Addendum 1.docx

DOCX document 86 KB Posted

Attached to
Estimate the Cost of a Manufacturing Plant for NMCA Cathode Materials
Solicitation number
2-B148-P-00143-00
Issued by

View the file

Other files

File Type Posted
Appendix B-1 - SOW 3-4-22.docx DOCX document
Reps and Certs ANL-70B (Long).doc DOC document
Draft FP Contract (For Reference Only).doc DOC document
Appendix D8-29-JUN-2020.PDF PDF
Appendix A-Fixed Price-10-DEC-2021.PDF PDF
Request for Proposal.docx DOCX document
Appendix B - SOW 2-3-22.pdf PDF
Enclosure 4- Evaluation Criteria - Cost of Cathode Matls Mfg.docx DOCX document
PD-9 Contract Pricing RandD.doc DOC document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Cully M. Johnston Procurement Specialist 3

FMPS

Procurement Department Argonne National Laboratory 9700 South Cass Avenue, Bldg. 201 Lemont, IL 60439

(630)252-7049 cjohnston@anl.gov

3/7/22

TO ALL PROSPECTIVE OFFERORS:

Subject: Replace Appendix B with Appendix B-1, dated 3/4/22 Request for No. 2-B148-P-00143-00 Addendum No. 1

Attached herewith for your information and use in preparing your proposal for subject project is one (1) copy of Addendum No. 1.

Sincerely, Cully Johnston

Cully M. Johnston Procurement Specialist 3 Procurement Department

Receipt Acknowledged:

Company:

By:

cc: File

CF

ADDENDUM NO. 1

TO

REQUEST FOR 2-B148-P-00143-00

FOR

Argonne National Laboratory

BLDG. 201 OCF

9700 S. Cass Ave.

Lemont, IL 60439

03/07/22

This addendum is being issued to modify the subject as follows:

Appendix “B”, Argonne National Laboratory Statement of Work entitled “Estimate the Cost of a Manufacturing Plant for NMCA Cathode Materials”, dated 2/3/22, is here removed. Appendix B-1, Argonne National Laboratory Statement of Work entitled “Estimate the Cost of a Manufacturing Plant for NMCA Cathode Materials”, dated 3/4/22, which clarifies effort levels and estimate requirements, replaces the originally included Statement of Work.

U. S. Department of Energy laboratory managed by UChicago Argonne, LLC image1.jpeg

File details come from the government source that posted it. Updated .