2C JFSD210011 Demonstration Material Submittal Schedule Jul 2021.pdf

PDF 43 KB Posted

Attached to
Multiple Award Task Order Contract for Construction Projects Federal contract opportunity
Solicitation number
FA465922R0003
Issued by
Department of the Air Force Air Mobility Command

About this file

This document outlines a Multiple Award Task Order Contract solicitation for construction projects. The solicitation is a 100% total small business set-aside under NAICS code 236220 with a size standard of $36.5 million. The Air Force will award indefinite delivery/indefinite quantity contracts with a five year base ordering period and an option to extend services. The minimum guarantee is $1,000 per awardee. Task orders between $500,000 and $1 million will be issued for a demonstration project only. The total program amount shall not exceed $75 million. Proposals are due by email to the points of contact listed by August 22, 2022. A pre-proposal conference will be held on that date to review the demonstration project location.

View the file

Other files for this federal contract opportunity

Other files attached to Multiple Award Task Order Contract for Construction Projects, newest first.
File Type Posted
Solicitation Amendment FA465922R00030004 SF 30 (1).pdf PDF
2E JFSD210011 Building Wage Determination Feb 2022.pdf PDF
(Conformed Copy) FA465922R00030003.pdf PDF
MATOC Questions (FA465922R0003) - 23 Sep 22.pdf PDF
Solicitation Amendment FA465922R00030003 SF 30.pdf PDF
Solicitation Amendment FA465922R00030002 SF 30 (1).pdf PDF
2A JFSD210011 Demonstration Project Specifications Aug 2022 v2.pdf PDF
6. CSI Breakdown Example 16 Sep 22.pdf PDF
5. MATOC Questions (FA465922R0003) - 16 Sep 22.pdf PDF
MATOC Questions (FA465922R0003) - 31 Aug 22.pdf PDF
Demonstration Project_ Room 112A Electrical Room Photos.pdf PDF
Solicitation Amendment FA465922R00030001.pdf PDF
Demonstration Project_ Room 8 Mechanical Room Photos.pdf PDF
Demonstration Project_ Room 7 Comm Room Photos.pdf PDF
3 Past Performance Reference.docx DOCX document
2D JFSD210011 Demonstration Project Bid Schedule Jul 2021.pdf PDF
2A JFSD210011 Demonstration Project Specifications Jul 2021.pdf PDF
JFSD210011 MATOC Technical Specifications - Aug 22.pdf PDF
Solicitation - FA465922R0003.pdf PDF
2B JFSD210011 Demonstration Project Drawings Jul 2021.pdf PDF
4 JFSD210011 Past Performance Questionnaire MATOC.pdf PDF
Show all 21

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

156-005 01000-1

PROJECT NO.

