y) | 32 17 23 | LF | 654 | $0.00 | 52 | 3217.0202 8" SLD Pvmt Marking HAS (Y) | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 53 | 3217.0401 18" SLD Pvmt Marking HAE (W) | 32 17 23 | LF | 68 | $0.00 | 53 | 3217.0401 18" SLD Pvmt Marking HAE (W) | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 54 | 3217.0403 18" SLD Pvmt Marking HAE (Y) | 32 17 23 | LF | 256 | $0.00 | 54 | 3217.0403 18" SLD Pvmt Marking HAE (Y) | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 55 | 3217.0501 24" SLD Pvmt Marking HAE (W) | 32 17 23 | LF | 450 | $0.00 | 55 | 3217.0501 24" SLD Pvmt Marking HAE (W) | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 56 | 3217.0502 Preformed Thermoplastic Contrast Markings - 24” Crosswalk | 32 17 23 | LF | 52 | $0.00 | 56 | 3217.0502 Preformed Thermoplastic Contrast Markings - 24” Crosswalk | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 57 | 3217.1004 Lane Legend Only | 32 17 23 | EA | 3 | $0.00 | 57 | 3217.1004 Lane Legend Only | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 58 | 3217.1016 Preformed Thermoplastic Contrast Markings – Legend Yield Symbol | 32 17 23 | EA | 23 | $0.00 | 58 | 3217.1016 Preformed Thermoplastic Contrast Markings – Legend Yield Symbol | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 59 | 3217.2103 REFL Raised Marker TY II-A-A | 32 17 23 | EA | 34 | $0.00 | 59 | 3217.2103 REFL Raised Marker TY II-A-A | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 60 | 3217.2104 REFL Raised Marker TY II-C-R | 32 17 23 | EA | 173 | $0.00 | 60 | 3217.2104 REFL Raised Marker TY II-C-R | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 61 | 3217.1002 Lane Legend Arrow | 32 17 23 | EA | 3 | $0.00 | 61 | 3217.1002 Lane Legend Arrow | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 62 | 3217.5001 Curb Address Painting | 32 17 25 | EA | 49 | $0.00 | 62 | 3217.5001 Curb Address Painting | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 63 | 3291.0100 Topsoil | 32 91 19 | CY | 40 | $0.00 | 63 | 3291.0100 Topsoil | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 64 | 3292.0100 Block Sod Placement | 32 92 13 | SY | 3,400 | $0.00 | 64 | 3292.0100 Block Sod Placement | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 65 | 3305.0118 Meter Box Adjustment | 33 05 14 | EA | 20 | $0.00 | 65 | 3305.0118 Meter Box Adjustment | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 66 | 3346.0008 4" Pipe Underdrain, Type 8 | 33 46 00 | LF | 75 | $0.00 | 66 | 3346.0008 4" Pipe Underdrain, Type 8 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 67 | 3349.5005 Remove and Replace Inlet Top, 5' | 33 49 20 | EA | 5 | $0.00 | 67 | 3349.5005 Remove and Replace Inlet Top, 5' | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 68 | 3349.5006 Remove and Replace Inlet Top, 10' | 33 49 20 | EA | 3 | $0.00 | 68 | 3349.5006 Remove and Replace Inlet Top, 10' | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 69 | 3441.4006 Install Alum Sign Ground Mount | 34 41 30 | EA | 1 | $0.00 | 69 | 3441.4006 Install Alum Sign Ground Mount | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 70 | 3441.4110 Remove and Reinstall Sign Panel and Post | 34 41 30 | EA | 27 | $0.00 | 70 | 3441.4110 Remove and Reinstall Sign Panel and Post | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 71 | 3471.0001 Traffic Control | 34 71 13 | MO | 6 | $0.00 | 71 | 3471.0001 Traffic Control | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 72 | 9999.0003 Type III Barricade | 00 00 00 | EA | 11 | $0.00 | 72 | 9999.0003 Type III Barricade | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 73 | 9999.0004 Install Guardrail | 00 00 00 | LF | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 74 | 9999.0005 Landscaping Reset - Boulders | 00 00 00 | LS | 1 | $0.00 | 74 | 9999.0005 Landscaping Reset - Boulders | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 75 | 9999.0006 Concrete Steps | 00 00 00 | SF | 120 | $0.00 | 75 | 9999.0006 Concrete Steps | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 76 | 9999.0007 4" Stamped Concrete Median | 00 00 00 | SF | 750 | $0.00 | 76 | 9999.0007 4" Stamped Concrete Median | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 77 | 9999.0008 P-2 Ramp MOD | 32 13 20 | EA | 1 | $0.00 | 77 | 9999.0008 P-2 Ramp MOD | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 78 | 9999.0009 P-1 Ramp MOD | 32 13 20 | EA | 9 | $0.00 | 78 | 9999.0009 P-1 Ramp MOD | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 79 | 9999.0010 R-1 Ramp MOD | 32 13 20 | EA | 2 | $0.00 | 79 | 9999.0010 R-1 Ramp MOD | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 80 | 9999.0012 Remove and Reset Concrete Barricade | 00 00 00 | LS | 1 | $0.00 | 80 | 9999.0012 Remove and Reset Concrete Barricade | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 