Contractor Furnished Items
View the file
Other files
| File | Type | Posted |
|---|---|---|
| FBO_-_1._Offeror's_Capability_Statement.docx | DOCX document | |
| FBO_-_3._Offeror's_Minimum_Equipment_Requirements.doc | DOC document | |
| FBO_-_5._Contractor_Approved_Lubricants.doc | DOC document | |
| FBO_-_2._Statement_of_Work.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NATIONAL SECURITY TECHNOLOGIES, LLC
CONTRACTOR - FURNISHED ITEMS
The Contractor (National Security Technologies, LLC) shall furnish, at the work site(s), the following items, facilities, and services for the work under this Subcontract:
1. Maintained access roads to the surface location(s).
2. Surface location(s) adequate for Subcontractor to perform work under this specification.
3. Construction water, with deliveries to Subcontractor’s on-site storage containers for Subcontractor use.
4. Tubular goods, packers, and all other downhole hardware for testing, as specified, including handling equipment such as spiders, slips, elevators, and lifting subs for all Contractor-furnished tubular goods and tools.
5. Geophysical logging services, as required.
6. Cementing materials and services, as required.
7. Directional surveying equipment and services, as required.
8. Fuel, biodiesel for Subcontractor's equipment, and approved thread lubricant for downhole threaded materials with delivery of fuel to Subcontractor’s on-site fuel storage tank.
9. Geologic sampling and processing, as required.
10. Transportation of applicable Contractor-furnished items, to and from the borehole sites.
11. Housing, meals, and recreational facilities at regular cost and to the extent available on the NNSS.
12. Portable toilets, with servicing, at or near the job sites for Subcontractor's use.
13. Lined sump for on-site decontamination/cleaning of equipment, as necessary.
14. Max of two (2) days of training just prior to mobilization, including General Employee Radiological Training, miscellaneous safety training, Work Control, and Integrated Safety Management.
15. Electricians and materials to install all grounding wiring on each site pad, as required.
NSTec. Contractor - Furnished Items