27009-Bradley Lake 3 Phase power long lead equipment -ITB Manual.pdf
PDF 1 MB Posted
- Attached to
- BRADLEY LAKE – 3-PHASE POWER LONG LEAD EQUIPMENT
- Solicitation number
- 27009
- Issued by
- Kenai Peninsula Borough, Alaska
About this file
This is an Invitation to Bid (ITB) manual issued by the Alaska Energy Authority (AEA) for the procurement of three-phase long-lead equipment to support the Bradley Lake three-phase power upgrade project. The solicitation seeks bids for the purchase and delivery of conductor, fiber optic cable, switchgear, and fiberglass elbows. The ITB manual provides comprehensive bidding instructions, evaluation criteria, and contract terms for prospective vendors. The document establishes the procedural framework for bid submission, including requirements for bid preparation, documentation, and compliance with Alaska procurement regulations.
The ITB specifies that bids must be submitted in accordance with AEA's procurement policies and includes detailed specifications for each long-lead item category. Bidders are required to demonstrate capability to deliver equipment meeting technical specifications within the required timeframe, as long-lead items necessitate advance procurement due to extended manufacturing and delivery schedules. The contract will be awarded to the responsive and responsible bidder offering the lowest evaluated cost. Payment terms, delivery schedules, and quality assurance requirements are outlined within the ITB documentation to ensure timely delivery of critical equipment for the Bradley Lake infrastructure upgrade project.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ALASKA ENERGY AUTHORITY – INVITATION TO BID (ITB) # 27009
Issue Date: August 21, 2026
Due Date: September 11, 2026
BRADLEY LAKE – 3-PHASE POWER LONG LEAD EQUIPMENT
Alaska Energy Authority (AEA) is soliciting bids to purchase commodities as indicated in Appendix C - Scope of Work & Specifications, Appendix D - Bid Schedule.
IMPORTANT NOTICE: If you received this solicitation from the State of Alaska’s “Online Public Notice” web site, or you downloaded this solicitation from AEA’s procurement website, you must register on the online Plan Holders List to receive notification of subsequent amendments to the solicitation. Failure to register may result in the rejection of your bid. It is the bidder’s responsibility to ensure that they have received all addenda affecting this ITB. To register, go to www.aideaaeaprocurement.org and select the Plan Holders Registration link and complete the Planholders Registration.
BIDDER'S NOTICE: By signature on this form, the bidder certifies that they comply with the following:
(1) the bidder has a valid Alaska business license or will obtain one prior to award of any contract resulting from this ITB. If the bidder possesses a valid Alaska business license, the license number must be written below or one the following forms of evidence submitted with the bid:
• a canceled check for the business license fee;
• a copy of the business license application with a receipt date stamp from the State's business license office;
• a receipt from the State’s business license office for the license fee;
• a copy of the bidder’s valid business license;
• a sworn notarized affidavit that the bidder has applied and paid for a business license;
(2) the price(s) submitted was arrived at independently and without collusion, under penalty of perjury, and that the bidder is complying with:
• the laws of the State of Alaska;
• the applicable portion of the Federal Civil Rights Act of 1964;
• the Equal Employment Opportunity Act and the regulations issued thereunder by the state and federal Government;
• the Americans with Disabilities Act of 1990 and the regulations issued thereunder by the state and federal government;
• the bid will remain open and valid for at least 30 days;
• all terms and conditions set out in this Invitation to Bid (ITB).
(3) the bidder does not have a conflict of interest as described in Section 1.08.
If a bidder does not hold an Alaska Business License (1) at the time designated in the ITB for opening the Authority will disallow the Alaska Bidder Preference. Bids must also be submitted under the name as appearing on the bidder’s current Alaska business license in order to receive the Alaska Bidder Preference. If a bidder fails to comply with (2) or (3) of this paragraph, the Authority may reject the bid, terminate the contract, or consider the contractor in default.
Selwin C. Ray
Contract Officer
COMPANY SUBMITTING BID
*DOES YOUR BUSINESS QUALIFY FOR THE
ALASKA BIDDER’S PREFERENCE?
[ ] YES [ ] NO
813 West Northern Lights Blvd Anchorage, AK 99503
AUTHORIZED SIGNATURE
*DOES YOUR BUSINESS QUALIFY FOR THE
ALASKA VETERAN PREFERENCE?
[ ] YES [ ] NO
Phone: (907) 771-3035
FAX: (907) 771-3044
PRINTED NAME
*SEE ITB FOR EXPLANATION OF CRITERIA
TO QUALIFY
Email:
AEAProcurement@akenergyauthority.org
DATE