81 | 9999.0013 Remove and Reinstall Historical Tiles | 00 00 00 | EA | 5 | $0.00 | 81 | 9999.0013 Remove and Reinstall Historical Tiles | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 82 | 9999.0014 4" Concrete Median | 00 00 00 | SF | 654 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 83 | 9999.0001 Miscellaneous Utility Adjustment (Irrigation) | 00 00 00 | LS | 1 | $30,000.00 | $30,000.00 | 83 | 9999.0001 Miscellaneous Utility Adjustment (Irrigation) | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 84 | 9999.0002 Construction Allowance (Paving) | 00 00 00 | LS | 1 | $100,000.00 | $100,000.00 | 84 | 9999.0002 Construction Allowance (Paving) | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||||
| Sub-Total Unit 3 - Paving Improvements | $130,000.00 | Sub-Total Unit 3 - Paving Improvements | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||||
| Unit 3 Alternate A (POL) | Unit 3 Alternate A (POL) | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 1A | 0241.1700 Pavement Pulverization (11") | 02 41 15 | SY | 6,618 | $0.00 | 1A | 0241.1700 Pavement Pulverization (11") | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 2A | 3123.0101 Unclassified Excavation by Plan | 31 23 16 | CY | 401 | $0.00 | 2A | 3123.0101 Unclassified Excavation by Plan | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 3A | 3211.0601 CEMLIME™ 30 lbs/SY | 32 11 29 | TN | 101 | 3A | 3211.0601 CEMLIME™ 30 lbs/SY | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| 4A | 3212.0305 3" Asphalt Pvmt Superpave SP-D | 32 12 16 | SY | 6,618 | $0.00 | 4A | 3212.0305 3" Asphalt Pvmt Superpave SP-D | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 5A | 3216.0101 6" Conc Curb and Gutter | 32 16 13 | LF | 3,505 | $0.00 | 5A | 3216.0101 6" Conc Curb and Gutter | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 6A | 3216.0301 7" Conc Valley Gutter, Residential | 32 16 13 | SY | 27 | $0.00 | 6A | 3216.0301 7" Conc Valley Gutter, Residential | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 7A | 3305.0111 Valve Box Adjustment w/Concrete Collar | 33 05 14 | EA | 14 | $0.00 | 7A | 3305.0111 Valve Box Adjustment w/Concrete Collar | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 8A | Deduct Items 1B-6B | 1 | $0.00 | $0.00 | 8A | Deduct Items 1B-6B | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||||
| 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||||
| Sub-Total Alternative A | $0.00 | Sub-Total Alternative A | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||||
| Unit 1: Water Improvements | $130,000.00 | 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||||
| Unit 2: Sanitary Sewer Improvements | $60,000.00 | 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||||
| Unit 3: Paving Improvements Base Bid (Concrete) | $130,000.00 | 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||||
| Unit 3: Paving Improvements Alternate A Bid (POL) | $0.00 | 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||||
| Total 1 (Total Bid Units 1, 2, & 3: Base Bid (Concrete) | $320,000.00 | 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||||
| Total 2 (Total Bid Units 1, 2, 3, & 3A: Alternate A Bid (POL) | $320,000.00 | 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||||
| The City reserves the right to select the responsible low bidder of either Total 1 or Total 2 | The City reserves the right to select the responsible low bidder of either Total 1 or Total 2 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||||
| END OF SECTION | END OF SECTION | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
&8&A
BID PROPOSAL
Page &P of &N
&8CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Revised 9/19/2025 &8 2022 Bond Year 3 Contract 18
00 43 13
| SECTION 00 43 13 |
| BID BOND |
KNOW ALL BY THESE PRESENTS:
| That we, | , known as |
| "Bidder" herein and | a corporate surety |
| duly authorized to do business in the State of Texas, known as “Surety” herein, are held and firmly bound unto the City of Fort Worth, a municipal corporation created pursuant to the laws of Texas, known as “City” herein, in the penal sum of five percent (5%) of Bidder’s maximum bid price, in lawful money of the United States, to be paid in Fort Worth, Tarrant County, Texas for the payment of which sum well and truly to be made, we bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents. |
| WHEREAS, the Principal has submitted a bid or proposal to perform Work for the following project | ||
| designated as | 2022 Bond Year 3 Contract 18 |
| NOW, THEREFORE, the condition of this obligation is such that if the City shall award | |