JFSD

200976A&B

APPROVED DISAPPROVED

1 Contractor Warranty. Sec. 01000 Para. 3.3 4

2 Base CE Work Clearance Request. Sec. 01000, Para. 4.1 4

3 USAF Welding, Cutting or Brazing Permit. Sec. 01000, Para. 4.2 4

4 NDDH Notification of Demolition and Renovation. Sec. 01000, Para. 4.3

5 New Air Emission Source Specifications. Sec. 01000, Para. 4.4 4

6 Project Site Plan. Sec. 01000, Para. 7.2.1 4

7 Dirt and Dust Control Plan. Sec. 01000, Para. 7.2.2 4

8 Contractor's Health and Safety Plan. Sec. 01000, Para. 7.2.3 4

9 Site Superintendent/ Project Manager Designation Letter. Sec.

01000, Para. 10.1.2

10 Site Conditions Photographs. Sec. 01000, Para. 12.5 4

11 Critical Path Method (CPM) Network Schedule. Sec. 01000, Para.

12.6.1

12 Schedule Showing Procurement Plans for Materials and Equipment. Sec. 01000, Para. 12.6.2

13 Exterior Utility System Drawings. Sec. 01000, Para. 12.7.1.1 1

14 As-Built Drawings. Sec. 01000, Para. 12.7.1.1 1

15 Real Property Record - Form DD1354. Sec. 01000, Para. 12.9 4

16 Environmental Pollution Control Plans. Sec. 01000, Para. 13.2 4

17 Storm Water Protection Plan. Sec. 01000, Para. 13.3.1 4

18 Waste Disposal Plan. Sec. 01000, Para. 13.6 4

19 Dust Control Plan. Sec. 01000, Para. 13.7 4

20 Radioactive Materials Documentation. Sec. 01000, Para. 13.10 4

21 Spill Control Plan. Sec. 01000, Para. 13.12 4

22 Erosion and Sediment Control Plan. Sec. 01000, Para. 13.13 4

23 Asbestos Abatement Submittals. Sec. 01000, Para. 13.16 and Spec. Sect. 02 82 14, if used.

24 Contractor Quality Control Plan. Sec. 01000, Para. 14.4 4

25 O & M Manuals. Sec. 01000, Para. 16 3

26 Sec. 01000, Affirmative Procurement Report 4

27 Sec. 01000, Bio-Based Product Report 4

S A

M P

LE

S

REQUIRED

DATE OF

SUBMISSION

DATE

RECEIVED

CONTRACTING

REMARKS

DATE

TO

CIVIL

ENGR.

RETURN

SUSPENSION

DATE

SUBMITTAL

NUMBER

DATE CONTRACTOR NOTIFIED

CONTRACTOR

RESUBMITTAL

FINAL

APPROVAL

NO. OF COPIES REQUIRED

LI

N

E N

U M

B E

R ITEM DESCRIPTION, CONTRACT REFERENCE,

TYPE OF SUBMITTAL

P R

O O

F O

F C

O M

P

LI

A N

C E

P R

O C

E D

U R

E S

S H

O P

D R

A W

IN

G

S

M A

N U

FA

C

TU

R

IN

G

D A

TA

C E

R

TI

FI

C

A

TE

S

TE

S

T D

A

TA

G U

A R

A N

TE

E

S

SCHEDULE OF MATERIAL SUBMITTALS

TO BE COMPLETED BY PROJECT MANAGER

TO BE COMPLETED BY CONTRACT ADMINISTRATOR

CONTRACT NO.PROJECT TITLE

UAS (RQ-4) ADD UTILITIES AND

ELECTRICAL SERVICES B516 (MC)

& UAS (RQ-4) REPAIR B516 (R/M)

GRAND FORKS AFB, ND

156-005 01000-2

JFSD

200976A&B

APPROVED DISAPPROVED

S A

M P

LE

S

REQUIRED

DATE OF

SUBMISSION

DATE

RECEIVED

CONTRACTING

REMARKS

DATE

TO

CIVIL

ENGR.

RETURN

SUSPENSION

DATE

SUBMITTAL

NUMBER

DATE CONTRACTOR NOTIFIED

CONTRACTOR

RESUBMITTAL

FINAL

APPROVAL

NO. OF COPIES REQUIRED

LI

N

E N

U M

B E

R ITEM DESCRIPTION, CONTRACT REFERENCE,

TYPE OF SUBMITTAL

P R

O O

F O

F C

O M

P

LI

A N

C E

P R

O C

E D

U R

E S

S H

O P

D R

A W

IN

G

S

M A

N U

FA

C

TU

R

IN

G

D A

TA

C E

R

TI

FI

C

A

TE

S

TE

S

T D

A

TA

G U

A R

A N

TE

E

S

SCHEDULE OF MATERIAL SUBMITTALS

TO BE COMPLETED BY PROJECT MANAGER

TO BE COMPLETED BY CONTRACT ADMINISTRATOR

CONTRACT NO.PROJECT TITLE

UAS (RQ-4) ADD UTILITIES AND

ELECTRICAL SERVICES B516 (MC)

& UAS (RQ-4) REPAIR B516 (R/M)