TELEPHONE NUMBER
ALASKA BUSINESS LICENSE NUMBER
FEDERAL TAX ID NUMBER
E-MAIL ADDRESS
http://www.aideaaeaprocurement.org/ mailto:AEAProcurement@akenergyauthority.org
BRADLEY LAKE Alaska Energy Authority ITB# 27009 3-PHASE POWER LONG LEAD EQUIPMENT Invitation to Bid
Page 2 of 16 Rev. 4/24
TABLE OF CONTENTS
SECTION 1. INTRODUCTION & INSTRUCTIONS
SEC. 1.01 PURPOSE OF THE ITB
SEC. 1.02 DEADLINE FOR RECEIPT OF BIDS
SEC. 1.03 PRIOR EXPERIENCE
SEC. 1.04 INVITATION TO BID (ITB) REVIEW
SEC. 1.05 QUESTIONS PRIOR TO DEADLINE FOR RECEIPT OF BIDS
SEC. 1.06 SITE INSPECTION
SEC. 1.07 SUBMITTING BIDS
SEC. 1.08 BID FORMS
SEC. 1.09 PRICES
SEC. 1.10 PRE-BID CONFERENCE
SEC. 1.11 ASSISTANCE TO BIDDERS WITH A DISABILITY
SEC. 1.12 AMENDMENTS TO BIDS
SEC. 1.13 AMENDMENTS TO THE ITB
SEC. 1.14 ITB SCHEDULE
SEC. 1.15 ALTERNATE BIDS
SEC. 1.16 SUPPORTING INFORMATION
SEC. 1.17 FIRM, UNQUALIFIED, AND UNCONDITIONAL OFFER
SECTION 2. CONTRACT INFORMATION
SEC. 2.01 CONTRACT TERM
SEC. 2.02 CONTRACT ADMINISTRATION
SEC. 2.03 CONTRACT FUNDING
SEC. 2.04 CONTRACT EXTENSION
SEC. 2.05 CONTRACT CHANGES – UNANTICIPATED AMENDMENTS
SEC. 2.06 SUBCONTRACTORS
SEC. 2.07 JOINT VENTURES
SEC. 2.08 CONTRACT PERFORMANCE LOCATION
SEC. 2.09 RIGHT TO INSPECT PLACE OF BUSINESS
SEC. 2.10 SCOPE OF WORK AND SPECIFICATIONS
SEC. 2.11 F.O.B. POINT
SEC. 2.12 SHIPPING DAMAGE
SEC. 2.13 DELIVERY TIME
SEC. 2.14 INSPECTION & MODIFICATION - REIMBURSEMENT FOR UNACCEPTABLE DELIVERABLES
SEC. 2.15 CONTINUING OBLIGATION OF CONTRACTOR
SEC. 2.16 ESTIMATED QUANTITIES
SEC. 2.17 CONTRACT PRICE ADJUSTMENTS
SEC. 2.18 INFORMAL DEBRIEFING
SEC. 2.19 INDEMNIFICATION
SEC. 2.20 INSURANCE
SEC. 2.21 MANDATORY REPORTING
NOT APPLICABLE
SECTION 3. CONTRACT INVOICING AND PAYMENTS
SEC. 3.01 BILLING INSTRUCTIONS
SEC. 3.02 PAYMENT FOR AUTHORITY PURCHASES
SEC. 3.03 THIRD-PARTY FINANCING AGREEMENTS NOT ALLOWED
SECTION 4. EVALUATION AND CONTRACTOR SELECTION
SEC. 4.01 EVALUATION OF BIDS
SEC. 4.02 APPLICATION OF PREFERENCES
Page 3 of 16 Rev. 4/24
SEC. 4.03 ALASKA BIDDER PREFERENCE
SEC. 4.04 ALASKA VETERAN PREFERENCE
SEC. 4.05 USE OF LOCAL FOREST PRODUCTS
SEC. 4.06 LOCAL AGRICULTURAL AND FISHERIES PRODUCT PREFERENCE
SEC. 4.07 ALASKA PRODUCT PREFERENCE
SEC. 4.08 EMPLOYMENT PROGRAM PREFERENCE
SEC. 4.09 ALASKANS WITH DISABILITIES PREFERENCE
SEC. 4.10 PREFERENCE QUALIFICATION LETTER
SEC. 4.11 EXTENSION OF PRICES
SEC. 4.12 METHOD OF AWARD
SEC. 4.13 NOTICE OF INTENT TO AWARD
SECTION 5. GENERAL PROCESS AND LEGAL INFORMATION
SEC. 5.01 ALASKA BUSINESS LICENSE AND OTHER REQUIRED LICENSES
SEC. 5.02 AUTHORITY
SEC. 5.03 COMPLIANCE (REFER TO APPENDIX A, A.9)
SEC. 5.04 SUITABLE MATERIALS, ETC. (REFER TO APPENDIX A, A.2)
SEC. 5.05 SPECIFICATIONS
SEC. 5.06 CONTRACTOR SITE INSPECTION
SEC. 5.07 ORDER DOCUMENTS
SEC. 5.08 HUMAN TRAFFICKING
SEC. 5.09 RIGHT OF REJECTION
SEC. 5.10 AUTHORITY NOT RESPONSIBLE FOR PREPARATION COSTS
SEC. 5.11 DISCLOSURE OF BID CONTENTS
SEC. 5.12 ASSIGNMENTS (REFER TO APPENDIX A, A.5)
SEC. 5.13 FORCE MAJEURE (REFER TO APPENDIX A, A.14)
SEC. 5.14 DEFAULT (REFER TO APPENDIX A, A.4)
SEC. 5.15 DISPUTES (REFER TO APPENDIX A, A.3)
SEC. 5.16 SEVERABILITY (REFER TO APPENDIX A, A.16)
SEC. 5.17 CONTRACT CANCELLATION
SEC. 5.18 GOVERNING LAW; FORUM SELECTION (REFER TO APPENDIX A, A.18)
SEC. 5.19 SOLICITATION ADVERTISING
SEC. 5.20 QUALIFIED BIDDERS
SEC. 5.21 FEDERALLY IMPOSED TARIFFS
SEC. 5.22 PROTEST
SECTION 6. APPENDICES
(a) Appendix A – General Conditions
(b) Appendix B – Federal Assurances
(c) Appendix C – Scope of Work & Specifications
(d) Appendix D - Bid Schedule
Page 4 of 16 Rev. 4/24
SECTION 1. INTRODUCTION & INSTRUCTIONS
SEC. 1.01 PURPOSE OF THE ITB
Alaska Energy Authority (AEA) is soliciting bids to purchase commodities as indicated in Appendix C - Scope of
Work & Specifications, and Appendix D - Bid Schedule. AEA to solicit bids for bid on the purchase and delivery of
3-phase long lead equipment to support the Bradley Lake 3-phase power upgrade. Long lead items include conductor, fiber, switchgear, and fiberglass elbows. Material bid sheet is attached. Issued for Construction
Drawings attached for reference. Sheet Specifications for materials are included in the construction drawings.
Note that items shown in the drawings, which are not listed in the bid tab are NOT included in this bid.
SEC. 1.02 DEADLINE FOR RECEIPT OF BIDS
Bids must be received no later than the time and date indicated in the ITB Schedule, Sec. 1.14, at which time they will be publicly opened. Late bids or amendments will be disqualified and not opened or accepted for evaluation. The bid opening will be conducted telephonically. Potential bidders may attend telephonically by calling 1 469-810-0642 and entering the conference I.D. 589 151 215#.
SEC. 1.03 PRIOR EXPERIENCE
Minimum prior experience, if applicable, is indicated in the attached Specifications. A bidder's failure to meet these minimum prior experience requirements will cause their bid to be considered non-responsive and rejected.