| the Contract for the foregoing project to the Principal, and the Principal shall satisfy all requirements and conditions required for the execution of the Contract and shall enter into the Contract in writing with the City in accordance with the terms of such same, then this obligation shall be and become null and void. If, however, the Principal fails to execute such Contract in accordance with the terms of same or fails to satisfy all requirements and conditions required for the execution of the Contract, this bond shall become the property of the City, without recourse of the Principal and/or Surety, not to exceed the penalty hereof, and shall be used to compensate City for the difference between Principal’s total bid amount and the next selected bidder’s total bid amount. |
| PROVIDED FURTHER, that if any legal action be filed on this Bond, venue shall lie in Tarrant County, | |
| Texas or the United States District Court for the Northern District of Texas, Fort Worth Division. |
| IN WITNESS WHEREOF, the Principal and the Surety have SIGNED and SEALED this instrument by | |||
| duly authorized agents and officers on this the | day of | , 2026. |
PRINCIPAL:
| BY: | ||
| Signature | ||
| ATTEST: |
Witness as to Principal Name and Title
Address:
SURETY:
| BY: | |
| Signature |
Name and Title
Address:
Witness as to Surety Telephone Number:
Attach Power of Attorney (Surety) for Attorney-in-Fact
*Note: If signed by an officer of the Surety Company, there must be on file a certified extract from the by laws showing that this person has authority to sign such obligation. If Surety’s physical address is different from its mailing address, both must be provided. The date of the bond shall not be prior to the date the Contract is awarded.
END OF SECTION
BID BOND
Page &P of &N
&"Arial,Regular"&8CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Revised 9/19/2025 &"Arial,Regular"&8 2022 Bond Year 3 Contract 18
00 43 37
| SECTION 00 43 37 | |
| VENDOR COMPLIANCE TO STATE LAW NON RESIDENT BIDDER |
Texas Government Code Chapter 2252 was adopted for the award of contracts to nonresident bidders. This law provides that, in order to be awarded a contract as low bidder, nonresident bidders (out-of-state contractors whose corporate offices or principal place of business are outside the State of Texas) bid projects for construction, improvements, supplies or services in Texas at an amount lower than the lowest Texas resident bidder by the same amount that a Texas resident bidder would be required to underbid a nonresident bidder in order to obtain a comparable contract in the State which the nonresident’s principal place of business is located.
The appropriate blanks in Section A must be filled out by all nonresident bidders in order for your bid to meet specifications. The failure of nonresident bidders to do so will automatically disqualify that bidder. Resident bidders must check the box in Section B.
| A. | Nonresident bidders in the State of | , our principal place of business, | |
| are required to be | percent lower than resident bidders by State Law. A copy of the | ||
| statute is attached. |
| Nonresident bidders in the State of | , our principal place of business, |
| are not required to underbid resident bidders. |
| B. | The principal place of business of our company or our parent company or majority owner is |
| in the State of Texas. |
BIDDER:
By:
(Signature)
Title:
Date:
END OF SECTION
VENDOR COMPLIANCE TO STATE LAW
Page &P of &N
&"Arial,Regular"&8CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Revised 9/19/2025 &"Arial,Regular"&8 2022 Bond Year 3 Contract 18
00 45 12
| SECTION 00 45 12 | |
| PREQUALIFICATION STATEMENT |
Each Bidder for a City procurement is required to complete the information below by identifying the prequalified contractors and/or subcontractors whom they intend to utilize for the major work type(s) listed.
Major Work Type Contractor/Subcontractor Company Name Prequalification Expiration Date
Water Distribution, Urban and Renewal, 12-inch diameter and smaller
Sewer Collection Systems, Urban/Renewal, 12inches and smaller
CCTV, 18-inches and smaller
Asphalt Paving Construction/Reconstruction (Greater than 15,000 SY)
Concrete Paving Construction/Reconstruction (Greater than 15,000 SY)
Sanitary Sewer Manhole/Structure Interior Lining - Chesterton Coating
Sanitary Sewer Manhole/Structure Interior Lining - Chesterton Coating
Bypass pumping
The undersigned hereby certifies that the contractors and/or subcontractors described in the table above are currently prequalified for the work types listed.
BIDDER:
0 By: 0
| 0 | ||
| 0 | (Signature) | |
| 0 | ||
| Title: | 0 |
Date:
END OF SECTION
PREQUALIFICATION STATEMENT
Page &P of &N
&"Arial,Regular"&8CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Revised 09/19/2025 &"Arial,Regular"&8 2022 Bond Year 3 Contract 18
File details come from the government source that posted it. Updated .