GRAND FORKS AFB, ND

1 ASBESTOS REMOVAL AND DISPOSAL 3 4 02 82 14

2 CONCRETE REINFORCEMENT 4 03 20 00

3 CONCRETE MIX DESIGN 03 30 00

4 JOINT SEALERS 4 3 07 92 00

5 METAL DOORS AND FRAMES 4 4 08 11 13

6 HARDWARE 4 4 08 71 00

7 RESILIENT FLOORING 4 3 09 65 00

8 PAINT 4 3 09 90 00

9 FIRE SPRINKLER EQUIPMENT, LAYOUT DRAWINGS

AND CALCULATIONS 4 4 21 05 00

10 PLUMBING FIXTURES 4 4 3 22 40 00

11 O&M MANUALS 3 23 00 00

12 RECORD DRAWINGS 1 23 00 00

13 PIPE AND FITTINGS 4 22 05 00/23 05 00

14 VALVES 4 22 05 00/23 05 00

15 PIPING SPECIALTIES 4 22 05 00/23 05 00

16 METERS AND GAUGES 4 22 05 00/23 05 00

17 SUPPORTS AND ANCHORS 4 22 05 00/23 05 00

18 MECHANICAL IDENTIFICATION 4 22 05 00/23 05 00

19 VIBRATION CONTROL 4 22 05 00/23 05 00

20 INSULATION 4 22 07 00/23 07 00

21 TEST AND BALANCE REPORT 4 23 05 93

22 VARIABLE FREQUENCY DRIVES 4 23 09 15

23 VFD FIELD REPORT/PARAMETERS AND SETTINGS 4 23 09 15

24 BUILDING MANAGEMENT AND CONTROL SYSTEM 4 4 23 09 05

25 HYDRONIC SPECIALTIES 4 23 21 13

26 FILTERS 4 23 30 00

27 SMOKE DAMPERS 4 23 30 00

156-005 01000-3

JFSD

200976A&B

APPROVED DISAPPROVED

S A

M P

LE

S

REQUIRED

DATE OF

SUBMISSION

DATE

RECEIVED

CONTRACTING

REMARKS

DATE

TO

CIVIL

ENGR.

RETURN

SUSPENSION

DATE

SUBMITTAL

NUMBER

DATE CONTRACTOR NOTIFIED

CONTRACTOR

RESUBMITTAL

FINAL

APPROVAL

NO. OF COPIES REQUIRED

LI

N

E N

U M

B E

R ITEM DESCRIPTION, CONTRACT REFERENCE,

TYPE OF SUBMITTAL

P R

O O

F O

F C

O M

P

LI

A N

C E

P R

O C

E D

U R

E S

S H

O P

D R

A W

IN

G

S

M A

N U

FA

C

TU

R

IN

G

D A

TA

C E

R

TI

FI

C

A

TE

S

TE

S

T D

A

TA

G U

A R

A N

TE

E

S

SCHEDULE OF MATERIAL SUBMITTALS

TO BE COMPLETED BY PROJECT MANAGER

TO BE COMPLETED BY CONTRACT ADMINISTRATOR

CONTRACT NO.PROJECT TITLE

UAS (RQ-4) ADD UTILITIES AND

ELECTRICAL SERVICES B516 (MC)

& UAS (RQ-4) REPAIR B516 (R/M)

GRAND FORKS AFB, ND

28 FIRE DAMPERS 4 23 30 00

29 DIFFUSERS, REGISTERS, AND GRILLES 4 23 30 00

30 LOUVERS 4 23 30 00

31 TERMINAL BOXES 4 23 30 00

32 AIR HANDLING UNITS 4 23 73 13

33 COMPUTER ROOM AIR CONDITIONERS (CRAC'S) 4 23 81 23

34 HUMIDIFIERS 4 23 84 13

35 COILS 4 23 82 00

36 OCCUPANCY SENSORS 4 26 09 23

37 PANELBOARDS 4 26 24 16

38 TRANSFORMERS 4 26 22 13

39 TRANSFER SWITCH 4 26 36 00

40 GENERATOR 4 26 32 13

41 WIRING DEVICES - SWITCHES 4 26 27 26

42 LIGHTING FIXTURES 4 26 51 13

44 FIRE ALARM SYSTEM 4 4 28 31 10

45 CONCRETE MIX DESIGN 4 32 16 13

46 ASPHALTIC CONCRETE MIX DESIGN 4 32 16 13

47 LANDSCAPING 3 32 93 00

Y\156_005\DOCUMENTS\SPECS\01000 PART 2.xls NOTE: This Submittal Schedule is for the Contractor's use in assembling and organizing the Submittals to be made to the Government. See individual specification sections for possible additional submittal requirements.

Sheet1

File details come from the government source that posted it. Updated .