SEC. 1.04 INVITATION TO BID (ITB) REVIEW
Bidders shall carefully review this ITB for defects and questionable or objectionable material. Comments concerning defects and questionable or objectionable material in the ITB should be made in writing and received by the contracting officer at least ten days before the bid opening date. This will allow time for an amendment to be issued if one is required. It will also help prevent the opening of a defective bid, upon which award cannot be made, and the resultant exposure of bidders' prices.
SEC. 1.05 QUESTIONS PRIOR TO DEADLINE FOR RECEIPT OF BIDS
All questions must be in writing and directed to the contracting officer. The interested party must confirm telephone conversations in writing. Two types of questions generally arise. One may be answered by directing the questioner to a specific section of the ITB. These questions may be answered over the telephone. Other questions may be more complex and may require a written amendment to the ITB. The contracting officer will make that decision.
Contract Officer Selwin C. Ray Phone 907-771-3035 Fax 907-771-3044
SEC. 1.06 SITE INSPECTION
Not Applicable
SEC. 1.07 SUBMITTING BIDS
Bids must be either Emailed, Hand Delivered or Mailed as follows:
EMAIL: AEAProcurement@akenergyauthority.org
HAND DELIVERED OR MAILED: The sealed bid package must be addressed as follows:
Alaska Energy Authority
Attention: Selwin C. Ray
Invitation to Bid (ITB) Number: 27009 mailto:AEAProcurement@akenergyauthority.org
Page 5 of 16 Rev. 4/24
ITB Title: BRADLEY LAKE - 3-PHASE POWE LONG LEAD EQUIPMENT
813 W NORTHERN LIGHTS BLVD
ANCHORAGE, AK 99503
It is the bidder’s responsibility to contact the issuing agency at 907-771-3035 to confirm that the bid has been received. The Authority is not responsible for unreadable, corrupt, or missing attachments.
SEC. 1.08 BID FORMS
Bidders shall use the front page of this ITB and any other forms identified in this ITB for submitting bids. All bids must be signed by an individual authorized to bind the bidder to the provisions of the ITB.
BIDDER'S CERTIFICATION
By signature on the bid, the bidder certifies that they comply with the following:
A. the laws of the State of Alaska;
B. the applicable portion of the Federal Civil Rights Act of 1964;
C. the Equal Employment Opportunity Act and the regulations issued thereunder by the state and federal government;
D. the Americans with Disabilities Act of 1990 and the regulations issued thereunder by the state and federal government;
E. all terms and conditions set out in this ITB;
F. the price(s) submitted was arrived at independently arrived and without collusion, under penalty of perjury; and
G. that the bid will remain open and valid for at least 30 days.
If any bidder fails to comply with [a] through [g] of this paragraph, the Authority reserves the right to disregard the bid, terminate the contract, or consider the contractor in default.
CONFLICT OF INTEREST
Each bid shall include a statement indicating whether or not the company or any individuals working on the contract has a possible conflict of interest (e.g., currently employed by the State of Alaska or formerly employed by the State of Alaska within the past two years) and, if so, the nature of that conflict. The contracting officer reserves the right to consider a bid non-responsive and reject it or cancel the award if any interest disclosed from any source could either give the appearance of a conflict or cause speculation as to the objectivity of the contract to be performed by the bidder.
SEC. 1.09 PRICES
The bidder shall state prices in the units of issue on this ITB. Prices quoted in bids must be exclusive of federal, state, and local taxes. If the bidder believes that certain taxes are payable by the state, the bidder may list such taxes separately, directly below the bid price for the affected item.
SEC. 1.10 PRE-BID CONFERENCE
Not Applicable
Page 6 of 16 Rev. 4/24
SEC. 1.11 ASSISTANCE TO BIDDERS WITH A DISABILITY
Bidders with a disability may receive accommodation regarding the means of communicating this ITB or participating in the procurement process. For more information, contact the contracting officer no later than ten days prior to the deadline for receipt of bids.
SEC. 1.12 AMENDMENTS TO BIDS
Amendments to or withdrawals of bids will only be allowed if acceptable requests are received prior to the deadline that is set for receipt of bids, in accordance with 3 AAC 109.170. No amendments or withdrawals will be accepted after the deadline unless the delay is due to an error of the procurement agency, in accordance with 3
AAC 109.360.
SEC. 1.13 AMENDMENTS TO THE ITB
If an amendment is issued, it will be provided to all who were notified of the ITB and to Planholders who have registered on the ITB Plan Holders Registration at www.aideaaeaprocurement.org.
SEC. 1.14 ITB SCHEDULE
The ITB schedule set out herein represents the Authority’s best estimate of the schedule that will be followed. If an Activity of this schedule is changed, the schedule may be adjusted. All times are Alaska Time.
ACTIVITY TIME DATE
Issue Date / ITB Released 8/21/2026
Deadline for Protest (10 days prior to Bid Due) 1:00 PM 9/01/2026
Deadline for Comments/Questions (5 days prior to Bid Due) 1:00 PM 9/06/2026
Deadline for Receipt of Bids / Bid Due Date 1:00 PM 9/11/2026
This ITB does not, by itself, obligate the Authority. The Authority's obligation will commence when the contract is approved by the AEA Executive Director, or the Director's designee. Upon written notice to the contractor, the
Authority may set a different starting date for the contract. The Authority will not be responsible for any work done by the contractor, even work done in good faith, if it occurs prior to the contract start date set by the
Authority.
SEC. 1.15 ALTERNATE BIDS
Bidders may only submit one bid. In accordance with 3 AAC 109.270 alternate bids (bids that offer something different than what is asked for) will be rejected.
SEC. 1.16 SUPPORTING INFORMATION
Bidders shall submit all required technical, specification, and other supporting information with their bid, so that a detailed analysis and determination can be made by the contracting officer that the product offered meets the
ITB specifications and that other requirements of the ITB have been met. However, provided a bid meets the requirements for a definite, firm, unqualified, and unconditional offer, the Authority reserves the right to request supplemental information from the bidder, after the bids have been opened, to ensure that the products or services offered completely meet the ITB requirements. The requirement for such supplemental information will be at the reasonable discretion of the Authority and may include the requirement that a bidder will provide a sample product(s) so that the Authority can make a first-hand examination and determination.
