Section F – 0200000 Management and Administration
Deliveries or Performance
DELIVERABLES
Annex/ Spec Item
Form Attachment
Number Deliverable Title Date (s) of Submission
Distribution
Frequency Original
Copies (including original)
2.2.1.2 N/A Request to Work
Outside Government’s Regular Working Hours
At least seven calendar days prior to requested day.
KO and
COR
1 As required
2.3.1 N/A Sign-in Sheets and
Minutes
Within two working days
KO, COR
and all attendees
1 As Required
2.3.1 N/A Final Revision of
Minutes
Within two working days
KO, COR
and all attendees
1 As Required
2.3.4 N/A Permits and
Licenses
Before work commences and as requested by the KO.
KO and
COR
1 As specified
2.3.5 N/A Certificate of
Insurance
At least 30 calendar days prior to start of contract performance and annually thereafter
KO and
COR
1 As specified
2.3.5 N/A Written Notice of
cancellation or material change in policy coverage
At least 30 calendar days prior to cancellation or material change in policy coverage
KO and
COR
1 As required
2.6.3 N/A Work Reception
Phone Numbers
Furnished 10 days prior to the start of the contract
KO and
COR
1 As required
2.6.4 N/A Scheduling and
Work Status Updates
Weekly, witihin 30 minutes of the inquiry during regular working hours, and by 08:00 the following work day for inquiries after regular hours
KO and
COR
1 As Specified
Spec Item
Form Attachment
Number Deliverable Title Date (s) of Submission
Distribution
Frequency Original
Copies (including original)
2.6.5 N/A Work Schedules Within 15
calendar days prior to contract start, 10 days prior to the beginning of the month in which services are scheduled to be performance, and within two calendar days of changes
COR 1 Monthly
2.6.5 N/A Notification of any
Difficulty in Scheduling Work
By the end of each workday
KO and
COR
1 As required
2.6.6 N/A Status of
Deliverables
Within 30 minutes of the inquiry during regular working hours, and by 0800 the following work day for inquiries after regular working hours
KO and
COR
1 As required
2.6.7 N/A Service
Interruptions
At least five working days in advance
KO and
COR
1 As required
2.6.9.1 N/A Quality
Management Plan
At least 30 calendar days prior to start of contract performance and within 15 calendar days prior to any changes
KO and
COR
1 As specified
2.6.9.1 N/A Revised Quality
Management Plan
Within seven calendar days of changes.
KO and
COR
1 As specified
2.6.9.2 N/A QC Inspection File Within five
calendar days of completion/ termination of the contract.
KO and
COR
1 As specified
Spec Item
Form Attachment
Number Deliverable Title Date (s) of Submission
Distribution
Frequency Original
Copies (including original)
2.6.9.3 N/A Contractor Quality
Inspection and Surveillance Report
First work day of each month.
KO and
COR
1 Monthly
2.7.1 N/A List of Key
Personnel and Qualifications
At least 30 calendar days to start of contract performance
KO and
PAR
1 As specified
2.7.1 N/A Organizational
Chart
Within 15 calendar days after award
KO and
PAR
1 As specified
2.7.2.6 N/A Proof of Legal
Residency
Prior to be admitted to site of work.
KO/PAR 1 As specified
2.7.2.6 N/A Proof of United
States of America Citizenship
Prior to be admitted to site of work.
KO and
COR
1 As specified
2.8.1 N/A Employee List Within 15
calendar days prior to contract start and within seven calendar days of changes
KO and
PAR
1 As required
2.8.8 N/A OF-306
Declaration for Federal Employment and Digital Fingerprints
Prior to commencement of work
KO, COR,
and
Security Manager
1 As required
2.9.2 N/A Accident
Prevention Plan
At least 30 calendar days prior to tart of contract performance and 15 calendar days prior to any changes
KO and
PAR
1 As specified
2.9.3 N/A Activity Hazard
Analysis (AHA)
Together with the Accident Prevention Plan and within seven calendar days of changes.
KO and
PAR
Spec Item
Form Attachment
Number Deliverable Title Date (s) of Submission
Distribution
Frequency Original
Copies (including original)
2.9.4 N/A Safety and
Occupational Health (SOH) Risks and Compliance Plans
Together with the Accident Prevention Plan and within seven calendar days of changes.
