Water Main Bridge Crossings Repair Project Summary
This file consists of construction drawings for the Long Beach Water Department's Water Main Bridge Crossings Repair Project, Fiscal Year 2021-22, prepared by Krista Harper, a registered professional engineer with Harper & Associates Engineering, Inc. The project addresses repairs to water main pipes that cross two separate bridge locations within Long Beach, California. Site 1 involves a 24-inch diameter steel pipe, 561 feet in length, located at 6th Street and Los Angeles River with an installation date of 1955. Site 21 involves a 12-inch diameter welded steel pipe, 180 feet in length, located at Anaheim Road and Los Cerritos Channel with an installation date of 1983. The drawings were designed and checked on January 5, 2023, and approved by Robert Verceles, Director of Engineering/Chief Engineer, on July 10, 2023. Both sites have hazardous coatings requiring removal and disposal, no cathodic protection systems, and are owned by the City of Long Beach with access points clearly identified for construction activities.
The project scope includes surface preparation and painting of both pipelines, pipe supports, girders, and gates using epoxy/urethane paint systems. Work requires containing, removing, and disposing of all hazardous and nonhazardous waste generated during operations. Construction notes specify coordination requirements with multiple city departments including Edison Company, LB Energy, City Engineering, Verizon, and Fire Department. The contractor must obtain temporary construction water use permits through the Long Beach Water Department and is required to secure the project site during construction duration. Project working hours are limited to 7:00 AM to 4:00 PM on weekdays, with additional hours available only through permit approval. The contract number is WD-68-22, drawing file number is 6002040004, and contract number MO-3775 is assigned. No specific pricing, funding sources, or contract term information is provided in these technical drawings.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Water Main Bridge Crossings_MO-3775-Specifications062623.pdf | ||
| MO 3775 QA.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LONG BEACH WATER DEPARTMENT
LONG BEACH, CALIFORNIA
DRAWINGS FOR THE CONSTRUCTION OF
WATER MAIN BRIDGE CROSSINGS REPAIR
PROJECT, FY21-22
SITE NUMBERS 1 AND 21
WD-68-22
JANUARY 2023
GENERAL MANAGER
CHRISTOPHER GARNER
SUBMITTED BY:
ROBERT VERCELES - DIRECTOR OF ENGINEERING/ CHIEF ENGINEER DATE
APPROVED BY:
06/21/2023
REV. DATE DESCRIPTION
EDISON CO.
DEPARTMENT
LB ENERGY
CITY ENG.
BY CK'D. APP'D.
VERIZON
FIRE
CHECKED BY DATE
1-5-23
1-5-23
DATECORRECTED BY
POSTED GIS
CONSTRUCTED BY
AS-BUILT BY
GATE VALVES REC.
DATE
DATE
DATE
DATE
KRISTA HARPER
KRISTA HARPER
CHECKED BY:
DESIGNED BY: DATE:
DATE
GIS TILE
SECTION MAPS
SPEC. NO
SERVICE ATLAS PAGES
SCALE NTS
WATER MAIN BRIDGE CROSSING
REPAIR PROJECT
GENERAL MANAGER
LONG BEACH WATER DEPARTMENT
MANAGER OF ENGINEERING
DIRECTOR OF ENGINEERING/ CHIEF ENGINEER
RECOMMENDED
CONTRACT NO. SENIOR APPROVED
DATE
DATE LONG BEACH
WATER DEPARTMENT
PROJECT:
DRAWING-FILE NUMBER:
MO-3775
6002040004
WD-68-22
71280
K R I S T A H A R P ER
C I V I L
RE
GI
S T E R
E D P R O F E S S I O N A L E NGINEERS T A T E O F C A L I F O R N I A
7/10/2023
7/10/2023
REV. DATE DESCRIPTION
EDISON CO.
DEPARTMENT
LB ENERGY
CITY ENG.
BY CK'D. APP'D.
VERIZON
FIRE
CHECKED BY DATE
1-5-23
1-5-23
DATECORRECTED BY
POSTED GIS
CONSTRUCTED BY
AS-BUILT BY
GATE VALVES REC.
DATE
DATE
DATE
DATE
KRISTA HARPER
KRISTA HARPER
CHECKED BY:
DESIGNED BY: DATE:
DATE
GIS TILE
SECTION MAPS
SPEC. NO
SERVICE ATLAS PAGES
SCALE NTS
WATER MAIN BRIDGE CROSSING
REPAIR PROJECT
GENERAL MANAGER
LONG BEACH WATER DEPARTMENT
MANAGER OF ENGINEERING
DIRECTOR OF ENGINEERING/ CHIEF ENGINEER
RECOMMENDED
CONTRACT NO. SENIOR APPROVED
DATE
DATE LONG BEACH
WATER DEPARTMENT
PROJECT:
DRAWING-FILE NUMBER:
MO-3775
6002040004
WD-68-22
71280
K R I S T A H A R P E R
C I V I L
RE
GI
S T E R
E D P R O F E S S I O N A L E NGI NEERS T A T E O F C A L I F O R N I A
24" STL
APPROX. 561'
BE
G
IN
P
IP
E
R
EP
AI
R
4"
D
IA
. S
TL
P
IP
E
EN
D
P
IP
E R
EP
AI
R
4" D
IA
. S
TL
P
IP
E
SITE NO. 1 DATA
LOCATION 6TH ST & LOS ANGELES RIVER
ACCESS ATTACHED TO DEDICATED BRIDGE
INVESTIGATION JULY 2018
TYPE STEEL
INSTALLATION DATE 1955
LENGTH 561 FT
DIAMETER 24-INCH
EXTERIOR COATING UNKNOWN PAINT SYSTEM
HAZARDOUS COATING YES
CATHODIC PROTECTION NO
BRIDGE OWNER CITY OF LONG BEACH
CONFINED SPACE NO
TRAFFIC CONTROL NONE
N
REV. DATE DESCRIPTION
EDISON CO.