A bidder's failure to provide this supplemental information or the product sample(s), within the time set by the
Authority, will cause the Authority to consider the offer non-responsive and reject the bid.
http://www.aideaaeaprocurement.org/
Page 7 of 16 Rev. 4/24
SEC. 1.17 FIRM, UNQUALIFIED, AND UNCONDITIONAL OFFER
Bidders must provide enough information with their bid to constitute a definite, firm, unqualified and unconditional offer. To be responsive a bid must constitute a definite, firm, unqualified and unconditional offer to meet all the material terms of the ITB. Material terms are those that could affect the price, quantity, quality, or delivery. Also included as material terms are those which are clearly identified in the ITB and which, for reasons of policy, must be complied with at risk of bid rejection for non-responsiveness.
SECTION 2. CONTRACT INFORMATION
SEC. 2.01 CONTRACT TERM
The length of the contract will be from the date of award until the time of delivery and acceptance at the F.O.B.
point.
SEC. 2.02 CONTRACT ADMINISTRATION
The administration of this contract is the responsibility of the contracting officer or person appointed by AEA.
SEC. 2.03 CONTRACT FUNDING
Refer to Appendix A, A.13. AEA estimates a budget of between $2,000,000.00 and $3,000,000.00 dollars for this contract.
SEC. 2.04 CONTRACT EXTENSION
A month-to-month extension may only be executed by the contracting officer via a written contract amendment.
Refer to Appendix A, A.15.
SEC. 2.05 CONTRACT CHANGES – UNANTICIPATED AMENDMENTS
During the course of this contract, the contractor may be required to perform additional work. That work will be within the general scope of the initial contract. When additional work is required, the Authority will provide the contractor a written description of the additional work and request the contractor to submit a firm time schedule for accomplishing the additional work and a firm price for the additional work. Cost and pricing data must be provided to justify the cost of such amendments per 3 AAC 109.540.
The contractor will not commence additional work until the contracting officer has secured required Authority approvals necessary for the amendment and issued a written contract amendment.
SEC. 2.06 SUBCONTRACTORS
Subcontractors will not be allowed.
SEC. 2.07 JOINT VENTURES
Joint ventures will not be allowed.
SEC. 2.08 CONTRACT PERFORMANCE LOCATION
Not Applicable.
SEC. 2.09 RIGHT TO INSPECT PLACE OF BUSINESS
At reasonable times, the Authority may inspect those areas of the contractor's place of business that are related to the performance of a contract. If the Authority makes such an inspection, the contractor must provide reasonable assistance.
Page 8 of 16 Rev. 4/24
SEC. 2.10 SCOPE OF WORK AND SPECIFICATIONS
Alaska Energy Authority (AEA) is soliciting bids to purchase commodities as indicated in Appendix C - Scope of
Work & Specifications, and Appendix D - Bid Schedule.
SEC. 2.11 F.O.B. POINT
The F.O.B. point for all items purchased under this contract is the final destination. Ownership of and title to the ordered items remains with the contractor until the items have been delivered to their final destination and are accepted by the Authority. The F.O.B. point is indicated in Appendix C - Scope of Work & Specification.
SEC. 2.12 SHIPPING DAMAGE
The Authority will not accept or pay for damaged goods. The contractor must file all claims against the carrier(s) for damages incurred to items in transit from the point of origin to the ultimate destination. The Authority will provide the contractor with written notice when damaged goods are received. The Authority will deduct the cost of the damaged goods from the invoice prior to payment. The contractor must file all claims against the carrier(s) for reimbursement of the loss.
SEC. 2.13 DELIVERY TIME
The Scope of Work indicates the desired delivery date in calendar weeks. In the space provided on the Bid
Schedule indicate the earliest firm delivery date in calendar weeks required to make delivery after the receipt of an order. Failure to make an entry in the space provided will be construed as an offer to deliver by the desired delivery. Bids that specify deliveries in excess of the desired delivery may be considered non-responsive and may be rejected.
SEC. 2.14 INSPECTION & MODIFICATION - REIMBURSEMENT FOR UNACCEPTABLE
DELIVERABLES
The contractor is responsible for proving all products or the completion of all work set out in the contract. All products or work is subject to inspection, evaluation, and approval by the Authority. The Authority may employ all reasonable means to ensure that the work is progressing and being performed in compliance with the contract.
The Authority may instruct the contractor to make corrections or modifications if needed in order to accomplish the contract’s intent. The contractor will not unreasonably withhold such changes.
Substantial failure of the contractor to perform the contract may cause the Authority to terminate the contract.
In this event, the Authority may require the contractor to reimburse monies paid (based on the identified portion of unacceptable products or work received) and may seek associated damages.
SEC. 2.15 CONTINUING OBLIGATION OF CONTRACTOR
Refer to Appendix A, A.17.
SEC. 2.16 ESTIMATED QUANTITIES
The quantities in this ITB are indicated in Appendix D - Bid Schedule.
SEC. 2.17 CONTRACT PRICE ADJUSTMENTS
Not Applicable.
SEC. 2.18 INFORMAL DEBRIEFING
When the contract is completed, an informal debriefing may be performed at the discretion of the contracting officer. If performed, the scope of the debriefing will be limited to the products provided or work performed by the contractor.
Page 9 of 16 Rev. 4/24
SEC. 2.19 INDEMNIFICATION
The contractor shall indemnify, hold harmless, and defend the contracting agency from and against any claim of, or liability for error, omission or negligent act of the contractor under this agreement. The contractor shall not be required to indemnify the contracting agency for a claim of, or liability for, the independent negligence of the contracting agency. If there is a claim of, or liability for, the joint negligent error or omission of the contractor and the independent negligence of the contracting agency, the indemnification and hold harmless obligation shall be apportioned on a comparative fault basis.
“Contractor” and “contracting agency”, as used within this and the following article, include the employees, agents and other contractors who are directly responsible, respectively, to each. The term “independent negligence” is negligence other than in the contracting agency’s selection, administration, monitoring, or controlling of the contractor and in approving or accepting the contractor’s work.