KO and
PAR
1 As specified
2.9.6 N/A NAVFAC
Contractor Incident Reporting System
(CIRS)
Within five calendar days of accident.
KO and
PAR
1 As required
2.9.6 N/A Weight Handling
Equipment Accident Report
Within 15 working days of accident.
KO and
PAR
1 As required
2.9.6 N/A Crane and Rigging
Gear Near Miss Report
Within 15 working days of accident.
KO and
PAR
1 As required
2.9.8 N/A Monthly On-Site
Labor Report
First work day of each month.
KO and
PAR
1 Monthly
2.9.9 N/A OSHA Citations
and Violations Corrective Action Report
Within 48 hours after receiving a citation.
KO and
PAR
1 As required
2.9.10 N/A Safety Inspection
and Monitoring Report
Upon request KO and
PAR
1 As required
2.9.11 N/A Safety
Certifications
At least 15 calendar days prior to start of contract performance and prior to expiration of certifications
KO and
PAR
1 As specified
2.10 N/A EMS Goals and
Policy Measurement Information
Upon request KO and
COR
1 As specified
2.10.1.1 N/A Water
Conservation Plan
At least 30 calendar days prior to start of contract performance and 15 calendar days prior to any changes
KO and
PAR
Spec Item
Form Attachment
Number Deliverable Title Date (s) of Submission
Distribution
Frequency Original
Copies (including original)
2.10.2 N/A Environmental
Protection Plan
Within 15 calendar days prior to contract start and within seven calendar days of changes
KO and
COR
1 As specified
2.10.2.7 N/A Fuel and hazardous
substance spill notification
Within 15 minutes of discovery
Regional Dispatch Center
1 As required
2.10.2.7 N/A Fuel and hazardous
substance spill notification
As soon as possible but not more 24 hours of discovery
KO and
COR
1 As required
2.10.2.7 N/A Fuel and hazardous
substance spill report
Within 48 hours of discovery
KO and
COR
1 As required
2.10.2.8 N/A Emergency
Planning and Community Right- To-Know Act (EPCRA) Report
At least 15 calendar days prior to contract performance and not less than 10 working days prior to planned use of hazardous material
KO and
COR
1 As specified
2.10.2.8 J-0200000-07 Contractor
Hazardous Material Inventory Log
Within 15 calendar days after the end of each calendar year and at termination of the contract
KO and
COR
1 Annually
2.10.2.12 N/A Asbestos
Containing Material (ACM)
Verbally notify the KO and COR within one hour and follow-up with written Notification within 24 hours
KO and
Spec Item
Form Attachment
Number Deliverable Title Date (s) of Submission
Distribution
Frequency Original
Copies (including original)
2.10.2.13 N/A Hazardous Air
Pollutants Semi-annual Reports
At intervals of 160 to 200 calendar days
KO, COR,
Installatio n Environm ental Division, City, State, and
EPA
1 Semi-annually
2.10.2.13 N/A Hazardous Air
Pollutants Monthly Data
First workday of each month.
KO, COR,
Installatio n Environm ental Division
1 Monthly
2.10.3 N/A Sustainable
Procurement and Practices Plan
At least 15 calendar days prior to contract start and within 15 calendar days after exercised option periods
KO and
COR
1 Annually
2.10.3 N/A Sustainable
Delivery of Services Report
Within five calendar days after each contract period.
KO and
COR
1 Annually
2.10.3.2 N/A Recovered
Material Certification
As specified KO and
COR
1 When a product containing recovered materials is equal to or better than the original and could be used.
2.11 N/A Mission Essential
Contractor Services Plan
Within 15 calendar days prior to contract start and within seven calendar days of changes.
KO and
1 As Required
Spec Item
Form Attachment
Number Deliverable Title Date (s) of Submission
Distribution
Frequency Original
Copies (including original)
2.11 N/A Mission
Critical/Mission Essential Personnel
Within 15 calendar days prior to contract start and within seven calendar days of changes.
KO and
COR
1 As specified
2.14.1 Recurring Work
Proposals
Within two calendar days following receipt of request
KO and
COR
1 As required
2.14.2 N/A Notification to the
Government for Work Above the Recurring Work Limitations and Rough Order of Magnitude
Within two hours of identification
KO and
1 As required