DEPARTMENT
LB ENERGY
CITY ENG.
BY CK'D. APP'D.
VERIZON
FIRE
CHECKED BY DATE
1-5-23
1-5-23
DATECORRECTED BY
POSTED GIS
CONSTRUCTED BY
AS-BUILT BY
GATE VALVES REC.
DATE
DATE
DATE
DATE
KRISTA HARPER
KRISTA HARPER
CHECKED BY:
DESIGNED BY: DATE:
DATE
GIS TILE
SECTION MAPS
SPEC. NO
SERVICE ATLAS PAGES
SCALE NTS
WATER MAIN BRIDGE CROSSING
REPAIR PROJECT
GENERAL MANAGER
LONG BEACH WATER DEPARTMENT
MANAGER OF ENGINEERING
DIRECTOR OF ENGINEERING/ CHIEF ENGINEER
RECOMMENDED
CONTRACT NO. SENIOR APPROVED
DATE
DATE LONG BEACH
WATER DEPARTMENT
PROJECT:
DRAWING-FILE NUMBER:
MO-3775
6002040004
WD-68-22
71280
K R I S T A H A R P E R
C I V I L
RE
GI
S T E R
E D P R O F E S S I O N A L E NGI NEERS T A T E O F C A L I F O R N I A
12" STL
APPROX. 180'
BEGIN PIPE REPAIR 12" DIA. STL PIPE
END PIPE REPAIR 12" DIA. STL PIPE
SITE NO. 21 DATA
LOCATION ANAHEIM RD & LOS CERRITOS CHANNEL
ACCESS NORTH EAST CORNER OF THE BRIDGE
INVESTIGATION JULY 2018
TYPE WELDED STEEL
INSTALLATION DATE 1983
LENGTH 180 FT
DIAMETER 12-INCH
EXTERIOR COATING UNKNOWN PAINT SYSTEM WITH
MORTAR COATED ENDS
HAZARDOUS COATING YES
CATHODIC PROTECTION NO
BRIDGE OWNER CITY OF LONG BEACH
CONFINED SPACE NO
TRAFFIC CONTROL NONE
N
SITE ACCESS
REV. DATE DESCRIPTION
EDISON CO.
DEPARTMENT
LB ENERGY
CITY ENG.
BY CK'D. APP'D.
VERIZON
FIRE
CHECKED BY DATE
1-5-23
1-5-23
DATECORRECTED BY
POSTED GIS
CONSTRUCTED BY
AS-BUILT BY
GATE VALVES REC.
DATE
DATE
DATE
DATE
KRISTA HARPER
KRISTA HARPER
CHECKED BY:
DESIGNED BY: DATE:
DATE
GIS TILE
SECTION MAPS
SPEC. NO
SERVICE ATLAS PAGES
SCALE NTS
WATER MAIN BRIDGE CROSSING
REPAIR PROJECT
GENERAL MANAGER
LONG BEACH WATER DEPARTMENT
MANAGER OF ENGINEERING
DIRECTOR OF ENGINEERING/ CHIEF ENGINEER
RECOMMENDED
CONTRACT NO. SENIOR APPROVED
DATE
DATE LONG BEACH
WATER DEPARTMENT
PROJECT:
DRAWING-FILE NUMBER:
MO-3775
6002040004
WD-68-22
71280
K R I S T A H A R P E R
C I V I L
RE
GI
S T E R
E D P R O F E S S I O N A L E NGI NEERS T A T E O F C A L I F O R N I A
CONSTRUCTION NOTES - SITE 1 CONSTRUCTION NOTES - SITE 21
REV. DATE DESCRIPTION
EDISON CO.
DEPARTMENT
LB ENERGY
CITY ENG.
BY CK'D. APP'D.
VERIZON
FIRE
CHECKED BY DATE
1-5-23
1-5-23
DATECORRECTED BY
POSTED GIS
CONSTRUCTED BY
AS-BUILT BY
GATE VALVES REC.
DATE
DATE
DATE
DATE
KRISTA HARPER
KRISTA HARPER
CHECKED BY:
DESIGNED BY: DATE:
DATE
GIS TILE
SECTION MAPS
SPEC. NO
SERVICE ATLAS PAGES
SCALE NTS
WATER MAIN BRIDGE CROSSING
REPAIR PROJECT
GENERAL MANAGER
LONG BEACH WATER DEPARTMENT
MANAGER OF ENGINEERING
DIRECTOR OF ENGINEERING/ CHIEF ENGINEER
RECOMMENDED
CONTRACT NO. SENIOR APPROVED
DATE
DATE LONG BEACH
WATER DEPARTMENT
PROJECT:
DRAWING-FILE NUMBER:
MO-3775
6002040004
WD-68-22
71280
K R I S T A H A R P E R
C I V I L
RE
GI
S T E R
E D P R O F E S S I O N A L E NGINEERS T A T E O F C A L I F O R N I A
| Sheets and Views |
| 2862-Pipe Crossing Plans Site 1 & 21-1 |
| 2862-Pipe Crossing Plans Site 1 & 21-2 |
| 2862-Pipe Crossing Plans Site 1 & 21-3 |
| 2862-Pipe Crossing Plans Site 1 & 21-4 |
| 2862-Pipe Crossing Plans Site 1 & 21-5 |
File details come from the government source that posted it. Updated .