SEC. 2.20 INSURANCE
Without limiting the contractor's indemnification, it is agreed that the contractor shall purchase at its own expense and maintain in force at all times during the performance of services under this agreement the following policies of insurance. Where specific limits are shown, it is understood that they shall be the minimum acceptable limits.
If the contractor's policy contains higher limits, the Authority shall be entitled to coverage to the extent of such higher limits.
Certificates of Insurance must be furnished to the contracting officer prior to contract approval and must provide for a notice of cancellation, non-renewal, or material change of conditions in accordance with policy provisions.
Failure to furnish satisfactory evidence of insurance or lapse of the policy is a material breach of this contract and shall be grounds for termination of the contractor's services. All insurance policies shall comply with and be issued by insurers licensed to transact the business of insurance under AS 21.
Proof of insurance is required for the following:
• Workers' Compensation Insurance: The contractor shall provide and maintain, for all employees engaged in work under this contract, coverage as required by AS 23.30.045, and; where applicable, any other statutory obligations including but not limited to Federal U.S.L. & H. and Jones Act requirements. The policy must waive subrogation against the state.
• Commercial General Liability Insurance: covering all business premises and operations used by the contractor in the performance of services under this agreement with minimum coverage limits of $300,000 combined single limit per occurrence.
• Commercial Automobile Liability Insurance: covering all vehicles used by the contractor in the performance of services under this agreement with minimum coverage limits of $300,000 combined single limit per occurrence.
SEC. 2.21 MANDATORY REPORTING
SECTION 3. CONTRACT INVOICING AND PAYMENTS
Page 10 of 16 Rev. 4/24
SEC. 3.01 BILLING INSTRUCTIONS
Invoices must be billed to the ordering agency's address shown on the individual Purchase Order, Contract Award or Delivery Order. The Authority will make payment after it receives the goods or services and the invoice.
Questions concerning payment must be addressed to the Authority.
SEC. 3.02 PAYMENT FOR AUTHORITY PURCHASES
Payment for agreements under $500,000 for the undisputed purchase of goods or services provided to the
Authority will be made within 30 days of the receipt of a proper billing or the delivery of the goods or services to the location(s) specified in the agreement, whichever is later.
SEC. 3.03 THIRD-PARTY FINANCING AGREEMENTS NOT ALLOWED
Because of the additional administrative and accounting time required of the Authority when third party financing agreements are permitted, they will not be allowed under this contract.
SECTION 4. EVALUATION AND CONTRACTOR SELECTION
SEC. 4.01 EVALUATION OF BIDS
After bid opening, the contracting officer will evaluate the bids for responsiveness. Bids deemed non-responsive will be eliminated from further consideration. An evaluation may not be based on discrimination due the race, religion, color, national origin, sex, age, marital status, pregnancy, parenthood, disability, or political affiliation of the bidder.
SEC. 4.02 APPLICATION OF PREFERENCES
Not Applicable.
SEC. 4.03 ALASKA BIDDER PREFERENCE
Not Applicable.
SEC. 4.04 ALASKA VETERAN PREFERENCE
Not Applicable.
SEC. 4.05 USE OF LOCAL FOREST PRODUCTS
Not Applicable.
SEC. 4.06 LOCAL AGRICULTURAL AND FISHERIES PRODUCT PREFERENCE
Not Applicable.
SEC. 4.07 ALASKA PRODUCT PREFERENCE
Not Applicable.
SEC. 4.08 EMPLOYMENT PROGRAM PREFERENCE
Not Applicable.
SEC. 4.09 ALASKANS WITH DISABILITIES PREFERENCE
Not Applicable.
SEC. 4.10 PREFERENCE QUALIFICATION LETTER
Page 11 of 16 Rev. 4/24
SEC. 4.11 EXTENSION OF PRICES
In case of error in the extension of prices in the bid, the unit prices will govern; in a lot bid, the lot prices will govern.
SEC. 4.12 METHOD OF AWARD
Award will be made to the lowest responsive and responsible bidder. In order to be considered responsive, bidders must bid on all items.
SEC. 4.13 NOTICE OF INTENT TO AWARD
After the responses to this ITB have been opened and evaluated, a tabulation of the bids will be prepared. This tabulation, called a Notice of Intent to Award, serves two purposes. It lists the name of each company or person that offered a bid and the price they bid. It also provides notice of the Authority's intent to award a contract(s) to the bidder(s) indicated. A copy of the Notice of Intent will be emailed to each company or person who responded to the ITB. Bidders identified as the apparent low responsive bidders are instructed not to proceed until a Purchase
Order, Contract Award, Lease, or some other form of written notice is given by the contracting officer. A company or person who proceeds prior to receiving a Purchase Order, Contract Award, Lease, or some other form of written notice from the contracting officer does so without a contract and at their own risk.
SECTION 5. GENERAL PROCESS AND LEGAL INFORMATION
SEC. 5.01 ALASKA BUSINESS LICENSE AND OTHER REQUIRED LICENSES
Prior to the award of a contract, a bidder must hold a valid Alaska business license. However, in order to receive the Alaska Bidder Preference and other related preferences, such as the Alaska Veteran Preference and Alaskans with Disabilities Preference, a bidder must hold a valid Alaska business license prior to the deadline for receipt of bids. Bidders should contact the Department of Commerce, Community and Economic Development, Division of
Corporations, Business, and Professional Licensing, PO Box 110806, Juneau, Alaska 99811-0806, for information on these licenses. Acceptable evidence that the bidder possesses a valid Alaska business license may consist of any one of the following:
• copy of an Alaska business license;
• certification on the bid that the bidder has a valid Alaska business license and has included the license number in the bid;
• a canceled check for the Alaska business license fee;
• a copy of the Alaska business license application with a receipt stamp from the state's occupational licensing office; or
• a sworn and notarized statement that the bidder has applied and paid for the Alaska business license.
You are not required to hold a valid Alaska business license at the time bids are opened if you possess one of the following licenses and are offering services or supplies under that specific line of business:
• fisheries business licenses issued by Alaska Department of Revenue or Alaska Department of Fish and
Game,
• liquor licenses issued by Alaska Department of Revenue for alcohol sales only, Page 12 of 16 Rev. 4/24
• insurance licenses issued by Alaska Department of Commerce, Community and Economic Development, Division of Insurance, or
• Mining licenses issued by Alaska Department of Revenue.
Prior the deadline for receipt of bids, all bidders must hold any other necessary applicable professional licenses required by Alaska Statute.
SEC. 5.02 AUTHORITY
This ITB is written in accordance with 3 AAC 109 and 2 AAC 12.
SEC. 5.03 COMPLIANCE (Refer to Appendix A, A.9)
SEC. 5.04 SUITABLE MATERIALS, ETC. (Refer to Appendix A, A.2)
SEC. 5.05 SPECIFICATIONS
Unless otherwise specified in this ITB, product brand names or model numbers specified in this ITB are examples of the type and quality of product required, and are not statements of preference. If the specifications describing an item conflict with a brand name or model number describing the item, the specifications govern. Reference to brand name or number does not preclude an offer of a comparable or better product, if full specifications and descriptive literature are provided for the product. Failure to provide such specifications and descriptive literature may be cause for rejection of the offer.
SEC. 5.06 CONTRACTOR SITE INSPECTION
The Authority may conduct on-site visits to evaluate the bidder's capacity to perform the contract. A bidder must agree, at risk of being found non-responsive and having its bid rejected, to provide the Authority reasonable access to relevant portions of its work sites. Individuals designated by the contracting officer at the Authority’s expense will make site inspection.
SEC. 5.07 ORDER DOCUMENTS
Except as specifically allowed under this ITB, an ordering agency will not sign any vendor contract. The Authority is not bound by a vendor contract signed by a person who is not specifically authorized to sign for the Authority under this ITB. Unless otherwise specified in this ITB, the Authority Purchase Order, Contract Award and Delivery
Order are the only order documents that may be used to place orders against the contract(s) resulting from this
ITB.
SEC. 5.08 HUMAN TRAFFICKING
By signature on their bid, the bidder certifies that the bidder is not established and headquartered or incorporated and headquartered in a country recognized as Tier 3 in the most recent United States Department of State’s
Trafficking in Persons Report.
The most recent United States Department of State’s Trafficking in Persons Report can be found at the following website: http://www.state.gov/j/tip/
Failure to comply with this requirement will cause the Authority to reject the bid as non-responsive, or cancel the contract.
http://www.state.gov/j/tip/
Page 13 of 16 Rev. 4/24
SEC. 5.09 RIGHT OF REJECTION
Bidders must comply with all of the terms of this ITB, 3 AAC 109 (Procurement for Alaska Energy Authority
Managed Grants), and all applicable local, state, and federal laws, codes, and regulations. The contracting officer may reject any bid that does not comply with all of the material and substantial terms, conditions, and performance requirements of the ITB.
Bidders may not qualify the bid nor restrict the rights of the Authority. If a bidder does so, the contracting officer may determine the bid to be a non-responsive counter-offer and the bid may be rejected.
Minor informalities that:
• do not affect responsiveness;
• are merely a matter of form or format;
• do not change the relative standing or otherwise prejudice other offers;
• do not change the meaning or scope of the RFP;
• are trivial, negligible, or immaterial in nature;
• do not reflect a material change in the work; or
• do not constitute a substantial reservation against a requirement or provision;
may be waived by the contracting officer.
The Authority reserves the right to refrain from making an award if it determines that to be in its best interest.
A bid from a debarred or suspended bidder shall be rejected.
SEC. 5.10 AUTHORITY NOT RESPONSIBLE FOR PREPARATION COSTS
The Authority will not pay any cost associated with the preparation, submittal, presentation, or evaluation of any bid.
SEC. 5.11 DISCLOSURE OF BID CONTENTS
All bid prices become public information at the bid opening. After the deadline for receipt of bids, all other bid material submitted become the property of the State of Alaska and may be returned only at the Authority's option.
AAC 109.270 and 3 AAC 109.700 require public records to be open to reasonable inspection. All other bid information will be held in confidence during the evaluation process and prior to the time a Notice of Intent to
Award is issued. Thereafter, bids will become public information.
Trade secrets and other proprietary data contained in bids may be held confidential if the bidder requests, in writing, that the contracting officer does so, and if the contracting officer agrees, in writing, to do so. The bidder’s request must be included with the bid, must clearly identify the information they wish to be held confidential, and include a statement that sets out the reasons for confidentiality. Unless the contracting officer agrees in writing to hold the requested information confidential, that information will also become public after the Notice of Intent to Award is issued.
SEC. 5.12 ASSIGNMENTS (Refer to Appendix A, A.5) Bids that are conditioned upon the Authority’s approval of an assignment will be rejected as non-responsive.
Page 14 of 16 Rev. 4/24
SEC. 5.13 FORCE MAJEURE (Refer to Appendix A, A.14)
SEC. 5.14 DEFAULT (Refer to Appendix A, A.4)
SEC. 5.15 DISPUTES (Refer to Appendix A, A.3)
SEC. 5.16 SEVERABILITY (Refer to Appendix A, A.16)
SEC. 5.17 CONTRACT CANCELLATION
The Authority reserves the right to cancel the contract at its convenience upon 30 calendar days written notice to the contractor. The Authority is only liable for payment in accordance with the payment provisions of this contract for supplies or services provided before the effective date of termination.
SEC. 5.18 GOVERNING LAW; FORUM SELECTION (Refer to Appendix A, A.18)
SEC. 5.19 SOLICITATION ADVERTISING
Public notice has been provided in accordance with 3 AAC 109.150.
SEC. 5.20 QUALIFIED BIDDERS
Per 2 AAC 12.875, unless provided for otherwise in the ITB, to qualify as a bidder for award of a contract issued under 3 AAC 109, the bidder must:
1) Add value in the contract by actually performing, controlling, managing, or supervising the services to be provided; or
2) Be in the business of selling and have actually sold on a regular basis the supplies that are the subject of the ITB.
If the bidder leases services or supplies or acts as a broker or agency in providing the services or supplies in order to meet these requirements, the contracting officer may not accept the bidder as a qualified bidder under 3 AAC
109.
SEC. 5.21 FEDERALLY IMPOSED TARIFFS
Changes in price (increase or decrease) resulting directly from a new or updated federal tariff, excise tax, or duty, imposed after contract award may be adjusted during the contract period or before delivery into the United States via contract amendment.
• Notification of Changes: The contractor must promptly notify the contracting officer in writing of any new, increased, or decreased federal excise tax or duty that may result in either an increase or decrease in the contact price and shall take appropriate action as directed by the contracting officer.
• After-imposed or Increased Taxes and Duties: Any federal excise tax or duty for goods or services covered by this contract that was exempted or excluded on the contract award date but later imposed on the contractor during the contract period, as the result of legislative, judicial, or administrative action may result in a price increase provided:
a) The tax or duty takes effect after the contract award date and isn’t otherwise addressed by the contract;
Page 15 of 16 Rev. 4/24
b) The contractor warrants, in writing, that no amount of the newly imposed federal excise tax or duty or rate increase was included in the contract price, as a contingency or otherwise.
• After-relieved or Decreased Taxes and Duties: The contract price shall be decreased by the amount of any decrease in federal excise tax or duty for goods or services under the contract, except social security or other employment taxes, that the contractor is required to pay or bear, or does not obtain a refund of, through the contractor's fault, negligence, or failure to follow instructions of the contracting officer.
• Authority’s Ability to Make Changes: The Authority reserves the right to request verification of federal excise tax or duty amounts on goods or services covered by this contract and increase or decrease the contract price accordingly.
• Price Change Threshold: No adjustment shall be made in the contract price under this clause unless the amount of the adjustment exceeds $250.
SEC. 5.22 PROTEST
3 AAC 109.570 provides that an interested party may protest the content of the ITB.
An interested party is defined in 3 AAC 109.900 (17) as "an actual or prospective bidder or offeror whose economic interest might be affected substantially and directly by the issuance of a contract solicitation, the award of a contract, or the failure to award a contract."
If an interested party wishes to protest the content of a solicitation, the protest must be received, in writing, by the contracting officer at least ten days prior to the deadline for receipt of bids.
3 AAC 109 also provides that an interested party may protest the award of a contract or the proposed award of a contract.
If a bidder wishes to protest the award of a contract or the proposed award of a contract, the protest must be received, in writing, by the contracting officer within 10 days after the date the Notice of Intent to Award for the contract is issued.
A protester must have submitted a bid in order to have sufficient standing to protest the proposed award of a contract. Protests must include the following information:
• the name, address, and telephone number of the protester;
• the signature of the protester or the protester's representative;
• identification of the contracting agency and the solicitation or contract at issue;
• a detailed statement of the legal and factual grounds of the protest including copies of relevant documents; and the form of relief requested.
Protests filed by telex or telegram are not acceptable because they do not contain a signature. Fax copies containing a signature are acceptable.
The contracting officer will issue a written response to the protest. The response will set out the contracting officer's decision and contain the basis of the decision within the statutory time limit in 3 AAC 109.570. A copy of https://www.law.cornell.edu/definitions/index.php?width=840&height=800&iframe=true&def_id=e7c3de2c69ecf724736be4cfdf5433ce&term_occur=7&term_src=Title:48:Chapter:1:Subchapter:H:Part:52:Subpart:52.2:52.229-3
Page 16 of 16 Rev. 4/24 the decision will be furnished to the protester by certified mail, fax or another method that provides evidence of receipt.
All bidders will be notified of any protest. The review of protests, decisions of the contracting officer, appeals, and hearings, will be conducted in accordance with 3 AAC 109 – Procurement for Alaska Energy Authority Managed
Grants.)
SECTION 6. APPENDICES
(a) Appendix A – General Conditions
(b) Appendix B – Federal Assurances
(c) Appendix C – Scope of Work & Specifications
(d) Appendix D - Bid Schedule
Alaska Energy Authority Invitation to Bid Appendix A – General Conditions
Appendix A - 1
APPENDIX A - GENERAL CONDITIONS
A.1 INSPECTIONS AND REPORTS
The department may inspect, in the manner and at reasonable times it considers appropriate, all of the contractor's facilities and activities under this contract. The contractor shall make progress and other reports in the manner and at the times the department reasonably requires.
A.2 SUITABLE MATERIALS, ETC.
Unless otherwise specified, all materials, supplies or equipment offered by the contractor shall be new, unused, and of the latest edition, version, model or crop and of recent manufacture.
A.3 DISPUTES
If the contractor has a claim arising in connection with the contract that it cannot resolve with the Authority by mutual agreement, it shall pursue the claim, if at all, in accordance with the provisions of 2 AAC 108.915.
A.4 DEFAULT
In case of default by the contractor, for any reason whatsoever, the Authority may procure the goods or services from another source and hold the contractor responsible for any resulting excess cost and may seek other remedies under law or equity.
A.5 NO ASSIGNMENT OR DELEGATION
The contractor may not assign or delegate this contract, or any part of it, or any right to any of the money to be paid under it, except with the written consent of the Contracting Officer.
A.6 NO ADDITIONAL WORK OR MATERIAL
No claim for additional supplies or services, not specifically provided in this contract, performed or furnished by the contractor, will be allowed, nor may the contractor do any work or furnish any material not covered by the contract unless the work or material is ordered in writing by the Contracting Officer.
A.7 INDEPENDENT CONTRACTOR
The contractor and any agents and employees of the contractor act in an independent capacity and are not officers or employees or agents of the Authority in the performance of this contract.
A.8 PAYMENT OF TAXES
As a condition of performance of this contract, the contractor shall pay all federal, State, and local taxes incurred by the contractor and shall require their payment by any subcontractor or any other persons in the performance of this contract. Satisfactory performance of this paragraph is a condition precedent to payment by the Authority under this contract.
A.9 COMPLIANCE
In the performance of this contract, the contractor must comply with all applicable federal, state, and borough regulations, codes, and laws, and be liable for all required insurance, licenses, permits and bonds.
A.10 CONFLICTING PROVISIONS
Unless specifically amended and approved by the Department of Law, the terms of this contract supersede any provisions the contractor may seek to add. The contractor may not add additional or different terms to this contract; AS 45.02.207(b)(1). The contractor specifically acknowledges and agrees that, among other things, provisions in any documents it sees to append hereto that purport to (1) waive the State of Alaska’s sovereign immunity, (2) impose indemnification obligations on the Authority, or (3) seek to limit liability of the contractor for acts of contractor negligence, are expressly superseded by this contract and are void.
Alaska Energy Authority Invitation to Bid Appendix A – General Conditions
Appendix A - 2
A.11 OFFICIALS NOT TO BENEFIT
Contractor must comply with all applicable federal or State laws regulating ethical conduct of public officers and employees.
A.12 CONTRACT PRICES
Contract prices for commodities must be in U.S. funds and include applicable federal duty, brokerage fees, packaging, and transportation cost to the FOB point so that upon transfer of title the commodity can be utilized without further cost. Prices for services must be in U.S. funds and include applicable federal duty, brokerage fee, packaging, and transportation cost so that the services can be provided without further cost.
A.13 CONTRACT FUNDING
Contractors are advised that funds are available for the initial purchase and/or the first term of the contract. Payment and performance obligations for succeeding purchases and/or additional terms of the contract are subject to the availability and appropriation of funds.
A.14 FORCE MAJEURE
The parties to this contract are not liable for the consequences of any failure to perform, or default in performing, any of their obligations under this Agreement, if that failure or default is caused by any unforeseeable Force Majeure, beyond the control of, and without the fault or negligence of, the respective party. For the purposes of this Agreement, Force Majeure will mean war (whether declared or not);
revolution; invasion; insurrection; riot; civil commotion; sabotage; military or usurped power; lightning;
explosion; fire; storm; drought; flood; earthquake; epidemic; quarantine; strikes; acts or restraints of governmental authorities affecting the project or directly or indirectly prohibiting or restricting the furnishing or use of materials or labor required; inability to secure materials, machinery, equipment or labor because of priority, allocation or other regulations of any governmental authorities.
A.15 CONTRACT EXTENSION
Unless otherwise provided, the Authority and the contractor agree: (1) that any holding over of the contract excluding any exercised renewal options, will be considered as a month-to-month extension, and all other terms and conditions shall remain in full force and effect, and (2) to provide written notice to the other party of the intent to cancel such month-to-month extension at least thirty (30) days before the desired date of cancellation.
A.16 SEVERABILITY
If any provision of the contract is declared by a court to be illegal or in conflict with any law, the validity of the remaining terms and provisions will not be affected; and, the rights and obligations of the parties will be construed and enforced as if the contract did not contain the particular provision held to be invalid.
A.17 CONTINUING OBLIGATION OF CONTRACTOR
Notwithstanding the expiration date of this contract, the contractor is obligated to fulfill its responsibilities until warranty, guarantee, maintenance and parts availability requirements have completely expired.
A.18 GOVERNING LAW; FORUM SELECTION
This contract is governed by the laws of the State of Alaska. To the extent not otherwise governed by Article 3 of this Appendix, any claim concerning this contract shall be brought only in the Superior Court of the State of Alaska and not elsewhere.
Alaska Energy Authority Invitation to Bid Appendix B – Federal Assurances
Appendix B - 1
APPENDIX B – FEDERAL ASSURANCES
Because this contract is funded with federal funds, the following contract provisions shall apply, where applicable, to all work performed on the contract by the contractor’s own organization and by subcontractors. As provided in this Section, the contractor shall insert in each subcontract all of the stipulations contained in these Required Contract Provisions and further require their inclusion in any lower tier subcontracts or purchase orders that may in turn be made. The prime contractor shall be responsible for compliance by any subcontractor or lower tier subcontractor with all applicable Required Contract Provisions.
B.1 BREACHES AND DISPUTE RESOLUTION.
Contracts in excess of $250,000. Any dispute arising under this Contract which is not disposed of by mutual agreement shall be resolved in accordance with 3 AAC 108.915.
B.2 TERMINATION.
Contracts in excess of $10,000. This Contract may be terminated by either party upon 10 days written notice if the other party fails substantially to perform in accordance with its terms through no fault of the party initiating the termination (“Default Termination”). If the Authority terminates this agreement, the Authority will pay the Contractor a sum equal to the percentage of Work completed that can be substantiated either by the Contractor to the satisfaction of the Authority, or by the Authority. If the Authority becomes aware of any non-conformance with the Work or this agreement by the Contractor, the Authority will promptly notify the Contractor in writing of the non-conformance. Should the Contractor’s Work remain in non-conformance after having received written notification, the percentage of total compensation attributable to the non-conforming Work may be withheld. The Authority may at any time suspend or terminate (“Convenience Termination”) this Agreement for its needs or convenience with or without cause upon written notice. In the event of a Convenience Termination, the Contractor will be compensated for all authorized Work and authorized expenditures performed to the date of receipt of written notice of termination plus reasonable expenses. No fee or other compensation will be due for any incomplete portion of the Work.
B.3 EQUAL EMPLOYMENT OPPORTUNITY.
Except as otherwise provided under 41 CFR Part 60, all construction contracts must include, and all contractors and subcontractors must comply with, the equal opportunity clause provided under 41 CFR 60-1.4(b), in accordance with Executive Order 11246, “Equal Employment Opportunity” (30 FR 12319, 12935, 3 CFR Part, 1964-1965 Comp., p. 339), as amended by Executive Order 11375, “Amending Executive Order 11246 Relating to Equal Employment Opportunity,” and implementing regulations at 41 CFR part 60, “Office of Federal Contract Compliance Programs, Equal Employment Opportunity, Department of Labor.”
B.4 DAVIS-BACON ACT, AS AMENDED (40 U.S.C. 3141-3148).
Construction contracts in excess of $2,000 are required to comply with the Davis-Bacon Act (40 U.S.C.
3141-3144, and 3146-3148) as supplemented by Department of Labor regulations (29 CFR Part 5, “Labor Standards Provisions Applicable to Contracts Covering Federally Financed and Assisted Construction”).
Contractors are required to pay wages to laborers and mechanics at a rate not less than the prevailing wages specified in a wage determination made by the Secretary of Labor. In addition, contractors must pay wages not less than once a week. A copy of the current prevailing wage determination issued by the Department of Labor is included in this solicitation. Contract and subcontract awards must be conditioned upon the acceptance of the wage determination.